PWS Korea MHE Maint Updated Final.docx

DOCX document 36 KB Posted

Attached to
South Korea MHE Preventative and Correctional Maintenance
Solicitation number
SP451022Q1013
Issued by

View the file

Other files

File Type Posted
Appendix 1 - Korea MHE Listing 2.0.xlsx XLSX spreadsheet
Appendix 2 - MHE Information.xlsx XLSX spreadsheet
SP451022Q1013 Questions_Rqmnts Response.docx DOCX document
Korea MHE Price Schedule V2.xlsx XLSX spreadsheet
Attachment 1 Bid Schedule - South Korea MHE.xlsx XLSX spreadsheet
Appendix 2 - List of Manufacturers.xlsx XLSX spreadsheet
Appendix 3 - Place of Performance.xlsx XLSX spreadsheet
Appendix 1 - Korea MHE List.xlsx XLSX spreadsheet
QASP Korea MHE Maint.docx DOCX document
Korea MHE Price Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

Material Handling Equipment (MHE) Maintenance Services at DLA Disposition Services Korea

TABLE OF CONTENTS

1. GENERAL

2. SCOPE

3. PREVENTIVE MAINTENANCE (PM)

4. CPRRECTIVE MAINTENANCE (CM)

5. QUALITY ASSURANCE (QA)

6. ACCEPTABLE PERFORMANCE LEVELS (APL)

7. BACKGROUND

8. PLACE OF PERFORMANCE OF SERVICES

9. FEDERAL HOLIDAYS

10. SAFETY & SECURITY

11. GOVT FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND SERVICES

12. CONTRACTOR FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND SERVICES

13. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

14. CONTRACT MINIMUM/MAXIMUM

1. GENERAL:

Defense Logistics Agency (DLA) Disposition Services is a Major Subordinate Command (MSC) of the DLA with the responsibility of disposing and reutilizing Department of Defense (DoD) excess and surplus property generated by the military services. This is accomplished through reutilization to other DoD activities, transfer to other Federal agencies, donation to authorized state and local organizations, sale to the general public, or ultimate disposal through abandonment or destruction. The headquarters for DLA Disposition Services is in Battle Creek, Michigan.

2. SCOPE:

a. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform preventive maintenance (PM), corrective maintenance (CM), and annual testing requirements and services, as defined in this PWS. The date of manufacture of MHE covered in this PWS ranges from 2003 through 2020. A complete list all the equipment may be found in Appendix 1 of this PWS.

b. The Period of Performance for this contract is One (1) Base Year of 12 months with two (2) One Year Options.

3. PREVENTATIVE MAINTENANCE (PM)

The Contractor or subcontractor shall:

a. Perform a PM service on each piece of equipment in appendix 1 every six months or 250 operating hours, as scheduled with the COR.

b. The Contractor shall schedule and coordinate to complete the first PM service on all equipment with the COR within 30 days of contract award.

c. Ensure all PM services are completed IAW the Original Equipment Manufacturer (OEM) manual’s specifications.

d. Perform a fork inspection IAW the American National Standards Institute/Industrial Trucks Standards Development Foundation (ANSI/ITSDF). Standards can be located at the following link: www.itsdf.org.

e. Perform PM services on USG premises to minimize downtime.

f. Complete each PM service within 14 calendar days of notification by the COR unless otherwise rescheduled and coordinated between the COR and the Contractor.

g. The Contractor shall provide the COR a maintenance sheet showing the status of each item checked during the PM service within five business days of completing each PM service.

h. The Contractor shall utilize CLIN 0029 to charge for transportation to and from PMs.

i. Perform lug nut torquing for all equipment within thirty calendar days of contract award and biannually thereafter.

j. Perform annual load testing for all MHE listed in Appendices 1 IAW ANSI/ITSDF once during the period of performance.

