Tab_13_Attachment_9_Subcontract_Worksheet.docx

DOCX document 13 KB Posted

Attached to
Cutter Lateral Reach 22B Federal contract opportunity
Solicitation number
R16PS01019
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment 9 Subcontract Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Cutter Lateral Reach 22B, newest first.
File Type Posted
Tab_13_Amendment_4_Attachment_2_Drawing_76-1695-D-60096.pdf PDF
Tab_13_Amendment_4_Attachment_1_Specifications.pdf PDF
Tab_13_Amendment_4_SF30_as_posted_in_FedConnect.pdf PDF
Tab_13_Amendment_3_SF30_as_posted_in_FedConnect.pdf PDF
Tab_13_Amendment_3_Attachment_2_Reach_22b_Q A_Amendment__3R__(1).docx DOCX document
Tab_13_Amendment_3_Attachment_1_Revised_Specifications_Sections.pdf PDF
Tab_13_Amendment_2_Attachment_4_REVISED_Section_F_R16PS01019_T C's.pdf PDF
Tab_13_Amendment_2_SF-30_Sol_R16PS01019_Amd_000002.pdf PDF
Tab_13_Amendment_2_Attachment_2_REVISED_00_00_02_-_Drawings.pdf PDF
Tab_13_Amendment_2_Attachment_1_REVISED_00_00_01_-_Specifications.pdf PDF
Tab_13_Amendment_2_Attachment_3_Q_and_A.pdf PDF
Tab_13_Amendment_1_Attachment_2_Site_Tour_Sign-in_Sheet.pdf PDF
Tab_13_Amendment_1_Attachment_1_Indian_Preference_Clauses.docx DOCX document
Tab_13_Amendment_1_SF-30.pdf PDF
Tab_13_Amendment_1_Attachment_3_Q_and_A.docx DOCX document
Tab_13_Attachment_4_Drawings_Part3.pdf PDF
Tab_13_R16PS01019.pdf PDF
Tab_13_Attachment_7_Wage_Rate_Requirements_(Construction)_Wage_Determinations_pulled_6-13-2016.pdf PDF
Tab_13_Attachment_8_Past_Performance_Questionnaire.docx DOCX document
Tab_13_Attachment_5_Geology_Drawings_04-05-2016.pdf PDF
Tab_13_Attachment_1_R16PS01019_Specifications.pdf PDF
Tab_13_Attachment_2_Drawings_Part1.pdf PDF
Tab_13_Attachment_3_Drawings_Part2.pdf PDF
Tab_13_Attachment_6_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Tab_09_Synopsis.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF THE INTERIOR

FAR CLAUSE 52.219-14, LIMITATIONS OF SUBCONTRACTING

SUBCONTRACTING PERCENTAGE WORKSHEET

PRIME CONTRACTOR:

SOURCE:

SUBCONTRACTOR:

SOURCE:

PRIME CONTRACTOR
SUBCONTRACTOR
Direct Labor
$
$
Fringe Benefits*
$
$
SUBTOTAL
(A)$
(B)$
Labor G&A** @ %
$
$
TOTAL LABOR COSTS
(C)$
(D)$

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and or the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTAOTAL figure in space (A).

Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE =

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs.

***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs, use it in the formulation above. If you do not have a break down, you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.

File details come from the government source that posted it. Updated .