This document is a Soil Erosion and Sediment Control (SESC) Plan for the Fisk Chapel Site Improvements project located at 38 Fisk Street in Fair Haven, New Jersey, prepared by The Goldstein Partnership Architects in collaboration with Frank H. Lehr Associates (site and civil engineers). The project involves site improvements including demolition of existing gravel driveways and construction of a new paved parking lot, with a total site disturbance area of 23,956 square feet. The anticipated project timeline is estimated to begin in XXXX 2025 with an estimated completion of 6 months, involving key construction phases such as installing silt fence and inlet filters, demolishing existing site improvements, site grading, constructing a bioretention basin, underground stormwater basin, sitework (sidewalks, curbs, aprons), and parking lot pavement.

The site is located on Block 39, Lot 11 and does not lie within a flood hazard area, as confirmed by FEMA mapping. The project will implement specific soil management and seeding strategies, including topsoil preparation, fertilization, and permanent seeding using a mix of creeping red fescue and rough bluegrass. The site's soil is classified as FrrC - Freehold-Urban Land Complex with 0 to 10 percent slopes. The plan includes detailed specifications for temporary and permanent stabilization, mulching techniques, and a comprehensive sequence of construction that prioritizes soil erosion control and site restoration. The project team includes multiple engineering and consulting firms specializing in site, civil, mechanical, electrical, and structural engineering.

View the file

Other files

File Type Posted
ReferenceDrawingsComplete.pdf PDF
FCSI C205.pdf PDF
FCSI C208.pdf PDF
FCSI C204.pdf PDF
FCSI E-1.pdf PDF
FCSI C207.pdf PDF
FCSI C206.pdf PDF
FCSI C201.pdf PDF
FCSI C202.pdf PDF
FCSI C203.pdf PDF
FCSI Spec Book - Complete.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E/T/C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

O H

L O

H L

O H

L

4.

