Rogers Park and Broadview School UST Removal and Replacement.pdf

PDF 45 MB Posted

Attached to
“Heating Fuel Tank Systems Replacements – Rogers Park & Broadview Schools”
Solicitation number
08-26-27-01
Issued by
Fairfield County, Connecticut

About this file

This sealed bid invitation is issued by the City of Danbury, Connecticut's Purchasing Department for the removal and replacement of heating fuel tank systems at two municipal schools under Bid #08-26-27-01. The project encompasses removal of one 10,000-gallon underground storage tank (UST) system at Broadview Middle School (72 Hospital Avenue) and one 15,000-gallon UST system at Rogers Park Middle School (21 Memorial Drive), including all associated piping, appurtenances, and contaminated materials. The work also requires installation of replacement double-wall steel protected aboveground storage tank systems—10,000 gallons at Broadview and 12,000 gallons at Rogers Park—along with complete tank systems, foundation pads, bollards, piping, electrical components, monitoring devices, and site restoration. A mandatory pre-bid conference is scheduled for September 15, 2026 at 11:00 a.m. at Danbury City Hall; bidders who do not attend will have their submissions rejected as non-responsive. Sealed bids must be received by October 1, 2026 at 10:00 a.m. at the Purchasing Department office. The contract includes a 30-day minimum bid validity period, with the City reserving the right to award within 30 working days following bid opening. The contract includes an option to renew for up to two additional one-year periods by mutual consent.

Bidders are required to submit a 5% bid bond or certified check with their proposals, and the successful contractor must furnish a 100% performance bond and 100% labor and material bond pursuant to Connecticut General Statutes Section 49-41 prior to contract execution. All bid prices must be submitted on City-provided forms, exclude state and federal taxes, and include FOB delivery to Danbury. Pricing shall include all labor, materials, equipment, permits, testing, waste disposal, site restoration, and incidentals necessary to complete the work. The contractor is responsible for obtaining all required permits, licenses, and approvals, including Connecticut Department of Environmental Protection closure approvals, Connecticut Department of Transportation testing certification, City Building Department and Fire Marshal approvals, and all necessary disposal facility certifications. Post-excavation soil sampling and analysis are mandatory, with results required before backfill authorization. The City is exempt from taxes and reserves the right to accept or reject any or all bids, award line-by-line if beneficial, or reject portions due to budgetary constraints. Prevailing wage rates per Connecticut standards apply, and all contractors must comply with affirmative action, equal employment opportunity, Immigration Reform and Control Act provisions, and local preference requirements for City of Danbury residents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The City of Danbury, CT

Sealed Bid Request

BID TITLE: Bid #08-26-27-01 “Heating Fuel Tank Systems Replacements – Rogers Park & Broadview Schools”

DATE BID OPENING: Thursday, October 1, 2026 TIME: 10:00 AM

LOCATION: Purchasing Department, City Hall, 155 Deer Hill Avenue, Danbury, CT 06810

Bid Bond or Certified Check required with bid: 5%

Performance Bond required if awarded bid: 100%

Labor & Material Bond required if awarded bid: 100% (per CGS §49-41)

The City of Danbury reserves the right to accept or reject any or all bids or any portion thereof, to waive technicalities, and to award the contract as deemed to best serve the public interest.

Omit State and Federal Taxes

All prices must be FOB Destination (Danbury, CT) unless otherwise specified

Dated in Danbury: September 3, 2026 Purchasing Agent Charles J. Volpe, Jr.

Pursuant to and in accordance with the Invitation to Bid, General/Technical Specifications and Instructions to Bidders, the undersigned agrees to perform the heating fuel tank systems replacements at the price stated below:

Complete & return accompanying Bid Sheets (4)

A mandatory Pre-Bid conference for bidders will be held at 11:00 am on Tuesday, September 15, 2026, at Danbury City Hall, Purchasing Dept. Conference Room, 155 Deer Hill Ave. Danbury, CT 06810. Bids from contractors who did not attend this mandatory Pre-Bid Conference will not be considered.

Attached State of Connecticut Wage Requirements are applicable to this bid

Company: ___________________________________________ Phone: ________________________________

Address: ___________________________________________ Fax: __________________________________

___________________________________________ E-mail: ________________________________

Submitted By (signature): _______________________________ Payment Terms: _________________________

Signed By (print/type): __________________________________

Title: __________________________________

Dated: ____________________

EXCEPTIONS

Page # Paragraph Item Description & Alternate Proposal

REFERENCES

List Below at least five (5) references for similar projects, including all information requested. THIS PAGE MUST BE COMPLETED. If Bidders wish to keep their references confidential, this page may be removed from the bid package and submitted with the bid in a separate sealed envelope marked “REFERENCES – CONFIDENTIAL”. The City of Danbury is not responsible for maintaining the confidentiality of the references unless this procedure is followed.

