Tab_13_Attachment_6_Continuation_of_Section_B_in_Excel_Format.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Cutter Lateral Reach 22B Federal contract opportunity
- Solicitation number
- R16PS01019
About this file
Attachment 6 Continuation of Section B in Excel Format
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTINUATION OF |
| SECTION B - SUPPLIES OR SERVICES AND PRICE |
B.1 PRICE SCHEDULE
| (a) Offers will be considered for award on the following Price Schedule, but no offer will be |
| considered for award on only a part of the Price Schedule. |
(b) Offers are subject to the terms and conditions of this solicitation.
| (c) Quantities in the Price Schedule are estimated quantities for comparison of offers only. |
| Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, |
| no claim shall be made against the Government for overruns or underruns. The contract clause at |
| FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items. |
| (d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, |
| for CLIN 1. |
| (e) Definitions: |
| (1) CLIN - Contract Line Item Number. |
| PRICE SCHEDULE | ||||||
| CLIN | Section | Supplies or Services | Quantity and Unit | Unit Price | Amount | |
| 1 | WBR 1452.232-81 | Mobilization and Preparatory Work | For the lump sum of | |||
| 2 | 01 31 30 | Contract Document Management System | For the lump sum of | $ | ||
| 3 | 01 33 26 | Electrical Drawings and Data | For the lump sum of | $ | ||
| 4 | 01 56 15 | Utility Investigation | For the lump sum of | $ | ||
| 5 | 22 11 35 | Pre-manufactured Pump Station No. 1 | For the lump sum of | $ | ||
| 6 | 22 11 35 | Pre-manufactured Pump Station No. 2 | For the lump sum of | $ | ||
| 7 | 25 00 01 | SCADA System | For the lump sum of | $ | ||
| 8 | 26 05 02 | Complete Electrical System | For the lump sum of | $ | ||
| 9 | 26 42 10 | Buried Galvanic Anode Cathodic Protection and Corrosion Monitoring Systems | For the lump sum of | $ | ||
| 10 | 26 42 11 | Submerged Galvanic Anode Cathodic Protection System For Welded Tanks | For the lump sum of | $ | ||
| 11 | 26 42 12 | Bolted Tank Submerged Galvanic Anode Cathodic Protection System | For the lump sum of | $ | ||
| 12 | 31 02 10 | Water for Dust Abatement | 7,900 Mgal | $ | $ | |
| 13 | 31 02 30 | Dust Palliative | 84,000 lin ft | $ | $ | |
| 14 | 31 11 00 | Clearing and Grubbing | For the lump sum of | $ | ||
| 15 | 31 14 10 | Stripping, Stockpiling, and Placement | For the lump sum of | $ | ||
| 16 | 31 23 10 | Common Excavation | 2,900 yd3 | $ | $ | |
| 17 | 31 23 10 | Placing and Compacting Backfill | 2,800 yd3 | $ | $ | |
| 18 | 31 23 22 | Common Excavation for Pipe Trenches | 115,000 yd3 | $ | $ | |
| 19 | 31 23 22 | Rock Excavation for Pipe Trenches | 33,000 yd3 | $ | $ | |
| 20 | 31 23 22 | Backfill for Pipe Trenches | 115,000 yd3 | $ | $ | |
| 21 | 31 23 22 | Compacting Backfill in Pipe Trenches | 900 yd3 | $ | $ | |
| 22 | 31 37 00 | Cobble Channel Lining | 230 yd3 | $ | $ | |
| 23 | 32 15 10 | Gravel Surfacing | 1,400 yd3 | $ | $ | |
| 24 | 32 31 10 | Chain Link Fence | 1,400 lin ft | $ | $ | |
| 25 | 32 91 60 | Erosion Control Blanket | 10,500 yd2 | $ | $ | |
| 26 | 32 92 20 | Seeding | 84,000 lin ft | $ | $ | |
| 27 | 33 05 21 | Bore and Jack Station 22251+30 to 22252+80 | For the lump sum of | $ | ||
| 28 | 33 05 21 | Bore and Jack Station 22283+50 to 22285+90 | For the lump sum of | $ | ||
| 29 | 33 05 21 | Bore and Jack Station 22415+40 to 22418+00 | For the lump sum of | $ | ||
| 30 | 33 05 21 | Bore and Jack Station 22938+50 to 22939+55 | For the lump sum of | $ | ||
| 31 | 33 11 10 | 24B50 | 540 lin ft | $ | $ | |
| 32 | 33 11 10 | 24D50 | 550 lin ft | $ | $ | |
| 33 | 33 11 10 | 24B75 | 2,500 lin ft | $ | $ | |
| 34 | 33 11 10 | 24B100 | 1,400 lin ft | $ | $ | |
