R17PS00304_Amendment_No_0004.pdf
PDF 4 MB Posted
- Attached to
- NK- KIRWIN DAM SPILLWAY GATES REHAB
- Solicitation number
- R17PS00304
About this file
Project: Kirwin Spillway Gates Guide Replacement and Painting. Amendment 0004.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R17PS00304_Amend_0003.pdf | ||
| R17PS00304_Amendment_0002.pdf | ||
| R17PS00304_Amendment_0001.pdf | ||
| R17PS00304.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R17PS00304
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
05/08/2017000004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/31/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project: Kirwin Spillway Gates Guide Replacement and Painting
See Page 2 of 2 for changes incorporated by this Amendment
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0004 Solicitation No. R17PS00304
Description of Changes:
1. Table of Contents - Remove the Table of Contents in its entirety and substitute therefor the attached Revised Table of Contents.
2. In Section B – Schedule, remove Section B in its entirety and substitute therefor the attached Revised Section B.
3. In Section C – Specifications, remove Section 01 11 00 - Summary of Work in its entirety and substitute therefor the attached Revised Section 01 11 00.
4. In Section C – Specifications, remove Section 01 14 20 Dam and Reservoir
Operations in its entirety and therefor substitute the attached Revised Section 01 14 20.
5. In Section C – Specifications, Section 01 33 00 Submittals, remove pages 01 33 00-9 and 01 33 00-10 and substitute therefor the attached Revised pages 01 33 00-9 and 01 33 00-10.
6. In Section C – Specifications, remove Section 02 83 30 Removal and Disposal of
Coatings Containing Heavy Metals in its entirety and substitute therefor the attached Revised Section 02 83 30.
7. In Section C – Specifications, add the attached new Section 02 83 33 Removal and
Disposal of Equipment with Coatings Containing Heavy Metals.
8. In Section C – Specifications, remove Section 05 50 00 Metal Fabrications in its entirety and therefor substitute the attached Revised Section 05 50 00.
9. In Section C – Specifications, Section 09 96 20 Coatings, remove pages 09 96 20-17 and 09 96 20-18 and substitute therefor the attached Revised pages 09 96 20-17 and 09 96 20-18.
10. In Section C – Specifications, Section – Drawings: The attached revised drawings are incorporated into the solicitation.
Sheet No. Drawing Number 6 371-D-128 8 371-D-31 9 371-M-3-1 12 371-D-160 14 371-600-60002 15 372-600-60003
Amendment No. 0004 Solicitation No. R17PS00304
11. The period of performance has changed from 180 calendar days to 240 calendar days.
Therefore, in Section F – Remove Section F in its entirety and substitute therefor the attached revised Section F.
Receipt of Proposals: The hour and date for receipt of proposals is hereby extended to 3:00 PM on May 18, 2017.
The Final contractor questions from prospective contractors and their respective answers are attached to this amendment and are provided for informational purposes only.
This Page Intentionally Left Blank
Kirwin Dam Spillway Gates Amendment 0004 Guide Replacement and Maintenance Painting Specifications No. 60-C0640
(Revised) Table of Contents - 1
TABLE OF CONTENTS
PART 1 – THE SCHEDULE
SECTION A – Solicitation, Offer, and Award Form (SF 1442)
SECTION B – Supplies or Services and Prices
SECTION C – Specification/Drawings/Maps
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 20 Dam and Reservoir Operations 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 60 Protected Species 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 – EXISTING CONDITIONS
02 83 30 Removal and Disposal of Coatings Containing Heavy Metals 02 83 33 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 09 – FINISHES
09 96 20 Coatings
DIVISION 32 – EXTERIOR IMPROVEMENTS
Guide Replacement and Maintenance Painting Specifications No. 60-C0640
(Revised) Table of Contents - 2
32 92 20 Seeding and Soil Supplements
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 02 Reservoir Elevation Data 51 02 83 Existing Coatings Test Results 51 09 96 Photographs
DIVISION 52 – DRAWINGS
52 00 00 Drawings
SECTION D – Not Used
SECTION E – Inspection and Acceptance E.1 Material and Workmanship E.2 Inspection of Construction
SECTION F – Deliveries or Performance F.1 Commencement, Prosecution, and Completion of Work F.2 Variation in Estimated Quantity F.3 Suspension of Work
SECTION G – Contract Administration Data G.1 Authorities and Delegations G.2 Electronic Invoicing and Payment Requirements
SECTION H – Special Contract Requirements
H.1 Site Security
PART II – CONTRACT CLAUSES
SECTION I – Contract Clauses I.1 Clauses By Reference I.2 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements
I.3 Commercial and Government Entity Code Maintenance I.4 Order of Precedence – Sealed Bidding I.5 Minimum Wages Under Executive Order 13658 I.6 Subcontractor Responsibility Matters Regarding Compliance with Labor Laws Under Executive Order 13673 I.7 Compliance with Labor Laws Under Executive Order 13673 I.8 Paycheck Transparency Under Executive Order 13673 I.9 Paid Sick Leave Under Executive Order 13706
Guide Replacement and Maintenance Painting Specifications No. 60-C0640
(Revised) Table of Contents - 3
I.10 Buy American Act – Construction Materials I.11 Bid Guarantee I.12 Additional Bonding I.13 Performance and Payment Bonds - Construction I.14 Payments Under Fixed-Price Construction Contracts I.15 Prompt Payment for Construction Contracts I.16 Differing Site Conditions I.17 Accident Prevention I.18 Schedules For Construction Contracts I.19 Specification and Drawings for Construction Contracts Alt II I.20 Changes I.21 Restriction on Endorsements I.22 Release of Claims I.23 Examination of Records By the Department of Interior I.24 Liability Insurance I.25 Safety and Health I.26 Protecting Federal Employees and the Public From Exposure to Tobacco Smoke I.27 Certification of Representations I.28 Equipment Ownership I.29 Payment for Mobilization and Preparatory Work I.30 Other Contracts