1) Client __________________________________________________________________________________________________________

Project Address __________________________________________________________________________________________________

Approximate $ Value ____________________ Date: Started ____________________ Completed ____________________

Contact: Name _______________________________________________ Telephone # _________________________

2) Client __________________________________________________________________________________________________________

Project Address __________________________________________________________________________________________________

Approximate $ Value ____________________ Date: Started ____________________ Completed ____________________

Contact: Name _______________________________________________ Telephone # _________________________

3) Client __________________________________________________________________________________________________________

Project Address __________________________________________________________________________________________________

Approximate $ Value ____________________ Date: Started ____________________ Completed ____________________

Contact: Name _______________________________________________ Telephone # _________________________

4) Client __________________________________________________________________________________________________________

Project Address __________________________________________________________________________________________________

Approximate $ Value ____________________ Date: Started ____________________ Completed ____________________

Contact: Name _______________________________________________ Telephone # _________________________

5) Client __________________________________________________________________________________________________________

Project Address __________________________________________________________________________________________________

Approximate $ Value ____________________ Date: Started ____________________ Completed ____________________

Contact: Name _______________________________________________ Telephone # _________________________

_______________________________________________ Bid Title _____________________________________________ Company

_______________________________________________ Bid # _______________________________________________ Street

City, State, Zip Telephone #

INSTRUCTIONS TO BIDDERS

Sealed bids will be received at the Office of the Purchasing Agent, 155 Deer Hill Avenue, Danbury, CT 06810 until the time and date specified on the cover sheet. Bids received later than the time specified will not be accepted. Amendments to or withdrawal of any section of the submitted bid received later than the time & date set for the bid opening will not be considered. Bid proposals must remain in effect for a minimum of 30 days unless otherwise noted elsewhere in the bid specifications.

BID DOCUMENTS: are available upon receipt of this invitation (if not attached) over the internet at the City’s website:

www.danbury-ct.gov. Adobe Acrobat reader is required to view this document. If you do not have this software you may down load at no cost from Adobe at http://www.adobe.com. Businesses without internet access may obtain a copy of the bid by contacting the Purchasing Agent’s Office, City Hall, 155 Deer Hill Avenue, Danbury, CT 06810, (203) 797-4571.

BID BOND: shall be in the amount of $5,000.00 made out in favor of the City of Danbury and issued by a Surety company acceptable to the City of Danbury, and must accompany each bid. A certified check in the same amount may be submitted in lieu of the bid bond. Bids submitted without Certified Check or Bid Bond will not be accepted. The City of Danbury will not be held liable for the accrual of interest on any check held by the City in conjunction with this bid. All checks or bid bonds will be refunded to the unsuccessful bidders after award of the bid. The deposit check or Bid Bond of the successful bidder will be held in escrow until such time as the City determines that the bidder has or will meet their obligations as stated by the bid. If the bidder fails or refuses within a reasonable time after due notice that the contract has been awarded, to execute the same, an amount representing a loss to the City by reason of such failure shall be retained and paid into the City treasury.

REPLIES: whether bid or no bid, must have the bid number clearly identified on the outside of the envelope. Bidders not marking the envelopes with the Bid number and date/time of opening on the envelope will have no recourse against the City of Danbury or its employees. Such bidders run the risk of the bid being opened prior to the scheduled Bid Opening time. Once opened such bids are public record. Any alleged oral agreement made by a bidder or contractor with any agency or employee of the City of Danbury will be disregarded.

FREIGHT: Prices quoted shall be net delivery F.O.B. Danbury, CT. All bid prices must include prepaid delivery, assembly, and/or installation (ready for operation and/or use) of all equipment and/or materials to the individual locations(s) as designated by the Purchasing Agent. All bid prices are to be submitted on the sheets provided for this bid.

Quantities and pricing are to be listed in accordance with these sheets.

QUESTIONS: Request for interpretation of any portion of the bid may be made by telephone to the Purchasing Agent at 203-797-4571. All replies will be given verbally and a copy of any such inquiry and advice (if deemed vital to the bid by the Purchasing Agent) will be made available to each prospective bidder in the form of an addendum. Bidder should check the City’s website for addendums/updates 48 hours prior to the bid opening.

IDENTICAL BIDS: In the event of receipt of identical bids as to offerings, delivery, service, content, price, etc., the bid will be awarded in accordance with the information contained in the bid document, based on first received as to date and time of receipt of the bid.

NON-COLLUSION STATEMENTS: In order for bids to be considered, a non-collusive statement must be submitted with the bid. A sample non-collusive bid statement is attached. Bidders may elect to submit their own notarized non-collusion statement.

CONDITIONAL, QUALIFIED OR NON-RESPONSIVE BIDS/PROPOSALS: All bids/proposals shall be submitted in the form and manner as indicated by the bid documents and bid forms. Any proposal which is not submitted in the form and manner indicated by the bid documents or which contains information, statements, conditions, or qualifications which place conditions or qualifications on the proposal submittal for purposes of making an award, or which alter any proposal terms, conditions, specifications, or forms, which has not been previously approved by written addendum from the Purchasing Agent, or which does not meet legal requirements, shall be declared as a qualified, conditional, or non-responsive proposal and shall be rejected without further consideration. Any proposal response that does not fully respond to and comply with all detailed specifications or requests for information, including execution of proposal forms, may be declared “non-responsive” and recommended for rejection. The City of Danbury shall not be responsible for any errors or omissions by the Offeror.

