This document is a Question and Answer record from a Mandatory Pre-Bid Conference held on August 4, 2026, at 10:00 AM for a state and local contract award (GovTribe ID: edfabd7cea9a6d3aef6c19f6321c42d7) involving Elgin MHC. The document captures clarifications requested by potential bidders regarding project requirements and site conditions.

The project involves building remediation work, including minor demolition as needed, with utilities (water and electricity) available on site. Air clearance testing for mold or encapsulation is not required due to the building's unoccupied status. The project start date is contingent upon completion of roof repairs currently being coordinated. A fire exit map will be provided once mold testing results are received. The bid timeline has been extended to allow Elgin MHC to obtain and post mold testing results, which will be attached to the bid upon availability.

View the file

Other files

File Type Posted
Test Results B-53527.pdf PDF
MAP One South.pdf PDF
Scope of Services B-53527~2.docx DOCX document
Standards terms and conditions EMHC~39.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer at the Mandatory Pre-Bid Conference scheduled for 08/04/2026 at 10:00 AM

Questions and Answers:

1. Is air clearance testing required for mold or encapsulation?

Answer: No. The building is currently unoccupied, so air clearance testing is not required.

2. Are water and electricity available on site?

Answer: Yes, both water and electricity are available.

3. When will the start date be?

Answer: The start date will be scheduled after the roof repairs are completed. We are currently working on coordinating those repairs.

4. Will demolition be required?

Answer: Minor demolition will be required as necessary.

5. Can we request a copy of the map showing fire exits?

Answer: Yes. The map will be included in this attachment when the test results are received.

Note: This bid is being extended to allow Elgin MHC to obtain the results for mold testing. The results will be posted to this bid when available.