RFP FA855224R0001.pdf
PDF 2 MB Posted
- Attached to
- TH-1H Depot Level Maintenance Federal contract opportunity
- Solicitation number
- FA8552-24-R-0001
About this file
This is a solicitation for a single award requirements contract for TH-1H depot level maintenance services. The solicitation seeks aircraft preparation and induction, teardown and inspection, programmed depot maintenance labor and material, aircraft preparation and delivery, travel and per diem, and over and above labor and material. The period of performance is one base year with seven option years. Services include aircraft induction, teardown, programmed depot maintenance, and delivery at various locations in accordance with performance work statements and specifications. The solicitation is a total small business set-aside issued by AFLCMC/WIUKB on behalf of the Department of the Air Force Materiel Command. Responses are due by December 15, 2023. Pricing is on a firm-fixed-price or cost-reimbursement basis as specified in the line items.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8552-24-R-0001
X
X
6.SOLICITATION ISSUE DATE
13 OCT 2023
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 336411
8(A) SIZE STANDARD: 1,500
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
DX: A1
3. AWARD/EFFECTIVE DATE
FA8552
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:C
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Aircraft Manufacturing
9. (Agency Use)
Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
15-DEC-2023 4:30PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
SOF/RW - ROTARY WING, AFLCMC/WIUKB RW
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Tarha A. Mazyck, Capt, USAF/WIUKB tarha.mazyck.2@us.af.mil Phone: (478) 926- 3952
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JS
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
DATE AND LOCAL TIME 15 DEC 2023 4:30 PM
SOLICITATION NUMBER FA855224R0001
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Tarha A Mazyck/WIUKB
SOF/RW - ROTARY WING, AFLCMC/WIUKB RW
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
FA8552-24-R-0001
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Any questions relating to the issuance of Solicitation FA8552-24-R-0001 must be submitted to the Government no later than 31 October 2023 at 4:30 PM EST.
Notice to Offeror(s):
B.1. This acquisition is a competitive, total small business set-aside.
B.2. This is a solicitation for a Single Award Requirements Type Contract. Delivery or performance shall be made only as authorized orders issued in accordance with the ordering clause. The Contractor shall furnish to the Government, when and if ordered, services specified in this schedule up to and including the "maximum" amount.
B.3. The period of performance (PoP) will consist of one 12-month base year period with seven 12-month option year periods. The effective date for ordering under this contract is from the date of award of the Basic Requirements Contract through twelve months thereafter or until all options are exercised. Performance shall continue through completion of all orders properly issued hereunder.
B.4. Pursuant to FAR 52.232-18, “Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.” The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Aircraft Preparation & Induction (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Induction of Aircraft IAW PWS Revision 2 Paragraphs 4.8, 4.15, 4.21.3, 4.22.2, 4.26, 4.37.1, 4.37.2, 4.37.5, 5.5, 5.6, 5.7; Work Specification Sections 2.1.1, 2.1.2, 3.1, and 3.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Aircraft Preparation & Induction (FFP/BEQ)
Base Year Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Aircraft Teardown & Inspection (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Teardown & Inspection (FFP/BEQ) IAW PWS paragraphs 3.3, 3.3.1, 4.3.1, 4.3.8, 4.3.10, 4.5.2, 4.6, 4.7.4, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.9, 4.12, 4.13, 4.14, 4.15, 4.17, 4.23, 4.24, 4.29, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.2 & 3.3.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Programmed Depot Maintenance (PDM) & Repair - Labor (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Programmed Depot Maintenance (PDM) - Labor (FFP/BEQ) IAW PWS paragraphs 4.6, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.21, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ)
Base Year Programmed Depot Maintenance (PDM) - Material (FFP/BEQ) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.5.2, 4.8, 4.9, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.19, 4.21, 4.23, 4.25, 4.26, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To PACRN Mark For
PAA
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed Delivery
3 EA
Aircraft Preparation & Delivery (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Preparation & Delivery (FFP/BEQ) IAW PWS paragraphs 4.8, 4.9, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.15, 4.17, 4.19, 4.20, 4.21, 4.22, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.5, 2.1.6, 3.5 & 3.6.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Aircraft Preparation & Delivery (FFP/BEQ)
Base Year Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *260 Calendar Days
Proposed Delivery
3 EA
Travel & Per Diem (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Travel & Per Diem (CRNF) IAW PWS paragraph 4.27 and as authorized, in writing, by the PCO.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Travel schedule(s) will be authorized as needed and IAW the PWS.