CONTRACT: The party to whom the contract is awarded will be required to execute the contract in the form attached, and furnish the referenced performance bond within fifteen (15) days, excluding Sundays and legal holidays, from the date of the mailing of the notice from the City of Danbury to the bidder, that the contract is ready for signature.

TAXES: Omit all State and Federal taxes from the bid. The City of Danbury is exempt from the payment of taxes imposed by Federal government and/or the State of Connecticut.

OWNERSHIP OF DOCUMENTS: All documents, including drawings, plans, specifications, videotapes, or other documents or maps prepared by a contractor pursuant to any agreement arising from this bid shall become the property of the City of Danbury upon completion of the project or any termination of the project prior to the completion of the project.

LEGALITY: All bid offers for commodities, work, materials, or equipment hereunder shall comply in every respect with the laws, specifications and requirements of the State of Connecticut and the Federal government. Contractor will comply with the provisions of the Connecticut Fair Employment Practices Law.

LANGUAGE DISPUTES: Any disputes over the interpretation and/or meaning of any individual terms, conditions, and/or language within this Request for Bid/Proposal document shall be resolved by and at the sole discretion of the City Purchasing Agent in a manner that is in the best interest of, and best advantage to, the City of Danbury, provided any such interpretation shall be reasonable.

RESPONSIBILITY: The Contractor shall save the City of Danbury, its agents or employees, harmless from liability of any kind for all claims of labor payments and materials furnished for this work, and for use of any copyrighted or uncopyrighted composition, secret process patented or unpatented invention, article or application furnished or used in the performance of the contract of which the Contractor is not the patentee, assignee, or licensee. The successful bidder agrees to indemnify and hold harmless the City of Danbury, its agents and employees from any and all liability arising out of the successful bidders’ operations, functions and/or supplied items.

The successful bidder, vendor, and/or contractor must protect all property of the City of Danbury (i.e. all floors, furniture, grass, land, etc.) from injury or other damage. Any damage so caused must be repaired by contractor/vendor at his/her own expense. At the completion of work, the vendor and/or contractor must remove from the premises all surplus materials and all debris created by same. The premises must be left in a broom-clean and finished condition acceptable to the owner or its agents. Successful bidder will furnish adequate protection from damage for all work and to repair damage of any kind, for which he or his workers are responsible, to the premises or equipment to his own work or to the work of other contractors.

DEFAULT: It shall be understood that a bidder supplying equipment and/or supplies will be considered to be in default if/when they have not delivered the item(s) within the time constraints listed in this document or subsequent purchase orders and/or contract. Bidders providing a service and/or construction will be considered to be in default if/when they have failed to meet the completion date set forth in this document or its subsequent contract and/ or purchase orders and/ or they have ceased work on the project for a period of fifteen (15) working days, cumulative or consecutive.

TRADE NAME REFERENCES: Any and all references to trade names, types, styles, model numbers, stock numbers or catalogs are intended to be descriptive only and not restrictive. The intention is to indicate to bidders the type and quality of the articles and or materials that will be satisfactory. When reviewing the information, it is the responsibility of the prospective bidder to inform the City of Danbury of any discrepancy that is found (i.e. number listed does not fit item description). Bids received on other makes or models with reference to other catalogs will be considered. The bidder is to clearly state in his/her bid exactly what he/she intends to furnish and to furnish with his/her bid a cut or illustration or other descriptive matter that will clearly indicate and give specification as to the product he/she proposes to furnish. Where a bid is offered on an item other than the trade standard used in the specification the item should be identified on the bid form by entering the MAKE, TRADE NAME AND MODEL NUMBER. It is understood that any substitute and/or alternate that might be offered are guaranteed by the bidder to be of equal or better quality than is referenced in the bid. The item(s) must be equivalent as to function, basic design, type and quality of material, method of construction and any required dimensions. It shall be further understood that during original as well as subsequent shipments spot checks will be performed to insure that the items received are in fact the items offered in the bid. When received, should items/materials prove to be different from what was bid in any way, the bidder agrees to the return of the items and agrees to supply correct items (per bid specifications) at the bidders expense. In the event this return action is required, it is understood the bidder may be subject to removal from the City’s approved bidder’s list. Bidders are cautioned that surplus, seconds, factory rejects, floor samples, close outs or distressed items are not acceptable and shipments of substitutions, defective or shop-worn equipment will be returned for a full refund at the vendor’s expense.

QUANTITY: The quantities and/or materials listed in the specifications/bid sheets may be increased or decreased by the City of Danbury or its designated representative based on actual need at the time the purchase orders are placed.

QUALITY: The City of Danbury reserves the right to reject any proposal in whole or in part offering equipment and/or materials and/or services that in its or its agent’s opinion does not meet the quality standards desired. Such decision is final and not subject to further recourse by the bidder.

SAMPLES: forwarded by the bidder will be returned to the bidder at his request and expense. Requests for return of samples must be submitted in writing at the time the sample is given to the City of Danbury or its representative.

Samples not returned to the bidder will be disposed of at the discretion of the City of Danbury or its designated representative. Large pieces of equipment submitted for evaluation and inspection are to be picked up by the bidder within 30 days of the bid opening date. The City of Danbury or its designated agent will dispose of items not picked up within 30 days.

