Project: Kirwin Spillway Gates Guide Replacement and Painting. Remove Drawings in their entirety and substitute therefore the attached revised Drawings.

View the file

Other files

File Type Posted
R17PS00304_Amendment_No_0004.pdf PDF
R17PS00304_Amend_0003.pdf PDF
R17PS00304_Amendment_0001.pdf PDF
R17PS00304.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R17PS00304

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

04/12/2017000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/31/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: Kirwin Spillway Gates Guide Replacement and Painting

See Page 2 of 2 for changes incorporated by this Amendment

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0002

Solicitation No. R17PS00304

Description of Changes:

1. DRAWINGS – Remove Drawings in their entirety and substitute therefore the attached revised Drawings.

371–D-1

371-D-47

371-D-48

371–D-49

371-D-127

371-D-128

371-D-108

371-D-31

371-M-3-1

371-D-229

371-D-230

371-D-160

371-D-161

371-600-60002

371-600-60003

2. The time and date proposals are due remains unchanged at May 11, 2017 at 3:00 p.m. Mountain Time.

FORINFORMATIONONLY

clarsen Text Box

This Page Intentionally Left Blank

Line clarsen Line clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen

CLarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen clarsen Line clarsen Typewritten Text

FOR INFORMATION ONLY

clarsen

A

LW

A

YS

T H

IN

K

S A

FE

TY

D

C

B

A

D

C

B

A

LAR M TA IOCE N

1' 2' 3'0 1' 2' 3'0

D ra ft

CLarsen

A

LW

A

YS

T H

IN

K

S A

FE

TY

D

C

B

A

D

C

B

A

LAR M TA IOCE N

3" 6" 9"0 3" 6" 9"0

3" 6" 9"0

3" 6" 9"0

3" 6" 9"03" 6" 9"0

D ra ft

CLarsen

File details come from the government source that posted it. Updated .