RFB936200-01 - CBC Geothermal Replacement - Drawings.pdf
PDF 17 MB Posted
- Solicitation number
- RFB936200-01
- Issued by
- Marshall County, Iowa
About this file
This document is a set of drawings related to a Request for Bids (RFB) issued by the Iowa Department of Administrative Services for the replacement of an existing open loop geothermal system with a new closed loop system at the Community Based Corrections (CBC) Facility located in Marshalltown, Iowa. The project is for the CBC District 2 facility in Marshall County. The scope of work includes the design and installation of the new geothermal system to serve the facility. No specific item quantities or response due dates are provided in this drawing set.
The contract will be awarded to the successful bidder, but no details are given regarding pricing terms, set asides, incumbent contractors, funding sources, or contract duration. This document focuses solely on providing the technical drawings and specifications for the geothermal system replacement project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D
DEPARTMENT OF CORRECTIONS RESIDENTIAL FACILITY
1401 S 17TH AVE,
MARSHALLTOWN, IA 50158
SITE LOCATION
iA 1: NO SCALE
A
C"'
B
C D
I
II
E
I ll l!!i i II I
E
F
PROJECT LOCATION
SHEET NUMBER
GENERAL
G000
MECHANICAL
M100
M101
M102
ELECTRICAL
E101
F
G
SHEET INDEX
SHEET TITLE
COVER SHEET
SITE PLAN
MECHANICAL FLOOR PLANS, DETAILS, AND
SCHEDULES
CONTROLS AND DETAILS
FLOOR PLANS, DETAILS, AND SCHEDULES
G
H
I HEREBY CERTIFY lHAT THIS ENGINEERING DOCUMENT
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND lHAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF TI-IE
STATE OF IOWA.
SIGNATURE: _ _ _ _ _ _ _ _ _ _ _
NAME: TIMOTHY R. FEHR
DATE: LICENSE NUMBER:
MY LICENSE RENEWAL DATE IS: DECEMBER 31, 20:15
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
G SHEETS M SHEETS
I HEREBY CERTIFY lHAT THIS ENGINEERING DOCUMENT
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND lHAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF TI-IE
STA.TE OF IOWA..
12877
SIGNATURE: _ _ _ _ _ _ _ _ _ _ _
NAME: �J�AK� E�J �. H�EN�K �LE�- - -- - --
DATE: _____ LICENSE NUMBER: _1_26_68_
MY LICENSE RENEWAL DATE IS: DECEMBER 31, 20<4
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
E SHEETS
H l!J :::
�i 0
� w
♦ t-
.1.:::
t-w"' < ::! .., ::i;:
l!J � 0: N W □ N > "' -w <:,:
!;: s: ti) "'0 - :,: - a t- - "
I� Cl'.� go-z () ill tn:
C") 3: Ol"'0 -N - <'>
SEAL
w I-en en
....J
0::::
w I I-w C) z
I- ....J ....J
I en 0::::
N
I- �
(_) ::J
- u 0:::: <(
I- _J en f-- z 0 w rJ) w
D:'.
co rJ)
(_) I-z
(_) z u w LO ow D:'. -
D:'. LO
0� 0 <(u. w LL -Z, 0 (_) O�s;
f- <( 0 z J: f-w f- _J • ....J ::; ,,__ _J
N a.. f- -<( co D:'. rJ) J:
w <( rJ)
(") 0.. - D:'.
0::::
WO<(
0) Q :! ::?!
s::t 0
N ci5 0
Cl)O (")
I- .._ z t:! -
UJ .. ii'.
�UJ w ::::, I-ro
0 z
I- 0 W 0� w
- Cl) D:'. cc_ 0..
GOOO
2/8/2024
2/8/24
S. 17th AVE
(E)3" WELL WATER LINES ESTIMATED
48" BELOW GRADE. REUSE FOR NEW
GEOTHERMAL FIELD
ABANDON (E)WELLS
GEOTHERMAL SUPPLY
AND RETURN PIPING
GEOTHERMAL
TRENCH
LOCATION
300'-0"
GEOTHERMAL
VAULT
NEW 3" GTS/R
ABANDON (E)GEO
DISCHARGE
ESTIMATED
PROPERTY
EXTENTS
96'-11"
DISCONNECT
(E)WELL PIPING TRENCH
SUMP DISCHARGE. PROVIDE
SCREENED COVER AT TERMINATION
SIMILAR TO EXISTING.
REMOVE TREES
AS NECESSARY
PRIOR TO CONNECTING TO THE
EXISTING PIPING, CONTRACTOR
SHALL PRESSURE TEST THE
EXISTING PIPING FROM THIS
POINT TO THE BUILDING PER
THE SPECIFICATION.
43'-6"
E(C)
W(C)
G(C)
San(D)
OH E
T(C)
FO(C)
ALLIANT ENERGY
BURIED ELECTRIC
MARSHALLTOWN WATER WORKS
BURIED WATER LINE
CENTURYLINK
BURIED TELEPHONE
ALLIANT ENERGY
BURIED GAS
CITY OF MARSHALLTOWN
SANITARY SEWER
OVERHEAD ELECTRIC
HEART OF IOWA
BURIED FIBER
GEOTHERMAL SITE PLAN
1" = 30'-0"1
NUMBERED HEADER FOR INDICATED GROUP OF WELLS
EXISTING TEST WELLS, FULLY GROUTED INCLUDING 1" LOOP
HORIZONTAL BORE/WELL NUMBER
HORIZONTAL WELL 15' BELOW GRADE
HORIZONTAL WELL 30' BELOW GRADE
CONTRACTOR'S REQUIRED POST-PROJECT AS-BUILT SHALL INDICATE SIZES OF ALL
140 GPM TO/FROM WELLFIELD THROUGH 28 HORIZONTAL BORES = 5 GPM PER 1" WELL LOOP
DO NOT EXCEED TYPICAL POLYETHYLENE SIZING:
A) U-TUBE AND TAKEOFF/RUNOUT TO EACH INDIVIDUAL WELL: 1" SDR 11
REFER TO DETAIL BELOW FOR SIZES OF HEADER PIPING.