I.31 Preservation of Cultural Resources I.32 Security Requirements
I.33 Modification Proposals
PART III – DOCUMENTS, EXHIBITS, AND OTHER
SECTION J – List of Documents, Exhibits, and Other Attachments Wage Determination Standard Form 24 – Bid Guarantee
Past Jobs Reference List Past Performance Questionnaire
DIAPR 2011-06
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors
K.1 Prohibition on Contracting with Entities That Require Certain Internal Confidentiality Agreements
K.2 Annual Representations and Certifications K.3 Information Regarding Responsibility Matters
SECTION L – Instructions, Conditions and Notices to Bidders L.1 System for Award Management L.2 Commercial and Government Entity Code Reporting
Guide Replacement and Maintenance Painting Specifications No. 60-C0640
(Revised) Table of Contents - 4
L.3 Submission of Offers in the English Language L.4 Submission of Offers in U.S. Currency L.5 Instructions to Offerors L.6 Type of Contract L.7 Construction Wage Rate Requirements L.8 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction L.9 Site Visit (Construction) L.10 Preparation of Proposals L.11 Use and Disclosure of Proposal Information L.12 Service of Protest L.13 Notice of Intent to Acquire Metric Products and Services L.14 Source Evaluation and Selection Procedures L.15 General Proposal Instructions L.16 Technical Proposal Instructions L.17 Pricing Proposal Instructions L.18 Instruction for Mobilization and Preparatory Work L.19 Authorized Workers Notice to Potential
SECTION M – Evaluation Factors for Award M.1 Evaluation Factors for Award
M.2 Notice of World Trade Organization Government Procurement Agreement Evaluations
Kirwin Dam Spillway Gates Amendment 004 Guide Replacement and Maintenance Painting Specification No.60-C0649
Revised Schedule (Revised) B - 1
CONTINUATION OF SECTION B – SUPPLIES OR SERVICES AND PRICES
KIRWIN DAM
SPILWWAY GATES GUIDE REPLACEMENT AND MAINTENANCE PAINTING
Kirwin Unit, Solomon Division Pick-Sloan Missouri Basin Program
Kansas
B.1 SCHEDULE
(a) Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) The quantities in the schedule[s] are estimated quantities for comparison of offers only, and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
2 02 83 30 Handling and Disposing of Coatings Containing Heavy Metals
For the lump sum of $
3 02 83 33 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
For the lump sum of $
4 05 50 00 Sluice Gate Frames for 15 Gates
15 ea $ $
5 09 96 20 Sluice Gate Lift Structure Access Plates and Frames
660 ft2 $ $
Revised Schedule (Revised) B - 2
SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
6 09 96 20 Bulkhead Gate Access Plates and Frames
660 ft2 $ $
7 09 96 20 10-Inch Diameter Gate Air Vent Piping Openings
40 ft2 $ $
8 09 96 20 Access Houses Stairway Metalwork
264 ft2 $ $
TOTAL FOR SCHEDULE $_________________
END OF SCHEDULE
Summary of Work
(Revised) 01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located at the Kirwin Reservoir in Phillips County, Kansas, approximately 1 mile south of Kirwin, KS along South 1st Street. It is also approximately 13 miles southeast of Phillipsburg, KS on the east side of the Kirwin Reservoir and the Kirwin National Wildlife Refuge.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Repair of the existing sluice gate frames which includes:
1. Complete removal of the existing steel sluice gate frame structural steel components and replacing with new galvanized structural steel components; and,
2. Temporary removal of the existing cast iron gate frame wedges, cleaning surface scale/rust from the wedges, and permanently reinstalling the wedges.
B. Application of new 3-coat coating system of the following:
1. 15 gate lift structure access plates (both sides) and associated imbedded frames located in the gallery of the concrete spillway crest structure;
2. 15 sluice bulkhead gate access plates (both sides) and associated imbedded frames located in the gallery of the concrete spillway crest structure;
3. The first 1-foot of the 10-inch diameter gate air vent piping openings interiors located in the spillway sluice openings; and,
4. Handling and disposal of all waste material.
C. Application of new 2-coat coating system for spot repairs of existing coating system and handle and dispose of all waste materials for the following description of elements:
1. Access houses stairway metalwork.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.
Summary of Work
(Revised) 01 11 00 - 2
1.04 DEFINITIONS
A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 53:
1. CO: Contracting Officer
2. COR: Contracting Officer’s Representative
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Dam and Reservoir Operations
(Revised) 01 14 20 - 1
SECTION 01 14 20
DAM AND RESERVOIR OPERATIONS
PART 1 GENERAL
1.01 COST
A. Include cost in prices offered in the Schedule for other items of work.
1.02 REFERENCES
A. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards, including revisions posted at:
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals
B. RSN 01 14 20-1, Spillway Gate Operation Schedule:
1. Spillway Gate (sluice gate) operation shall be performed by a Government Representative. The Contractor will supply the COR with a proposed schedule of when sluice gate operation will be necessary to accomplish the requirements of these Specifications. Adjustments to the schedule can be made with a 24-hour advance notice to the on-site Government Representative.
