ReferenceDrawingsComplete.pdf

PDF 2 MB Posted

Attached to
Fisk Chapel Site Improvements
Solicitation number
Not on record
Issued by
Monmouth County, New Jersey

About this file

This document is a civil engineering drainage connections drawing for the Borough of Fair Haven Municipal Buildings located at 35 Fisk Street in Fair Haven, New Jersey, prepared by Frank H. Lehr Associates, Consulting Civil Engineers. The drawing, dated 01/10/2025 with prior addendums on 8/8/2023 and 8/15/2023, details the proposed drainage infrastructure for the site, including multiple structures with specific invert elevations, pipe lengths, and pipe types such as 15" HDPE, 15" RCP, 12" HDPE, and 4" pipes with varying slope percentages. The drawing includes a proposed bio-retention basin with an elevation of 21.50 and indicates that drainage work will be performed by a PD/CC contractor.

The technical drawing provides detailed topographical information, showing ground elevations, pipe inverts, and specific drainage structure characteristics across the municipal building site. The drainage plan involves multiple interconnected structures, with pipe runs ranging from 11 to 70 linear feet and utilizing different pipe materials and diameters. Specific elevation data is provided for each structure, including top of ground (T/G) and invert elevations, which will be critical for understanding the site's stormwater management approach. The drawing is part of a larger site improvement project that includes regrading along the building to manage drainage effectively.

View the file

Other files

File Type Posted
FCSI C205.pdf PDF
FCSI C208.pdf PDF
FCSI C204.pdf PDF
FCSI E-1.pdf PDF
FCSI C207.pdf PDF
FCSI C206.pdf PDF
FCSI C201.pdf PDF
FCSI C202.pdf PDF
FCSI C203.pdf PDF
FCSI C209.pdf PDF
FCSI Spec Book - Complete.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

7+

�3

(5 6+

,3 $5

,7

V

A

LL

E Y

S T

R E

E T

, S U

IT

E

, M A

P

LE

W O

O D

, N J

O F

C : 9

-7

-4

DRAWING NUMBER

THIS DRAWING IS

INCOMPLETE UNLESS

CONTRACT DOCUMENTS.

USED WITH ALL OTHER

C O

P Y

R

IG

H T

B Y

T H

E G

O L

D S

T E

IN

P

A R

T N

E R

S H

IP

A L

L R

IG

H

T S

R E

S E

R V

E D

D W

N

C K

D : B

P /M

A S

C A

LE

: A

S N

O T

E D

D A

T E

/0 1/

W

W W

.G O

L D

S T

E

IN

-A R

C H

IT

E

C T

S .C

O M

F R

A N

K H

. L E

H R

A S

S O

C

IA

T E

S , S

IT

E

C

IV

IL

E N

G

IN

E E

R S

S O

U T

H H

A R

R

IS

O N

S T

. E A

S T

O R

A N

G E

, N J

T

3)

-2

F

3)

-6

O M

D E

X , I

N C

M

E C

H A

N

IC

A L

E

LE

C

T R

IC

A

L E

N G

IN

E

E R

S

C R

O S

S A

V E

. M

ID

LA

N

D P

A R

K , N

J

T

1)

-0

F

1)

-0

A L

L A

N K

L E

IN

, P

E

S T

R U

C T

U R

A L

E N

G

IN

E E

R S

R O

U T

E

W

E S

T , M

O U

N T

A

IN

S

ID

E , N

J

O F

C : 9

-2

-8

F A

X : 9

-2

-8

L O

R

IN

G C

O N

S U

L T

IN

G

E N

G

IN

E E

R S

, T E

C H

N O

LO

G

Y C

O N

S U

LT

A

N T

S

A

LE

X

A N

D E

R P

A R

K , S

U

IT

E

, P

R

IN

C E

T O

N , N

J

T

9)

-6

F

9)

-6

N J

L

IC

E N

S E

B ri a n W

P a se ch n ic k, P E

G B

F A

IR

H

A V

E N

M U

N

IC

IP

A

L B

U

IL

D

IN

G S

B O

R O

U G

H O

F F

A

IR

H A

V E

N P

O

LI

C E

B U

IL

D

IN

G

F

IS

K

S T

R E

E T

F A

IR

H

A V

E N

, N J

8/8/2023 ADDENDUM 1

8/15/2023 ADDENDUM 2

11/20/2023 REVISION 6

01/10/2025 LOT LIGHTING

TH

E

G O

LD

ST

EI

N

P A

R

TN

ER

SH

IP

AR

C H

IT

EC

TS

STRUCTURE - (4)