3.
1.
2.
B)
PIPING INSTALLED, INCLUDING ACTUAL WELL LOCATIONS RECORDED BY GPS.
PIPING INSTALLED, INCLUDING ACTUAL WELL LOCATIONS RECORDED BY GPS.
HEAT TRANSFER FLUID TO BE 30% PROPYLENE GLYCOL.4.
1. HORIZONTAL BORES AS SHOWN REFLECT TWO INSTALLATION PLANES, 15+', 30+' BELOW
GRADE PER DETAIL ON THIS SHEET.
2. CONTRACTOR SHALL COMPLETE A BORING LOG (INCLUDED IN THE PROJECT SPEC) FOR EACH WELL DRILLED, INDICATING BORE NUMBER (I.E. 'A1'), FINAL DEPTH, FEET OF CASING REQUIRED, DATE COMPLETED (INCLUDING GROUT). LOGS SHALL BE COMPLETED DAILY AND SUBMITTED
MONTHLY WITH GC'S PAYMENT APPLICATION.
3. EACH WELL SHALL HAVE U-TUBE INSTALLED AND FULLY GROUTED INCLUDING PLUG, AT THE
TIME OF DRILL RETRACTION. BORED WELLS NOT COMPLETED INCLUDING PLUG AT THE TIME
OF DRILL EXTRACTION SHALL BE DONE SO AT THE CONTRACTOR'S RISK.
4. ALL PIPING WITHIN HORIZONTAL TRENCHES SHALL BE MARKED BY GEOTHERMAL MARKING
TAPE AND TRACING WIRE PER PROJECT SPEC. LARGER TRENCHES CONTAINING MULTI PIPES
SHALL HAVE TRENCH LIMITS SIMILARLY MARKED.
5. GTS = GEOTHERMAL SUPPLY (FROM WELL FIELD TO BUILDING)
GTR = GEOTHERMAL RETURN (FROM BUILDING TO WELL FIELD)
6. HEADER NUMBERS SHALL BE MAINTAINED AND IDENTIFIED BY SUPPLY AND RETURN PAIR
INSIDE NEW VAULT. CONTRACTOR SHALL PROVIDE THE OWNER WITH (3) THREE COPIES OF A
LAMINATED HEADER INDEX WITH CORRESPONDING FLOWS.
7. CONTRACTOR SHALL ENSURE INSTALLATION OF COMPLETE CLOSED LOOP SYSTEM IS IN
COMPLIANCE WITH IGSHPA CLOSED LOOP AND GROUND SOURCE HEAD PUMP
RECOMMENDATIONS.
8. ALL EXTERIOR HORIZONTAL DISTRIBUTION PIPING SHALL BE MINIMUM 15'-0" BELOW GRADE
AND REFLECT SITE CONTOURS.
9. TEMPORARY ELECTRIC FOR A SINGLE CONSTRUCTION TRAILER MAY BE ROUTED FROM THE
MAIN BUILDING; ALL CONNECTIONS, WIRING, ETC. SHALL BE BY THE CONTRACTOR.
10. ALL FIELD WORK AND EQUIPMENT SHALL BE COMPLETELY ENCLOSED WITHIN ORANGE
SAFETY/CONSTRUCTION FENCE TO PREVENT UNWARRANTED CONTACT WITH BYSTANDERS,
PRIMARILY VISITORS ACCESSING THE MAIN BUILDING VIA THE FIELD. COORDINATE THE SILT
FENCE WITH THE CONSTRUCTION FENCE. ALL FENCES SHALL BE PROVIDED AND MAINTAINED
BY CONTRACTOR.
11. CONTRACTOR SHALL REVIEW ALL SITE-REALTED SPECIFICS, INCLUDING VARYING CONTOURS, TO GAIN REQUIRED KNOWLEDGE OF SITE COMPLEXITIES.
12. NOMINAL LENGTH OF HORIZONTAL LOOPS INSTALLED IS 300' MINIMUM; ACTUAL LENGTH MAY
INCREASE TO PROVIDE ACCEPTABLE ENTRY/EXIT LOCATIONS FOR DRILL HEAD AND LOOP
INSERTION.
13. REMOVE AND DISCHARGE OFFSITE ALL BOREHOLE CUTTINGS, SETTLING PIT ROCK, GROUTING
PRODUCTS AND DRILLING MUD. OVEREXCAVATE BACKFILL AND PROVIDE ADDITIONAL TOPSOIL
AS NECESSARY TO REDEEM SITE TO ORIGINAL CONDITION. OWNER'S REPRESENTATIVE AND
ENGINEER SHALL REVIEW THE FINISHED SITE PRIOR TO ANY TOPSOIL REDISTRIBUTION FOR
SEEDING RESTORATION.
14. IF SUBSTANTIAL WATER IS ENCOUNTERED DURING DRILLING, A SERIES OF SETTLING PITS
WITH FILTERING ROCK AND FINAL CLOTH FILTER WILL BE REQUIRED TO CLEANSE DISCHARGE
PRIOR TO DEWATERING THE SITE. FOR THIS PURPOSE, SUBSTANTIAL WATER SHALL BE
DEFINED AS WATER NOT NATURALLY RE-ABSORBED ONSITE.
