- Solicitation number
- SP451022Q1003
- Issued by
-
Defense Logistics Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix 1 - Guam MHE.xlsx | XLSX spreadsheet | |
| Guam MHE SP4510-22-Q-1001 Responses.docx | DOCX document | |
| Guam MHE SP4510-22-Q-1001 Questions.docx | DOCX document | |
| Appendix 2 - Guam ESS.xlsx | XLSX spreadsheet | |
| PWS Guam MHE Maint 2-11-2022.docx | DOCX document | |
| PWS Guam MHE Maint-1-11-2022.docx | DOCX document | |
| Appendix 3 - List of Manufacturers.xlsx | XLSX spreadsheet | |
| Appendix 4 - Place of Performance.xlsx | XLSX spreadsheet | |
| Attachment 2 Contractor Instructions.pdf | ||
| Attachment 3 CAC Turn-In Receipt.pdf | ||
| Attachment 1 Bid Schedule Guam MHE Maint.xlsx | XLSX spreadsheet | |
| Appendix 2 - Guam ESS.xlsx | XLSX spreadsheet | |
| Appendix 1 - Guam MHE.xlsx | XLSX spreadsheet | |
| SCA WD 2015-5693 Guam.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP for DLA Disposition Services Guam Performance-Based Material Handling Equipment (MHE) Maintenance
1. Purpose:
This document is to provide guidance on administering subject contracts such that the best possible quality in performance can be assured through appropriate surveillance and addressing of any performance failures as appropriate. The Acceptable Performance Level (APL) is the standard the U.S. Government (USG) expects the contractor to meet throughout the life of the contract. In general, the DLA Disposition Services Guam MHE Maintenance contract will have two APLs that will be used to measure contractor performance though additional ones may be identified depending on the contract requirements. The standard APLs are timely preventive maintenance of all equipment and timely completion of minor repairs.
2. Acceptable Performance Levels:
| a. Timely and Complete Preventive Maintenance (PM) | |
| (i). “item” in the standard and APL column means a single piece of MHE. | |
| (ii). The APL is measured per quarter. | |
| b. Timely and Complete Corrective Maintenance (CM) | |
| (i). “item” in the standard and APL column means a single piece of MHE. | |
| (ii). The APL is measured throughout the contract performance period. |
3. Surveillance:
| a. The primary method of surveillance for evaluating compliance is by Contracting Officer’s Representative (COR) reporting. The COR is responsible for reporting preventive maintenance performance to the Contracting Officer (KO) promptly after the performance deadline has passed. The COR will provide when the action was required to be performed by the contractor and the date it occurred. The COR shall also include what the negative impact of the contractor’s failure to meet the APL was on the DLA Disposition Services site. |
| b. In instances where there are late completions of PM or CM, the COR shall determine if the late performance is caused by an occurrence beyond the reasonable control of the contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the USG either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. In such cases as there is an excusable delay, the contractor will be deemed to have made the APL for the period. |
4. Reduction for Failed APL:
| a. Throughout each performance period of the contract, including options, the contractor is allowed one failure of the preventive maintenance APL and one failure of exceeding the 3 late repairs. After the failures the KO may take consideration for each additional instance of the contractor not meeting the APL. As indicated in the APL matrix, the reduction for failure to meet APLs is the same in all performance areas. The 5 - 100% consideration available is broad to give the contracting officer full latitude to take consideration based on the effect of the non-compliance on site operations and frequency of not meeting the APLs. |
| b. If valid failure to meet an APL is identified and consideration is warranted considering the pertinent facts, consideration is taken against the value of the preventive maintenance or repair for the item. Consideration is taken against the individual value of the maintenance or repair which is late. |
| c. In addition to the consideration and past performance annotation remedies available to the KO under the APL Matrix, the government may use such measures as partial or full terminations under FAR 52.212-4, not exercising options, and ending a contract early without these measures as long as it is IDIQ and has met its minimum government obligation for the period and a plan for a timely replacement contract is secured. |
Acceptable Performance Levels
| Deliverable |
| Standard |
| Time Frame |
| Clause |
| Acceptable Performance Level |
| Reduction for failed APL |
| Method of Surveillance |
| Timely and Complete PM |
| PM of all items under the appropriate CLINs |
| Within 3 weeks and/or as determined by site needs via call orders |
| PWS 11 f. |
| No more than 3 items maintained later per period. Failure to meet APL allowed once during performance period including options. |
| 5-100% consideration of the value of the maintenance per quarter and past performance annotated. |
| COR/ |
Customer
| Preventive Maintenance Sheet |
| Record of items inspected, and work performed for each piece of equipment receiving a PM service |
| Within 5 business days of PM service completion |
| PWS 11 g. |
| No more than 3 record sheets delivered late during each period of performance. |
| Payment will not be made until APL is achieved. Contract performance annotated and could affect future contract opportunities. |
| COR/ Customer |
| Timely and complete CM |
| MHE Operational in a timely manner |
| Within 5 business days of COR approval of cost estimate and repair |
| PWS 12 e. |
| No more than 3 items repaired exceeding the required timeframe. Failure to meet APL allowed once per contract period of performance (annually). |
| 5-100 % consideration of the value of the repair and past performance annotated. |
| COR/ |