Tab_14_-_Attachment_4_Subcontract_Worksheet_R16PS00929.docx
DOCX document 13 KB Posted
- Attached to
- Lemon Dam High Pressure Gate Modification Federal contract opportunity
- Solicitation number
- R16PS00929
About this file
Attachment 4 Subcontract Worksheet
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
FAR CLAUSE 52.219-14, LIMITATIONS OF SUBCONTRACTING
SUBCONTRACTING PERCENTAGE WORKSHEET
PRIME CONTRACTOR:
SOURCE:
SUBCONTRACTOR:
SOURCE:
| PRIME CONTRACTOR |
| SUBCONTRACTOR |
| Direct Labor |
| $ |
| $ |
| Fringe Benefits* |
| $ |
| $ |
| SUBTOTAL |
| (A)$ |
| (B)$ |
| Labor G&A** @ % |
| $ |
| $ |
| TOTAL LABOR COSTS |
| (C)$ |
| (D)$ |
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and or the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTAOTAL figure in space (A).
Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE =
*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs.
***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs, use it in the formulation above. If you do not have a break down, you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.
File details come from the government source that posted it. Updated .