Tab_13_Amendment_2_Attachment_2_REVISED_00_00_02_-_Drawings.pdf

PDF 7 MB Posted

Attached to
Cutter Lateral Reach 22B Federal contract opportunity
Solicitation number
R16PS01019
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment 2 - Revised Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Cutter Lateral Reach 22B, newest first.
File Type Posted
Tab_13_Amendment_4_Attachment_2_Drawing_76-1695-D-60096.pdf PDF
Tab_13_Amendment_4_Attachment_1_Specifications.pdf PDF
Tab_13_Amendment_4_SF30_as_posted_in_FedConnect.pdf PDF
Tab_13_Amendment_3_SF30_as_posted_in_FedConnect.pdf PDF
Tab_13_Amendment_3_Attachment_2_Reach_22b_Q A_Amendment__3R__(1).docx DOCX document
Tab_13_Amendment_3_Attachment_1_Revised_Specifications_Sections.pdf PDF
Tab_13_Amendment_2_Attachment_3_Q_and_A.pdf PDF
Tab_13_Amendment_2_Attachment_4_REVISED_Section_F_R16PS01019_T C's.pdf PDF
Tab_13_Amendment_2_SF-30_Sol_R16PS01019_Amd_000002.pdf PDF
Tab_13_Amendment_2_Attachment_1_REVISED_00_00_01_-_Specifications.pdf PDF
Tab_13_Amendment_1_Attachment_3_Q_and_A.docx DOCX document
Tab_13_Amendment_1_Attachment_2_Site_Tour_Sign-in_Sheet.pdf PDF
Tab_13_Amendment_1_Attachment_1_Indian_Preference_Clauses.docx DOCX document
Tab_13_Amendment_1_SF-30.pdf PDF
Tab_13_Attachment_2_Drawings_Part1.pdf PDF
Tab_13_Attachment_3_Drawings_Part2.pdf PDF
Tab_13_Attachment_6_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Tab_13_Attachment_4_Drawings_Part3.pdf PDF
Tab_13_Attachment_9_Subcontract_Worksheet.docx DOCX document
Tab_13_R16PS01019.pdf PDF
Tab_13_Attachment_7_Wage_Rate_Requirements_(Construction)_Wage_Determinations_pulled_6-13-2016.pdf PDF
Tab_13_Attachment_8_Past_Performance_Questionnaire.docx DOCX document
Tab_13_Attachment_5_Geology_Drawings_04-05-2016.pdf PDF
Tab_13_Attachment_1_R16PS01019_Specifications.pdf PDF
Tab_09_Synopsis.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC

No. 1

480V

RECEPTACLE

NO. 1

SPARE480V

RECEPTACLE

NO. 2

HVAC

No. 2

FLOW

CONTROL

VAULT

UXA1 UXA2

KXA

1500 kVA

13.8 kV - 4.16/2.4 kV

KPA

150 kVA

4.16 kV - 480/277 V

KPB

15 kVA 480 - 208/120 V

PM1

POWER MONITOR

Modbus RTU

ISW ISW ISW

MPA5

P.

F.

C A

PA

C

IT

O R

P.

F.

C A

PA

C

IT

O R

P.

F.

C A

PA

C

IT

O R

M2

UNIT NO. 2

200 HP

M3

UNIT NO. 3

200 HP

M4

UNIT NO. 4

200 HP

RVSS2 RVSS3 RVSS4

PFC PFC PFC

480-120 V

30100

RECEP - PUMPING PLANT CKT 1

20100

RECEP - PUMPING PLANT CKT 2

20100

INTERIOR LIGHTING

20100

EXTERIOR LIGHTING

20100

SCADA

20100

EMERGENCY & EXIT LIGHTS

20100

UNIT HEATER

20100

25100

INTERIOR LIGHTING

20100

EXTERIOR LIGHTS

20100

AIR CHAMBER CONTROL

AND SCADA

20100

RECEPTACLES 1

20100

EXHAUST FAN &

DAMPER MOTOR

20100

V1.2

UNIT 1

DSCHG VLV

V2.2

UNIT 2

DSCHG VLV

V3.2

UNIT 3

DSCHG VLV

V4.2

UNIT 4

DSCHG VLV

4160-120 V

ISW

RVSS1

PFC

CT

GCT

M1

UNIT NO. 1

200 HP

4160 - 120V

MPR

PM2

POWER MONITOR

Modbus RTU

DPB

DPAC

MPA (MCE REACH 22B PP1)

SWITCHBOARD DPA

P.

