Tab_13_Attachment_6_Continuation_of_Section_B_in_Excel_Format.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Cutter Lateral Reach 22B Federal contract opportunity
Solicitation number
R16PS01019
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment 6 Continuation of Section B in Excel Format

View the file

Other files for this federal contract opportunity

Other files attached to Cutter Lateral Reach 22B, newest first.
File Type Posted
Tab_13_Amendment_4_Attachment_2_Drawing_76-1695-D-60096.pdf PDF
Tab_13_Amendment_4_Attachment_1_Specifications.pdf PDF
Tab_13_Amendment_4_SF30_as_posted_in_FedConnect.pdf PDF
Tab_13_Amendment_3_SF30_as_posted_in_FedConnect.pdf PDF
Tab_13_Amendment_3_Attachment_2_Reach_22b_Q A_Amendment__3R__(1).docx DOCX document
Tab_13_Amendment_3_Attachment_1_Revised_Specifications_Sections.pdf PDF
Tab_13_Amendment_2_Attachment_4_REVISED_Section_F_R16PS01019_T C's.pdf PDF
Tab_13_Amendment_2_SF-30_Sol_R16PS01019_Amd_000002.pdf PDF
Tab_13_Amendment_2_Attachment_2_REVISED_00_00_02_-_Drawings.pdf PDF
Tab_13_Amendment_2_Attachment_1_REVISED_00_00_01_-_Specifications.pdf PDF
Tab_13_Amendment_2_Attachment_3_Q_and_A.pdf PDF
Tab_13_Amendment_1_Attachment_2_Site_Tour_Sign-in_Sheet.pdf PDF
Tab_13_Amendment_1_Attachment_1_Indian_Preference_Clauses.docx DOCX document
Tab_13_Amendment_1_SF-30.pdf PDF
Tab_13_Amendment_1_Attachment_3_Q_and_A.docx DOCX document
Tab_13_Attachment_4_Drawings_Part3.pdf PDF
Tab_13_Attachment_9_Subcontract_Worksheet.docx DOCX document
Tab_13_R16PS01019.pdf PDF
Tab_13_Attachment_7_Wage_Rate_Requirements_(Construction)_Wage_Determinations_pulled_6-13-2016.pdf PDF
Tab_13_Attachment_8_Past_Performance_Questionnaire.docx DOCX document
Tab_13_Attachment_5_Geology_Drawings_04-05-2016.pdf PDF
Tab_13_Attachment_1_R16PS01019_Specifications.pdf PDF
Tab_13_Attachment_2_Drawings_Part1.pdf PDF
Tab_13_Attachment_3_Drawings_Part2.pdf PDF
Tab_09_Synopsis.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTINUATION OF
SECTION B - SUPPLIES OR SERVICES AND PRICE