7%

W W W W W W

4''W 4''W

4''W 4''W

4''W

4''W

4''W 4''W

4''W

1.5''W 1.5''W

1.5''W 1.5''W

1.5''W

1.5''W 1.5''W

1.5''W

E/T/CE/T/CE/T/CE/T/CE/T/CE/T/C

E/ T/

C E/

T/ C

E/ T/

C E/

T/ C

E/ T/

C

E/T/CE/T/CE/T/CE/T/CE/T/CE/T/CE/T/CE/T/CE/T/CE/T/C

1+37

0+00

1+

0+00

6''W 6''W

6''W 6''W

6''W 6''W

6''W

2''W 2''W

2''W 2''W

2''W 2''W

2''W

2''W

BC:26.10

BC:26.18

BC:23.51

TC:24.01

BC:23.80

TC:24.30

BC:24.57

TC:25.07

BC:25.34

TC:25.84

BC:26.11

TC:26.61

BC:26.88

TC:27.38

BC:27.65

TC:28.15

BC:27.80

BC:28.00

BC:26.66

BC:26.61

TC:27.11

BC:26.32

FF:27.25

TC:26.32

26.41

24.98

26.69

FF:28.25

FF:28.25

FF:28.25

28.19

BC:27.50

TC:28.00

BC:26.64

BC:26.56

28.00 BC:26.80

TC:27.30

BC:22.59

TC:23.09

26.61

BC:26.56

TC:27.06

27.17

27.14

26.7226.75

26.67

26.17

26.10

24.22

BC:25.69

TC:25.83

BC:27.85

BC:27.92

BC:27.73

TC:26.56

28.18

TW:28.18

28.25

27.68

27.76

27.82

27.90

27.38

25.85

TC:26.10

TC:26.18

25.21

25.80

25.89

26.08

26.19

BC:23.75

TC:24.14

BC:24.66

TC:25.01

BC:23.25

TC:23.75

22.72 22.86

28.19

1+70

0+00

1+

22.64

24.08 23.59

23.28 23.23

23.52

23.58

22.57

24.16

BC:27.26

TC:27.76

22.57 23.71

22.51

23.7822.63

22.3722.36

INV=24.25

INV=23.25

BC:24.24

TC:24.61

BC:24.74

TC:25.13

BC:27.99

TC:27.99

28.18

26.28 26.46

27.14

27.43 27.71

28.25

28.25 28.25

28.25 28.25

28.25

TC:28.15

TC:28.23

TC:28.26

TC:28.30

28.18

28.75

27.75

27.45

27.54

BW:27.62

BW:27.60

BW:27.57

BW:28.18

TW:28.18

BC:23.34

TC:23.84

TW:28.20

TW:28.18

BW:27.59

CO

C O

CO

C O

C O

CO

C O

CO

C O

CO

CO

CO

CO

CO

25.08

CO

CO

CO

CO

SM-101

A

RADIO

CL

14 sq ft

VEST.

37 sq ft

EM

G

G

G

G AVEST.

37 sq ft

EM

G

G

G

G A

MEN'S RM.

106 sq ft

CT

G

G

G

G A

WEST

COMMUNITY ROOM

524 sq ft

R

G

G

CW

G SGA

WOMEN'S RM.

106 sq ft

CT

G

G

G

G A

VM-201

FMP-217

AL-203

VM-202

FMP-218

AL-204

LOBBY/VEST.

278 sq ft

EM/LVT

G

G

G

G A

CL.

10 sq ft

VM-206

VM-208FM-212 VM-209

FMP-213

HM-210

FMP-214

STORAGE

105 sq ft

VCT

G

G

G

G A

ELEC.

48 sq ft

TC

G

G

G

G NC

FOLDING

PARTITION

FM-211VMF-215

VMF-216

MECH.

48 sq ft

TC

G

G

G

G NC

CL.

16 sq ft

RECESSED DRINKING

FOUNTAIN & BOTTLE

FILLER (ADA)

RECESSED DRINKING

FOUNTAIN & BOTTLE

FILLER

ACCESSIBLE

WORK SPACE

(NO CABINETS

BELOW)

LADDER

LADDER

LO

C

KA

BL

E W

AL

L

M O

U N

TE

D

EQ

U

IP

C

AB

IN

ET

TR

AS

H

R

EC

YC

LI

N G

BE

LO

W

FD

FD

KITCHEN

105 sq ft

VCT

G

G

G

G A

SINK WITH

CONVERTIBLE

BASE

EAST

COMMUNITY ROOM

524 sq ft

R

G

G

CW

G SGA

JAN. CL.

VM-207

FLAT PANEL

TV MONITOR

AL-205

FLAT PANEL

TV MONITOR

FU

TU

R E

EV

FU

TU

R

E

EV

FU

TU

R E

EV

FU

TU

R

E

EV

FU

TU

R E

EV

FU

TU

R

E

EV

FU

TU

R E

EV

CHAIN LINK FENCE

18"

TREE

8"

TREE

G U

A R

D R

A

IL

G U

A R

D R

A

IL

FP

BLOCK 39

FISK STREET

No. 35

LOT 20.01

X X X X X X X X X X X X X X X

X X

X

X X

X X

X X

X

X X

H

D Y

10"

TREE

16"

TREE

20"

TREE

24"

TREE

18"

TREE

BLOCK 39

FISK STREET

No. 38

LOT 11

BUILDING

EXIST. 1 STORY

2 STY.

EXIST.

BLDG.

6"

TREE

18"

TREE4"

TREE

6" TR

EE

WV

WV

UP

B

T

G R

A V

E L

D R

IV

E

WOODED AREA

WOODED AREA

W O

O D

E D

A R

E A

(40' R.O.W.)

(3 3'

R .O

.W

I.P.

FOUND

.8

.0

\pxqc;N51%%D35'23"E 155.57'

UP JC 58

CONC.

WALK

CONC.

CONC.

C O

N C

W

A L

K

SHED

SHED

RADIO TOWER

24"

STUMP

BITUMINOUS PAVING

10"

TREE

MON.