F.

C A

PA

C

IT

O R

Note 4.

RECEPTACLES 2

20100

Note 5.

V1.4

UNIT 1

DSCHG VLV

V1.5

UNIT 1

DSCHG VLV

V1.7

UNIT 1

DSCHG VLV

PRE-MANUFACTURED PUMP STATION

3-Wye-300:5A C20

PRIMARY UNIT SUBSTATION

3-Delta-100:5A C10

50/51

50/51

11KXA

PRIMARY UNIT SUBSTATION ENCLOSURE LIGHTING

20 100

PRIMARY UNIT SUBSTATION ENCLOSURE RECEP

20 100

PRIMARY UNIT SUBSTATION RECP & LIGHT

20 100

11KXA - BUS PROTECTION RELAY

20 100

CONTROL POWER UXA2

20 100

CONTROL POWER UXA1

20 100

UXA/KXA SPACE HEATER

30 100

FROM UTILITY TAP

1-100:5A C20

A

LW

A

YS

T H

IN

K

S A

FE

TY

D

C

B

A

D

C

B

A

LAR M TA IOCE N

NOTES

EXPLANATION

DEVICE LOCATION DESCRIPTION

11KXA Primary Unit Substation

MULTIFUNCTION TRANSFORMER

PROTECTIVE RELAY

MPR Motor starter

MULTIFUNCTION MOTOR PROTECTIVE

RELAY

PM1 MPA POWER MONITOR 1

PM2 DPA POWER MONITOR 2

RVSS1 Motor starter

MOTOR 1 REDUCED VOLTAGE SOFT

STARTER (SIMILAR FOR MOTORS 2

THROUGH 4)

3. Facility equipment designations:

DPA 480 Volt Station-Service Switchboard DPAC Air Chamber Building 208/120 Volt Panelboard DPB Pump Station 208/120 Volt Panelboard KPA 4.16kV-480 Volt Station-Service Transformer KPB 480-208/120 Volt Station-Service Transformer KXA 13.8-4.16 kVolt Primary Unit Substation Transformer M1-M4 Main Pump Motors MPA Pump Station Motor Control Equipment MPA5 Medium Voltage Feeder Breaker for Station-Service UXA1 15KV Switchgear UXA2 4.16KV Switchgear

1. Pre-Manufactured Pump Station Single Line Diagram for reference only. Actual distribution equipment ratings and arrangement to be determined by pump station supplier.

2. Circuit breaker ratings are estimated. Actual ratings to be determined by contractor based on equipment furnished.

4. Air Chamber Panelboard, DPAC, provided by others. Power to be supplied from pre-manufactured pump station 208/120 V power panel. Approximate load 8kVA.

5. Approximate load 10kVA. See drawing 1695-D-375 for panelboard schedule.

REFERENCE DRAWINGS

Flow Control Vault Plan Panelboard Schedule 1695-D-375

R el ea se d

HVAC

No. 1

480V

RECEPTACLE

NO. 1

SPARE480V

RECEPTACLE

NO. 2

HVAC

No. 2

UXA1 UXA2

KXA

1500 kVA

24.9 kV - 4.16/2.4 kV

KPA

150 kVA

4.16 kV - 480/277 V

KPB

15 kVA 480 - 208/120 V

PM1

POWER MONITOR

Modbus RTU

ISW ISW ISW

MPA5

P.

F.

C A

PA

C

IT

O R

P.

F.

C A

PA

C

IT

O R

P.

F.