1.04 OPERATIONAL RESPONSIBILITY
A. Reclamation is responsible for overall operations of the Kirwin Reservoir. Kirwin Irrigation District #1 is responsible for certain operation and maintenance functions when the storage level is above elevation 1662.30 feet and below elevation 1729.25 feet.
B. The Corps of Engineers (COE) is responsible for the flood control operations when the reservoir is in the exclusive flood pool, elevation 1729.25 feet to 1757.30 feet.
C. Between elevations 1757.30 feet to 1779.00 feet, flood control regulation is transferred back to Reclamation.
1.05 KIRWIN RESERVOIR OPERATIONS
A. The Government will not attempt to operate the reservoir (Kirwin Reservoir) to accommodate the Contractor’s construction activities.
B. The Contractor’s construction operations shall be coordinated to maintain Government access to all critical facilities and to prevent interference with Government operations for controlling the releases.
Dam and Reservoir Operations
(Revised) 01 14 20 - 2
C. In the event that the water level in the reservoir, is above the upstream spillway apron, (> elevation 1720.0 feet), the Contractor can utilize the Government’s bulkhead gate to repair each sluice gate. The bulkhead gate would be installed and the sluice gate opened and the gate tunnel drained downstream. Consequently, the Contractor can only work on one sluice gate at a time. The bulkhead gate would remain in place until all work in the gate tunnel is completed or the reservoir water elevation drops below elevation 1720.0 feet, as approved by the COR.
1.06 SPILLWAY OPERATIONS – RESERVOIR RELEASES
A. Substantial increases in inflows are often generated by upstream flash flood conditions and are extremely unpredictable. Inflows can increase quickly resulting in spillway releases being required within a 24-hour period; however, this is generally during the April-July runoff season.
B. It should be noted for scheduling purposes that spillway releases are not anticipated;
however:
1. If releases are required, the COR will provide written notification to the Contractor. The Contractor must remove personnel and equipment from the reservoir and spillway within 24-hours of such notification.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Submittals (Revised) 01 33 00 - 9
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
02 83 30-3 Removal and Disposal of Coatings Containing Heavy Metals
Heavy Metal Exposure Certifications and Test Results
At least 20 days prior to beginning on-site work
COR 0 1 paper + 1 electronic
02 83 30-4 Removal and Disposal of Coatings Containing Heavy Metals
Preconstruction Test Results
Within 2 days after tests are completed
COR 0 1 paper + 1 electronic
02 83 30-5 Removal and Disposal of Coatings Containing Heavy Metals
Working Level Test Results
Within 2 days after tests are completed
COR 0 1 paper + 1 electronic
02 83 30-6 Removal and Disposal of Coatings Containing Heavy Metals
Post-Construction Test Results
At least 10 days following the beginning of the work week.
COR 0 1 paper + 1 electronic
02 83 30-8 Removal and Disposal of Coatings Containing Heavy Metals
Certificate of Disposal Within 7 days of waste disposal
COR 0 1 paper + 1 electronic
02 83 33-1 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Qualifications At least 21 days prior to beginning on-site work
COR 0 1 paper + 1 electronic
02 83 33-2 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Plans At least 21 days prior to beginning on-site work
COR 0 1 paper + 1 electronic
02 83 33-3 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Certificate of Disposal Witthin 7 days of waste disposal
COR 0 1 paper + 1 electronic
DIVISION 05 - METALS
05 50 00-1 Metal
Fabrications Test Reports At least 21 days before installation COR 0 1 paper + 1 electronic 05 50 00-2 Metal
Fabrications Shop Drawings At least 28 days before installation COR 0 1 paper + 1 electronic
Submittals
(Revised) 01 33 00 - 10
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
05 50 00-3 Metal Fabrications
Installation Plan At least 21 days before installation
COR 0 1 paper + 1 electronic
DIVISION 09 - FINISHES
09 96 20-1 Coatings Approval Data At least 20 days prior to beginning on-site work COR 0 1 paper + 1 electronic 09 96 20-2 Coatings Final Approval Data At least 20 days prior to beginning on-site work COR 0 1 paper + 1 electronic 09 96 20-3 Coatings Certifications At least 21 days prior to beginning on-site work COR 0 1 paper + 1 electronic 09 96 20-4 Coatings Documentation At least 21 days prior to beginning on-site work COR 0 1 paper + 1 electronic 09 96 20-5 Coatings Contractor Quality
Testing Data for “Field Applied” Coatings
Within 14 days of completion of work
COR 0 1 paper + 1 electronic
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 92 20-1 Seeding and Soil
Supplements Seeding Plan At least 20 days prior to beginning of on-site work
COR 0 1 paper + 1 electronic
32 92 20-2 Seeding and Soil Supplements
Certifications At least 20 days prior to beginning of on-site work
COR 0 1 paper + 1 electronic
Removal and Disposal of Coatings Containing Heavy Metals
(Revised) 02 83 30 - 1
SECTION 02 83 30
REMOVAL AND DISPOSAL OF COATINGS CONTAINING HEAVY METALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Removal and Disposal of Coatings Containing Heavy Metals:
1. Measurement:
a. Include in prices offered in the Price Schedule for items requiring removal and disposal of coatings containing heavy metals. Refer to Section 09 96 20 – Coatings for those items to be recoated and removal and disposal of existing coatings containing heavy metals.
