RFQ 2027-045M26 Fire Alarm Control Devices Upgrade.docx
DOCX document 77 KB Posted
- Solicitation number
- RFQ1 IHHA 2027000005 2
- Issued by
- Pueblo County, Colorado
About this file
This is a Request for Qualifications (RFQ) issued by the State of Colorado Department of Human Services, Division of Facilities Management, for Architect/Engineer/Consultant (A/E) services to design the replacement of fire alarm control and notification devices across nine buildings on the Colorado Mental Health Hospital in Pueblo (CMHHIP) campus. The project encompasses approximately 120,170 square feet across multiple facility types including industrial, maintenance, storage, museum, and administrative spaces. The RFQ is for Phase 1 of a potential four-phase project, with the first phase focused on non-patient facilities. The mandatory pre-submittal conference and site tour is scheduled for July 24, 2026 at 10:00 AM at Building 49, 1600 W. 24th Street, Pueblo, Colorado. Qualifications submittals are due August 14, 2026 by 1:00 PM MDT to jamie.gott@state.co.us. Short-listed firms will be invited to oral interviews during the week of August 31, 2026, with selection anticipated by September 10, 2026. Contract negotiation is expected to conclude by September 30, 2026, with design work anticipated to start October 5, 2026 and construction running from May 2027 through December 2027.
The estimated project cost is $1,973,939. The State is pursuing a Design/Bid/Build project delivery approach. Respondents must meet minimum qualifications including two years of operation under the same name, demonstrated design experience on at least two similar projects exceeding $2,000,000 in hard costs, and attendance at the mandatory pre-submittal conference. Colorado labor must comprise at least 80% of the work performed. The project is subject to the Buy Clean Colorado Act requirements for environmental product declarations and global warming potential limits on eligible materials. Preference is given to Colorado resident vendors and Colorado labor. The A/E will be expected to comply with state-approved codes and protocols, including FGI, CDPHE, and CMS standards, and coordinate with local authorities as appropriate. No guarantee of additional phases is offered, though the awarded consultant may be considered for future similar work at the State's sole discretion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CMHIP 035.pdf | ||
| CMHIP 054.pdf | ||
| CMHIP 055.pdf | ||
| CMHIP 119.pdf | ||
| CMHIP 049.pdf | ||
| Addendum 1 final (5).docx | DOCX document | |
| CMHIP 001.pdf | ||
| Appendix A Evaluation Forms.pdf | ||
| 2027-045M26 Presolicitation Meeting Sign In (7-24-26).pdf | ||
| CMHIP 033.pdf | ||
| Appendix B Sample AE Agreement with T&C.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
ARCHITECTURAL / ENGINEERING / CONSULTING SERVICES
State of Colorado Department of Human Services Notice Number: RFQ 2026000048/2027000005 Project Number: 2027-045M26 Project Title: Fire Alarm Device Replacement, CMHHIP Ph1 of 4 Estimated Project Cost: $ 1,973,939
Table of Contents
| I. NOTICES | 1 | |
| II. PROJECT OVERVIEW | 2 | |
| III. MINIMUM REQUIREMENTS | 3 | |
| IV. MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR | 3 | |
| V. SCHEDULE | 4 | |
| VI. QUESTIONS, CLARIFICATIONS AND ADDENDA | 4 | |
| VII. POINT OF CONTACT/CLARIFICATION | 4 | |
| VIII. SUBMITTALS OF QUALIFICATIONS | 5 | |
| IX. METHOD OF SELECTION AND AWARD | 5 | |
| A. | Short List | 5 |
| B. | Oral Interview | 5 |
| X. EVALUATION OF QUALIFICATIONS | 6 | |
| A. | PREQUALIFICATION SUBMITTAL CRITERIA | 6 |
| 1. | PROJECT TEAM | 6 |
| 2. | FIRM/TEAM CAPABILITIES | 6 |
| 3. | PRIOR EXPERIENCE | 6 |
| 4. | PROJECT APPROACH | 7 |
| 5. | EQUITY DIVERSITY AND INCLUSION | 7 |
| 6. | WORK LOCATION | 7 |
| XI. ORAL INTERVIEWS EVALUATION CRITERIA | 8 | |
| 1. | PROJECT TEAM | 8 |
| 2. | TEAM CAPABILITIES | 8 |
| 3. | PRIOR EXPERIENCE | 8 |
| 4. | PROJECT APPROACH | 8 |
| Appendix A: | Evaluation Forms | A |
| Appendix B: | Architect/Engineer/Consultant Contract (Standard) | B |
| Appendix C: Acknowledgement and Attestation Form | C |
RFQ-AE R3 pg. 1
REV 9/2025
I. NOTICES
For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
All respondents accept the conditions of this RFQ, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all submittals on the basis of being unresponsive to this RFQ or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
e. Any restriction as to the use of submitted materials must be clearly indicated as proprietary. The requested limitation or prohibition of use or release shall be identified in writing on a cover sheet. Blanket claims of proprietary submittals will not be honored. Fee proposals will be considered proprietary.
