PDF 87 KB Posted

Attached to
Lemon Dam High Pressure Gate Modification Federal contract opportunity
Solicitation number
R16PS00929
Issued by
Department of the Interior Bureau of Reclamation

About this file

Amendment 2 - SF30

View the file

Other files for this federal contract opportunity

Other files attached to Lemon Dam High Pressure Gate Modification, newest first.
File Type Posted
Amendment_004_SF_30.pdf PDF
PRICE_SCHEDULE_for_Amendment_4.docx DOCX document
519-D-93.pdf PDF
SF_30_Amendment_003.pdf PDF
519-D-94.pdf PDF
Solicitation_Questions_and_Answers_7.19.2016.docx DOCX document
TrashRackPhotos.pdf PDF
Solicitation_Questions_(1).docx DOCX document
site_visit_sign_in_sheet_7.6.16.pdf PDF
Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I_7.7.16.docx DOCX document
Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I_7.5.16.pdf PDF
SpecificationLemonDam_revised_7.5.16.pdf PDF
Lemon_Dam_High_Pressure_Gate_Modification_Amendment_001_SF_30.pdf PDF
Summary_of_changes_Ammendment_001.pdf PDF
Tab_14_-_Attachment_3_Performance_Questionnaire_R16PS00929.docx DOCX document
Tab_13_-R16PS00929_1442.pdf PDF
Tab_13_-_ATT_1_Wage_Determination_R16PS00929.pdf PDF
Tab_13_-Att_2_Specification_Lemon_Dam_High_Pressure_Gate_Modification_R16PS00929.pdf PDF
Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I.pdf PDF
Tab_14_-_Attachment_4_Subcontract_Worksheet_R16PS00929.docx DOCX document
Tab_09_-_Synopsis_Lemon_Dam_High_Pressure_Gate_Modification_(4).docx DOCX document
Tab_09_-_Synopsis_Lemon_Dam_High_Pressure_Gate_Modification.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R16PS00929

x x

5 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation

06/23/2016000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/23/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Lemmon Dam High-Pressure Gate Modification

Legacy Doc #: BOR

The purpose of this amendment is to:

- Posting site visit attendance sheet

- Volume I Section "I" - Add Clause 52.217-7 Option for Increased Quantity (March 1989)

- Volume I Section "H" - Change the COR from Mr. Tyler Artichoker to Mr. Robert Stump

- Post Questions and answers

All changes made to Volume I are depicted with a line in the left margin.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Lynette H. Rock

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

R16PS00929/000002

Period of Performance: 08/01/2016 to 03/01/2017