This Request for Proposal background document is prepared by the Washington Suburban Sanitary Commission Water (WSSC Water) in Maryland for the Advanced Metering Infrastructure (AMI) Program Manager position. WSSC Water seeks a Program Manager to oversee the implementation of an Advanced Metering Infrastructure turnkey solution, which will be managed by a vendor awarded through a separate future contract. Sealed responses must be submitted via WSSC Water's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater no later than 2:00 pm on Monday, July 13, 2026, with late responses not accepted. WSSC Water will only extend the solicitation due date in cases of significant scope changes and encourages questions to be submitted early with one question per submission.
WSSC Water currently operates over 500,000 meters from multiple manufacturers including Neptune (61%), Sensus (23%), Badger (14%), and other brands (2%), read through manual methods (90% quarterly billed), drive-by Automated Meter Reading (9.5% monthly billed), and existing AMI systems (approximately 1900 residential customers and 450 schools and commercial customers, 0.5% monthly billed). The agency faces significant deployment challenges including the need for customer appointments for approximately 67% of inside meters, outdated residential customer contact information, signal transmission issues for meters without remote touchpads, and aging large meters requiring replacement and vault updates prior to AMI installation. WSSC Water operates Oracle Utilities Customer-to-Meter (C2M) software suite, which is scheduled to complete an upgrade in Fall 2026, with various system components transitioning to newer versions during this period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal: Advanced Metering Infrastructure (AMI) Program Manager
Current Metering Infrastructure - May 2026
WSSC Water has over 500,000 meters of multiple meter manufacturers, read by a mix of methods, and billed at both quarterly and monthly frequencies.
Table 1: Approximate Meter Counts by Meter Size Table 2: Approximate Meter Population by Manufacturer
Challenges facing full AMI deployment include:
• 67% of inside meters require customer appointment for AMI install
• Outdated contact information for residential customers with inside meters
• Inside meters without remote touchpad, requires AMI signal from basements and through walls
• Aging large meters needing replacement and vault update before AMI install
WSSC Water utilizes the Oracle Utilities Customer-to-Meter (C2M) suite of products, which will be completing an upgrade in Fall 2026.
Below is a table of our internal software supporting billing operations:
Software Before Upgrade After Upgrade C2M 2.6.0.1 2.9.0.1.1 ODM 2.2.0.1 Part of C2M
C2M FW 4.3.0.5 4.5.0.1.1
SOA 12.2.1.3 12.2.1.4
SOA FW PIP 12.2 PIP 12.2
Manual - 90% billed quarterly
Drive-By AMR - 9.5% billed monthly
AMI Residential ~1900 Customers
AMI Schools and Commercial
~450 Customers
AMI - 0.5%
billed monthly
WSSC Water Meter Reading Methods
Manual Drive-By AMR AMI Residential AMI Schools and Commercial
Brand % in Population Neptune 61% Badger 14% Sensus 23% All Other Brands 2%
Inside Outside Total Residential Meters (1.5” and smaller) 345,000 163,000 508,000 Commercial Meters (2” and larger in vaults) 1,800 1,900 3,700
Request for Proposal: Advanced Metering Infrastructure (AMI) Program Manager
Current Metering Infrastructure - May 2026
Software Before Upgrade After Upgrade
MWM 2.3.0.2 2.3.0.3
MWM (iPad) MWM (Legacy) MWM Plus
MWM FW 4.3.0.4
4.3.0.6