15. SITE DEWATERING SHALL BE ACCOMPLISHED BY EITHER:
15.1. TRUCKING ALL SITE-GENERATED WATER TO AN APPROPRIATE LOCATION OFFSITE OR
15.2. BY PUMPING CLEANLY FILTERED WATER FROM THE LAST SETTLING PIT TO THE CITY'S
STREET STORMWATER INLET. IF FREEZING CONDITIONS DO NOT EXIST WHILE PUMPING,
DISCHARGE MAY BE DIRECTLY TO THE STREET, TO GRAVITY-FLOW TO THE STORM INLET;
IF FREEZING CONDITIONS DO EXIST, DISCHARGE HOSE SHALL BE THE ENTIRE DISTANCE
AND DISCHARGED DIRECTLY INTO THE INLET. DISCHARGE HOSE SHALL BE RECOILED
BACK TO PROPERTY DAILY. CONTRACTOR SHALL BRIEF CITY ENGINEERING PRIOR TO
PUMPING, IN PART TO APPRISE THE CITY OF ANTICIPATED SCHEDULE. CITY ENGINEERING
WILL PERIODICALLY INSPECT THE STREET AND STORM WATER INLET AND NOTIFY THE
CONTRACTOR OF EXCESSIVE SEDIMENT COLLECTION AND CORRECTIVE ACTION TO
PREVENT FURTHER ACCUMULATION AND REMOVAL OF SAME.
16. REFER TO SPECIFICATION SECTION 23 8144 FOR TRENCHING/BACKFILLING REQUIREMENTS
AND FLUSHING/PURGING REQUIREMENTS OF EXTERIOR PIPING.
1. NOTIFY UTILITY COMPANIES WHOSE FACILITIES ARE SHOWN ON THE PLANS OR KNOWN TO BE WITHIN
CONSTRUCTION LIMITS OF THE SCHEDULE PRIOR TO EACH STAGE OF CONSTRUCTION.
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL UNCOVER EXISTING UTILITIES AT CRITICAL
LOCATIONS TO VERIFY EXACT HORIZONTAL AND VERTICAL LOCATION.
3. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS
AND HOLIDAYS.
4. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT PRIOR AUTHORIZATION
FROM THE OWNER'S REPRESENTATIVE.
5. ALL PUBLIC CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPROPRIATE CITY METROPOLITAN AREA STANDARD SPECIFICATIONS, LATEST EDITION, UNLESS OTHERWISE NOTED ON THE DRAWINGS.
6. PROTECT EXISTING UTILITIES DURING CONSTRUCTION.
7. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE PROJECT DURATION.
8. ADJUST ALL VALVES, MANHOLES, CASTINGS, GAS VENTS, ETC., TO MATCH THE NEW SURFACE.
ADJUSTMENT SHALL BE COORDINATED WITH THE UTILITY COMPANIES AND THE COST FOR ALL
ADJUSTMENTS SHALL BE INCIDENTAL TO THE CONSTRUCTION. AT NO ADDITIONAL COST TO THE
OWNER, REPAIR ANY DAMAGE TO SAID STRUCTURES AND APPURTENANCES THAT OCCUR DURING
CONSTRUCTION.
9. CONTRACTOR SHALL REFER TO MECHANICAL PLANS FOR BUILDING DIMENSIONS, STOOP SIZES AND
LOCATIONS, AND BUILDING UTILITY ENTRANCE LOCATIONS AND ELEVATIONS.
10. SITE CLEAN-UP SHALL BE PERFORMED ON A DAILY BASIS. SIDEWALKS, PARKING LOTS, ROADWAYS, ETC. SHALL BE KEPT CLEAN AT ALL TIMES.
11. ALL OPEN EXCAVATIONS SHALL BE PROTECTED.
12. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY CONSTRUCTION. MONUMENTS
SHALL BE SET BY A LAND SURVEYOR REGISTERED TO PRACTICE IN THE STATE OF IOWA.
13. CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS.
14. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT BUT NOT SET FORTH AS A
SPECIFIC BID ITEM, SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED FOR THE COMPLETION OF THIS WORK.
15. ANY EXISTING FACILITIES (CURBS, PAVEMENT, UTILITIES, ETC.) THAT THE CONTRACTOR'S OPERATIONS
DAMAGE SHALL BE REPAIRED BY THAT CONTRACTOR AT HIS/HER COST.
16. THE CONTRACTOR SHALL PROVIDE SITE-CONSTRUCTION STAKING AND GRADING STAKING, THE COST OF ANY ADDITIONAL STAKING DUE TO RESETTING OF DESTROYED STAKES SHALL BE PAID BY THE
CONTRACTOR.
17. CONTRACTOR SHALL PROVIDE COMPACTION TESTING FOR EVERY 100'-0" OF MAJOR TRENCH, AND ACC
& PCC WHEREVER ENCOUNTERED; TEST RESULTS SHALL BE SUBMTTED TO THE ENGINEER FOR
REVIEW.
18. FINAL RESTORATION (HYDROSEEDING) SHALL COMMENCE ONLY UPON OWNER/ENGINEER REVIEW AND
APPROVAL OF FINAL GRADING.