FOUND

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L

O

VE

R H

EA

D

EL

EC

TR

IC

22.90 23.45

26.96 27.05

27.43

27.52

27.57 27.58

27.66

27.83

28.02

27.56

27.18

27.81

28.07

28.10

27.40

27.18

26.65

25.67

25.00

25.51

24.60

26.73

25.92

25.50

24.51

26.96

26.67

27.09

27.20 27.23

26.45

23.24

22.56 22.64 22.96

22.29 23.06

22.49 23.03

22.43

22.5023.01

22.5823.15 22.97

23.54

23.0323.61 23.17

24.35 24.70

24.50 24.26

22.89

23.33 22.60

22.58

23.06 22.7222.38

22.79

22.46 22.61 22.72

22.72 22.77

22.80

23.16

22.93

23.27

23.09

22.41 22.92

22.87

22.46 22.98

23.24

23.28 23.79

23.60 23.98

23.21 23.73

23.62

23.60 23.98

23.96 24.48

24.00 24.43

26.03

25.14

24.98

25.74

25.94

25.93

24.93

25.75

26.29

26.21

25.96

25.62

25.30

26.53

26.69

26.62

25.96

26.54

26.72 26.74

26.30

26.21

25.80

25.63

26.15

25.92 26.27 26.96

27.19

26.97

26.96 26.92

26.98

27.25 27.11

26.8226.80

27.17

27.16

27.10

25.35

25.73

25.22

24.57

24.06

24.28

24.44

24.52

24.56

23.73

23.98

23.59

23.22

23.31

23.71

25.73 25.81

25.44 25.42

25.71 25.90

25.84

25.86

25.34

25.51

25.29

25.22

24.75

24.72

24.60

24.28

23.99

24.60

24.71

22.87

23.48

23.41

22.85

27.56

27.91 27.92

27.53

27.86

27.91

28.00

28.11 28.18

28.12

28.19

28.20

28.42 28.33

28.07

27.45

27.90

27.40

27.30

27.16

27.12

27.4227.45

26.63

26.77

26.52

26.65

26.36

26.62

26.50 27.39

27.11

27.16

27.30

27.21 27.24

27.24

27.15 26.62

26.49

26.35

26.46

27.06 27.02

26.96

26.76

27.09 27.0627.04

27.0727.14

27.07

27.03

26.43

25.86 25.87

25.87 26.05

25.78

25.70

25.63

25.50 25.47

25.00

25.06

25.37

25.24 25.15

25.15

25.04

24.82

24.86 25.00

26.54 26.48

26.29

26.23

26.60

26.59

27.02

27.2327.60

27.61

27.60

27.64

27.2727.49

27.44

28.30 28.29

28.24 27.56

27.1627.54

28.24 28.22

27.54

28.21 28.2527.58

27.68 27.54 27.56

27.44

27.53 27.69

27.67 27.62

27.38

27.48

27.79

27.3827.68

27.80

27.31

27.6627.81 27.91

27.91

22.70 22.87

22.23

22.51

23.04

22.43 22.4522.94

22.95

23.12

25.76

26.12

26.07 26.04

26.04 25.97

26.01

25.49

25.64

25.62

25.32 25.48

25.53

25.52

25.42

26.13 26.28

26.15

26.97 26.96

26.79

26.18

26.57

26.30

26.25

26.31 26.08

26.27

25.73

26.29

26.40

26.22 25.88

22.23 22.62

23.16

24.06

23.6823.71 23.64

22.80

23.72 23.75

23.76

24.27

23.79

23.63

23.50

23.1823.20

23.52

23.19

23.40 23.38

23.43

23.25 23.31 23.28

23.30

23.21

23.26

23.23 22.93

23.25

22.80 23.09

23.18

23.00

22.93

22.95

22.74

22.82

22.85

22.86

22.73

22.65

22.48

22.54

22.5022.65

22.64

24.83

24.96 24.57

24.57

24.49

24.42

24.36

24.35

23.35 23.35

23.24

23.88

25.00

25.01

25.45

24.41

25.36 25.41

25.49

25.53 25.56

25.55

26.26

25.87 26.77

26.13

25.28

25.25

25.2325.69

25.82

25.73 26.23

26.3725.89

UP JC 59

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L O

H L

O H

L

8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S

'B ' I

N

LE

T

TC

3.