AWARD: It is the intent to award this bid in its entirety to one bidder, however, the City reserves the right to award the bid line item by line item if it is deemed in its best interest to do so. In addition, bidders are advised that should budgetary constraints dictate, part, and/or all the items in this bid may be rejected. This decision shall be considered final and not subject to recourse by the bidder.

In determining the lowest or highest responsible bidder, the City reserves the right to consider, in addition to price, the compatibility, quality, cost of maintenance and availability of parts, experience and/or past performance of the bidder, sufficiency of the financial resources of the bidder as relates to the offerings as well as the ability of the bidder to provide future maintenance and service.

Documents previously submitted to the City of Danbury will not be considered as satisfying submission requirements for this bid.

No bidder can claim any contract rights by virtue of bidding alone. Awarding of the contract means actual written notice by letter and a properly executed purchase order to the bidder or bidders to whom the bid has been awarded.

OPTION TO RENEW: This bid, once awarded, may be extended by mutual consent for up to two (2) additional one-year periods.

BONDS (if applicable):

Performance Bond: The Contractor, when awarded the Bid, must submit within 10 days of the bid award, and before beginning the work or signing a contract, a Performance Bond in the amount of $100,000.00. Said performance bond must be in favor of the City of Danbury and executed by a surety company authorized to do business in the State of Connecticut. The City of Danbury reserves the right to retain the Bid Bond or Certified Check on bids below $25,000.00 as a Performance Bond. On bids of $25,000.00 or more the Performance Bond may be furnished in the following manner: Performance Bond, Surety Bond, Certified Check, Bank Check, Savings Account in both the City & Vendor’s name or Letter of Credit.

Maintenance Bond: The contractor, upon signing a contract and before beginning the work, must submit to the Purchasing Agent a Maintenance Bond to guarantee that if defects in either labor or materials become evident within one year after completion and acceptance of work will be fixed at no cost to the City of Danbury. The maintenance bond may be included as a portion of the Performance Bond or as a separate bond. If it is issued as a separate bond said maintenance bond must be in favor of the City of Danbury and issued by a surety company licensed and authorized to do business in the State of Connecticut.

Labor and Material Bonds: Pursuant to Section 49-41(a) of the Connecticut General Statutes, as may be amended from time to time, a project for the construction, alteration or repair of any public building or public work, where the contract award amount is in excess of $100,000.00, a labor (payment) and material bond in the full amount of the contract must be furnished to the City with a surety or sureties satisfactory to the City. Said bonds shall be filed with the Purchasing Agent on or before the award date. Any such bond shall have as principal the name of the person awarded the contract.

Consent for Release of Final Payment: AIA Document G707 & G706, or equivalent, must be signed and returned by the Surety Company before final payment will be released to the contractor.

INSURANCE: See accompanying contract for insurance requirements (Section 12)

PERMITS: The successful bidder agrees to obtain all work/building permits as might be required. The cost of obtaining such permits is the responsibility of the bidder. The City of Danbury reserves the right to waive local permit fees. In addition, it shall be understood that where property lines are to be considered, bidders are to verify said lines and measurements with proper City Officials prior to commencement of work. It is to be understood that any/all specifications and/or plans or drawings contained in or developed as a result of the bid process are and shall be presented subject to the approval of the City of Danbury planning, zoning and building officials and that awards made prior to said approval are subject to cancellation.

PREVAILING WAGE: When the State of Connecticut Prevailing Wage Rate is applicable to the bid, the successful bidder must submit a Certified Payroll Record prior to any request and/or invoice for payment.

SAFETY:

Machine and/or Equipment Hazard Assessment and Safety Training: Upon delivery of machines and/or equipment, suppliers are required to provide to the end-user employees, at no additional charge, a training session, which will emphasize hazard awareness and assessment and the safe use of such machinery/equipment.

Occupational Safety and Health Act of 1970: Seller shall warrant that the machinery, equipment or other materials covered hereby shall upon delivery to the City of Danbury, be in compliance with the standards required by said Act and any updates as pertain to or reference said Act as well as the standards required by comparable State and local laws, if any, for such machinery, equipment or other materials in effect at the time of delivery.

Machines and/or Equipment Lockout/Tag out: In an effort to comply with OSHA’s final rule on the control of hazardous energy sources, vendors must warrant that any and all machines and/or equipment as is covered under this bid will be supplied and/or installed equipped with lockout/tag out devices as prescribed by OSHA.

Toxic Substance Control Act (PL94-469): Seller warrants that each and every chemical substance constituting or contained in the products sold or otherwise transferred to the City of Danbury under this bid and subsequent purchase orders is not on the list of prohibited chemical substances compiled and published by the Administrator of the Environmental Protection Agency pursuant to Act PL94-469 and are otherwise in compliance with said Act.

