Changes:
Section 01 33 00 Submittals
1. Nothing was added. The order was corrected. 35 23 10 ‐ 1 was placed in the correct position.
Section 35 21 30 Steel Bulkhead Bulkhead Gate
1. 35 21 30 – 1: Added 1.01, B.
2. 35 21 30 ‐ 2 and 3: Corrected RSN numbers.
3. 35 21 30 ‐ 3: Added RSN 35 21 30‐4
4. 35 21 30 – 15: Added 3.02.A.16.a.
5. 35 21 30 – 16: Addition to 3.03.A.6.
Section 35 23 10 High‐Pressure Gate Modification
1. 35 23 10 – 25: 3.17.C.2. Clarified maximum leakage rate.
2. 35 23 10 – 25: 3.17.C.5. Corrected the total maximum leakage rate.
Section 52 00 00 Drawings
1. 52 00 00 – 1: Added Sheet No. 8, 519‐D‐21
2. 52 00 00 – 2: Added Sheet No. 18, 519‐D‐204