4. CORRECTIVE MAINTENANCE (CM)

The Contractor or subcontractor shall:

a. Assess, inspect, test, and troubleshoot all CM service requests within five business days of notification from the COR to determine the root cause of the deficiency.

b. Provide an estimate for the repair, in writing, on Contractor letterhead documents, to the COR. The written estimate must contain the following information, at a minimum:

Description of the deficiency Parts necessary to correct the deficiency Cost of parts Quantity of parts necessary Quantity of labor hours to repair the deficiency Cost of labor per hour Total estimated cost of repair

c. Price estimates are subject to approval by the COR pending determination of available funding and if the repair is economical.

d. Price estimates shall be valid for a period of thirty calendar days to ensure adequate time for determination and approval by the COR

e. Price estimates shall utilize CLIN 0029 to charge for transportation to and from CMs.

f. Upon approval of the CM service estimates, the Contractor shall have five business days to complete the necessary repairs to return the equipment to full operational status. The five business days will begin upon receipt of all parts necessary to complete the CM.

g. Perform CM services on USG premises to the maximum extent possible.

h. Provide appropriate conveyance and equipment to load, un-load, and transport the MHE to their maintenance facility in the event that services cannot be provided on USG premises.

i. Prior to removal of any GFE from USG premises, the Contractor shall sign a Department of Defense Form 1149, transferring liability of the equipment to the Contractor for the duration of the maintenance. Upon return of the GFE to USG premises, the DLA Form 1311 will be signed by the COR accepting the equipment repair.

5. QUALITY ASSURANCE (QA)

a. The U.S. Government (USG) will evaluate the Contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the USG will do to ensure that the Contractor has performed in accordance with the performance standards as defined in the attached QASP. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

b. The Contractor shall develop, implement, and maintain a Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The QCP shall include procedures to identify, prevent, and ensure non-recurrence of defective services. The QCP is the means by which the Contractor assures itself that its work complies with the requirements of the contract. At a minimum, the Contractor shall develop the QCP procedures that address the areas identified in the QASP. A final QCP shall be submitted to the COR no later than 10 business days after contract award. After acceptance of the QCP, the Contractor shall obtain the KO’s acceptance in writing of any proposed changes to its QCP.

6. ACCEPTABLE PERFORMANCE LEVELS (APL)

Deliverable
Standard
Time Frame
Section
Acceptable Performance Level
Method of Surveillance
Timely and Complete PM
PM of all items under the appropriate CLINs
Within 14 calendar days and/or as determined by site needs via call orders
PWS 11
No more than 3 items maintained later per period of performance.
COR/

Customer

Preventive Maintenance Sheet
Record of items inspected, and work performed for each piece of equipment receiving a PM service
Within 5 business days of PM service completion
PWS 11
No more than 3 record sheets delivered late during period of performance.
COR/

Customer

Timely and complete CM
MHE Operational in a timely manner
Within 5 business days of COR approval of cost estimate and repair
PWS 12
No more than 3 items repaired exceeding the required timeframe.
COR/

Customer

7. BACKGROUND:

DLA Disposition Services requires the use of various pieces of MHE during daily operations in support of the military services. PM and CM services for MHE in Korean locations (near Camp Humphreys) are critical to ensure MHE is always operational to complete the mission. Without timely, efficient, and effective PM and CM services, DLA Disposition Services will be impacted to a point where we are unable to support our customers.

8. PLACE OF PERFORMANCE OF SERVICES:

The Contractor or subcontractor shall provide services on USG premises at the respective DLA Disposition Services field locations, specified in Appendix-3 of this PWS during normal business hours, except when the USG facility/installation is closed due to local or national emergencies or holidays, administrative closings, or similar USG-directed facility/installation closings. Performance shall be at the designated location specified by the Contracting Officer’s Representative (COR) for the respective DLA Disposition Services field location. The Contractor shall maintain an adequate work force for the performance of all tasks defined within this PWS when the USG facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential.

9. FEDERAL HOLIDAYS:

The Contractor or subcontractor is not required to provide services on the 11 federal holidays observed by the DLA unless approved by the Contracting Officer (KO) or COR. When one of the holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When the legal holiday falls on a Saturday, the preceding Friday is observed as the holiday. The following holidays are observed:

New Year’s Day
January 1st
Martin Lither King’s Birthday
Third Monday in January
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Juneteenth Day
June 19th
Independence Day
July 4th
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veteran’s Day
November 11th
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25th

The Contractor or subcontractor is not required to provide services on official holidays recognized by the Government of Korea unless approved by the KO or COR. When the legal holiday falls on a Saturday or Sunday, whichever day the Government of Korea has designated as the observed holiday the Contractor or subcontractor is not required to provide services on the observed holiday unless approved by the KO or COR.