Over and Above (O&A) - Labor (FFP)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
1 LO
Over and Above (O&A) - Labor (FFP) IAW PWS paragraphs 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.23.3, 4.23.4, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Over and Above (O&A) - Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Over and Above (O&A) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.23.3, 4.23.4, 4.23.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Over and Above (O&A) - Material (CRNF)
Base Year
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Labor (FFP)
Base Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Contractor Field Team (CFT) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9;
and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016
Contractor Field Team (CFT) - Labor (FFP)
Base Year
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Contractor Field Team (CFT) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.2, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed
Contractor Field Team (CFT) - Material (CRNF)
Base Year
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP)
Base Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF)
Base Year Quantity U/I Total Estimated Cost
1 LO
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9;
and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachmennt 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
CAP and Long Lead Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
CAP & Long Lead Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN. Estimated annual material is based on total material for CLINs X008, X010 and X012.
CAP and Long Lead Material (CRNF)
Base Year
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Exempt From Foreign Disclosure Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
The delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contract Data Requirements List (CDRLs) (NSP)
Base Year Item No.
Not Separately Priced Quantity U/I Unit Price
EA NSP
DATA
Contract Data Requirements List (CDRLs) Data IAW DD Form 1423-1 and PWS paragraph 4.2.
Exhibits A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D & A00E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD Form 1423-1
Meeting Agenda
Base Year Item No.
0014AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A001 Authority: DI-ADMN-81249C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423
Meeting Minutes
Base Year Item No.
0014AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A002 Authority: DI-ADMN-81250C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Base Year Item No.
0014AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A003 Authority: DI-ADMN-81373
Base Year
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Trip/Travel Report
Base Year Item No.
0014AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A004 Authority: DI-MISC-81943
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Status Report
Base Year Item No.
0014AE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A005 Authority: DI-MGMT-80368A/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: IAW DD1423-1
Technical Report - Study/Services
Base Year Item No.
0014AF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A006 Authority: DI-MISC-80508B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Government Property Inventory Report
Base Year Item No.
0014AG
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A007 Authority: DI-MGMT-80441D
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Item Unique Identification (IUID) Marking Plan
Base Year Item No.
0014AH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A008 Authority: DI-MGMT-81803A
Item Unique Identification (IUID) Marking Plan
Base Year
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
IUID Marking Activity, Validation & Verification Report
Base Year Item No.
0014AJ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A009 Authority: DI-MGMT-81804A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Counterfeit Prevention Plan
Base Year Item No.
0014AK
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00A Authority: DI-MISC-81832
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Accident/Incident Report
Base Year Item No.
0014AL
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00B Authority: DI-SAFT-81563
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Quality Assurance Program Plan
Base Year Item No.
0014AM
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00C Authority: DI-QCIC-81794A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Phase-In Transition Plan
Base Year Item No.
0014AN
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00D Authority: DI-SESS-82299
Phase-In Transition Plan
Base Year
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Phase-Out Transition Plan
Base Year Item No.
0014AP
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00E Authority: DI-MGMT-81945
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Aircraft Preparation & Induction (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Preparation and Induction of Aircraft IAW PWS Revision 2 Paragraphs 4.8, 4.15, 4.21.3, 4.22.2, 4.26, 4.37.1, 4.37.2, 4.37.5, 5.5, 5.6, 5.7; Work Specification Sections 2.1.1, 2.1.2, 3.1, and 3.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Aircraft Preparation & Induction (FFP/BEQ) Option Year I
AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
4 EA *45 Calendar Days
Proposed Delivery
4 EA
Aircraft Teardown & Inspection (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Aircraft Teardown & Inspection (FFP/BEQ) IAW PWS paragraphs 3.3, 3.3.1, 4.3.1, 4.3.8, 4.3.10, 4.5.2, 4.6, 4.7.4, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.9, 4.12, 4.13, 4.14, 4.15, 4.17, 4.23, 4.24, 4.29, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.2 & 3.3.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
4 EA *45 Calendar Days
Proposed
4 EA
Programmed Depot Maintenance (PDM) & Repair - Labor (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Programmed Depot Maintenance (PDM) - Labor (FFP/BEQ) IAW PWS paragraphs 4.6, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.21, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
4 EA *170 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Programmed Depot Maintenance (PDM) - Material (FFP/BEQ) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.5.2, 4.8, 4.9, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.19, 4.21, 4.23, 4.25, 4.26, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ) Option Year I
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
4 EA *170 Calendar Days
Proposed Delivery
4 EA
Aircraft Preparation & Delivery (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Aircraft Preparation & Delivery (FFP/BEQ) IAW PWS paragraphs 4.8, 4.9, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.15, 4.17, 4.19, 4.20, 4.21, 4.22, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.5, 2.1.6, 3.5 & 3.6.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required
4 EA *260 Calendar Days
Aircraft Preparation & Delivery (FFP/BEQ) Option Year I
Proposed Delivery
4 EA
Travel & Per Diem (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Travel & Per Diem (CRNF) IAW PWS paragraph 4.27 and as authorized, in writing, by the PCO.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Travel schedule(s) will be authorized as needed and IAW the PWS.