1) Sluice Gate Lift Structure Access Plates and Frames
a) Both sides of the 15 gate lift structure access plates and associated frames.
2) Bulkhead Gate Access Plates and Frames
a) Both sides of the 15 sluice bulkhead gate access plates and associated frames.
3) 10-Inch Diameter Gate Air Vent Piping Openings
a) First 1-foot of gate air vent piping interior located in the downstream roof of each sluice opening. The vent pipes are imbedded in the concrete roof and coatings shall be limited to the exposed portion of the pipe.
4) Access Houses Stairway Metalwork
a) Support structural steel and handrails for access stairway from access houses (north and south) to spillway gallery.
Spot repair to the metalwork is located at the interface with the concrete walls and floor.
2. Payment: Lump-sum price offered in the schedule.
a. Include the prices for Certified Industrial Hygienist (CIH) oversight and laboratory costs.
1) CIH oversight costs for coatings application shall be included in Section 09 96 20 – Coatings.
b. Do not include the cost of disposal of wastes as hazardous waste. Waste stream is presumed to be non-hazardous unless sample testing, specified in Paragraph 1.04.D.4.a.1), indicates hazardous levels of heavy metals. Also refer to Part 1.09 – DISPOSING HAZARDOUS WASTE of these specifications.
(Revised) 02 83 30 - 2
1.02 DEFINITIONS
A. Acceptable Air Levels:
1. Less than or equal to background outside containment work area.
B. Acceptable Clearance Levels:
1. Non-detect air samples inside containment work area.
2. Less than or equal to background air samples outside.
3. Less than or equal to background surface samples outside containment work area.
C. Acceptable Decontamination Levels:
1. Less than requirements in the specification and regulations.
2. Non-detect for environmental soil or water contamination.
D. Acceptable Surface Levels:
1. Less than or equal to background surface concentrations.
2. Less than or equal to background soil concentrations outside containment work area.
3. Less than or equal to background water concentrations outside containment work area.
E. Background Monitoring and Sampling:
1. Air, soil, water, surface, bulk sampling conducted prior to on-site work.
2. Establish the pre-work thresholds for clearances.
F. Certified Industrial Hygienist (CIH): Certified in good current standing with the American Board of Industrial Hygiene. Refer to Section 01 35 30 – Contractor’s Onsite Safety and Health Personnel.
G. Coatings Containing Metals:
1. Coating containing lead, heavy metals, and other contaminants which may be present in such quantities that solid waste generated from coating removal operations will exhibit the toxicity characteristic when tested in accordance with 40 CFR 261.24 and/or which present airborne hazards during disturbance and removal operations.
2. The following metals and compounds may be present in aging paint and coating systems, unless otherwise noted:
a. Arsenic: See 29 CFR 1926.1118.
b. Beryllium.
c. Cadmium: See 29 CFR 1926.1127.
d. Chromium: See 29 CFR 1926.1126.
(Revised) 02 83 30 - 3
e. Lead: See 29 CFR 1926.62.
f. Manganese
g. Mercury
h. Silver.
i. Vanadium.
H. Competent Person:
1. For lead hazards: As defined in 29 CFR 1926.62.
2. For designing and implementing technical controls to limit employee exposure to airborne contaminants: As defined in 29 CFR 1026.55.
I. Current Medical Clearances: Employee specific medical clearance for the metals and respirator use signed by a licensed physician M.D. that is less than 12 months old at the completion of the work on-site. Signed by the employee.
J. Handling: Includes containment, collection, storage, and transportation.
K. HEPA: High Efficiency Particulate Absolute filtration efficiency of 99.97% at 0.3 microns.
L. Negative Exposure Assessment (NEA): Based on sampling conducted by a CIH on this work site, submitted and accepted by Reclamation, prior to changes in engineering controls, personal protective equipment or respiratory protection. NEA does not relieve the contractor from the requirements in the specification.
M. Regulated Area: Areas on the site where coating removal, surface preparation, surface repair, metalizing, recoating by any means, storage are conducted, including handling.
N. Removal Activities and Handling: include; unscrewing, unbolting flanges, breaking, saw cutting, torch cutting, plasma cutting, drilling, grinding, sanding, blasting, isolation, containment, solvent cleaning, chemical stripping, power tool removal, packaging, collection, storage, transportation and disposal of structural supports, equipment and elevator components and in-plant application of primers, middle coat and top coat chemicals.
