This performance work statement outlines requirements for armored vehicle automotive testing services for the Department of State. The contractor shall develop a detailed test plan to evaluate armored vehicles against the requirements in the Department of State Armored Vehicle Specification Revision 6. The contractor must have facilities to conduct automotive performance and endurance testing, including braking, speed and acceleration, steering and handling, and 3,500 miles each of highway, paved roads, gravel, and unimproved driving. The contractor will inspect vehicles, execute the test plan, and provide monthly status reports and a final test report. The period of performance is 36 months from contract award at the contractor's facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBU - CONTRACTING AND ACQUISITIONS
RFP 19AQMM23R0162
Performance Work Statement
Armored Vehicle Automotive Testing
(Date 5/1/2023)
1. Purpose
The Department of State, Bureau of Diplomatic Security, Countermeasures Directorate, Office of Physical Security Programs, Defensive Equipment and Armored Vehicle Division
(DS/C/PSP/DEAV) is striving for a higher level of quality and improved performance of armored vehicle (AV) platforms, by testing First Article – Approval Government Tested
(FAT) vehicles to a higher standard, as described in the 6th revision (SAQMMA16Axxxx
P0000x Spec REV 6_clean_20230705) of the Department of State Armored Vehicle
Specification. The purpose of this effort is to:
• Design and implement a detailed test plan to capture the automotive performance and reliability of armored vehicle first article systems and subsystems.
• Perform automotive performance and endurance testing on armored vehicle first articles and required subsystems as outlined by the most recent version of the
Department of State Armored Vehicle Specification.
• Provide a detailed test report and recommendations to the Department of State based on the results of automotive testing.
2. Introduction
The Bureau of Diplomatic Security (DS) provides security for U.S. personnel overseas and foreign dignitaries visiting the U.S. AVs are a key component in providing effective security and the Defensive Equipment and Armored Vehicle Division (DEAV) of the Office of
Physical Security Programs (PSP), Countermeasures Directorate, Bureau of Diplomatic
Security (DS), purchases armored sedans, SUVs and vans for both the Department of State
(the Department), other federal agencies and departments.
Currently, DEAV has a deployed fleet of over 4,000 AVs with several hundred AVs in production. In an effort to improve the quality of deployed AVs, DEAV has revised the
Department of State Armored Vehicle Specification Revision 6. This Revision 6 has updated requirements for performance and inspection, and greatly increased the endurance mileage performed.
3. Objective
The objective of this requirement is to more rigorously test FAT vehicles to ensure a higher quality of production AVs that will be deployed to posts. AV service life ranges from five to ten years depending on the environment, usage and build quality. The increased rigor of the performance and endurance testing is an attempt to extend this service life through improved build quality.
4. Organizational Background
As the law enforcement and security arm of the U.S. Department of State, DS is responsible for providing a safe and secure environment for the conduct of U.S. foreign policy. DS is the
RFP 19AQMM23R0162
most widely represented U.S. law enforcement and security organization in the world and protects people, property, and information at 275 State Department posts around the globe.
Every U.S. diplomatic mission in the world operates under a security program designed and maintained by Diplomatic Security. To achieve its mission, DS is a leader in detecting and mitigating terrorist threats to U.S. lives and facilities, mounting international investigations, and developing innovations in security training, cyber security, and physical security engineering.
The DS Countermeasures Directorate (DS/C) manages the development and implementation of all physical and technical countermeasures security standards and policies that apply to
U.S. Department of State facilities domestically and overseas; securely transports classified diplomatic materials across international borders; and provides defensive equipment to protect the lives of U.S. government personnel, classified information, and property.
The Office of Physical Security Programs (PSP) directs the development of Overseas
Security Policy Board (OSPB) security standards and Department policies and procedures associated with the physical security, construction security, transit security, secure procurement, defensive equipment, and armored vehicle programs at U.S. missions. PSP provides oversight on the implementation of these programs abroad to ensure compliance with the OSPB security standards.
DEAV manages the Department's domestic and overseas special protective equipment (SPE) and AV program. DEAV represents the Department to international and U.S. Government interagency committees involved in developing uniform security standards for defensive equipment and armored vehicles.
5. Scope
The scope of this requirement encompasses: (1) recommendations for standard procedures, developed through the application of specific subject matter expertise to Government armored vehicle testing; (2) project management and oversight; (3) tools; and (4) specialized armored vehicle characterization, performance, and endurance testing and related facilities.
6. Tasks
6.1. Task #1 Develop Detailed Test Plan
The Contractor shall be responsible for creating a Detailed Test Plan (DTP) (CDRL
A004) to ensure the vehicle meets all requirements in the most recent revision of the
Department of State Armored Vehicle Specification. The Detailed Test Plan shall be designed to fully capture the performance characteristics of each vehicle through conduct of standard automotive performance tests. The DTP shall identify clear pass/fail criteria for each test. While the Contractor shall be responsible for developing the DTP, it must be approved by the contracting officer’s representative (COR) and it shall include at least the following sections:
• Initial Inspection for conformance to Department of State Armored Vehicle
Specification.
