PRICE_SCHEDULE_for_Amendment_4.docx

DOCX document 19 KB Posted

Attached to
Lemon Dam High Pressure Gate Modification Federal contract opportunity
Solicitation number
R16PS00929
Issued by
Department of the Interior Bureau of Reclamation

About this file

Price Schedule for Amendment 4

View the file

Other files for this federal contract opportunity

Other files attached to Lemon Dam High Pressure Gate Modification, newest first.
File Type Posted
Amendment_004_SF_30.pdf PDF
519-D-93.pdf PDF
519-D-94.pdf PDF
Solicitation_Questions_and_Answers_7.19.2016.docx DOCX document
TrashRackPhotos.pdf PDF
SF_30_Amendment_003.pdf PDF
Solicitation_Questions_(1).docx DOCX document
Sol_R16PS00929_Amd_000002_SF_30.pdf PDF
Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I_7.7.16.docx DOCX document
site_visit_sign_in_sheet_7.6.16.pdf PDF
Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I_7.5.16.pdf PDF
SpecificationLemonDam_revised_7.5.16.pdf PDF
Summary_of_changes_Ammendment_001.pdf PDF
Lemon_Dam_High_Pressure_Gate_Modification_Amendment_001_SF_30.pdf PDF
Tab_14_-_Attachment_3_Performance_Questionnaire_R16PS00929.docx DOCX document
Tab_13_-R16PS00929_1442.pdf PDF
Tab_13_-_ATT_1_Wage_Determination_R16PS00929.pdf PDF
Tab_13_-Att_2_Specification_Lemon_Dam_High_Pressure_Gate_Modification_R16PS00929.pdf PDF
Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I.pdf PDF
Tab_14_-_Attachment_4_Subcontract_Worksheet_R16PS00929.docx DOCX document
Tab_09_-_Synopsis_Lemon_Dam_High_Pressure_Gate_Modification_(4).docx DOCX document
Tab_09_-_Synopsis_Lemon_Dam_High_Pressure_Gate_Modification.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. R16PS00929 Lemon Dam High Pressure Gate Modification

CONTINUATION OF

SECTION B – SCHEDULE

Offers will be considered for award on the following price schedule, but no offer will be considered for award on only part of the price schedule Offers are subject to the terms and conditions of this solicitation Quantities in the price schedule are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52,211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns and underruns. The Contract Clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to the lump sum items.

See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

Definitions:

CLIN-Contract Line Item Number

PRICE SCHEDULE

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
Mobilization
For the lump sum of
$
2
35 21 30
Steel Intake Bulkhead Gate
For the lump sum of
$
3
01 35 27
Mobilization and Demobilization for Underwater Work
For the lump sum of
$
4
01 35 27
Underwater Work
For the lump sum of
$
5
35 21 30
Maintaining Florida River Flow
Pumping River Flow per day
$/day

Days Proposed

6
35 21 10
Trashracks Repair

Optional

Per cubic inch of filler metal
$/in3
7
35 21 10
Trashracks Coating

Optional For the lump sum of

8
35 23 10
Disassembly of the High-Pressure Gate Leaves and Hoists
For the lump sum of
$
9
35 23 10
High-Pressure Gate Hoist Rehabilitation
For the lump sum of
$
10
35 23 10
High-Pressure Gate Leaf Rehabilitation and Modification
For the lump sum of
$
11
35 23 10
High-Pressure Gate Reassembly and Testing
For the lump sum of
$

TOTAL FOR SCHEDULE $ _______________