| 35 | 33 11 10 | 24B125 | 1,100 lin ft | $ | $ | |
| 36 | 33 11 10 | 24B150 | 1,500 lin ft | $ | $ | |
| 37 | 33 11 10 | 24B175 | 1,000 lin ft | $ | $ | |
| 38 | 33 11 10 | 24C175 | 290 lin ft | $ | $ | |
| 39 | 33 11 10 | 24D175 | 350 lin ft | $ | $ | |
| 40 | 33 11 10 | 24B200 | 2,700 lin ft | $ | $ | |
| 41 | 33 11 10 | 24C200 | 900 lin ft | $ | $ | |
| 42 | 33 11 10 | 24B225 | 1,900 lin ft | $ | $ | |
| 43 | 33 11 10 | 24C225 | 600 lin ft | $ | $ | |
| 44 | 33 11 10 | 24B250 | 1,500 lin ft | $ | $ | |
| 45 | 33 11 10 | 24C250 | 390 lin ft | $ | $ | |
| 46 | 33 11 10 | 24B275 | 1,800 lin ft | $ | $ | |
| 47 | 33 11 10 | 24B300 | 800 lin ft | $ | $ | |
| 48 | 33 11 10 | 24C300 | 500 lin ft | $ | $ | |
| 49 | 33 11 10 | 24D300 | 590 lin ft | $ | $ | |
| 50 | 33 11 10 | 24B325 | 3,200 lin ft | $ | $ | |
| 51 | 33 11 10 | 24C325 | 600 lin ft | $ | $ | |
| 52 | 33 11 10 | 24B350 | 2,900 lin ft | $ | $ | |
| 53 | 33 11 10 | 24C350 | 300 lin ft | $ | $ | |
| 54 | 33 11 10 | 24B375 | 6,300 lin ft | $ | $ | |
| 55 | 33 11 10 | 24C375 | 300 lin ft | $ | $ | |
| 56 | 33 11 10 | 24B400 | 5,000 lin ft | $ | $ | |
| 57 | 33 11 10 | 24C400 | 900 lin ft | $ | $ | |
| 58 | 33 11 10 | 24D400 | 590 lin ft | $ | $ | |
| 59 | 33 11 10 | 24B425 | 4,700 lin ft | $ | $ | |
| 60 | 33 11 10 | 24C425 | 1,200 lin ft | $ | $ | |
| 61 | 33 11 10 | 24B450 | 2,200 lin ft | $ | $ | |
| 62 | 33 11 10 | 24C450 | 600 lin ft | $ | $ | |
| 63 | 33 11 10 | 24B475 | 2,800 lin ft | $ | $ | |
| 64 | 33 11 10 | 24C475 | 980 lin ft | $ | $ | |
| 65 | 33 11 10 | 24D475 | 300 lin ft | $ | $ | |
| 66 | 33 11 10 | 24B500 | 2,400 lin ft | $ | $ | |
| 67 | 33 11 10 | 24C500 | 300 lin ft | $ | $ | |
| 68 | 33 11 10 | 24D500 | 400 lin ft | $ | $ | |
| 69 | 33 11 10 | 24B525 | 8,200 lin ft | $ | $ | |
| 70 | 33 11 10 | 24C525 | 1,600 lin ft | $ | $ | |
| 71 | 33 11 10 | 24D525 | 700 lin ft | $ | $ | |
| 72 | 33 11 10 | 24C540 | 450 lin ft | $ | $ | |
| 73 | 33 11 10 | 24B550 | 800 lin ft | $ | $ | |
| 74 | 33 11 10 | 24B575 | 600 lin ft | $ | $ | |
| 75 | 33 11 10 | 24B600 | 4,100 lin ft | $ | $ | |
| 76 | 33 11 10 | 24C600 | 250 lin ft | $ | $ | |
| 77 | 33 11 10 | 24D600 | 400 lin ft | $ | $ | |
| 78 | 33 11 10 | 24B625 | 4,600 lin ft | $ | $ | |
| 79 | 33 11 10 | 24C625 | 2,500 lin ft | $ | $ | |
| 80 | 33 11 10 | 24B650 | 1,900 lin ft | $ | $ | |
| 81 | 33 11 10 | 24C650 | 600 lin ft | $ | $ | |
| 82 | 33 11 10 | 24C675 | 560 lin ft | $ | $ | |
| 83 | 33 11 10 | 24D675 | 300 lin ft | $ | $ | |
| 84 | 33 11 10 | Filling and Testing Water | 1,900 Mgal | $ | $ | |
| 85 | 33 11 10 | Repair Kit | For the lump sum of | $ | ||
| 86 | 33 12 05 | NAPI Turnout | For the lump sum of | $ | ||
| 87 | 33 12 10 | Class 150B Two Inch Diameter Air Valve Assemblies | 8 ea | $ | $ | |
| 88 | 33 12 10 | Class 250B Two Inch Diameter Air Valve Assemblies | 22 ea | $ | $ | |
| 89 | 33 12 10 | Class 150 B Four Inch Diameter Blowoffs | 1 ea | $ | $ | |
| 90 | 33 12 10 | Class 250 B Four Inch Diameter Blowoffs | 6 ea | $ | $ | |
| 91 | 33 16 14 | Air Chamber No. 1 | For the lump sum of | $ | ||
| 92 | 33 16 14 | Air Chamber No. 2 | For the lump sum of | $ | ||
| 93 | 33 16 50 | Regulating Tank No. 1 | For the lump sum of | $ | ||
| 94 | 33 16 50 | Regulating Tank No. 2 | For the lump sum of | $ | ||
| 95 | 33 42 30 | 24 Inch Diameter Metal Culverts | 210 lin ft | $ | $ | |
| 96 | 35 21 95 | Steel Piping | For the lump sum of | $ | ||
| 97 | 35 22 15 | Valves and Equipment | For the lump sum of | $ | ||
| 98 | 35 42 35 | Wash Crossing Sta 22276+75 to 22279+25 | For the lump sum of | $ | ||
| 99 | 35 42 35 | Wash Crossing Sta 22343+25 to 22344+50 | For the lump sum of | $ | ||
| 100 | 35 42 35 | Wash Crossing Sta 22443+50 to 22450+50 | For the lump sum of | $ |
TOTAL FOR PRICE SCHEDULE $______________________