• Vehicle Physical Characteristics
• Braking
RFP 19AQMM23R0162
• Speed and Acceleration
• Steering and Handling
• Endurance Testing – Endurance Testing shall be performed in accordance with Table
1.
Terrain Type Average Speed
(mph)
Miles Average
RMS
Highway 50-65 3500 .05-.09
Paved roads in traffic/congestion
25-40 3500 .05-.09
Gravel 15-30 1500 .17-.25
Unimproved/dirt 15-30 1500 .85-1.8
Table 1
6.2. Task #2: Conduct Automotive Performance and Endurance Testing
The Contractor shall conduct all inspections and tests identified in the approved DTP.
The contractor shall provide all instrumentation and data processing equipment required to accurately capture all relevant data for each test.
The Contactor shall perform all required maintenance on test articles as needed including but not limited to fluid changes or refills, maintaining appropriate tire pressure, regularly inspecting major components for unusual wear or damage, and replacing broken or malfunctioning parts as needed.
The contract shall generate Test Incident Reports (TIRs) documenting noteworthy findings or equipment failures throughout test conduct. TIRs shall be verbally reviewed during the weekly status meetings. The contractor shall assume that 30 to 40 TIRs will be documented for each first article tested.
The Contractor shall generate and provide a test report (CDRL A005) summarizing all findings and results of the automotive and endurance testing. The report must include both narrative descriptions and tabular data detailing all testing performed and the outcome of each test.
6.3. Task #3: Conduct Additional First Article Tests
7. The Government may request testing of additional first articles depending on the armored vehicle procurement demands of the department. Each additional test shall be in accordance with the detailed test plan developed in Task #1. Each additional first article test will include test conduct, Monthly Status Reports (CDRL A003), Meeting
Minutes (CDRL A002), Test Report (CDRL A005), and a Failure Summary Report
(CDRL A008). Deliverables
In addition to the specific, task-based deliverables enumerated in Section 6, the Contractor shall support following programmatic milestone meetings and provide the following overall project-based deliverables:
RFP 19AQMM23R0162
Programmatic Milestone
Meeting
Frequency Due Date
Kickoff Meeting Once Within 30 calendar days of contract award
Weekly Status Meetings Monthly The first monthly status meeting shall be conducted on an agreed upon date after the close of the first full calendar month after contract award. Subsequent meetings will occur monthly on an agreed upon date.
Test Readiness Review Once Must be conducted a minimum of
15 business days prior to test conduct.
Test Results Review Once Must be conducted with 20 business days of test completion
Deliverables Mode of Delivery Due Date Presentation Material (CDRL
A001)
Via email to
DS_AV_CAP@state.gov.
The business day prior to weekly reviews.
3 Business days prior to milestone meetings:
Kickoff Meeting
Test Readiness Review
Meeting Minutes (CDRL
A002)
No later than 3 business days after the following meetings:
Kickoff Meeting
Monthly Status Meeting
Test Readiness Review
Monthly Status Reports
(CDRL A003)
The first Monthly Report must be submitted on the last business day of the first complete calendar month after contract award.
Subsequent Monthly reports must be submitted 3 business days prior to the monthly status meetings.
Dates for monthly status meetings will be proposed by the Contractor
Detailed Test Plan (CDRL
A004)
Draft due within 30 days of contract award.
Test Report (CDRL A005) Initial Inspection Draft due 15 business days after Contractor receipt of the test item. Final Report
Draft due 20 business days after the end of the testing period mailto:DS_AV_CAP@state.gov
RFP 19AQMM23R0162
Deliverables Mode of Delivery Due Date Contract Summary Report
(CDRL A006)
Draft due 30 Days prior to the end of the period of performance
Management Plan (CDRL
A007)
3 Days prior to the Kickoff
Meeting.
Failure Summary Report
(CDRL A008)
10 days after the end of the testing period.
Test Incident Reports (CDRL
A009)
Weekly from receipt of test article to completion of test conduct.
8. Constraints
The Contactor must have suitable facilities that can accommodate AV automotive performance and endurance testing and must have the ability to conduct testing to the
Department of State Armored Vehicle Specification Revision 6.
NOTE: This effort will be unclassified.
9. Government-Furnished Data and Data Rights/Intellectual Property
Government Furnished Data and the results of this contract are the property of the U.S.
Government and includes all information provided by the Government and the information gathered during this contract. Information provided by the Government and the results of this contract are considered proprietary, are not to be used for projects other than the subject project and are not to be shared with other entities. The contents of this project, including but not limited to instructions, templates, software, information, conclusions, and other
“material” are the property of the U.S. Government and may not be used outside of this agreement without express permission of the Contracting Officer (CO). The Contractor may not sell or modify the information, material, or reproduce, display, publicly perform, distribute, or otherwise use the material in any way for any public or commercial purpose. By contracting with the U.S. Government, the vendor does not acquire any right, title or interest in any of this information or conclusions.
10. Period and Place of Performance
All contracted activities shall be conducted at Contractor-provided facilities. The period of performance shall be 36 months after the date of contract award.