1.03 REFERENCES
A. American Conference of Governmental Industrial Hygienists (ACGIH)
1. ACGIH TLVs found at www.acgih.org.
B. ASTM International (ASTM)
1. ASTM E 1728-10 Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Lead Determination
(Revised) 02 83 30 - 4
C. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards, including revisions posted at:
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
D. Code of Federal Regulations (CFR)
1. 29 CFR 1910.1025 Lead
2. 29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists
3. 29 CFR 1926.62 Lead
4. 29 CFR 1926.1118 Inorganic Arsenic
5. 29 CFR 1926.1127 Cadmium
6. 40 CFR 117 Determination of Reportable Quantities for Hazardous Substances
7. 40 CFR 260 Hazardous Waste Management System: General
8. 40 CFR 261 Identification and Listing of Hazardous Waste
9. 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
10. 40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, Disposal Facilities
11. 40 CFR 268 Land Disposal Restrictions
12. 40 CFR 302 Designation, Reportable Quantities, and Notification
13. 49 CFR 107 Hazardous Materials Program Procedures
14. 49 CFR 178 Specifications for Packagings
15. 49 CFR Chapter I Research and Special Programs Administration, Department of Transportation, Hazardous Materials Regulations
E. Society For Protective Coatings (SSPC)
1. SSPC Guide 6-2012 Containing Surface Preparation Debris Generated During Paint Removal Operations
2. SSPC QP2-2009 Procedure for Evaluating the Qualifications of Painting Contractors (Field Removal of Hazardous Coatings from Complex Structures)]
1.04 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 02 83 30-1, Qualifications:
(Revised) 02 83 30 - 5
1. Contractor’s On-site Supervisor
a. Completed SSPC-C3 training with current certification and refresher training (SSPC C-5) training within the last 12 months.
2. Current copy of SSPC-QP2 certification for hazardous coating removal.
C. RSN 02 83 30-2, Plans:
1. Worker Protection Compliance Program:
a. Include information required by 29 CFR 1926.62 (e)(2).
b. Prepared and signed by certified industrial hygienist.
2. Containment System Plan:
a. Detailed plan to prevent the release of coatings, metals, dusts, vapors and solvents during the disturbance, removal and reapplication of coatings in accordance with SSPC Guide 6. If there are conflicts between this specification and the SSPC Guide, the most stringent or restrictive shall apply.
b. Include:
1) Drawings showing layout, attachment to structure, and relationship to structure.
2) Design calculations for ventilation system.
3) Load analysis for containment system loading on structure.
a) Include wind loads and dead load on containment system from debris.
c. Signed and sealed by qualified design professional.
3. Emissions Monitoring Plan:
a. Include:
1) Plan for monitoring total suspended particulate (TSP) air quality for heavy metal contamination by employee exposure personal monitors.
2) Plan for monitoring sediment for heavy metal contamination.
3) Plan for monitoring soil for heavy metal contamination.
4) Plan for monitoring and reporting reportable releases in accordance with 40 CFR 117, 40 CFR 300, 40 CFR 302.
5) Plan for decontamination of contaminated areas and surfaces.
b. Prepared and signed by certified industrial hygienist.
4. Waste Characterization, Handling, and Disposal Plan:
a. Include:
1) Plan for sampling, testing, characterization of waste:
(Revised) 02 83 30 - 6
a) Include required method detection limits.
b) Describe analytical data delivery package including quality control and quality assurance.
2) Plan for handling, storage, transporting, and disposal of project-generated waste and cleaning of reusable items.
3) Plan for disposal of wastewater: Include name, location, and address of proposed treatment facility and contact person at proposed treatment facility.
4) Name, address and qualifications of testing laboratory.
5) Name, address and qualifications of transporter.
6) Name, address and qualifications of disposal facility.
7) Written notice from owner or operator of disposal facility documenting permits and agreement to accept waste generated under this contract.
b. Prepared and signed by certified industrial hygienist.
D. RSN 02 83 30-3, Heavy Metal Exposure Certifications and Test Results:
1. Employee training certifications: Indicate employee training in hazardous materials and communication with an emphasis on lead, respiratory protection, hearing conservation, and personal protective equipment (PPE).
2. Pulmonary function tests (PFT) for respirator usage: Record of diagnostic test and examination by a Board Eligible or Certified Occupational Medicine Physician.
3. Blood tests for heavy metals:
a. Blood lead and zinc protoporphyrin level (ZPP).
b. Blood levels for other heavy metals.
E. RSN 02 83 30-4, Preconstruction Test Results:
1. Include following background results:
a. Personal Employee exposure and area monitoring results by personal employee exposure monitors.
b. Soil analysis for heavy metals.
c. Sediment analysis for heavy metals.
2. Include map indicating location of each sample. For sediment analysis, include depth of each sample.
3. Provide appropriate quality control information to supplement analytical data.
Include from blanks, laboratory control samples with percent recovery, duplicates, matrix spike samples with percent recovery, and other appropriate quality control measures.
4. Prepared and signed by certified industrial hygienist.
(Revised) 02 83 30 - 7
F. RSN 02 83 30-5, Working Level Test Results:
1. Include following working level test results:
a. TSP air quality monitoring results for heavy metals concentrations by personal employee exposure monitors.
2. Include map indicating location of each sample.
3. Provide appropriate quality control information to supplement analytical data.
Include from blanks, laboratory control samples with percent recovery, duplicates, matrix spike samples from project with percent recovery, and other appropriate quality control measures.
4. Prepared and signed by certified industrial hygienist.
G. RSN 02 83 30-6, Post-Construction Test Results:
1. Submit post-construction sample results within 24 hours of receipt from the lab
2. Blood tests for heavy metals:
a. Blood lead and zinc protoporphyrin level (ZPP).
b. Blood levels for other heavy metals.