Hazardous Materials: Any materials required by this bid and subsequent purchase orders that are hazardous under federal, state, or local statute, ordinance, regulation, or agency order will be packaged, labeled, marked and shipped by the seller to comply with all federal, state and local regulations then in effect including but limited to the provisions of the Hazardous Materials Transportation Act and Regulations promulgated there under and will further comply with any special requirements and any policies and procedures of the City of Danbury relating to the purchase of hazardous materials as might be noted on subsequent purchase orders or otherwise communicated to seller in writing.

Material Safety Data Sheets: Shall be provided by the Seller upon delivery to the City of Danbury of any goods having constituents listed in the following references - OSHA 1910, ACHIG Current Threshold Values, DOT HazMat Table 49, IARC Carcinogen List, National Toxicology Program Carcinogen List, and/or Radioactive Materials. These Material Safety Data Sheets must be consistent with and include information required by the OSHA Hazard Communication Standard published as 29 CFR 1910.1200, as the same may be amended or supplemented from time to time.

Asbestos: Bidders are advised that asbestos-containing material may be located in the boiler rooms, pipe tunnels, storage areas and various portions of City buildings. Before proceeding on any contractual work on City buildings or their interiors, it is mandatory that bidders familiarize themselves with the asbestos-containing material and that said material be considered as a health hazard and all precautionary measures according to the Ahera Rules & Regulations be observed. It is the bidder’s responsibility to notify all employees and/or subcontractors of this notification.

EEO: The successful bidder shall provide any/all additionally required, affirmative action statements, fair employment plans and non-discrimination programs and statement as might be required by the City of Danbury. In connection with the execution of this bid, subsequent purchase orders and/or contracts, the seller shall not discriminate against any employee or applicant for employment because of age, race, religion, color, sex or national origin. Bidders must comply with all rules & regulations of the Department of Labor with regard to Equal Employment Opportunities as pertains to municipalities.

TERMINATION OF CONTRACT: Any contract entered into by the City and the successful bidder shall provide that the City may terminate the contract upon thirty (30) days’ notice to the bidder.

The City of Danbury reserves the right to award or reject any or all bids, or any portion thereof, to waive technicalities, and to award the bid and/or contracts to one or more bidders submitting essentially identical proposals and, that in the City’s judgment, will best serve the public interest.

The terms and conditions of these “Instructions to Bidders” are made a part this bid.

SAMPLE FORM

Bid # _____________________________

NON-COLLUSION AFFIDAVIT

STATE OF _____________________________ COUNTY OF _____________________________

I, _____________________________ being first duly sworn, deposes and says that:

1. I am _____________________________ of _____________________________, the bidder that has submitted the attached request for bid for _____________________________;

2. I am fully informed respecting the preparation and contents of the attached bid and of all pertinent circumstances respecting such bid;

3. Such bid is genuine and is not a collusive or sham bid;

4. Neither the bidder nor any of its officers, partners, owners, agents, representatives, employees or parties of interest, including this affiant, has in any way colluded, conspired, connived or agreed directly or indirectly with any other bidder, firm or person to submit a collusive or sham bid in connection with the work for which the attached bid has been submitted nor has it in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other bidder, firm or person to fix the price or prices in the attached bid or of any other bidder, or to fix any overhead, profit or cost element of the bid price or the price of any bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Danbury or any person interested in the proposed bid; and

5. The price or prices quoted in the attached bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.

Signed _____________________________

Title _____________________________

Subscribed and sworn to before this

__________ day of _______________, 20_____.

My commission expires _______________

SAMPLE FORM

Bid # _____________________________

City □ Architect □ Contractor □ Surety □ Other □

PROJECT/BID NUMBER:

TO: City of Danbury Attn: Purchasing Agent 155 Deer Hill Avenue Danbury, CT 06810

CONTRACTOR:

In accordance with the provisions of the contract between the City of Danbury and the contractor as indicated above, the (insert name & address of Surety Co.)

_____________________________________________________, SURETY COMPANY on bond of

(insert name & address of Contractor) __________________________________________________

____________________________________________________________, CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the surety Company of any of its obligations to the City of Danbury as set forth in the Surety Company’s bond.

Subscribed and sworn to before this _____ day of __________, 20___ ________________________________

Surety Company

________________________________ Authorized Representative’s Signature Notary Public

Title

My commission expires ____________________

CONTRACT

Bid #08-26-27-01 “Heating Fuel Tank Systems Replacements – Rogers Park & Broadview Schools”

THIS AGREEMENT, made and entered into this ___________day of _____________, in the year Two Thousand and Twenty-Six by and between the City of Danbury, CT, hereinafter designated the “City”, and____________________________________________ hereinafter designated the “Contractor”, WITNESSETH: That the Contractor has agreed and by these presents does agree with the said City for the considerations herein mentioned and contained at his own cost and expense to provide all materials, labor, tools, equipment, and other means of construction to complete the proposed work in the manner and under the requirements further specified in this agreement.

Section 1. WORK TO BE PERFORMED.

Provide all equipment, labor, power, water, supplies, materials and incidentals required to: 1. At Broadview Middle School:

Remove and dispose of one (1) 10,000-gallon No. 2 fuel oil UST system, piping, and appurtenances. 2. At Rogers Park Middle School: Remove and dispose of one (1) 15,000-gallon No. 2 fuel oil UST system, piping, and appurtenances.