Over and Above (O&A) - Labor (FFP) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
Over and Above (O&A) - Labor (FFP) Option Year I
1 LO To be Negotiated
Over and Above (O&A) - Labor (FFP) IAW PWS paragraphs 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.23.3, 4.23.4, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Over and Above (O&A) - Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Over and Above (O&A) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.23.3, 4.23.4, 4.23.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Over and Above (O&A) - Material (CRNF) Option Year I
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Labor (FFP) Option Year I
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA To be Determined
Contractor Field Team (CFT) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9;
and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016
Contractor Field Team (CFT) - Labor (FFP) Option Year I
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Contractor Field Team (CFT) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.2, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP) Option Year I
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA To be Determined
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9;
and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachmennt 15 will be added to the cost of this CLIN.
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) Option Year I
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
CAP and Long Lead Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
CAP & Long Lead Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN. Estimated annual material is based on total material for CLINs X008, X010 and X012.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
CAP and Long Lead Material (CRNF) Option Year I
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
The delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contract Data Requirements List (CDRLs) (NSP) Option Year I
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Contract Data Requirements List (CDRLs) Data IAW DD Form 1423-1 and PWS paragraph 4.2.
Exhibits B001,B002, B003, B004, B005, B006, B007, B008, B009, B00A, B00B, B00C & B00E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD Form 1423-1
Meeting Agenda Option Year I
Item No.
1014AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B001
Meeting Agenda Option Year I
Authority: DI-ADMN-81249C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423
Meeting Minutes Option Year I
Item No.
1014AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B002 Authority: DI-ADMN-81250C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Option Year I
Item No.
1014AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B003 Authority: DI-ADMN-81373
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B
Trip/Travel Report Option Year I
Item No.
1014AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B004 Authority: DI-MISC-81943
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Status Report Option Year I
Item No.
1014AE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B005 Authority: DI-MGMT-80368A/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Technical Report - Study/Services Option Year I
Item No.
1014AF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B006 Authority: DI-MISC-80508B
Technical Report - Study/Services Option Year I
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Government Property Inventory Report Option Year I
Item No.
1014AG
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B007 Authority: DI-MGMT-80441D
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Item Unique Identification (IUID) Marking Plan Option Year I
Item No.
1014AH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B008 Authority: DI-MGMT-81803A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
IUID Marking Activity, Validation & Verification Report Option Year I
Item No.
1014AJ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B009 Authority: DI-MGMT-81804A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Counterfeit Prevention Plan Option Year I
Item No.
1014AK
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00A Authority: DI-MISC-81832
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Accident/Incident Report Option Year I
Item No.
1014AL
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00B Authority: DI-SAFT-81563
Accident/Incident Report Option Year I
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Quality Assurance Program Plan Option Year I
Item No.
1014AM
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00C Authority: DI-QCIC-81794A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Phase-Out Transition Plan Option Year I
Item No.
1014AN
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00E Authority: DI-MGMT-81945
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Aircraft Preparation & Induction (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Induction of Aircraft IAW PWS Revision 2 Paragraphs 4.8, 4.15, 4.21.3, 4.22.2, 4.26, 4.37.1, 4.37.2, 4.37.5, 5.5, 5.6, 5.7; Work Specification Sections 2.1.1, 2.1.2, 3.1, and 3.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Aircraft Teardown & Inspection (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Teardown & Inspection (FFP/BEQ) IAW PWS paragraphs 3.3, 3.3.1, 4.3.1, 4.3.8, 4.3.10, 4.5.2, 4.6, 4.7.4, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.9, 4.12, 4.13, 4.14, 4.15, 4.17, 4.23, 4.24, 4.29, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.2 & 3.3.
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Programmed Depot Maintenance (PDM) & Repair - Labor (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Programmed Depot Maintenance (PDM) - Labor (FFP/BEQ) IAW PWS paragraphs 4.6, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.21, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed
3 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Programmed Depot Maintenance (PDM) - Material (FFP/BEQ) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.5.2, 4.8, 4.9, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.19, 4.21, 4.23, 4.25, 4.26, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed Delivery
3 EA
Aircraft Preparation & Delivery (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Preparation & Delivery (FFP/BEQ) IAW PWS paragraphs 4.8, 4.9, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.15, 4.17, 4.19, 4.20, 4.21, 4.22, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.5, 2.1.6, 3.5 & 3.6.
Aircraft Preparation & Delivery (FFP/BEQ) Option Year 2
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *260 Calendar Days
Proposed Delivery
3 EA
Travel & Per Diem (CRNF) Option Year 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Trav…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .