Revised Exhibit 5 - Specifications.docx
DOCX document 67 KB Posted
- Attached to
- Manning MS Station Roof replacement
- Solicitation number
- S-73000-00017781
- Issued by
- Oregon
About this file
Manning MS Station Roof Replacement - Revised Exhibit 5 Specifications
This is a specifications document for the Manning MS Station Roof Replacement project in Oregon. The project involves the complete removal of the existing metal roof, insulation barrier, and gutters, followed by the installation of new insulated metal roof panels and gutters. The specifications detail the materials, workmanship standards, and technical requirements necessary for successful completion of the roof replacement. The document establishes quality benchmarks and installation procedures that contractors must follow to meet the project requirements. All work must comply with applicable building codes, manufacturer specifications, and industry standards for roofing installations.
The specifications include detailed material requirements for the metal roof panels, insulation systems, fastening hardware, flashing, and gutter systems. Contractors are required to follow manufacturer installation guidelines and use materials that meet specified performance standards for weather resistance, structural integrity, and durability. The document likely addresses site preparation, waste removal procedures, weather-related work stoppages, and final inspection and acceptance criteria. These specifications serve as binding requirements for all bidders and establish the baseline expectations for workmanship quality and material performance throughout the project execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017781_Addendum One.docx | DOCX document | |
| 00017781_Invitation to Bid draft.docx | DOCX document | |
| Revised Exhibit 7 - Statement of Work.doc | DOC document | |
| Exhibit 6 - Plans~11.pdf | ||
| Attachment B - Sample Contract~18.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Manning Maintenance Station Enclosed Storage Building Roof Replacement
Manning Maintenance Station Enclosed Storage Building Roof Replacement 48400 NW Sunset Hwy Banks 97106 Oregon Department of Transportation 885 Airport Rd SE Bldg X Salem, Or 97301-4790
F4340310 24 July 2026
SPECIFICATIONS GROUP
DIVISION 01 GENERAL REQUIREMENTS
011000 SUMMARY
012500 SUBSTITION PROCEDURES
013100 PROJECT MANAGEMENT AND COORDINATON
013300 SUBMITTAL PROCEDURES
015000 TEMPORARY FACILITIES AND CONTROLS
017300 EXECUTION
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017700 CLOSEOUT PROCEDURES
017839 PROJECT RECORD DOCUMENTS
DIVISION 02 EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
DIVISION 07 THERMAL AND MOISTURE PROTECTION
074116 - INSULATED METAL ROOF PANELS
077123 EXTRUDED GUTTERS AND DOWNSPOUTS
SECTION 011000 - SUMMARY
GENERAL
SUMMARY
Section Includes:
Project information.
Work covered by Contract Documents.
Time of commencement and completion.
Contractor's use of site and premises.
Excessive noise.
Coordination with occupants.
Work restrictions.
Specification and Drawing conventions.
Related Requirements:
Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
PROJECT INFORMATION
Project Identification: Boswell Springs Maintenance Station Closed Storage Roof Replacement.
Project Location: 48400 NW Sunset Hwy., Banks 97106 Owner: Oregon Department of Transportation, 885 Airport Rd SE Bldg X, Salem, Oregon.
Construction Project Manager (CPM): Oregon Department of Transportation, 885 Airport Rd SE, Bldg. X, Salem, Oregon, 97301.
CPM: Austin VAN_NETTE, Austin VAN_NETTE@odot.oregon.gov, 503.507.1394.
WORK COVERED BY CONTRACT DOCUMENTS
The Work of Project is defined by the Contract Documents and consists of the following:
Project consists of removal of existing metal roofing and insulation. Installation of new insulated metal roofing panels, and gutters.
Contractor shall provide related accessories such as fasteners ridge cap and eave trim as required for a complete installation.
TIME OF COMMENCEMENT AND COMPLETION
Notice to proceed: A written notice to proceed will be provided by ODOT to the Contractor as indicated in the invitation to bid. The Contractor shall begin the work upon receipt of the notice to proceed. Notwithstanding any other provision of the contract the Owner shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed, whether or not the Owner has knowledge of the furnishing of work.
Prior to beginning any roofing work the contractor shall provide a complete visual inspection of the roof and report any deficiencies not covered in the contract documents to the CPM.
CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS
Contractor shall be supplied electronically, with one set of full-size drawings, half size reduced drawings and specifications. At least one complete set of contract documents, including one full-size set of drawings shall be kept at the site of construction in good condition, and at all times available to the CPM.
PERMITS AND FEES
It shall be the responsibility of the contractor to submit for, obtain, and pay for the Coos County Building Department permit.
CONTRACTOR'S USE OF SITE AND PREMISES
Construction Operating Hours: Operating hours shall be limited to 0700 to 1700 Monday through Friday. Deviations from noted hours shall be with approval by CPM.
Limits on Use of Site: Contractors lay down/staging area will be coordinated through CPM. Do not disturb portions of Project site beyond areas in which the Work is indicated.
Driveways, Walkways, Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
EXCESSIVE NOISE
All equipment shall have muffling devices in good working order at all times. Equipment not so equipped will be removed from site.
Cooperate with Owner in locating high noise producing equipment in areas least offensive and/or provide sound enclosure or shielding to dampen sound.
Playing of loud music or similar noise will not be allowed at the work site.
WORK RESTRICTIONS
Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
Notify CPM not less than two days in advance of proposed utility interruptions.
Obtain CPM permission in writing before proceeding with utility interruptions.
Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.
Notify CPM not less than two days in advance of proposed disruptive operations.
Obtain CPM written permission before proceeding with disruptive operations.
Smoking and Controlled Substance Restrictions: Use of tobacco products , alcoholic beverages, and other controlled substances on Project site is not permitted.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION 01100
SECTION 012500 - SUBSTITUTION PROCEDURES
1. Substitution Requests.
a. Substitution requests shall be made only by the General Contractor
b. Substitution Requests shall be submitted to the Purchaser identified in Oregon Buys.
c. Substitution requests shall be allowed only during bidding process.
d. Substitution requests shall be submitted to the Purchaser within the timeline specified in the Invitation to Bid.
e. PCS will request additional information or issue acceptance or rejection within two days.
f. Documentation:
1) Justification.
2) Coordination information.
3) Detailed comparison.
4) Product Data.
5) Samples.
6) Certificates and qualification data.
7) List of similar installations.
8) Material test reports.
9) Research reports.
10) Detailed comparison of Contractor's construction schedule.
11) Cost information.
2. SUBSTITUTIONS
a. Substitutions for Convenience: Not allowed.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION 012500
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
GENERAL
SUMMARY
Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
Description General coordination procedures.
Coordination drawings.
Requests for Information (RFI's).
Project meetings.
Terms
DESCRIPTION
The Contractor shall coordinate with the CPM during the duration of the project.
The Contractor will be responsible for keeping the CPM informed of all activity throughout the project identified in this Contract.
GENERAL COORDINATION PROCEDURES
Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.
Coordinate delivery and storage of metal roof panels with CPM.
Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
Make adequate provisions to accommodate items scheduled for later installation.
Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
Preparation of Contractor's construction schedule.
Preparation of the schedule of values.
Installation and removal of temporary facilities and controls.
Delivery and processing of submittals.
Progress meetings.
Preinstallation conferences.
Project closeout activities.
QUALITY ASSURANCE
Throughout the progress of the work, the Contractor shall provide all necessary personnel thoroughly familiar with the Specifications and Drawings, completely trained and experienced in the necessary skills, who shall be present at the site and direct all work performed.
Conditions of Surfaces: Surfaces previously prepared or installed by another trade shall be inspected carefully before applying subsequent materials or finishes. If an unsatisfactory condition to that finish exists, notify the General Contractor and CPM in writing immediately. Otherwise assume full responsibility for resulting appearance, condition and acceptance of finished surfaces.
Covering Up: No Contractor or Subcontractor shall cover up work or conceal work of other Contractor/Subcontractor until same has been inspected and/or approved.
REQUEST FOR INFORMATION (RFI)
General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
CPM will return without response those RFIs submitted by other entities controlled by Contractor.
Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
Owner name.
Project Name Name of CPM.
Date.
Name of Contractor.
RFI number, numbered sequentially.
RFI subject.
Specification Section number and title and related paragraphs, as appropriate.
Drawing number and detail references, as appropriate.
Field dimensions and conditions, as appropriate.
Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state schedule and cost impact in the RFI.
Contractor's signature.
Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
RFI Forms: Electronic format containing information as noted above. Software-generated form with substantially the same content as indicated above, acceptable to the CPM.
RFI's will be reviewed to determine action required, and response. Allow five days for CPM response to each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.
The following Contractor-generated RFIs will be returned without action:
Requests for approval of submittals.
Requests for approval of substitutions.
Requests for approval of Contractor's means and methods.
Requests for coordination information already indicated in the Contract Documents.
Requests for adjustments in the Contract Time or the Contract Sum.
Requests for interpretation of review actions on submittals.
Incomplete RFIs or inaccurately prepared RFIs.
CPM's action may include a request for additional information, in which case CPM's time for response will date from time of receipt.
CPM's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal in accordance with General Provisions.
If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify CPM in writing within three days of receipt of the RFI response.
PROJECT MEETINGS
General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.
Preconstruction Meeting: A preconstruction meeting, before starting construction, at a time convenient to Owner and CPM, but no later than five business days following NTP.
Attendees: Authorized representatives of Owner and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
Agenda: Discuss items of significance that could affect progress, including the following:
Responsibilities and personnel assignments.
Tentative construction schedule.
Coordination between Contractor and CPM.
Critical work sequencing and long lead items.
Designation of key personnel and their duties.
Lines of communications.
Procedures for processing field decisions and Change Orders.
Procedures for RFIs.
Procedures for processing Applications for Payment.
Distribution of the Contract Documents.
Submittal procedures.
Preparation of Record Documents.
Use of the premises.
Work restrictions.
Working hours.
Owner's occupancy requirements.
Responsibility for temporary facilities and controls.
Construction waste management and recycling.
Parking availability.
Office, work, and storage areas.
Equipment deliveries and priorities.
First aid.
Security.
Progress cleaning.
Minutes: Contractor shall record and distribute meeting minutes.
Progress Meetings: Conduct progress meetings as directed by CPM .
Attendees: In addition to representatives of Owner , each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
TERMS
"APPROVED" as used herein means "approved by the ODOT CPM.
'FOR APPROVAL" means "for the CPM approval."
"SELECTED" means "selected by the CPM."
"PROVIDE" means "furnish and install."
Where words "or approved" ae used, Construction Project Manager is sole judge of quality and suitability of proposed alternate or substitution.
"CONSTRUCTION PROJECT MANAGER" (CPM) refers to the individual selected by ODOT to manage the project.
"Project Coordination" refers to the on-site individual (if) selected by ODOT to be the local liaison the contractor.
"INSTALL" means "furnish and install."
Items noted as "N.I.C." are "Not in Contract" and will be furnished and installed by Owner or others.
PRODUCTS (Not Used)
END OF SECTION 013100
SECTION 013300 - SUBMITTAL PROCEDURES
SUMMARY
Section Includes:
Submittal schedule requirements.
Administrative and procedural requirements for submittals.
DEFINITIONS
Action Submittals: Written and graphic information and physical samples that requires responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."
Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."
SUBMITTAL SCHEDULE
Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by CPM and additional time for handling and reviewing submittals required by those corrections.
SUBMITTAL FORMATS
Submittal Information: Include the following information in each submittal:
Project name.
Date.
Name of Contractor.
Names of subcontractor, manufacturer, and supplier.
Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.
Number and title of Specification Section, with paragraph number and generic name for each of multiple items.
Drawing number and detail references, as appropriate.
Indication of full or partial submittal.
Signature of transmitter.
Options: Identify options requiring selection by CPM.
Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by CPM on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.
Submittals shall be electronic.
SUBMITTAL PROCEDURES
Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.
Email: Prepare submittals as PDF package, and transmit to CPM by sending via email. Include PDF transmittal form. Include information in email subject line as requested by CPM.
Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.
Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.
Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
Resubmittal Review: Allow 10 days for review of each resubmittal.
Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.
SUBMITTAL REQUIREMENTS
Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.
Mark each copy of each submittal to show which products and options are applicable.
Include the following information, as applicable:
Manufacturer's catalog cuts.
Manufacturer's product specifications.
Standard color charts.
Statement of compliance with specified referenced standards.
Testing by recognized testing agency.
Application of testing agency labels and seals.
Notation of coordination requirements.
Availability and delivery time information.
For equipment, include the following in addition to the above, as applicable:
Wiring diagrams that show factory-installed wiring.
Printed performance curves.
Operational range diagrams.
Clearances required to other construction, if not indicated on accompanying Shop Drawings.
Submit Product Data before Shop Drawings, and before or concurrent with Samples.
Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
Identification of products.
Schedules.
Compliance with specified standards.
Notation of coordination requirements.
Notation of dimensions established by field measurement.
Relationship and attachment to adjoining construction clearly indicated.
Seal and signature of professional engineer if specified.
CONTRACTOR'S REVIEW
Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CPM.
Contractor's Approval: Indicate Contractor's approval for each submittal with contractors approval stamp . Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
CPM will not review submittals received from Contractor that do not have Contractor's review and approval.
ODOT REVIEW
Action Submittals: CPM will review each submittal, indicate corrections or revisions required.
PDF Submittals: CPM will indicate, via markup on each submittal, the appropriate action as follows:
Submittals will be returned marked Approved, Approved as Noted, Revise and Resubmit. Incomplete submittals will be marked Rejected and not reviewed.
Informational Submittals: CPM will review each submittal and will not return it, or will return it if it does not comply with requirements. CPM will forward each submittal to appropriate party.
Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from CPM.
Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.
Submittals received from sources other than Contractor will be returned without review.
Submittals not required by the Contract Documents will be returned by CPM without action.
PRODUCTS (Not Used)
END OF SECTION 013300
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
USE CHARGES
Water Service: Available from existing system without charge.
Electric Power Service: Available from existing system without charge.
TEMPORARY FACILITIES
Field office as required by contractor.
EQUIPMENT
Fire extinguishers.
TEMPORARY UTILITY INSTALLATION
Sanitary Facilities: Provide temporary toilets and wash facilities for all workers and inspectors.
Electric Power Service: Provide suitable construction grade extension cords as required to connect to existing facilities.
Lighting: Provide temporary lighting as required.
SECURITY AND PROTECTION FACILITIES INSTALLATION
Provide security fencing around staging and materials storage area at contractor's option.
END OF SECTION 015000
SECTION 017300 - EXECUTION
SUMMARY
Section includes general administrative and procedural requirements governing execution of the Work, including, but not limited to, the following:
Construction layout.
Installation of the Work.
Cutting and patching.
Progress cleaning.
Protection of installed construction.
Correction of the Work.
DEFINITIONS
Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.
QUALITY ASSURANCE
Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.
Structural Elements: Do not cut structural elements.
Existing Elements: Neatly cut existing insulation and install new insulation materials in a neat manner.
PRODUCTS
MATERIALS
Comply with requirements specified in other Sections.
Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
EXECUTION
EXAMINATION
Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
PREPARATION
Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CPM in accordance with requirements in Section 013100 "Project Management and Coordination."
CONSTRUCTION LAYOUT
Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings.
INSTALLATION
Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
Comply with manufacturers’ written instructions and recommendations for installing products in applications indicated.
Install products at the time and under conditions that will ensure satisfactory results as judged by CPM. Maintain conditions required for product performance until Substantial Completion.
Coordinate construction operations with CPM to assure minimal impacts on continuing operations.
Sequence the Work and allow adequate clearances to accommodate movement of construction items on-site and placement in permanent locations.
Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels.
PROGRESS CLEANING
Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.
Site: Maintain Project site free of waste materials and debris.
Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work.
Remove liquid spills promptly.
Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.
Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways.
During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
PROTECTION OF INSTALLED CONSTRUCTION
Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by construction are maintained in condition that existed at commencement of the Work.
Comply with manufacturer's written instructions for temperature and relative humidity.
CORRECTION OF THE WORK
Repair or remove and replace damaged, defective, or nonconforming Work. Restore damaged substrates and finishes.
Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
Repair Work previously completed and subsequently damaged during construction period. Repair to like-new condition.
Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
END OF SECTION 017300
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SUMMARY
Section includes administrative and procedural requirements for the following:
Disposing of nonhazardous demolition and construction and waste.
DEFINITIONS
Construction Waste: Building, structure, and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
Follow CPM direction for disposal or on site storage of ODOT supplied metal panels not required for this project..
Disposal: Removal of demolition or construction waste and subsequent salvage, sale, recycling, or deposit in a landfill.
PRODUCTS
NOT USED
EXECUTION
IMPLEMENTATION
Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.
DISPOSAL OF WASTE
General: Except for items or materials to be salvaged or recycled, remove waste materials from Project site and legally dispose of them off site.
Do not allow waste materials that are to be disposed of accumulate on-site.
Coordinate disposal of excess metal panels with CPM.
Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
Burning: Do not burn waste materials.
END OF SECTION 017419
SECTION 017700 - CLOSEOUT PROCEDURES
SUMMARY
Section includes administrative and procedural requirements for Contract closeout, including, but not limited to, the following:
Substantial Completion procedures.
Final completion procedures.
Warranties.
Final cleaning.
Related Requirements:
Section 017839 "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.
CLOSEOUT SUBMITTALS
Certificates of Release: From authorities having jurisdiction.
SUBSTANTIAL COMPLETION PROCEDURES
Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's "punch list"), indicating the value of each item on the list and reasons why the Work is incomplete.
Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.
Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.
Complete final cleaning requirements.
Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual defects.
PRODUCTS
MATERIALS
Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
EXECUTION
FINAL CLEANING
Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
Cleaning: Employ experienced workers for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project:
Clean Project site of rubbish, waste material, litter, and other foreign substances.
Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
Leave Project clean and ready for occupancy.
REPAIR OF THE WORK
Complete repair and restoration operations required by Section 017300 "Execution" before requesting inspection for determination of Substantial Completion.
END OF SECTION 017700
SECTION 017839 - PROJECT RECORD DOCUMENTS
GENERAL
SUMMARY
Section includes administrative and procedural requirements for Project Record Documents, including the following:
As-built Drawings.
CLOSEOUT SUBMITTALS
As-built Drawings: Comply with the following:
Number of Copies: Submit one copy of Contractors As-built Drawings .
Submit copies of As-built Drawings as follows:
Initial Submittal:
Submit one paper-copy of updated As-built Drawings.
PRODUCTS (Not Used)
END OF SECTION 017839
SECTION 024119 - SELECTIVE DEMOLITION
SUMMARY
Section Includes:
Demolition and removal of selected portions of building or structure.
Salvage of existing items to be reused or recycled.
MATERIALS OWNERSHIP
Unless otherwise indicated, demolition waste becomes property of Contractor.
PREINSTALLATION MEETINGS
Pre-demolition Conference: Conduct conference at Project site.
FIELD CONDITIONS
Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
Notify CPM of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
Storage or sale of removed items or materials on-site is not permitted.
Arrange selective demolition schedule so as not to interfere with Owner's operations.
PRODUCTS
Not used.
EXECUTION
EXAMINATION
Verify that existing loose materials have been removed prior to starting work.
SELECTIVE DEMOLITION
General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.
Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
Dispose of demolished items and materials promptly.
Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
Removed and Reinstalled Items:
Clean and repair items to functional condition adequate for intended reuse.
Protect items from damage during transport and storage.
Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
CLEANING
Remove demolition waste materials from Project site Do not allow demolished materials to accumulate on-site.
Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
Burning: Do not burn demolished materials.
Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
SECTION 074116 - INSULATED METAL ROOF PANELS
SUMMARY
Steel faced, polyisocyanurate foamed-in-place insulated metal roof panels.
Accessories including fasteners, perimeter trim and penetration treatments, gutters, downspouts and other materials for a complete installation.
REFERENCES
American Architectural Manufacturers Association (AAMA):
AAMA 501.2: Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems.
American Society of Civil Engineers (ASCE):
ASCE 7: Minimum Design Loads for Buildings and Other Structures.
ASTM International: Am inclined to take all of this in Section C out as we are calling for a specific manufacturer with their performance standards.
ASTM A653: Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
ASTM A755: Standard Specification for Steel Sheet, Metallic Coated by the Hot-Dip Process and Pre-painted by the Coil-Coating Process for Exterior Exposed Building Products.
ASTM C273: Standard Test Method for Shear Properties of Sandwich Core Materials.
ASTM C518: Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus.
ASTM D1621: Standard Test Method for Compressive Properties of Rigid Cellular Plastics.
ASTM D1622: Standard Test Method for Apparent Density of Rigid Cellular Plastics.
ASTM D1623: Standard Test Method for Tensile and Tensile Adhesion Properties of Rigid Cellular Plastics.
ASTM D1929: Standard Test Method for Determining Ignition Temperature of Plastics.
ASTM D6226: Standard Test Method for Open Cell Content of Rigid Cellular Plastics.
ASTM E72; Standard Test Methods of Conducting Strength Tests of Panels for Building Construction.
ASTM E84; Standard Test Method for Surface Burning Characteristics of Building Materials.
ASTM E283: Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.
ASTM E1646; Standard Test Method for Water Penetration of Exterior Metal Roof Panel Systems by Uniform Static Air Pressure Difference.
ASTM E1680; Standard Test Method for Rate of Air Leakage Through Exterior Metal Roof Panel Systems.
ASTM G153; Standard Practice for Operating Enclosed Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials.
ASTM G154; Standard Practice for Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials.
Underwriters Laboratories: Would leave what is currently items D, E and F in the spec.
UL 580; Tests for Uplift Resistance of Roof Assemblies.
International Building Code (IBC): current edition.
Factory Mutual:
FM 4880 Class 1 Fire Rating of Insulated Roof Panels.
FM 4471; Approval Standard for Class 1 Panel Roofs.
ACTION SUBMITTALS
Product Data: For each type of product.
Shop Drawings: Include fabrication and installation layouts of metal panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories; and special details.
Panel Analysis: Provide panel calculations to verify panels will withstand the design wind loads indicated without detrimental effects or deflection exceeding L/240. Include effects of thermal differential between the exterior and interior panel facings and resistance to fastener pullout.
Samples: For each type of metal panel indicated.
Quality Assurance Submittals:
Design Data, Test Reports: Provide manufacturer test reports indicating product compliance with requirements.
Manufacturer Erection Instructions: Provide manufacturer’s written installation instructions including proper material storage, material handling, installation sequence, panel location(s), and attachment methods, details and required trim and accessories.
ADMINISTRATIVE REQUIREMENTS
Pre-installation meeting: Conduct a pre-installation meeting at the job site attended by CPM, Manufacturer’s Technical Representative needed???, Panel Installer, and Contractors of related trades. Coordinate structural support requirements in relation to insulated roof panel system, installation of any separate air/water barriers, treatment of fenestration, and other requirements specific to the project.
CLOSEOUT SUBMITTALS
Maintenance data.
QUALITY ASSURANCE
Manufacturer Qualifications:
Manufacturer shall have a minimum of five (5) years experience in the production of insulated metal standing seam roof panels. Manufacturer shall demonstrate past experience with examples of projects of similar type and exposure.
Installer Qualifications:
Installer shall be authorized by the panel manufacturer and the work shall be supervised by a person having a minimum of five (5) years experience installing insulated metal standing seam roof panels on similar type and size projects. Installer shall provide a letter, with current date, from the manufacturer stating their acceptance of installer.
Installation shall be in accordance with manufacturer’s installation guidelines and recommendations.
DELIVERY, STORAGE AND HANDLING
Deliver panel materials and components in manufacturer's original, unopened, undamaged packaging with identification labels intact.
Store roof panels on dry, level, firm and clean surface. Stack no more than two bundles high. Elevate one end of bundle to allow moisture run-off, cover and ventilate to allow air to circulate and moisture to escape.
WARRANTY
Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal panel systems that fail in materials or workmanship within specified warranty period.
Warranty Period: Two years from date of Substantial Completion.
Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.
Finish Warranty Period: 20 years from date of Substantial Completion.
PRODUCTS
MANUFACTURER
Basis of Design: Kingspan KingSeam roof panels.
Kingspan Insulated Panels, Inc., 726 Summerhill Drive, Deland, FL 32724 (888-882-5862); 2000 Morgan Road, Modesto, CA 95358 (800-377-5110) (www.kingspanpanels.us).
Alternates: As approved by CPM. Manufacturers of products meeting product specifications will be considered.
STANDING SEAM ROOF PANELS
Design Criteria – Roof Panels:
Uplift Rating:
Design Uplift Load: 34.3 psf - Zone 1, 45.3 psf - Zone 2, and 61.7 psf - Zone 3 per ASCE 7.
Design criteria shall be L/240 for roof.
Units shall be rated and carry the following listings:
Factory Mutual 1-60 uplift rating for 5 foot spans with minimum 16 gauge purlins.
Factory Mutual 4471 – Class 1 Approval.
Fire Classifications:
Factory Mutual Class 1A Approval when installed at a maximum roof slope of 5:12. Not sure this really applies. Remove??
Panel Assembly Description:
Panel thickness: 5 inches thick. If there is a desired R-value check this dimension or just state an R-value.
Panel width: 40 inches.
Panel length: As indicated on drawings.
The side joint shall consist of a 2 inch vertical sidelap, mechanically seamed, with fasteners and attachment clip completely concealed within the side joint.
Exterior Face of Panel:
Material: AZ50/Galvalume/Zincalume per ASTM A 792. Minimum Grade 33.
Texture: Smooth (non-embossed).
Gauge: 24 gauge.
Exterior Finish: PVDF finish, dry film thickness of 1.0 mil including primer.
Color: Selected from current manufacturers Insulated Panels standard color chart.
Interior Face of Panel:
Material: AZ35/Galvalume/Zincalume per ASTM A792 minimum Grade 33.
Texture: Smooth (non-embossed).
Gauge: 24 gauge.
Interior Finish: PVDF finish, dry film thickness of 1.0 mil including primer.
Color: White.
Insulating Core: Minimum 95 percent closed cell structure (per ASTM D6226) urethane modified isocyanurate core with the following minimum physical properties:
Density Nominal: 2.1-2.5 pcf per ASTM D1622.
Shear Strength: 28-32 psi per ASTM C273.
Compressive Strength: 25 psi per ASTM D1621.
Dimensional Stability: 28 day aged (ASTM D 2126) -20 degree F < 1% chg, dry heat 200 degree F < 1% chg, Humid Heat 158 degree F.
Surface burning characteristics when tested in accordance with ASTM E84:
Surface burning characteristics when tested in accordance with ASTM E84:
Flame Spread: less than 25.
Smoke Developed: less than 450 I think all of this could be removed and just say Insulating Core: Manufacturers standard foam core insulation system.
ACCESSORIES
Fasteners:
Self drilling fasteners shall be corrosion resistant plated steel, designed to resist maximum negative pulloff loads and hold the face sheet mechanically to the structural support.
Panel attachment clip shall be one piece and fully concealed within the panel side joint. Clip shall be a minimum 24 gauge stainless steel.
Perimeter Trim and Penetration Treatments: All required trim, gutters, downspouts and metal flashing with same coating, color, and gauge as the exterior face of the insulated metal roof panel. Edit as needed.
Butyl Tape: Per panel manufacturer’s recommendations for panel to panel and panel to trim seal.
Butyl Sealants: Non-skinning type per panels manufacturer’s recommendations.
FABRICATION
General: Fabricate and finish metal panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.
Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.
Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's recommendations and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated.
EXECUTION
EXAMINATION
Contractor shall inspect existing structure and support prior to installing the insulated metal roof panels. Report any concerns and findings to the Construction Project Manager prior to construction.
Structure Tolerance: In the plane of the roof 0 inches inward, plus 3/16 inch outward.
All deviations from structural tolerances shall be corrected by the responsible party prior to installation of the panels. Not at all sure this will happen. Suggest removing 1 and 2.
Examine individual panels upon removing from the bundle; both edges should be visually examined and any slight overfill of insulation should be carefully removed.
PREPARATION
Remove protective film before installation, or immediately thereafter to prevent sunlight damage.
Cut panels, where indicated on shop drawings, using a power circular saw with fine tooth carbide tip blades or a band saw prior to installation. Ventilate area where polyurethane dust is generated. Personnel should wear respiratory and eye protection devices.
METAL PANEL INSTALLATION
Lap-Seam, Foamed-Insulation-Core Metal Roof Panels: Fasten insulated metal roof panels to supports with fasteners at each lapped joint at location and spacing recommended by manufacturer.
Apply butyl sealant vapor seal around interior perimeter of roof assembly per panel manufacturer’s instructions.
Apply butyl tape on panel sidelaps and clip assemblies per panel manufacturer’s instructions.
Secure units to the steel supports with manufacturer’s recommended fastener.
Standing-Seam, Foamed-Insulation-Core Metal Roof Panels: Fasten insulated metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended in writing by manufacturer.
Install clips to supports with self-tapping fasteners.
Place panel fasteners through predrilled top clip and base clip, concealed within the side joint of the panel.
Heads of concealed fasteners shall be insulated from the exterior environment to prevent condensation and “ice balling” from occurring on the fastener shaft.
Endlap panel stitch fasteners to be vibration resistant type.
As each panel is installed, crimp hidden clip assembly prior to placement of next panel.
Seamed Joint: Crimp standing seams with manufacturer-approved, motorized seamer tool so cleat, insulated metal roof panel, and factory-applied side-lap sealant are completely engaged.
Accessory Installation: Install accessories with positive anchorage to building and weathertight mounting, and provide for thermal expansion. Coordinate installation with flashings and other components.
TRIM INSTALLATION
Flashing and Trim: Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level. Install work with laps, joints, and seams that are permanently watertight and weather resistant.
Place trim to determine the location of the closure strips, sealant and ridge closure trims.
Apply butyl tape above and below the foam closure strip and seat the closure strip firmly in the tape to ensure a continuous seal. If any voids exist add butyl caulking and reseat the closure.
Fasten the exterior ridge trim to the metal ridge closure trims, per manufacturer’s recommendations, on center with 1/4 inch by 7/8 inch low profile vibration resistant stitch fasteners.
SEALANT INSTALLATION FOR EXPOSED JOINTS AT ROOF PANELS
Clean and prime surfaces to receive exterior exposed sealants in accordance with sealant manufacturer’s recommendations.
Follow sealant manufacturer’s recommendations for joint width-to-depth ratio, application temperature range, size and type of backer rod, and compatibility of materials for adhesion.
Direct contact between butyl and silicone sealants shall not be permitted.
CLEANING
Remove temporary protective coverings and strippable films, if any, as metal panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal panel installation, clean finished surfaces as recommended by metal panel manufacturer. Maintain in a clean condition during construction.
Touch-up, repair or replace metal panels and trim that have been damaged.
After metal roof and wall panel installation, clear weep holes and drainage channels of obstructions, dirt, and sealant.
Clean finished surfaces as recommended by metal panel manufacturer.
Repair or replace any damaged or defective panels.
END OF SECTION 074116
SECTION 077123 – Extruded Gutters and Downspouts
SECTION INCLUDES
Pre-finished aluminum gutters and downspouts.
REFERENCED STANDARDS
AAMA 611 - Voluntary Specification for Anodized Architectural Aluminum; American Architectural Manufacturers Association.
AAMA 2604 - Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels.
AAMA 2605 -…