Section 2. TIME OF BEGINNING AND COMPLETING WORK. The Contractor shall begin operations under this contract upon a date to be specified in a written order from the General Supervisor and the Contractor shall fully complete all work hereunder within the time limits stated in the Contractor’s Proposal. Should the Contractor be delayed in the execution of the contract by any valid causes beyond his control, such as Acts of God, fire, flood or other causes deemed valid by the General Supervisor, the Contractor may submit a claim for an extension of the prescribed time limit. To receive consideration, such claim or claims shall be filed in writing, with a full statement of the reasons therefor, within seven (7) days of the occurrence of the delay. The decision of the General Supervisor regarding extension of time will be final.

Section 3. CITY, CONTRACTOR, AND GENERAL SUPERVISOR DEFINED. Whenever the words defined in this section occur in this contract and in the specifications, they shall have the meaning given below:

CITY: The word “City” shall mean the City of Danbury, CT.

CONTRACTOR: The word “Contractor” shall mean the party above designated.

GENERAL

SUPERVISOR: The word “General Supervisor” shall mean the of the City of Danbury, CT, acting either directly or through his personally authorized agent.

Section 4. GENERAL SUPERVISOR TO DETERMINE. It is agreed by the parties to this contract that the General Supervisor for the City shall in all cases determine the amount and character of the work to be done and to be paid for under this agreement, the quality and acceptability of the materials to be used therein, and shall decide all questions that may arise relative to the intent and fulfillment of this contract. His estimate and decisions shall be final and conclusive and shall be a condition precedent to the right of the Contractor to receive any payments under this agreement.

Section 5. ABSENCE OF CONTRACTOR. Whenever the Contractor is not present at the work when it may be desired to give instructions, orders may be given by the General Supervisor, or his agent, to the superintendent or foreman who may have charge of the work at the time, and he shall receive and obey such orders forthwith.

Section 6. DISCREPANCIES, ERRORS AND OMISSIONS. The plans and specifications are intended to be explanatory of the work to be done and of each other, but should any discrepancies, errors or omissions appear they shall be subject to correction and interpretation by the General Supervisor thereby defining and fulfilling the intent of this contract. If any part of the work is omitted in the specifications, whether intentionally or otherwise, when the same is clearly shown or indicated on the drawings, or is usually and customarily required to complete fully such work as is specified herein, the Contractor will not be entitled to extra compensation, but the said fixtures or work, or both, shall be installed or done the same as if called for both by the drawings and by the specifications.

Section 7. ALTERATIONS. The General Supervisor may make alterations in the line, grade, plan, form, dimensions, or materials of the work or any part thereof, either before or after the commencement of construction. If such alterations increase or diminish the quantity of work to be done, adjustment for such increase or decrease shall be made at the unit prices stipulated for such work under this contract, except that if unit prices are not stipulated for such work, compensation for increased work shall be made under the item for Extra Work, and for decreased work the Contractor shall allow the City a reasonable credit as determined by the General Supervisor. If such alterations diminish the quantity of work to be done, they shall not warrant any claim for damages or for anticipated profits on the work that is dispensed with.

Section 8. OBLIGATIONS OF CONTRACTOR. The Contractor shall do all the work and furnish all the materials, equipment, tools, and appliances necessary or proper for performing and completing the work required by this contract within the allowed time. He shall complete the entire work to the satisfaction of the General Supervisor and in accordance with the plans and specifications forming a part of this contract and the directions of the General Supervisor as given during the progress of the work, at the prices agreed upon and fixed therefor.

The Contractor shall conduct his work so as to interfere as little as possible with private business and public travel. He shall, at his own expense (except as provided in the General Specifications in respect to traffic officers) whenever necessary or required, maintain fences, furnish watchmen, maintain lights, and take such other precautions as may be necessary to protect life and property.

The Contractor shall take responsibility for the work done under this contract, for the supervision and protection of the work, and for the prevention of injuries to persons and damage to property and utilities on or about the work.

Section 9. COMPETENT AND SUFFICIENT WORKERS. Sufficient and competent workers shall be employed by the Contractor to complete the work in the specified time. If, in the opinion of the General Supervisor, the Contractor shall employ personnel who are incompetent or unfaithful in the performance of the work, they shall be removed from the job at the request of the General Supervisor.

Section 10. EXAMINATION OF WORK. The General Supervisor shall be furnished with every reasonable facility for ascertaining that the work is in accordance with the requirements and intention of this contract, even to the extent of uncovering or taking down portions of finished work. Should the work thus exposed or examined prove satisfactory, the uncovering or taking down and replacement of material and rebuilding of the work shall be considered as extra work unless the original work was done in the absence of the General Supervisor or his inspector without his written authorization. Should the work exposed or examined prove unsatisfactory, the uncovering, taking down, replacing, and making good, shall be at the expense of the Contractor.