C A

PA

C

IT

O R

RVSS2 RVSS3 RVSS4

PFC PFC PFC

480-120 V

30100

RECEP - PUMPING PLANT CKT 1

20100

RECEP - PUMPING PLANT CKT 2

20100

INTERIOR LIGHTING

20100

EXTERIOR LIGHTING

20100

SCADA

20100

EMERGENCY & EXIT LIGHTS

20100

UNIT HEATER

20100

25100

INTERIOR LIGHTING

20100

EXTERIOR LIGHTS

20100

AIR CHAMBER CONTROL

AND SCADA

20100

RECEPTACLES 1

20100

EXHAUST FAN &

DAMPER MOTOR

20100

4160-120 V

ISW

RVSS1

PFC

CT

GCT

FU

4160 - 120V

MPR

PM2

POWER MONITOR

Modbus RTU

PRIMARY UNIT SUBSTATION

DPB

DPAC

MPA (MCE REACH 22B PP1)

SWITCHBOARD DPA

P.

F.

C A

PA

C

IT

O R

Note 4.

RECEPTACLES 2

20100

PRE-MANUFACTURED PUMP STATION

V1.7

UNIT 1

DSCHG VLV

V1.5

UNIT 1

DSCHG VLV

V1.4

UNIT 1

DSCHG VLV

V4.2

UNIT 4

DSCHG VLV

V3.2

UNIT 3

DSCHG VLV

V2.2

UNIT 2

DSCHG VLV

V1.2

UNIT 1

DSCHG VLV

M1

UNIT NO. 1

250 HP

M4

UNIT NO. 4

250 HP

M3

UNIT NO. 3

250 HP

M2

UNIT NO. 2

250 HP

50/51

50/51

11KXA

FROM UTILITY TAP

CONTROL POWER UXA1

20 100

UXA/KXA SPACE HEATER

30 100

CONTROL POWER UXA2

20 100

11KXA - BUS PROTECTION RELAY

20 100

PRIMARY UNIT SUBSTATION RECP & LIGHT

20 100

PRIMARY UNIT SUBSTATION ENCLOSURE RECP

20 100

PRIMARY UNIT SUBSTATION ENCLOSURE LIGHTING

20 100

A

LW

A

YS

T H

IN

K

S A

FE

TY

D

C

B

A

D

C

B

A

LAR M TA IOCE N

NOTES

EXPLANATION

DEVICE LOCATION DESCRIPTION

11KXA Primary Unit Substation

MULTIFUNCTION TRANSFORMER

PROTECTIVE RELAY

MPR Motor starter

MULTIFUNCTION MOTOR PROTECTIVE

RELAY

PM1 MPA POWER MONITOR 1

PM2 DPA POWER MONITOR 2

RVSS1 Motor starter

MOTOR 1 REDUCED VOLTAGE SOFT

STARTER (SIMILAR FOR MOTORS 2

THROUGH 4)

3. Facility equipment designations:

DPA 480 Volt Station-Service Switchboard DPAC Air Chamber Building 208/120 Volt Panelboard DPB Pump Station 208/120 Volt Panelboard KPA 4.16kV-480 Volt Station-Service Transformer KPB 480-208/120 Volt Station-Service Transformer KXA 24.9-4.16 kVolt Primary Unit Substation Transformer M1-M4 Main Pump Motors MPA Pump Station Motor Control Equipment MPA5 Medium Voltage Feeder Breaker for Station-Service UXA1 25KV Switchgear UXA2 4.16KV Switchgear

1. Pre-Manufactured Pump Station Single Line Diagram for reference only. Actual distribution equipment ratings and arrangement to be determined by pump station supplier.

2. Circuit breaker ratings are estimated. Actual ratings to be determined by contractor based on equipment furnished.

4. Air Chamber Panelboard, DPAC, provided by others. Power to be supplied from pre-manufactured pump station 208/120 V power panel. Approximate load 8kVA.

R el ea se d

004 - 1695-D-60005
005 - 1695-D-60006
006 - 1695-D-60007
007 - 1695-D-60008
011 - 1695-D-60022
098 - 1695-D-60215-RD-1
100 - 1695-D-60217-RD-1
102 - 1695-D-60219
103 - 1695-D-60220
106 - 1695-D-60223
107 - 1695-D-60224

File details come from the government source that posted it. Updated .