This Request for Proposals document is issued by the City of Pasadena, California for Fair Oaks Substation Professional Design Services. The project addresses equipment obsolescence and supports the PWP 4-kV to 17-kV conversion program by providing 17-kV distribution capacity to replace existing Fair Oaks 4-kV units. The engineering services encompass two phases with a desired in-service date of June 2029 for Phase One. The scope of work includes final design, bid assistance, design build bridging documents, and engineering services during construction. The document contains conceptual site diagrams for Phase One and Phase Two plot plans for both the Fair Oaks Substation (located at 1420 N. Fair Oaks Ave, Pasadena, CA 91103) and the Brookside Substation (located at 1001 N. Arroyo Blvd, Pasadena, CA 91103), as well as diagrams of existing 35kV lines.
The document does not specify pricing terms, set-asides, response dates, or other financial details in the materials provided. The request seeks qualified engineering firms capable of executing the technical services outlined in the referenced Scope of Work document, which contains the detailed requirements and specifications for proposal submission.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals for Fair Oaks Substation Professional Design Services
Conceptual Site Diagrams
PHASE ONE: PLOT PLAN FAIR OAKS SUBSTATION
PHASE TWO: PLOT PLAN FAIR OAKS SUBSTATION
PHASE TWO: PLOT PLAN BROOKSIDE SUBSTATION
PHASE TWO: EXISTING 35KV LINES
FAIR OAKS SUBSTATION
1420 N. FAIR OAKS AVE, PASADENA, CA 91103
BROOKSIDE SUBSTATION
1001 N. ARROYO BLVD, PASADENA, CA 91103