f. The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Architect/Engineer/Consultant Contract are expressly workable without reservation.
g. This is phase 1 of a possible 4 phases. Additional work on future phases, similar in nature to this project, may be given to the awarded consultant at a later date without public advertisement. It shall be the sole discretion of the owner if additional work will be granted to the consultant based on, but not limited to, the consultant’s quality, and timeliness. The owner has the right to publicly advertise any additional work and the awarded consultant is not guaranteed additional work.
The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Architect/Engineer/Consultant Contract are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the solicitation closes. Bearing in mind any and all exceptions may be considered non-negotiable.
Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
Preference shall be given to Colorado resident vendors and for Colorado labor, as provided by law.
II. PROJECT OVERVIEW
Introduction
The Division of Facilities Management (DFM) of the Colorado Department of Human Services (CDHS) is selecting an Architect/Engineer/Consultant (A/E) team to design the replacement of outdated and obsolete fire alarm control and notification devices in nine buildings located on the Colorado Mental Health Hospital In Pueblo (CMHHIP) campus.
CMHHIP is a 516-bed acute care psychiatric facility. Its mission is to empower Coloradans to thrive by providing exceptional, safe, and innovative inpatient behavioral health care to vulnerable populations and civil and forensic patients with serious mental illnesses. The CMHHIP campus includes multiple administrative and infrastructure support facilities necessary to support patient care.
CMHHIP and CDHS are selecting an A/E team to design upgrades to fire alarm devices in nine buildings on the CMHHIP campus. The nine buildings have a combined square footage of approximately 120,170 square feet. The structures have a range of occupancies including industrial, maintenance and storage facilities, museum space, and administrative facilities. All facilities are located on the 302-acre CMHHIP campus. This is potentially a four-phase project with the first phase implemented in non-patient facilities.
Although the state is generally exempt from local planning and zoning regulations and procedures, it is customary and appropriate to coordinate and otherwise interact with local authorities as needed. Accordingly, the A/E is expected to participate in meetings and briefings as necessary. The A/E is also required to comply with all the state approved codes, and state protocols + requirements. (Including but not limited to FGI, CDPHE, CMS, and Code review and compliance is subject to state procedures and protocols as described by the OSA.
Background
The primary need for this project is to modernize and standardize the fire alarm control devices across nine critical support facilities. Because these structures encompass a wide variety of occupancy types - such as administrative offices, maintenance shops and logistical hubs – maintaining optimal code-compliant life safety systems is essential to protect campus staff and physical assets. The current fire alarm infrastructure in these buildings requires upgrading to address technological obsolescence, reduce maintenance vulnerabilities, and ensure seamless communication with the campus’s broader emergency response network. The project will update fire alarm control devices and notification systems to the latest, technologically accessible devices.
CDHS anticipates using a Design / Bid /Build (DBB) approach to project delivery. The Architect/Engineer is expected to provide Basic Services as described in the sample Architect/Engineer/Consultant Agreement and Terms and Conditions of the Contract unless otherwise noted.