30'0
A
SEAL
B C D E F HG
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
D
AT
E
FI
EL
D
PR
O
JE
C
T
Pr in te d: M100
SI
TE
P
LA
N
TA
B
M
SJ
BI
D
DO
CU
M
EN
TS
/0
8/
.0
- D O
C
CB
C
DI
ST
RI
CT
M
AR
SH
AL
LT
O
W N
G
EO
TH
ER
M
AL
S
YS
TE
M
RE
PL
AC
EM
EN
T
DE
PA
RT
M
EN
T
O F
CO
RR
EC
TI
O
NS
R
ES
ID
EN
TI
AL
F
AC
IL
IT
Y
S
7T
H
AV
E, \\s h.
sh ive
-h at te ry
.c om
\d at a\ Pr oj ec ts
\IC
\2
0\ de liv er ab le s\
Dr aw in gs
\5 _M ec ha ni ca l\M
0.
dw g 2/
8/
2:
:3
PM
M
AR
SH
AL
LT
O
W N, IA
8'
-6
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
%%UMECHANICAL LEGEND:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL MECHANICAL NOTES:
AutoCAD SHX Text
%%UPOLYETHYLENE PIPE SIZING CRITERIA:
AutoCAD SHX Text
%%UGENERAL NOTES:
TUNNEL
RELOCATE AIR SEPARATOR
(D)EXPANSION TANK
(D)TRIPLE-DUTY
VALVE - ONE FOR
EACH PUMP
(D)2x CIRC. PUMP
(D)HEX
4" GTS/R
3" GTS/R
(E)WH-1
WATER TO WATER
HP SERVING
RADIANT FLOOR
FREEZER AND
COOLER COND. UNIT.
(E)FD
(E)FD
(E)FD
3" GTS
6" PVC
(E)GREASE
INTERCEPTOR
B001
B002
B003
(E)ELECTRICAL
EQUIPMENT
M02
TUNNEL
B001
B002
B003
TUNNEL
4" GTS/R
3" GTS/R
(E)WH-1
WATER TO WATER
HP SERVING
RADIANT FLOOR
FREEZER AND
COOLER COND. UNIT.
(E)FD
(E)FD
(E)FD
(E)GREASE
INTERCEPTOR
B001
B002
B003
(E)ELECTRICAL
EQUIPMENT
P-1 P-2 M01
M02
INFILL OPENING PER
DETAIL 9 ON THIS
SHEET
GF-1
ET-1
RELOCATED AIR
SEPARATOR
4" GTS/R
INSTALL 3-WAY
VALVE
(E)3"
GTS/R
DASHED AREAS
INDICATE SERVICE
CLEARANCE
4" GTS
1" GTS
1" GTS
SUGGESTED
LOCATION FOR
DIFFERENTIAL
PRESSURE SENSOR
CONCRETE INSERT
STRUT MOUNTED PIPE GUIDE
INSUL.
PIPE
SHEET METAL SHIELD
6" LONG FIRE TREATED HARDWOOD
BLOCKS SHAPED TO FIT PIPE & SHIELD
DOUBLE NUT & FLAT WASHER (TYP)
STRUT
SHIELD SCHEDULE
2" & SMALLER - 16 GAGE
2-1/2" TO 6" - 14 GAGE
8" & LARGER - 12 GAGE
LENGTH OF SHIELD TO BE AT
LEAST 6" LONGER THAN THE
OUTSIDE DIA. OF THE INSULATION
NOTES:
1. SIZE STRUT AND CLAMP TO ADEQUATELY SUPPORT LOAD
2. STRUT SHALL BE EPOXY PAINTED.
3. FIBERGLASS PIPING REQUIRES MANUFACTURERS RECOMMENDED SADDLE.
AIR SEPARATOR
3/4"
GLYCOL FEEDER
EXPANSION
TANK
RETURN FROM
LOOP/WELL FIELD
ECCENTRIC
REDUCER (TYP.)
1" DRAIN VALVE
1" ANTI-SIPHON LOOP.
TAKE LOOP OFF SIDE OF
PIPE; NOT TOP OR
BOTTOM.
TO DISTRIBUTION
PUMPS
ISOLATION VALVE (TYP.)
CHECK VALVE
AUTOMATIC AIR VENT
GAUGE (TYP)
INVERT ECCENTRIC
REDUCER AS REQUIRED
FLEX CONNECTOR (TYP)
STRAINER W/ BLOW
DOWN VALVE & CAP
ISOLATION VALVE (TYP)
P&T PORT (TYP)
CIRCUIT SETTER
THERMOMETER
STRAIGHT
ECCENTRIC
INCREASER AS
REQUIRED
IN-LINE PUMP
FLOOR MOUNTED PUMP
SUPPORT
TYPE-A
8" OR LARGER
TYPE-B
6" OR SMALLER
TYPICAL ELEVATION
ROD
HANGER
INSULATION
~C PIPE
SHEET METAL SHIELD
PIPE AND HANGER
6" LONG HARDWOOD
BLOCKS SHAPED TO FIT
HANGER
ROD
~C PIPE
~C PIPE
2" AND SMALLER:
2 1/2" TO 6":
8" AND LARGER:
LENGTH OF SHIELD TO BE AT
LEAST 6" LONGER THAN THE
OUTSIDE DIAMETER OF THE
INSULATION
12 GAGE
14 GAGE
16 GAGE
SHIELD SCHEDULE
6" LONG HARDWOOD
BLOCKS SHAPED TO
FIT PIPE AND HANGER
2. STRUT SHALL BE EPOXY PAINTED.
SHIELD SCHEDULE:
2" & SMALLER - 16 GAGE
2-1/2" TO 6" - 14 GAGE
8" & LARGER - 12 GAGE
LENGTH OF SHIELD TO BE AT
LEAST 6" LONGER THAN THE
OUTSIDE DIA. OF THE INSULATION
6" LONG HARDWOOD BLOCKS
SHAPED TO FIT PIPE & SHIELD
PIPE
SHEET METAL SHIELD
INSUL.