Section 11. REJECTED MATERIALS AND DEFECTIVE WORK. Materials of whatever kind furnished by the Contractor and condemned by the General Supervisor as unsuitable or not in conformity with the specifications shall forthwith be removed from the working area by the Contractor, and shall forthwith be removed elsewhere in the work. Any errors, defects or omissions in the execution of the work or in the materials used in the work even though they may have been passed or overlooked or have appeared after completion of the work and discovered at any time before the final payment is made hereunder, shall be forthwith rectified and made good by and at the expense of the Contractor and in a manner satisfactory to the General Supervisor. The Contractor shall reimburse the City for any expense, losses or damages incurred in consequence of any defect, error, omission or act of the Contractor or his employees, as determined by the General Supervisor occurring previous to the final payment.

The presence of a General Supervisor during construction will in no wise relieve the Contractor of his liability for defective work or materials. The Contractor shall repair, at his own expense, any defective work occurring within a period of one (1) year from the time of completion of the contract. The Contractor shall bear all losses resulting to him or the City on account of the work, or because the nature of the land in or on which the work is done is different from what was estimated or expected, or on account of the weather, elements or other causes.

Section 12. INSURANCE. The Contractor shall not commence work under the contract until he has obtained all insurance required under this article and such insurance has been approved by the City, nor shall the Contractor allow any subcontractor to commence work on his subcontract until all similar insurance required of the subcontractor has been so obtained and approved. Certificates of such insurance shall be filed with the City and shall be subject to the approval of the City for adequacy of protection before the execution of the contract.

All policies relating to this contract shall be so written that the City shall be notified of cancellation or change at least thirty

(30) days prior to the effective date of such cancellation or change.

Certificates from the insurance carrier shall be filed in triplicate with the City and shall state the limits of liability and the expiration date for each policy and type of coverage. The City of Danbury shall be named as an additional insured.

Renewal certificates covering the renewal of all policies expiring during the life of the contract shall be filed with the City not less than ten (10) days before the expiration of such policies.

A. Comprehensive General Liability Insurance.

The Contractor shall take out and maintain during the life of this contract such Comprehensive General Liability Insurance (which shall include explosion and collapse and underground hazards if so requested by the City), as will protect it, the City, and any subcontractor performing work covered by this contract, from claims for damages for personal injury, including accidental or wrongful death, as well as claims for property damages, which may arise from operations under this contract whether such operations be by itself or by any subcontractor or by anyone directly or indirectly employed by either of them and the amounts of such insurance shall be in the following minimum limits:

Bodily Injury Liability and - $1,000,000 (combined) - each occurrence

Property Damage Liability

The Contractor agrees that in the event that one or more claims are paid under policies containing an aggregate coverage limit, it shall immediately notify the City thereof and at the same time shall seek either to reinstate the limits of said policy or policies or alternatively to seek to obtain a new policy providing for full coverage in accordance with the limits established within. Said replacement coverage shall be obtained within twenty-four (24) hours and the City shall be notified thereof.

B. Comprehensive Auto Liability Insurance.

The Contractor shall take out and maintain during the life of this Contract Comprehensive Auto Liability Insurance which shall cover the operation of all motor vehicles owned by the Contractor or used by the Contractor in the prosecution of the work under the contract and the amounts of such insurance shall be in the following minimum limits:

Bodily Injury Liability and -$1,000,000 (combined) - each occurrence

Property Damage Liability

C. Excess Liability Insurance.

The Excess Liability Policy coverage is in addition to the limits expressed in A. and B. above:

Bodily Injury Liability, - $5,000,000 (combined) Property Damage Liability - each occurrence and Auto

D. Workers’ Compensation Insurance and Employer’s Liability.

The Contractor shall take out and maintain during the life of this contract, Workers’ Compensation Insurance for all of his employees, employed at the site and in case any work is sublet, the Contractor shall require the subcontractor similarly to provide Workers’ Compensation Insurance for all employees of the latter unless such employees are covered by the protection afforded by the Contractor.

1. Workers’ Compensation and Employer’s Liability - Statutory Limits.

Section 13. DAMAGE, SUITS AND CLAIMS. The Contractor covenants and agrees to and shall at all times indemnify, protect and save harmless and defend the City from and against all costs or expenses resulting from any and all losses, damages, detriment, suits, claims, demands, costs and charges, including attorneys’ fees, if any, which the City may directly or indirectly suffer, sustain or be subjected to by reason or on account of the work to be performed pursuant to this contract or any activities in connection with said contract, or on account of any claim for patent, trademark or copyright infringement, whether such losses and damages be suffered or sustained by the City directly or by its employees, licensees or invitees or be suffered or sustained by other persons or corporations who may seek to hold the City liable therefor. The City may withhold such portions of any payments that may be due hereunder as may be considered necessary to cover any suits and claims until they have been settled and satisfactory evidence to that effect has been furnished to the City. This section shall also apply to “extra work” and all other operations by the Contractor in connection with this contract.

Section 14. CLAIMS AND LIENS. The Contractor shall pay punctually the workers who are employed on the work and the parties who have furnished materials, and shall give the City satisfactory evidence that all parties who have done work or furnished materials have been fully paid. If the Contractor shall fail to give such satisfactory evidence to the City, the City may withhold from the payment otherwise due the Contractor hereunder such sums of money as will in its judgment cover such claims, or the City may pay such claims and charge the same to the account of the Contractor.