The process to be used in the selection of the Architect/Engineer/Consultant is comprised of two steps. In STEP I submittals will be screened and scored as described in detail in Section X. STEP II is the Oral Interview as described in detail in Section XI. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with the project will evaluate responses to this RFQ. Upon completion of the evaluation of the Submittals, a limited number of firms will be invited to the oral interviews.
III. MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested parties should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
1. The consultant must have been in the same business under the same name for the last two (2) years.
Demonstrated design experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 2,000,000 (hard costs), utilizing the expertise present in their Colorado Office; and Attended and signed in at the Mandatory Pre-Submittal Conference.
The Acknowledgment and Attestation Form, Appendix C is a mandatory requirement for a respondent to be considered responsive to this RFQ Prequalification Submittal.
a. Qualifications made by a respondent in executing this form may render a submittal non-responsive as determined by the State.
IV. MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR
To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have CDHS staff able to discuss the project. Firms preparing submittals must attend and sign-in to have their submittals accepted.
A mandatory Pre-Submission Meeting will be held at:
| Building Address: | 1600 W. 24th Street, Building 49, Pueblo, CO 81003 |
| Room: DFM Conference Room | Date/Time: July 24, 2026 10:00 AM |
V. SCHEDULE
The following is a tentative schedule of events for the Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.
| Request for Qualifications Issued | July 2, 2026 | Mandatory Pre-Submittal Conference and Tour | July 24, 2026 10:00 AM | Request for Clarifications Due | July 31, 2026 2:00 PM | |
| Final Addendum Issued (anticipated) | August 7, 2026 | |||||
| Submittals Due (Prequalification: Step I) | August 14, 2026, 1:00 PM | |||||
| Interview Short List Announced | August 21, 2026 | |||||
| Oral Interviews | Week of August 31, 2026 | |||||
| Selection Announced | September 10, 2026 | |||||
| Negotiation of Contract | September 30, 2026 | |||||
| Anticipated Design Start | October 5, 2026 | |||||
| Anticipated Construction Start/Finish | May 2027 to December 2027 |
The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on the ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
VI. QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this RFQ will be issued under numerically sequenced addenda.
Owner initiated changes to this RFQ will be posted in the form of addenda on ColoradoVSS.
Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.
Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.
VII. POINT OF CONTACT/CLARIFICATION
| Name: | Ms. Jamie Gott, Purchasing Agent | Agency: | Colorado Department of Human Services |
| Email Address: | Jaime.gott@state.co.us |
VIII. SUBMITTALS OF QUALIFICATIONS
1. This RFQ document, it’s appendices, and any written addenda issued prior to the closing of the solicitation, and written clarifications shall serve as the only basis for the submittal.
1. All submittals must comply with the following items, a through h. The State retains the right to waive any minor irregularity, or requirement should it be judged to be in the best interest of the State.
Qualifications shall be formatted and tabbed in the exact form and numeric sequence of the Evaluation Form (1 through 7) in Appendix A. A one-sided single-page cover letter addressed to the Colorado Department of Human Services, Attention Jaime Gott, outlining the firm(s) qualifications is required at the front of the submittal.
Qualifications shall be evaluated in accordance with criteria as indicated in PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding Evaluation Form in Appendix A.
Response to all items shall be complete.
All references shall be current and relevant.
Complete and execute the Appendix C: Acknowledgment and Attestation Form and submit at the back of the Qualification Submittal.
An electronic copy of the qualification package is due August 14, 2026 and shall be received no later than 1:00 PM MDT to jamie.gott@state.co.us.
Late submittals will be rejected without consideration. The State of Colorado assumes no responsibility for costs related to the preparation of submittals.
IX. METHOD OF SELECTION AND AWARD
A. Short List
1. From the submittals received, a short list of qualified respondents shall be identified using the scoring indicated on the enclosed Evaluation Form, Appendix A.
2. Firms failing to meet the minimum required qualifications will not receive further consideration.
B. Oral Interview
1. Mandatory oral interviews shall be conducted for the short-listed firm(s) only. Interview times and location will be arranged by CDHS and all short-listed firms will be notified in advance. At the option of the State, a visit to the short-listed firm(s) managing home office and/or representative field office may be required.
C. Method of Selection and Award
1. Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest will be invited to an oral interview. It is anticipated no fewer than three (3) or no more than five (5 ) will be interviewed.