ADJUSTABLE HANGER ROD
NUT & FLAT WASHER (TYP)
1. SIZE STRUT AND CLAMP TO ADEQUATELY SUPPORT LOAD
NOTES:
STRUT
STRUT MOUNTED PIPE GUIDE
DEMOLISH HEX
DEMOLISH PIPING
DEMOLISH GEO PIPE
WHERE EMBEDDED METAL SLEEVE EXISTS, CORE DRILL HOLE BIG ENOUGH TO REMOVE
FLANGE. ASSUME FLANGE IS 2" LONG ALONG ENTIRE PERIMETER OF OPENING. MAINTAIN 6"
BETWEEN OTHER CORE DRILLS. IF STEEL FLANGE REMAINS AND CANNOT BE REMOVED
WITHOUT DAMAGING OTHER OPENINGS, APPLY CORROSION INHIBITING MATERIAL TO
EXPOSED STEEL AND PLACE WATERSTOP ON OUTSIDE FACE OF PLATE WHILE MAINTAINING
WATERSTOP MANUFACTURER RECOMMENDED COVER.
USE THIS DETAIL TO INFILL
EXISTING OPENINGS,
UNLESS NOTED OTHERWISE
CONCRETE INFILL W/ INTEGRAL
WATERPROOFING ADMIXTURE
PER SPECIFICATIONS
COAT SURFACE W/
BONDING AGENTINTERIOR
IF MAXIMUM DIMENSION OF OPENING IS 8" OR LESS, REPLACE #4
BARS WITH (3) 1/4"Ø STAINLESS STEEL THREADED RODS DRILLED
AND EPOXY SET WITH 4" EMBEDMENT
#4 BARS @ 8" OC
AROUND PERIMETER
WITH 5" EMBEDMENT
EXISTING
CONCRETE ROOF,
FLOOR, OR WALL
KEYNOTES
KEY NOTE
M01
CONNECT WATER COOLED
FREEZER AND COOLER TO
DOMESTIC WATER DURING
CONSTRUCTION. PIPE DRAIN TO
(E)FD. RECONNECT TO
GEOTHERMAL SYSTEM AFTER
SYSTEM IS OPERATIONAL.
M02 GTS/R UP TO HEAT PUMP ON
FLOOR ABOVE.
INSTALL TEE AND ISOLATION VALVE.
CONNECT TO DOMESTIC COLD WATER
INSTALL TEE AND ISOLATION VALVE.
PIPE DRAIN TO FLOOR DRAIN.
TO DOMESTIC COLD WATER
TO WATER COOLED EQUIPMENT
WATER LINES TO DOMESTIC COLD
WATER ARE TEMPORARY. REMOVE
PIPING AT THE END OF PROJECT. NEW
VALVES SHOWN SHALL HAVE LOCK
OUT/TAG OUT CAPABILITY. VALVES ARE
TO REMAIN.
BASEMENT MECHANICAL DEMOLITION PLAN
1/4" = 1'-0"
BASEMENT MECHANICAL NEW PLAN
1/4" = 1'-0"
PUMP SCHEDULE
MARK GPM FT HD HP
ELECTRICAL
DESIGN BASIS REMARKSV PH
P-1 140 180 10 208 3 TACO KS-2007D 1, 2, 3
P-2 140 180 10 208 3 TACO KS-2007D 1, 2, 3
1. 30% PROPYLENE GLYCOL
2. PUMP SIZED FOR 140 GPM, BALANCE PUMP TO 125 GPM.
3. PROVIDE FLOOR MOUNTED STAND.
4'0 4'0
WALL MOUNTED TYPE HANGER DETAIL
N.T.S.3 AIR SEPARATOR/BLADDER TYPE EXP. TANK W/ GLYCOL FEEDER DETAIL
N.T.S.4 PIPING DIAGRAM - IN-LINE PUMP
N.T.S.5
1 2
INSULATED PIPE HANGER DETAIL
N.T.S.7 TRAPEZE TYPE HANGER DETAIL
N.T.S.8 INFILL EXISTING OPENING DETAIL
N.T.S.9
WATER COOLED EQUIPMENT PIPING DIAGRAM
N.T.S.11
EXPANSION TANK SCHEDULE
MARK TYPE
TANK CAPACITY
(GAL)
ACCEPTANCE
CAPACITY (GAL)DESIGN BASIS REMARKS
ET-1 BLADDER 67 34 TACO
CBX254-125 1
1. 30% PROPYLENE GLYCOL
2. PRECHARGED TO 12 PSI.
GLYCOL FEEDER SCHEDULE
MARK
CUT-IN PRESSURE
(PSI)
CUT-OUT PRESSURE
(PSI) GPM HP
ELECTRICAL
DESIGN BASIS REMARKSV P
GF-1 10 - 45 20 - 60 1.5 1/3 120 1 NEPTUNE G-50-1 1
1. 30% PROPYLENE GLYCOL
NOTE:
CONTRACTOR TO FLUSH AND FILL PIPING
WITHIN BUILDING.
ESTIMATED BUILDING PIPING: 330 GALLONS.
PRIOR TO FLUSHING, CONTRACTOR SHALL
DISCONNECT THE FLEX HOSES FROM THE
EXISTING HEAT PUMPS (APPROXIMATELY 16
TOTAL) AND CONNECT THEM TOGETHER.
RECONNECT FLEX HOSES TO THE HEAT
PUMPS PRIOR TO FILLING THE SYSTEM.
REFER TO SPECIFICATION SECTION 23 2500
FOR CLEANING/FLUSHING/FILLING
REQUIREMENTS FOR INTERIOR PIPING.