3. Include following post-construction content data:
a. Soil analysis for heavy metals.
b. Sediment analysis for heavy metals.
c. Clearance surface sampling each time containment or barriers are moved.
d. Clean-up surface sampling following a spill, breech, leak, tracking or other uncontrolled release.
4. Compare with preconstruction test results for increased contaminant levels.
5. Include map indicating location of each sample. For sediment analysis, include depth of each sample.
6. Provide appropriate quality control information to supplement analytical data.
Include from blanks, laboratory control samples with percent recovery, duplicates, matrix spike samples from project with percent recovery, and other appropriate quality control measures.
7. Prepared and signed by certified industrial hygienist.
H. RSN 02 83 30-7, Certificate of Disposal:
1. Certification hazardous materials have been treated.
1.05 QUALIFICATIONS
A. Contractor’s Onsite Supervisor Qualifications: Competent Person, as defined in 40 CFR 1926.62, experienced working under OSHA and EPA regulations.
(Revised) 02 83 30 - 8
B. Contractor’s Certified Industrial Hygienist Qualifications: Competent Person, as defined in 40 CFR 1926.62, experienced working under OSHA and EPA regulations and meeting the requirements of Section 01 35 30 – Contractor’s Onsite Safety and Health Personnel.
C. Coating Removal Contractor Qualifications: Certified by SSPC Painting Contractor Certification Program (PCCP) in accordance with SSPC QP-2.
D. Laboratory Qualifications: Certified analytical laboratory meeting requirements of EPA National Lead Laboratory Accreditation Program and American Industrial Hygiene Association (AIHA) for metals.
E. Disposal Facility Qualifications for Hazardous Waste: RCRA permitted facility.
1.06 REGULATORY REQUIREMENTS
A. Solid waste debris is subject to Federal, State, and local requirements. The most stringent regulation shall apply.
1.07 SAFETY AND HEALTH REGULATIONS
A. Comply with USBR RSHS.
B. Comply with 29 CFR 1926.
C. Limit employee exposure to lead and other airborne contaminants in accordance with 29 CFR 1926.55 and 29 CFR 1926.62
1.08 PROJECT CONDITIONS
A. The existing coatings may contain other heavy metals. Refer to Section 51 02 83 – Existing Coatings Test Results for detection levels of heavy metals at the facility.
B. The work in this contract will be conducted in a waterway and where drainage from the work area enters a waterway. Release of contaminants during coating removal, surface preparation, surface repair, handling and application of new coatings, and waste handling are prohibited.
C. The remote location of the work site requires additional planning for outside emergency assistance and timely laboratory support.
D. The work activities may extend over different seasons and different weather conditions which will require controlling the temperature and humidity inside the containments.
E. The Contractor will be considered the co-generator of any hazardous waste, in accordance with 40 CFR 260.10, in the event that a portion of the waste stream is verified as hazardous waste. In that event, the contractor would need to obtain facility owner EPA Identification number.
F. Each of the 15 sluice gates consist of a gate stem that passes through the sluice gate lift structure access plate and therefore, the access plate cannot be removed without extensive
(Revised) 02 83 30 - 9 dis-assembly of the hoist equipment assemblies. Existing coatings removal of the access plate shall be done within the limitation of unbolting the stuffing box and the access plate and raising the access plate as high as allowable with the gate stem still inserted through the access plate. Operation of the hoist equipment will be done by a Government representative and will require 24-hour notification prior to operation.
1.09 DISPOSING HAZARDOUS WASTE
A. The following applies if the waste stream tests as hazardous waste (these provisions would be a modification to this specification).
1. Assemble a written plan to submit to the Reclamation CO for additional funds upon acceptance.
2. Obtain EPA Identification number, in accordance with 40 CFR 262.12 before treating, storing, or transporting hazardous waste.
3. Prepare manifest, in accordance with 40 CFR 262 Subpart B, before transporting hazardous waste for offsite treatment, storage, or disposal.
4. Before transporting hazardous waste, obtain written notice from owner or operator of hazardous waste facility, including documentation that facility has required permits and that facility will accept waste to be shipped under this contract, in accordance with 40 CFR 264.12.
5. Obtain certificate of disposal from disposal facility.
6. Obtain required transportation permits and placard vehicle in accordance with Kansas and other governing State Department of Transportation regulations.
1.10 CONTRACTOR’S RESPONSIBILITIES
A. Obtain EPA Identification number, in accordance with 40 CFR 262.12 before treating, storing, or transporting hazardous waste.
B. Prepare manifest, in accordance with 40 CFR 262 Subpart B, before transporting hazardous waste for offsite treatment, storage, or disposal.
C. Before transporting hazardous waste, obtain written notice from owner or operator of hazardous waste facility, including documentation that facility has required permits and that facility will accept waste to be shipped under this contract, in accordance with 40
CFR 264.12.
D. Obtain certificate of disposal from disposal facility when hazardous waste has been treated.
E. Obtain required transportation permits and a placard vehicle in accordance with Kansas and other governing State Department of Transportation regulations.
(Revised) 02 83 30 - 10
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CONTAINMENT SYSTEM
A. Design and construct containment system to control emissions to the environment in conformance with Federal, State, and local regulations and the following criteria:
1. Do not exceed ambient air quality standards.
2. Prevent contamination of any reservoir, watercourse, or water system.
3. Prevent contamination of sediment in any reservoir or watercourse.
4. Prevent contamination of soil.
B. Design and construct containment system for following:
1. Suitable for surface preparation method specified in Section 09 96 20 - Coatings.
2. Containment and ventilation components in accordance with SSPC Guide 6.
C. Perform the following activities within containment system:
1. Coating removal,
2. Surface preparation,
3. Waste and debris containerization,
4. Activities which may spread contamination outside contained area.
D. Provide signs and barriers at each point of entry to containment area to prevent unauthorized personnel access.
3.02 WASTE CHARACTERIZATION, HANDLING, AND DISPOSAL
A. Characterize solid waste debris generated from removal operations, in accordance with 40 CFR 261, TCLP Method 1311. Presume waste is hazardous until characterized.
B. Comply with approved written Plan for Waste Characterization, Handling, and Disposal.
C. RCRA-defined Hazardous Waste:
1. Comply with 40 CFR 262 and 40 CFR 268.
2. Do not co-mix different types of hazardous and non-hazardous waste materials.
3. Store coating debris in EPA approved weatherproof, watertight steel containers.
4. Seal, label, and store in accordance with 49 CFR 178.
5. Notify the COR, provide inventory and approval to move off-site, transport and dispose.
(Revised) 02 83 30 - 11
6. Dispose of waste at EPA permitted RCRA Subtitle C disposal facility.
D. Non-hazardous Waste:
1. Store in labeled closed containers separate from hazardous waste storage areas.
2. Notify the COR, provide inventory and approval to move off-site, transport and dispose.
3. Dispose waste in accordance with local, county, state, and federal regulations.
4. Comply with Section 01 74 00 – Cleaning and Waste Management.
E. Wastewater from Coating Removal Operations:
1. Filter water contaminated with lead-containing coating debris.
2. Dispose of wastewater in accordance with Federal, State, and local regulations.
F. Transport hazardous waste materials in accordance with 40 CFR 263, 49 CFR 107, and applicable regulations contained in 49 CFR Chapter I.
G. Transport waste in secured sealed labeled containers in such a manner to prevent any/all leakage during transport to disposal site.
H. Reclamation reserves the authority to observe the sampling, transport and disposal of all components of the waste stream.
3.03 EMISSIONS MONITORING, GENERAL
A. Sampling protocol shall be in accordance with EPA, National Institute for Occupational Safety and Health (NIOSH), or OSHA sampling criteria.
B. Monitor TSP lead and heavy metal concentration levels of the following:
1. Air monitoring of emissions using personal employee exposure monitors.
2. Sediment analysis for heavy metals.
3. Soil analysis for heavy metals.
C. CIH shall review all sample results for allowable compliance limits.
3.04 AIR QUALITY MONITORING BY AREA AND EMPLOYEE EXPOSURE
PERSONNEL MONITORS
A. Perform employee exposure monitoring to determine exposure to lead and other heavy metals in accordance with NIOSH or OSHA analytical sampling methods.
B. Not to exceed emissions limit standards in 29 CFR 1910.1025, 29 CFR 1926.1118, 29 CFR 1926.1127, 29 CFR 1926.55, and 29 CFR 1926.62.
C. At the same time that employee exposure monitoring is done, monitor airborne contaminants at boundary of regulated area.
(Revised) 02 83 30 - 12
D. If emissions exceed specified maximum allowable concentrations, stop work until the containment system is corrected to meet required standards.
3.05 SOIL ANALYSIS FOR HEAVY METALS
A. Before beginning work, take soil samples at the following sites:
1. Below and at the perimeter of the containment system.
2. Waste storage areas.
B. Take a minimum number of samples as determined by the CIH.
1. Record sample location and depth. Prepare map to identify location of samples.
2. Test samples to determine heavy metal content in accordance with certified laboratory's approved procedure.
C. After completion of removal work, take soil samples at same locations as previous samples.
1. Record sample location and depth. Prepare map to identify location of samples.
2. Test samples to determine heavy metal content in accordance with certified laboratory's approved procedure.
D. Compare with pre-construction test results for increased contaminant levels.
3.06 SEDIMENT ANALYSIS FOR HEAVY METALS
A. Before beginning work, take soil samples at the following sites:
1. Below and at the perimeter of the containment system.
B. After completion of removal work, take sediment samples at same locations as previous samples.
1. Test samples to determine heavy metal content in accordance with certified laboratory's approved procedure.
C. Compare with pre-construction test results for increased contaminant levels.
3.07 REPORTABLE RELEASES
A. Notify applicable agencies and COR.
3.08 CLEARANCE TESTING
A. Non-porous surfaces:
1. Wipe samples: Take wipe samples to collect surface dust in accordance with approved Emissions Monitoring Plan. Follow ASTM E1728 wipe sample collection and analysis criteria.
2. Analyze samples for total lead and other heavy metal content.
(Revised) 02 83 30 - 13
3. Acceptance criteria: Not to exceed 500 micrograms per square foot.
B. Porous surfaces:
1. Visual methods:
a. Visible paint chips and dust.
b. Visible abrasives.
3.09 DECONTAMINATION OF CONTAMINATED AREAS
A. Decontaminate areas and surfaces contaminated with lead and other heavy metals in accordance with approved Emissions Monitoring Plan.
(Revised) 02 83 30 - 14
This page intentionally left blank.