G

R

2.

IN

V

.9

8( A)

IN

V

.7

8( B)

\Q20;(A) \Q20;(B)

\Q20;(A) \Q20;(B)

'B' INLET

TC 22.96

GR 22.29

FILLED W/

DEBRIS

SAN MH

RIM 22.87

INV 15.85(A)

INV 16.32(B)

SAN MH

RIM 23.38

'B' INLET

TC 22.98

GR 22.46

'B' INLET

TC 23.73

GR 23.21

'B' INLET

TC 22.45

GR 21.81

'B' INLET

TC 23.79

GR 23.28

'B' INLET

TC 26.23

GR 25.73

'B' INLET

TC 26.16

GR 25.63

{\C256;CO}

{\C256;CO}

\W1.4300;CO

{\W1.5;\C256;FISK STREET}

{\W1.

4;\C2

56;MA

PLE A

VENU

E}

CONSTRUCT

HMA SIDEWALK

MATCH

EXISTING GRADES

4'

FU

TU

R E

EV

5'

5'

3.9

12 13 14 15 16 17 18 19 20 21 22 23 24 25

293031

5.9'

LIMIT OF DISTURBANCE

23,956 SF

STABILIZED CONSTRUCTION ENTRANCE

PROPOSED INLET FILTER (TYP.)

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

W W

W W

W W

W W

W W

W W

W W

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

STEP

58 LF 12" HDPE@

0.50%

45 LF 12" HDPE@ 0.44%

11 LF 12" HDPE@ 0.50%

FLUSH CURB

STRUCTURE - (8)

T/G:23.85

INV IN: 22.25 12" HDPE

STRUCTURE - (9)

T/G:25.63

INV IN: 22.54 12" HDPE

INV OUT:22.54 12" HDPE

STRUCTURE - (11)

T/G:25.45

INV OUT:23.60 12" HDPE

STRUCTURE - (14)

T/G:24.16

INV OUT:22.30 12" HDPE

OUTLET- (16)

T/G:23.50

INV OUT:20.46 12" HDPE

TRENCH DRAIN

TG=24.16

INV=22.30

TRENCH DRAIN

TG=25.45 TO 25.70

(MATCH PAVEMENT SLOPE)

INV=23.60

57' 12" DIP@ 0.52%

STRUCTURE - (16) (1) (1)

T/G:22.88

INV IN: 20.05 12"

STRUCTURE - (16) (1)

T/G:22.67

INV IN: 20.35 12" RCP

INV OUT:20.35 12"

STRUCTURE - (18)

T/G:24.20

INV IN: 20.40 12" HDPE

INV IN: 22.10 12" HDPE

INV OUT:20.40 12" RCP

11 LF 12" RCP@ 0.50%

PROPOSED

BIO RETENTION

BASIN

ELEV. 21.50

INV. 23.47±

VERIFY IN FIELD

INV. 22.31±

INV.out 22.31± (12" RCP)

VERIFY IN FIELD

INV. 18.21± (12" RCP)

INV.out 18.21 (21" RCP)

(VERIFY IN FIELD)

INV. 21.12±

VERIFY IN FIELD

BC:27.60 BC:27.39

BC:27.42

BC:27.69

BC:26.10

BC:25.84

BC:25.70

BC:25.60 BC:25.41

BC:25.07BC:25.35

BC:25.41

BC:25.67

BC:26.30

BC:26.40

BC:25.75BC:25.89

BC:25.50BC:25.38

BC:25.28

BC:24.90

BC:25.52

BC:25.79

BC:26.69

BC:23.85

BC:24.75

BC:24.60

BC:23.95

BC:23.31BC:23.33

BC:23.27 BC:23.31

BC:22.75BC:22.78

TC:28.10

TC:25.25

BC:27.44

BC:27.40

TC:27.72

TC:24.45

TC:26.00

TC:27.19 BC:25.24

BC:25.34

22.00

28.15

28.10

28.18

28.18 28.17

27.54 27.45

27.51 27.42

TC:27.75

27.84

27.81 28.18

28.18

TC:26.25

TC:26.53

INV=16.38

8"