A
SEAL
B C D E F HG
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
D
AT
E
FI
EL
D
PR
O
JE
C
T
Pr in te d: M101
M
EC
HA
NI
CA
L
FL
O
O R
PL
AN
S, DE
TA
IL
S, A
ND
SC
HE
DU
LE
S
TA
B
M
SJ
BI
D
DO
CU
M
EN
TS
/0
8/
.0
- D O
C
CB
C
DI
ST
RI
CT
M
AR
SH
AL
LT
O
W N
G
EO
TH
ER
M
AL
S
YS
TE
M
RE
PL
AC
EM
EN
T
DE
PA
RT
M
EN
T
O F
CO
RR
EC
TI
O
NS
R
ES
ID
EN
TI
AL
F
AC
IL
IT
Y
S
7T
H
AV
E, \\s h.
sh ive
-h at te ry
.c om
\d at a\ Pr oj ec ts
\IC
\2
0\ de liv er ab le s\
Dr aw in gs
\5 _M ec ha ni ca l\M
1.
dw g 2/
8/
2:
:0
PM
M
AR
SH
AL
LT
O
W N, IA
EXISTING HEAT EXCHANGER
N.T.S.10
EXISTING GEOTHERMAL DISCHARGE PIPE
N.T.S.6
AutoCAD SHX Text N
AutoCAD SHX Text N
../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg
P1
P2
VFD
VFD
GTS
BO - LOOP WATER PUMP 1 START/STOP
AO - LOOP WATER PUMP 1 VFD SPEED
BI - LOOP WATER PUMP 1 VFD FAULT
BO - LOOP WATER PUMP 2 START/STOP
AO - LOOP WATER PUMP 2 VFD SPEED
BI - LOOP WATER PUMP 2 VFD FAULT
BI - LOOP WATER PUMP 2 STATUS
BI - LOOP WATER PUMP 1 STATUS
GTS
GTR GTR
AI - BUILDING LOOP WATER RETURN TEMP
AI - BUILDING LOOP WATER
SUPPLY TEMP
BI - BUILDING LOOP WATER
FLOW STATUS
T
T
M
M
CT
CT
AO - BYPASS VALVE
M
1. GEOTHERMAL PLANT LOOP MONITOR AND PUMPS (TYPICAL OF 1)
THE FOLLOWING LOOP WATER CONDITIONS SHALL BE MONITORED:
· BUILDING FLOW STATUS.
· SUPPLY TEMPERATURE (BUILDING AND FIELD).
· RETURN TEMPERATURE (BUILDING AND FIELD).
· BUILDING LOOP DIFFERENTIAL PRESSURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
· NO BUILDING LOOP FLOW.
· HIGH LOOP WATER SUPPLY TEMP (BUILDING AND FIELD): IF THE LOOP WATER
SUPPLY TEMPERATURE IS GREATER THAN 90°F (ADJ.)
· LOW LOOP WATER SUPPLY TEMP (BUILDING AND FIELD): IF THE LOOP WATER SUPPLY
TEMPERATURE IS LESS THAN 60°F (ADJ.)
LOOP WATER PUMP LEAD/LAG OPERATION:
THE TWO LOOP WATER PUMPS SHALL OPERATE IN A LEAD/LAG FASHION.
· THE LEAD PUMP SHALL RUN FIRST.
· ON FAILURE OF THE LEAD PUMP, THE LAG PUMP SHALL RUN AND THE LEAD PUMP
SHALL TURN OFF.
· ON DECREASING BUILDING LOOP WATER DIFFERENTIAL PRESSURE, THE LAG PUMP
SHALL STAGE ON AND RUN IN UNISON WITH THE LEAD PUMP TO MAINTAIN LOOP
WATER DIFFERENTIAL PRESSURE SETPOINT.
THE DESIGNATED LEAD PUMP SHALL ROTATE UPON ONE OF THE FOLLOWING
CONDITIONS (USER SELECTABLE):
· MANUALLY THROUGH A SOFTWARE SWITCH
· IF PUMP RUNTIME (ADJ.) IS EXCEEDED
· DAILY
· WEEKLY
· MONTHLY
ALARMS SHALL BE PROVIDED AS FOLLOWS:
· LOOP WATER PUMP 1
·· FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
·· RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
·· RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT.
·· VFD FAULT.
· LOOP WATER PUMP 2
·· FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
·· RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
·· RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT.
·· VFD FAULT.
A MODULATING 3-WAY, BYPASS CONTROL VALVE (FULL SIZED, BUTTERFLY STYLE, FAIL
OPEN TO FEILD), SHALL BE PROVIDED IN THE FULL SIZED LOOP FIELD BYPASS. THE VALVE
WILL BE PROGRAMMED TO OPERATE ACCORDING TO THE FOLLOWING SCHEDULE:
BUILDING LOOP RETURN TEMPERATURE VALVE POSITION (% OPEN TO BYPASS)
≤ 40 F 0%
41 TO 50 F 50%
51 TO 70 F 100%
71 TO 79 F 50%
≥ 80 F 0%
LOOP WATER DIFFERENTIAL PRESSURE CONTROL:
THE CONTROLLER SHALL MEASURE LOOP WATER DIFFERENTIAL PRESSURE AND
MODULATE THE LOOP WATER PUMP VFDS IN SEQUENCE TO MAINTAIN ITS LOOP WATER
DIFFERENTIAL PRESSURE SETPOINT. THE FOLLOWING SETPOINTS ARE RECOMMENDED
VALUES. ALL SETPOINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING
PERIOD TO MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
THE CONTROLLER SHALL MODULATE LOOP WATER PUMP SPEEDS TO MAINTAIN A LOOP
WATER DIFFERENTIAL PRESSURE OF 12LBF/IN2 (ADJ.). THE VFD MINIMUM SPEED SHALL
NOT DROP BELOW 20% (ADJ.).