T/G:23.50

INV IN: 21.11 15" HDPE

INV OUT:21.11 15" RCP

STRUCTURE - (3)

T/G:24.14

INV IN: 21.00 15" RCP

INV IN: 19.95 15" RCP

INV IN: 19.95 15" RCP

INV OUT:19.95 15" RCP

W W W W

32 LF 15" RCP@ 0.31%

53 LF 15" RCP@ 2.19%

STRUCTURE - (6)

T/G:25.87

70 LF 15" HDPE@ 1.99%

BC:23.51

TC:24.01

BC:23.80

TC:24.30

BC:24.57

TC:25.07

BC:25.34

TC:25.84

25.21

25.80

25.89

26.08

T/G:22.29

INV OUT:20.05 15" RCP

BC:23.25

TC:23.75

22.72 22.86

22.64

22.57 22.57 23.71

22.51

23.7822.63

22.3722.36

BC:23.34

TC:23.84

62 LF 6" HDPE@ 1.00%

EXIST PD CLEANOUT

T/G:22.42

INV IN: 19.00 4"

INV OUT:19.00 4"

EXIST TIEIN

T/G:22.66

INV IN: 15.60 8" PVC

INV IN: 15.60 4"

INV OUT:15.60 8" PVC

68 LF 4" @ 1.87%

25.00

25.51

24.60

25.50

24.51

27.20 27.23

22.96

22.29 23.06

22.49 23.03

22.43

22.5023.01

22.5823.15 22.97

24.26

24.93

26.96 27.19

26.97

26.96 26.92

26.98

27.25 27.11

26.8226.80

27.17 27.16

27.10

25.35

25.73

25.22

24.57

24.06

24.28

24.44

24.52

24.56

23.73

23.98

23.59

23.22

23.31

23.71

25.73 25.81

25.44 25.42

25.71 25.90

22.85

25.00

25.06 25.37

25.24 25.15

25.15

25.04

24.82

24.86 25.00

22.70 22.87

22.23

22.51

23.04

22.43 22.45

23.71 23.64

22.80

23.72 23.75

23.76

24.27

23.79

23.63

23.50

23.1823.20

23.52

23.19

45 LF 12" HDPE@ 0.44%

11 LF 12" HDPE@ 0.50%

STRUCTURE - (14)

T/G:23.57

INV OUT:22.30 12" HDPE

OUTLET- (16)

T/G:23.50

INV OUT:20.46 12" HDPE

TRENCH DRAIN

TG=24.16

INV=22.30

57' 12" DIP@ 0.52%

STRUCTURE - (16) (1) (1)

T/G:22.88

INV IN: 20.05 12"

STRUCTURE - (16) (1)

T/G:22.67

INV IN: 20.35 12" RCP

INV OUT:20.35 12"

STRUCTURE - (18)

T/G:24.20

INV IN: 20.40 12" HDPE

INV IN: 22.10 12" HDPE

INV OUT:20.40 12" RCP

11 LF 12" RCP@ 0.50%

PROPOSED

BIO RETENTION

BASIN

ELEV. 21.50

BC:23.85

BC:24.75

BC:23.95

BC:23.31BC:23.33

BC:23.27 BC:23.31

BC:22.75BC:22.78

TC:25.25

TC:24.45

22.00

REGRADE ALONG

BUILDING TO DRAIN

BO

R

O O

F

FA

IR

H

AV

EN

M U

N

IC

IP

AL

B

LD

G S

F

IS

K

ST

R

EE

T

F a ir H a ve n N e w

J e rs e y

Dr ai na ge

C on ne ct io ns fo r O ff- Si te

Pl an

SK

-3

D

R

AW

N B

Y C

H

EC

KE

D

B Y

D

AT

E

SC

AL

E

PR

O

JE

C

T N

O

SH

EE

T N

O

D

AT

E F

R A

N K

H L E

H R

A S

S O

C

IA

T E

S C

O N

S U

L T

IN

G

C

IV

IL

E

N G

IN

E

E R

S S o u th

H a rr is o n S tr e e t

E a st

O ra n g e N e w

J e rs e y

C er tif ic at e of A ut ho riz at io n

N o.

4G

A2

C

C op yr ig ht

Fr an k H

. L eh r A ss oc ia te s

A ll

R ig ht s

R es er ve d

DRAINAGE TO BE PERFORMED

BY PD/CC CONTRACTOR

File details come from the government source that posted it. Updated .