Removal and Disposal of Equipment With Coatings Containing Heavy Metals
(New) 02 83 33 - 1
SECTION 02 83 33
REMOVAL AND DISPOSAL OF EQUIPMENT WITH COATINGS CONTAINING
HEAVY METALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Removal and Disposal of Equipment with Coatings Containing Heavy Metals:
1. Existing Sluice Gate Frames for 15 Gates:
a. Measurement:
1) Include in prices offered in the Price Schedule for structural steel items requiring removal and disposal that contain coatings with heavy metals. Refer to Sections 05 50 00 – Metal Fabrications and 52 00 00 – Drawings for those items to be removed and disposed.
b. Payment: Lump-sum price offered in the schedule.
1) Include the prices for Certified Industrial Hygienist (CIH) oversight and laboratory costs.
2) CIH oversight costs for coatings application shall be included in Section 09 96 20 – Coatings.
3) These items will be removed and disposed of as hazardous waste.
Refer to Part 1.09 – DISPOSING HAZARDOUS WASTE of these specifications.
1.02 DEFINITIONS
A. Competent person:
1. For lead hazards: As defined in 29 CFR 1926.62.
2. For designing and implementing technical controls to limit employee exposure to contaminants: As defined in 29 CFR 1926.55.
B. Handling: Includes containment, collection, storage, and transportation.
C. Regulated area: Areas on project site where Action Level is exceeded for heavy metals.
1.03 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM E 1728-10 Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Lead Determination
(New) 02 83 33 - 2
B. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards, including revisions posted at:
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
C. Code of Federal Regulations (CFR)
1. 29 CFR 1910.1025 Lead
2. 29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists
3. 29 CFR 1926.62 Lead
4. 29 CFR 1926.1118 Inorganic Arsenic
5. 29 CFR 1926.1127 Cadmium
6. 40 CFR 260 Hazardous Waste Management System: General
7. 40 CFR 261 Identification and Listing of Hazardous Waste
8. 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
9. 40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, Disposal Facilities
10. 40 CFR 268 Land Disposal Restrictions
11. 49 CFR 107 Hazardous Materials Program Procedures
12. 49 CFR 178 Specifications for Packagings
13. 49 CFR Chapter I Research and Special Programs Administration, Department of Transportation, Hazardous Materials Regulations
1.04 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 02 83 33-1, Qualifications:
1. Contractor’s On-site Supervisor
a. Completed training and certification in removal and disposal of material containing heavy metals within the last 12 months
C. RSN 02 83 33-2, Plans:
1. Worker Protection Compliance Program:
a. Include information required by 29 CFR 1926.62 (e)(2).
b. Prepared and signed by certified industrial hygienist.
2. Containment System Plan:
(New) 02 83 33 - 3
a. Include:
1) Drawings showing layout, attachment to structure, and relationship to structure.
2) Design calculations for ventilation system.
3) Load analysis for containment system loading on structure.
a) Include wind loads and dead load on containment system from debris, if necessary.
b. Signed and sealed by qualified design professional.
D. RSN 02 83 33-3, Certificate of Disposal:
1. Certification hazardous materials have been treated.
1.05 QUALIFICATIONS
A. Contractor’s Onsite Supervisor Qualifications: Competent person, as defined in 40 CFR 1926.62, experienced working under OSHA and EPA regulations.
B. Certified Industrial Hygienists (CIH): Certified by American Board of Industrial Hygiene
(ABIH).
C. Disposal Facility Qualifications for Hazardous Waste: RCRA permitted facility.
1.06 REGULATORY REQUIREMENTS
A. Solid waste debris is subject to Federal, State, and local requirements. The most stringent regulation shall apply.
1.07 SAFETY AND HEALTH REGULATIONS
A. Comply with USBR RSHS.
B. Comply with 29 CFR 1926.
C. Limit employee exposure to lead and other airborne contaminants in accordance with 29 CFR 1926.55 and 29 CFR 1926.62.
1.08 PROJECT CONDITIONS
A. Existing coating contains lead and may contain other heavy metals. See Section 51 00 20
- Hazardous Materials Reports.
B. The work in this contract will be conducted in a waterway and where drainage from the work area enters a waterway. Release of contaminants during coating removal, surface preparation, surface repair, handling and application of new coatings, and waste handling are prohibited.
(New) 02 83 33 - 4
C. The Contractor will be considered the co-generator of any hazardous waste, in accordance with 40 CFR 260.10.
D. Refer to Section 01 14 20 – Dam and Reservoir Operations for limitations while working in the sluice gate tunnels.
1.09 CONTRACTOR’S RESPONSIBILITIES
A. Obtain EPA Identification number, in accordance with 40 CFR 262.12 before treating, storing, or transporting hazardous waste.
B. Prepare manifest, in accordance with 40 CFR 262 Subpart B, before transporting hazardous waste for offsite treatment, storage, or disposal.
C. Before transporting hazardous waste, obtain written notice from owner or operator of hazardous waste facility, including documentation that facility has required permits and that facility will accept waste to be shipped under this contract, in accordance with 40
CFR 264.12.
D. Obtain certificate of disposal from disposal facility when hazardous waste has been treated.
E. Obtain required transportation permits and a placard vehicle in accordance with Kansas and other governing State Department of Transportation regulations.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CONTAINMENT SYSTEM
A. Design and construct containment system to control emissions to the environment in conformance with Federal, State, and local regulations and the following…
This is the start of the file's text. The full file is on GovTribe.