.0

(P

E R

D E

S

IG

N

REGRADE ALONG

BUILDING TO DRAIN

REGRADE TO DRAIN

REGRADE ALONG

BUILDING TO DRAIN

88 LF 12" HDPE@ 0.84%

64 LF 12" HDPE@ 0.50%

STRUCTURE - (11) (1)

T/G:26.39

INV IN: 22.86 12" HDPE

INV OUT:22.86 12" HDPE

24.47

GEO-MEMBRANE

5'

4'

RIPRAP OUTLET

PROTECTION

D50=6", T=18"

SHEET OF

TH

E

G O

LD

ST

EI

N

P A

R

TN

ER

SH

IP

AR

C H

IT

EC

TS

VA

LL

EY

S

TR

EE

T, S U

IT

E

0, M

AP

LE

W

O O

D , N

J

O

FC

: 9

-7

-4

DRAWING NUMBER

THIS DRAWING IS

INCOMPLETE UNLESS

CONTRACT DOCUMENTS.

USED WITH ALL OTHER

C O

PY

R

IG

H

T

B

Y

TH

E G

O

LD

ST

EI

N P

AR

TN

ER

SH

IP

AL

L

R

IG

H

TS

R

ES

ER

VE

D

D

ES

IG

N

ED

: r ja C

KD

: R

JA

SC

AL

E:

A S

N O

TE

D

D

AT

E:

2/

/2

W W

W .G

O

LD

ST

EI

N -A

R C

H

IT

EC

TS

.C O

M

FI

SK

C H

A

PE

L

SI

TE

IM

PR

O

VE

M

EN

TS

B O

R O

U G

H O

F

FA

IR

H

A

VE

N

FR

A N

K H

. L

EH

R A

SS

O

C

IA

TE

S

SI

TE

C

IV

IL

E

N G

IN

EE

R S

SO

U

TH

H

AR

R

IS

O

N S

T.

E

AS

T

O R

AN

G

E, N

J

T:

(9

) 6

-2

F:

(9

) 6

-6

O M

D

EX

, I N

C

M

EC

H

AN

IC

AL

E

LE

C

TR

IC

AL

E

N G

IN

EE

R S

C

R O

SS

A

VE

. M

ID

LA

N D

P

AR

K, N

J

T:

(2

) 4

-0

F

1)

-0

A

LL

A N

K

LE

IN

, P

E .

ST

R U

C

TU

R

AL

E N

G

IN

EE

R

S

R

O U

TE

W

ES

T, M O

U N

TA

IN

SI

D

E, N

J

O

FC

: 9

-2

-8

LO

R

IN

G

C O

N

SU

LT

IN

G E

N G

IN

EE

R S

TE

C H

N O

LO

G

Y C

O N

SU

LT

AN

TS

AL

EX

AN

D

ER

P

AR

K, S U

IT

E

0, P R

IN

C

ET

O

N , N

J

T:

(6

) 7

-6

F:

(6

) 7

-6

RI

CH

AR

D

J.

A

DE

LS

O

HN

, P E, P P, C M

E

F

IS

K

ST

R

EE

T

BL

O C

K

L

O T

FA

IR

H

AV

EN

, N J

N

J

PR

O

FE

SS

IO

N

AL

E N

G

IN

EE

R

N J

LI

C

EN

SE

N O

. G E3

FH

LA

P R

O J

N O

. 9

6.

c

9.

dw g rja

3/

/2

8:

P

M

PR

O

PO

SE

D

PA

R

KI

N G

L O

T

SE

/S C

P

LA

N

Scale: 1"=10' SOIL EROSION AND SEDIMENT CONTROL PLAN1 Feet

20100 5

{SOIL EROSION AND SEDIMENT CONTROL

SEEDING

1. SUB-SOIL PREPARATION: Immediately prior to seeding and topsoil application, the surface should be scarified to a depth of 6" to 12" where there has been soil compaction (e.g. areas of heavy construction traffic). This practice is to be applied to all compacted areas where there is no danger to underground utilities (cables, irrigation systems, etc.).