ON DROPPING LOOP WATER DIFFERENTIAL PRESSURE, THE VFDS SHALL RUN TO
MAINTAIN SETPOINT AS FOLLOWS:
· THE CONTROLLER SHALL MODULATE THE LEAD VFD TO MAINTAIN SETPOINT.
· IF THE LEAD VFD SPEED IS GREATER THAN A SETPOINT OF 90% (ADJ.), THE LAG VFD
SHALL STAGE ON.
· THE LAG VFD SHALL RAMP UP TO MATCH THE LEAD VFD SPEED AND THEN RUN IN
UNISON WITH THE LEAD VFD TO MAINTAIN SETPOINT.
ON RISING LOOP WATER DIFFERENTIAL PRESSURE, THE VFDS SHALL RUN TO MAINTAIN
SETPOINT AS FOLLOWS:
· IF THE VFD SPEEDS THEN DROPS BACK TO 60% (ADJ.) BELOW SETPOINT, THE LAG
VFD SHALL STAGE OFF.
· THE LEAD VFD SHALL CONTINUE TO RUN TO MAINTAIN SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
· HIGH LOOP WATER DIFFERENTIAL PRESSURE: IF THE LOOP WATER DIFFERENTIAL
PRESSURE IS 25% (ADJ.) GREATER THAN SETPOINT.
· LOW LOOP WATER DIFFERENTIAL PRESSURE: IF THE LOOP WATER DIFFERENTIAL
PRESSURE IS 25% (ADJ.) LESS THAN SETPOINT.
NO BUILDING LOOP FLOW x
LOW BUILDING LOOP WATER SUPPLY TEMP SHUTDOWN
x
LOW BUILDING LOOP WATER SUPPLY TEMP x
LOOP WATER PUMP 2 RUNTIME EXCEEDED x LOOP WATER PUMP 2 RUNNING IN HAND x LOOP WATER PUMP 2 FAILURE x LOOP WATER PUMP 1 RUNTIME EXCEEDED x LOOP WATER PUMP 1 RUNNING IN HAND x LOOP WATER PUMP 1 FAILURE x
HIGH BUILDING LOOP WATER SUPPLY TEMP SHUTDOWN x HIGH BUILDING LOOP WATER SUPPLY TEMP x HIGH BUILDING LOOP WATER DIFFERENTIAL PRESSURE x OUTSIDE AIR TEMP x x LOOP WATER PUMP 2 START/STOP x x LOOP WATER PUMP 1 START/STOP x x LOOP WATER PUMP 2 VFD FAULT x x x LOOP WATER PUMP 2 STATUS x x x LOOP WATER PUMP 1 VFD FAULT x x x LOOP WATER PUMP 1 STATUS x x x LOOP WATER FLOW STATUS x x LOOP WATER PUMP 2 VFD SPEED x x x LOOP WATER PUMP 1 VFD SPEED x x x
BUILDING LOOP WATER SUPPLY TEMP x x x BUILDING LOOP WATER RETURN TEMP x x x
BYPASS VALVE POSITION, FEEDBACK x x x
POINT NAME AI AO BI BO AV BV TREND ALARM SHOW ON
GRAPHIC NOTES
POINTS LIST - GEOTHERMAL - LOOP MONITOR AND PUMPS
GTR
L
H
AI - BUILDING LOOP WATER
DIFFERENTIAL PRESSURE
GTS
AI - FIELD LOOP WATER
RETURN TEMP
T
AI - FIELD LOOP WATER
SUPPLY TEMP
T
FIELD LOOP WATER SUPPLY TEMP x x x FIELD LOOP WATER RETURN TEMP x x x
BUILDING LOOP WATER DIFFERENTIAL PRESSURE x xx
LOW BUILDING LOOP WATER DIFFERENTIAL PRESSURE x
HIGH FIELD LOOP WATER SUPPLY TEMP SHUTDOWN x HIGH FIELD LOOP WATER SUPPLY TEMP x
LOW FIELD LOOP WATER SUPPLY TEMP SHUTDOWN
LOW FIELD LOOP WATER SUPPLY TEMP x x
VFDS SHALL RUN AT CONSTANT
SPEED WHEN BYPASS VALVE IS
FULLY OPEN TO THE FIELD. VFDS
SHALL MODULATE AS INDICATED
BELOW AS THE BYPASS VALVE
OPENS/CLOSES.