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be
considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity,
no claim shall be made against the Government for overruns or underruns. The contract clause at
FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work,
for CLIN 1.
(e) Definitions:
(1) CLIN - Contract Line Item Number.
PRICE SCHEDULE
CLINSectionSupplies or ServicesQuantity and UnitUnit PriceAmount
1WBR 1452.232-81Mobilization and Preparatory WorkFor the lump sum of
201 31 30Contract Document Management SystemFor the lump sum of$
301 33 26Electrical Drawings and DataFor the lump sum of$
401 56 15Utility InvestigationFor the lump sum of$
522 11 35Pre-manufactured Pump Station No. 1For the lump sum of$
622 11 35Pre-manufactured Pump Station No. 2For the lump sum of$
725 00 01SCADA SystemFor the lump sum of$
826 05 02Complete Electrical SystemFor the lump sum of$
926 42 10Buried Galvanic Anode Cathodic Protection and Corrosion Monitoring SystemsFor the lump sum of$
1026 42 11Submerged Galvanic Anode Cathodic Protection System For Welded TanksFor the lump sum of$
1126 42 12Bolted Tank Submerged Galvanic Anode Cathodic Protection SystemFor the lump sum of$
1231 02 10Water for Dust Abatement7,900 Mgal$$
1331 02 30Dust Palliative84,000 lin ft$$
1431 11 00Clearing and GrubbingFor the lump sum of$
1531 14 10Stripping, Stockpiling, and PlacementFor the lump sum of$
1631 23 10Common Excavation2,900 yd3$$
1731 23 10Placing and Compacting Backfill2,800 yd3$$
1831 23 22Common Excavation for Pipe Trenches115,000 yd3$$
1931 23 22Rock Excavation for Pipe Trenches33,000 yd3$$
2031 23 22Backfill for Pipe Trenches115,000 yd3$$
2131 23 22Compacting Backfill in Pipe Trenches900 yd3$$
2231 37 00Cobble Channel Lining230 yd3$$
2332 15 10Gravel Surfacing1,400 yd3$$
2432 31 10Chain Link Fence1,400 lin ft$$
2532 91 60Erosion Control Blanket10,500 yd2$$
2632 92 20Seeding84,000 lin ft$$
2733 05 21Bore and Jack Station 22251+30 to 22252+80For the lump sum of$
2833 05 21Bore and Jack Station 22283+50 to 22285+90For the lump sum of$
2933 05 21Bore and Jack Station 22415+40 to 22418+00For the lump sum of$
3033 05 21Bore and Jack Station 22938+50 to 22939+55For the lump sum of$
3133 11 1024B50540 lin ft$$
3233 11 1024D50550 lin ft$$
3333 11 1024B752,500 lin ft$$
3433 11 1024B1001,400 lin ft$$
3533 11 1024B1251,100 lin ft$$
3633 11 1024B1501,500 lin ft$$
3733 11 1024B1751,000 lin ft$$
3833 11 1024C175290 lin ft$$
3933 11 1024D175350 lin ft$$
4033 11 1024B2002,700 lin ft$$
4133 11 1024C200900 lin ft$$
4233 11 1024B2251,900 lin ft$$
4333 11 1024C225600 lin ft$$
4433 11 1024B2501,500 lin ft$$
4533 11 1024C250390 lin ft$$
4633 11 1024B2751,800 lin ft$$
4733 11 1024B300800 lin ft$$
4833 11 1024C300500 lin ft$$
4933 11 1024D300590 lin ft$$
5033 11 1024B3253,200 lin ft$$
5133 11 1024C325600 lin ft$$
5233 11 1024B3502,900 lin ft$$
5333 11 1024C350300 lin ft$$
5433 11 1024B3756,300 lin ft$$
5533 11 1024C375300 lin ft$$
5633 11 1024B4005,000 lin ft$$
5733 11 1024C400900 lin ft$$
5833 11 1024D400590 lin ft$$
5933 11 1024B4254,700 lin ft$$
6033 11 1024C4251,200 lin ft$$
6133 11 1024B4502,200 lin ft$$
6233 11 1024C450600 lin ft$$
6333 11 1024B4752,800 lin ft$$
6433 11 1024C475980 lin ft$$
6533 11 1024D475300 lin ft$$
6633 11 1024B5002,400 lin ft$$
6733 11 1024C500300 lin ft$$
6833 11 1024D500400 lin ft$$
6933 11 1024B5258,200 lin ft$$
7033 11 1024C5251,600 lin ft$$
7133 11 1024D525700 lin ft$$
7233 11 1024C540450 lin ft$$
7333 11 1024B550800 lin ft$$
7433 11 1024B575600 lin ft$$
7533 11 1024B6004,100 lin ft$$
7633 11 1024C600250 lin ft$$
7733 11 1024D600400 lin ft$$
7833 11 1024B6254,600 lin ft$$
7933 11 1024C6252,500 lin ft$$
8033 11 1024B6501,900 lin ft$$
8133 11 1024C650600 lin ft$$
8233 11 1024C675560 lin ft$$
8333 11 1024D675300 lin ft$$
8433 11 10Filling and Testing Water1,900 Mgal$$
8533 11 10Repair KitFor the lump sum of$
8633 12 05NAPI TurnoutFor the lump sum of$
8733 12 10Class 150B Two Inch Diameter Air Valve Assemblies8 ea$$
8833 12 10Class 250B Two Inch Diameter Air Valve Assemblies22 ea$$
8933 12 10Class 150 B Four Inch Diameter Blowoffs1 ea$$
9033 12 10Class 250 B Four Inch Diameter Blowoffs6 ea$$
9133 16 14Air Chamber No. 1For the lump sum of$
9233 16 14Air Chamber No. 2For the lump sum of$
9333 16 50Regulating Tank No. 1For the lump sum of$
9433 16 50Regulating Tank No. 2For the lump sum of$
9533 42 3024 Inch Diameter Metal Culverts210 lin ft$$
9635 21 95Steel PipingFor the lump sum of$
9735 22 15Valves and EquipmentFor the lump sum of$
9835 42 35Wash Crossing Sta 22276+75 to 22279+25For the lump sum of$
9935 42 35Wash Crossing Sta 22343+25 to 22344+50For the lump sum of$
10035 42 35Wash Crossing Sta 22443+50 to 22450+50For the lump sum of$

TOTAL FOR PRICE SCHEDULE $______________________