2. TOPSOILING: Areas to be seeded should have a minimum of 5" of friable, loamy, topsoil free of objectionable weeds, stones and debris.

3. FINAL GRADING: Grading is to be smooth of ruts and free of objectionable stones, depressions, vehicle tracks, and rough edges. There is to be positive drainage away from all buildings and dwellings. Refuse from seedbed preparation (roots, sticks, stones, construction debris) must be disposed of properly.

4. FERTILIZING: Apply fertilizer to soil test recommendations or as follows:

A. Starter fertilizer, specified as 10-10-10, is to be applied at 500 lbs. per acre.

B. Fertilizer is to be worked into the soil to a depth of 4 inches.

TEMPORARY STABILIZATION WITH MULCH ONLY

Straw mulch (hay mulch may be substituted if approved by the District) is to be spread uniformly at the rate of 1-1/2 to 2 tons per acre (total ground surface coverage). This practice is limited to periods when vegetative cover cannot be established due to the season or other conditions. Mulch must be anchored in accordance with New Jersey Standards for Soil Erosion and Sediment Control.

Mulch alone can only be used for short periods and will require maintenance and renewal. Other mulch materials may be utilized if approved by the District

TEMPORARY SEEDING

Temporary seeding is to be used on all disturbed areas where permanent stabilization will not be accomplished for a period of up to 6 months.

Product dates Seeding Rate Recommended

Optimum

Perennial ryegrass 100 lbs. per acre 3/15 - 6/1 & 8/1 - 9/15

Winter Cereal Rye 112 lbs. per acre 8/1 - 11/1

PERMANENT SEEDING AND MULCHING:

-Topsoil - uniform application to a depth of 5" (unsettled).

-Fertilizer - 11 lbs./1,000 sf, 10-10-10 or equivalent worked into the soil a minimum of 4".

-Seed - Strong creeping red fescue 130 lbs./acre (3 lbs./1,000 sf); Rough Bluegrass 90 lbs./acre (2 lbs./1,000 sf); or other approved seeds; plant between March 15 and October 1.

-Mulch - straw or hay at a rate of 70 to 90 lbs./1,000 sf to be applied according to

{SEQUENCE OF CONSTRUCTION

}Anticipated beginning of project - XXXX, 2025. Estimated Completion 6 months.

1. NOTIFY SOIL CONSERVATION DISTRICT 72 HOURS BEFORE

PROCEEDING.

2. STRIP AREA FOR TRACKING BED AND CONSTRUCT TRACKING BED (2

DAYS)

3. INSTALL SILT FENCE AND INLET FILTERS (1 WEEK)

4. DEMOLISH EXISTING PAVEMENT AND SITE IMPROVEMENTS (1 WEEK)

5. BEGIN SITE GRADING (1 WEEK)

6. CONSTRUCT BIORETENTION BASIN (1 MONTHS)

7. CONSTRUCT UNDERGROUND STORMWATER BASIN (1 MONTH)

8. CONSTRUCT SITEWORK (SIDEWALK, CURBS, APRONS, ETC) (1 MONTH)

9. CONSTRUCT PARKING LOT PAVEMENT (2 WEEKS){

}10. REMOVE SESC MEASURES

{SOIL COMPACTION EXEMPTION:

}IN ACCORDANCE WITH THE STANDARDS FOR SOIL EROSION AND

SEDIMENT CONTROL IN NEW JERSEY, 7TH EDITION, REVISED JULY 2017,

THE PROPOSED DEVELOPMENT IS EXEMPT FROM SOIL COMPACTION

MITIGATION, DUE TO THE STANDARD FOR LAND GRADING, SOIL

MANAGEMENT AND PREPARATION NOTES #1, #2, AND #10.

{NOTE:

}- THE SITE DOES NOT LIE IN A FLOOD HAZARD AREA AS ESTABLISHED BY

FEMA MAP 34025C0181G DATED JUNE 15, 2022.

{NRCS SOIL SURVEY:

}- FrrC - FREEHOLD-URBAN LAND COMPLEX, 0 TO 10 PERCENT SLOPES