GTS/R HORIZONTAL BORE
FLOW DIRECTION
PIPE REDUCER
3" SUPPLY AND RETURN HEADERS
CONNECTED TO EXISTING PVC WELL PIPING
300'
2" GTS/R HEADER (PER HEADER)
1" U-TUBE (TYP)
2" GTS/R
1-1/4" GTS/R
HEADERS JOINED
IN VAULT
1-1/2" GTS/R
COMPACT
TRENCH FLOOR
PER SPEC
SECTION 23 8144
'-0
" M
IN
IM
U
M A
N D
D
EE
PE
R
A S
R
EQ
U
IR
ED
T
O A
D
EQ
U
AT
EL
Y
C
LE
AR
F
IE
LD
U
TI
LI
TI
ES
5'-0" 5'-0" 15 '-0
10'-0"
(SECTION A-A DETAIL)
PRESSURE/TEMPERATURE PORT (TYP)
2" HDPE CIRCUIT PIPE (TYP)
SLEEVE W/LINK SEAL (TYP)
2" ISOLATION VALVE (TYP)
3" HDPE MAIN (TYP)
REINFORCEMENT ROD - 1/2" @ 12" SPACING
RUBBERIZED STEEL WALL LINER & STAINLESS FLOOR - 12GA
CONCRETE WALL - 8" REINFORCED CONCRETE (4000 PSI)
WALL LINER BRACE - 3" X 3" X 1/4" ANGLE IRON
STEEL FRAME VAULT BASE - 3" X 8" X 1/4" SQ TUBING
MANHOLE - 1/4" STEEL WALL
ACCESS LADDER 1 1/4" SQ TUBING
CEILING AND WALL LINER BRACE
3" X 3" X 1/4" ANGLE IRON
CEILING - 8" REINFORCED CONCRETE
1/2" CONDUIT
TO SUMP
2" BALANCING VALVE (TYP)
2" BRASS UNION (TYP)
A A
3" MAIN W/4 CIRCUITS
(OUTSIDE DIMENSIONS)
3" VALVED MAIN (TYP)
2" FILL PORT (TYP)
(SECTION B-B DETAIL)
30" 12" 10"
8"
15"
50"
18"
STEEL SLEEVE
W/ LINK SEALS
B
(OUTSIDE DIMENSIONS)
RUBBERIZED STEEL CEILING LINER - 12
GA STEEL
REINFORCEMENT ROD - #6 REBAR @
12" ON CENTER
MANHOLE REINFORCEMENT - 3"
X 3" X 1/4" ANGLE IRON
LADDER STEP (TYP) #6 REBAR @ 12"
SPACING
MANHOLE COVER - 1/4"
TREADPLATE WITH 3" X 3" X 1/4"
ANGLE IRON REINFORCEMENT
1/2" CONTROLS CONDUIT
LADDER
GTS
GTR
GTS
GTR
SUMP DISCHARGE
TO GRADE. ROUTE
TO CREEK AS
SHOWN ON PLAN.
PRESSURE/TEMPERATURE PORT (TYP)
PRESSURE
IND. (TYP)
TEMPERATURE
IND. (TYP)
SUMP PIT W/ PUMP
8'-0"
4"
8" 2' -2
1'
-4
1' -6
6' -1
1"
6' -9
2' -9
2'
-6
14" X 14" X 15" STAINLESS SUMP PIT W/ LITTLE
GIANT SUMP MODEL 6 CIA-RFS PROVIDED (OR
ENGINEER PRE-APPROVED EQUIVALENT).
PROVIDE CONTROL PANEL WITH DRY CONTACT
FOR CONNECTION BY CONTROL CONTRACTOR
FOR ON/OFF STATUS AND HIGH-LEVEL ALARM.
ELECTRICAL BOX FOR OUTLET
PROVIDED BUT NOT WIRED
(ELECTRICIAN IS RESPONSIBLE)
ELECTRICAL BOX FOR LIGHT
SWITCH PROVIDED BUT NOT WIRED
(ELECTRICIAN IS RESPONSIBLE)
ELECTRICAL BOX FOR LIGHT
PROVIDED BUT NOT WIRED
(ELECTRICIAN IS RESPONSIBLE)
ISOLATION VALVE (TYP)
2" FIELD FLUSH
AND FILL VALVES
PUMPS
AIR SEPARATOR
EXPANSION TANK
GLYCOL FEEDER
M
MOTORIZED
THREE-WAY FIELD
BYPASS VALVE
INSTALL
PRESSURE
DIFFERENTIAL
SENSOR (REFER
TO PLAN FOR
LOCATION)
2" BUILDING FLUSH
AND FILL VALVES
EXTERIORINTERIOR
TO/FROM
GEOTHERMAL
FIELD
TO/FROM
BUILDING HEAT
PUMPS
BI - SUMP PUMP STATUS
POINT NAME AI AO BI BO AV BV TREND ALARM SHOW ON
GRAPHIC NOTES
POINTS LIST - SUMP PUMP
SUMP PUMP STATUS x x
HIGH LEVEL ALARM
HIGH LEVEL ALARM
x
A
SEAL
B C D E F HG
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
D
AT
E
FI
EL
D
PR
O
JE
C
T
Pr in te d: M102
CO
NT
RO
LS
A
ND
DE
TA
IL
S
TA
B
M
SJ
BI
D
DO
CU
M
EN
TS
/0
8/
.0
- D O
C
CB
C
DI
ST
RI
CT
M
AR
SH
AL
LT
O
W N
G
EO
TH
ER
M
AL
S
YS
TE
M
RE
PL
AC
EM
EN
T
DE
PA
RT
M
EN
T
O F
CO
RR
EC
TI
O
NS
R
ES
ID
EN
TI
AL
F
AC
IL
IT
Y
S
7T
H
AV
E, \\s h.
sh ive
-h at te ry
.c om
\d at a\ Pr oj ec ts
\IC
\2
0\ de liv er ab le s\
Dr aw in gs
\5 _M ec ha ni ca l\M
1.
dw g 2/
8/
:0 1:
P
M
M
AR
SH
AL
LT
O
W N, IA
GEO VAULT DETAILS
N.T.S.5
HORIZONTAL LOOP FIELD SECTION - 2 TIER
N.T.S.2
HORIZONTAL BORE LAYOUT
N.T.S.3
GEOTHERMAL FLOW DIAGRAM
N.T.S.4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg ../1_Civil/Title Blocks/30x42/SH - 30x42 Sheet Title Block Text.dwg
| G000 COVER SHEET.pdf |
| M100 SITE PLAN.pdf |
| M101 MECHANICAL FLOOR PLANS, DETAILS, AND SCHEDULES.pdf |
| M102 CONTROLS AND DETAILS.pdf |
| E101 FLOOR PLANS DETAILS AND SCHEDULES.pdf |
File details come from the government source that posted it. Updated .