X. EVALUATION OF QUALIFICATIONS
A. PREQUALIFICATION SUBMITTAL CRITERIA
Firms will be judged not only on their past experience for the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. The primary focus of the prequalification evaluation will be the firm(s) capability.
1. PROJECT TEAM
Identify the project principal, the project manager, key staff and subconsultants. Present a brief discussion regarding how the team's qualifications and experience relate to the specific project.
Qualifications and relevant individual experience.
Unique knowledge of key team members relating to the project.
Experience on projects as a team.
Key staff involvement in project management and on-site presence.
Time commitment of key staff.
Qualifications and relevant subconsultant experience.
2. FIRM/TEAM CAPABILITIES
Organization charts and graphs depicting your capacity may be included.
Are the lines of authority and coordination clearly identified?
Are essential management functions identified?
Are the functions effectively integrated? (e.g., subconsultants’ role delineated)?
Current and projected work load.
3. PRIOR EXPERIENCE
Include the name and current telephone number of the owner’s project manager for every project listed.
Experience of the key staff and firm with projects of similar scope and complexity.
Demonstrated success on past projects of similar scope and complexity.
References.
4. PROJECT APPROACH
For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues:
Budget Methodology / Cost Control
a. Establish and maintain estimates of probable cost within owner's established budget.
b. Control consultant contract costs
c. Coordinate value engineering activities
d. Budget Considerations Quality Control Methodology
0. Insure State procedures are followed Improve energy efficiency through the use of an integrated design process, life cycle costing, the use of an energy standard (current OSA energy code) and the specification of energy efficient materials, systems, and equipment Reduce embodied carbon emissions by utilizing and submitting Environmental Product Declarations (EPDs) that meet the OSA’s maximum acceptable global warming potential (GWP) limits Insure the project is designed for durability and maintainability Schedule
0. Manage the required work to meet the established schedule
5. EQUITY, DIVERSITY AND INCLUSION
0. Describe how your firm is incentivized to hire and promote diverse individuals
0. Describe how your team attempts to partner with Service-Disabled Veteran Owned Small Businesses or historically disadvantaged businesses
6. WORK LOCATION
Describe where the prime and subconsultants will do the key work elements of this project.
0. Proximity of firms office as it may affect coordination with the State's project manager and the potential project location.
Firm's familiarity with the project area.
Knowledge of the local labor and material markets.
XI. ORAL INTERVIEWS EVALUATION CRITERIA
(Note that the primary focus of the Oral Interview will be the proposed project management team members’ capabilities).
It is anticipated that oral interviews will be conducted during the week of August 31, 2026. Interviews will be conducted at: 1600 W. 24th Street, Building 49, Pueblo, CO 81003. The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the specific project approach proposed and in meeting the individuals who will act as the primary contacts with CDHS.
| 1. | PROJECT TEAM |
| 2. | TEAM CAPABILITIES |
| 3. | PRIOR EXPERIENCE |
| 4. | PROJECT APPROACH |
RFQ-AE R3
Rev 09/2025 Appendix A: Evaluation Forms
Appendix A1: Prequalification Submittal/Evaluation Form
| Appendix A2: | Oral Interview Evaluation Form |
| Appendix A3: | Submittal and Interview Ranking Matrix |
Appendix B: Architect/Engineer/Consultant Contract (Standard Format)
Appendix C:
ACKNOWLEDGEMENT AND ATTESTATION FORM
By responding to this RFQ, the respondent(s) certify that they have reviewed the Agreement and its Exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.
We certify and declare that the foregoing is true and correct.
| Subscribed on _______________________________ at _________________________, | ||
| Date | City |
| ___________________________, State of _____________________________________. | |
| County | State |
| ___________________________________ | ____________________________ | |
| Corporate Officer Signature | Date |
| ___________________________________ | ____________________________ | |
| Secretary | Date |
Note: Use full corporate name and attach corporate seal here.
Offeror Acknowledges Receipt of Addendum No. ____, ____, ____, ____ (Addenda MUST be acknowledged)
(SEAL)