10. SAFETY & SECURITY:

a. Unscheduled gate closures by the installation security personnel may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors or subcontractor are not compensated for unexpected closures or delays. Vehicles operated by Contractor or subcontractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the Contractor or subcontractor’s employee’s installation driving privileges.

b. The Contractor’s or subcontractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor or subcontractor employees should only enter restricted areas at the direction of USG personnel. Contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The USG reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor or subcontractor employees for reasons stated above does not relieve the Contractor or subcontractor from responsibility for total performance of this contract.

c. The Contractor or subcontractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation security personnel. The Contractor or subcontractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD) and/or local policy. Should the Force Protection Condition (FPCON) change, the USG may require changes in Contractor or subcontractor security matters or processes.

d. The Contractor shall develop, implement, and maintain a Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The QCP shall include procedures to identify, prevent, and ensure non-recurrence of defective services. The QCP is the means by which the Contractor assures itself that its work complies with the requirements of the contract. At a minimum, the Contractor shall develop the QCP procedures that address the areas identified in the QASP. A final QCP shall be submitted to the COR no later than 10 business days after contract award. After acceptance of the QCP, the Contractor shall obtain the KO’s acceptance in writing of any proposed changes to its QCP.

11. USG FURNISHED PROPERTY, EQUIPMENT AND SERVICES (GFP/E/S):

The USG will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

a. Property: The USG will furnish the necessary workspace for the Contractor to perform services as outlined in this PWS.

b. Equipment: The USG will, at its sole discretion, and upon approval of the COR, provide MHE for the Contractor to assist with the performance of PM or CM of other MHE.

c. Utilities: All utilities in the facility will be available for the Contactor’s or subcontractors use in the performance of this contract. The Contractor or subcontractor shall instruct employees in utilities conservation practices. The Contractor or subcontractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

12. CONTRACTOR FURNISHED PROPERTY, MATERIALS, AND EQUIPMENT

CFP/M/E):

The Contractor or subcontractor shall provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

a. Provide all personal protective equipment for employees IAW the Occupational Safety and Health Administration guidance.

b. Provide all materials to clean up spills caused by their employees during the performance of PM or CM services.

c. Ensure their employees are trained and certified to perform maintenance on MHE.

d. Provide the KO and COR a POC and phone number to coordinate and schedule CM and emergency repair services.

13. DLA DISPOSITION SERVICES ENVIRONMENTAL MANAGEMENT SYSTEM (EMS):

DLA Disposition Services implemented EMS in accordance with ISO 14001:2004(e), DOD and DLA requirements at all DLA Disposition Services appropriate facilities. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes, and resources for developing, implementing, achieving, reviewing, and maintaining the environmental policy of an organization. The DLA Disposition Services EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities and authorities while supporting the DLA Disposition Services mission. The DLA Disposition Services EMS program is explained in DRMS-I 6050.2, Environmental Management System (EMS) Core Instruction. Site supplements detail information required by EMS at a local level such as local, state and host environmental regulations as well as local emergency procedures and operating procedures unique to the location. Site supplements also contain information concerning the local interaction between the DLA Disposition Services tenant appropriate facility and the DOD/DLA host facility EMS program. Contractors and their personnel are required to be aware that each DLA Disposition Services appropriate facility has an EMS and to be aware of EMS policies to perform work and/or gain access to an installation. Each DLA Disposition Services appropriate facility maintains EMS awareness posters that identify the DLA Disposition Services Environmental Management Representative (EMR) and Host facility EMR for specific guidance concerning an individual facilities’ EMS program. Contractors may request current copies of EMS information identified in this paragraph by sending an e-mail request to DRMSEMS@dla.mil.

14. CONTRACT MINIMUM/MAXIMUM:

This is a firm-fixed price indefinite quantity contract. The contract minimum shall be $2,500.00. The maximum shall be 150% of the estimated value of the contract. There is no contract minimum for any option period if included in the contract.

File details come from the government source that posted it. Updated .