Section 15. NOT TO SUBLET. The Contractor shall give his personal care and attention to the faithful prosecution of the work, shall keep the work under his personal control and shall not assign or sublet the work or any part of the work, and shall not assign any of the money payable under this agreement, or his claim thereto, except by and with the consent of the City. No such consent by the City shall operate to relieve the Contractor from any obligation or liability hereunder or modify the obligations or liabilities of the Contractor to the City.

Section 16. WORK MAY BE SUSPENDED. Construction work may be temporarily suspended at any time on account of the weather or for any other reason, if deemed necessary or advisable by the General Supervisor of the City without additional compensation to the Contractor.

Section 17. TERMINATION WITHOUT CAUSE. City may terminate this Contract at any time without cause by giving thirty (30) days written notice to Contractor. As soon as practicable after receipt of a written notice of termination without cause, Contractor shall submit a statement to the City showing in detail the Services performed under this Contract through the date of termination. In the event of termination without cause pursuant to this Section, City agrees to: (i) pay Consultant a pro rata amount of the purchase price for Services rendered through the termination date based on percentage of completion of the services; and (ii) pay Contractor any reasonable and unavoidable additional costs and expenses which Contractor incurs or becomes obligated for prior to the effective termination date and/or as a result of such termination. The forgoing payment obligation is contingent upon Contractor having provided City with written documentation reasonably adequate to verify the above payments to Contractor for such termination.

Section 18. CITY’S RIGHT TO STOP WORK OR TERMINATE CONTRACT FOR CAUSE. If (a) the Contractor shall be adjudged bankrupt or make an assignment for the benefit of creditors; or (b) a receiver or liquidator shall be appointed for the Contractor or for any of his property and shall not be dismissed within twenty (20) days after such appointment, or the proceedings in connection therewith shall not be stayed on appeal within the said twenty (20) days; or (c) the contractor shall refuse or fail, after Notice of Warning from the General Supervisor, to supply enough properly skilled workers or proper materials, or (d) the Contractor shall refuse or fail to prosecute the work or any part thereof with such diligence as will insure its completion within the period herein specified (or any duly authorized extension thereof) and shall fail to complete the work within said period; or (e) the Contractor shall fail to make prompt payment to persons supplying labor or materials for the work or; (f) the Contractor shall assign this contract or any sums due hereunder or shall sublet all or any part of the work to be performed without the prior written consent of the City or; (g) the Contractor shall unnecessarily or unreasonably delay the work to be performed or; (h) the Contractor shall fail or refuse to regard laws, ordinances, or the instructions of the General Supervisor or otherwise be guilty of a substantial violation of any provisions of this contract;

then, and in any such event, the City without prejudice to any other rights or remedy it may have, may by seven (7) days notice to the Contractor terminate the employment of the Contractor and his right to proceed, and may take possession of the work and complete the work by contract or otherwise, as the City may deem expedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the compensation to be paid the Contractor hereunder shall exceed the expense of so completing the work (including compensation for additional managerial, administrative and inspection services and any damages for delay) such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor and his sureties shall be liable to the City for such excess. If the right to the Contractor to proceed with the work is so terminated, the City may take possession of and utilize in completing the work such materials, appliances, supplies, plant and equipment as may be on the site of the work and necessary therefor.

Section 19. RETAINAGE. The City may retain out of the money payable to the Contractor under this contract, the sum of five (5%) percent on the amount thereof, and may expend the same in the manner hereinafter provided for making repairs to the work as the City may deem expedient.

If, at any time within twelve (12) months following the completion of the work any part of the work constructed under the terms of this contract shall require repair, the City may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to make such repairs to the satisfaction of the City within (7) days of the date of giving or mailing of notice to the Contractor, then the City may cause the repairs to be made. The City shall pay the expense of any such repairs out of the sum retained for that purpose. Upon the expiration of the said 12-month period, provided that the work at that time shall be in good order, the Contractor shall be entitled to receive the whole or such part of the sum retained as may remain after the making of said repairs.

It is, however, agreed that the City may keep the whole or any portion of the sum retained, for settlement of all claims arising out of this contract against the City, its officials or agents, and for all expenses, losses or damages incurred by the City, by reason of said claims.

Section 20. EXTRA WORK: INCREASED COMPENSATION. The City may at any time, by written order, and without such notice to the sureties, require the performance of such Extra Work or change in the work as it may find necessary or desirable. The amount of compensation to be paid to the Contractor for Extra Work, as so ordered, shall be determined as follows:

(a) By such applicable unit prices, if any, as are set forth in the Contract; or

(b) If no such unit prices are set forth, then by a lump sum price mutually agreed upon by the City and the Contractor; or

(c) If no such unit prices are set forth and if the parties cannot agree upon a unit price, then by the actual net cost to the Contractor of the materials and of the wages applicable (including premiums for Workers’ Compensation Insurance) required for such Extra Work plus such rental for plant and equipment (other than small tools) required and approved for such work, plus fifteen (15%) percentum as compensation for all items or profit, and costs or expenses including, but not limited to administration overhead, superintendence, insurance (other than Workers’ Compensation Insurance), materials used in temporary structures,…

This is the start of the file's text. The full file is on GovTribe.