PWS Attachment 1 - DSC501 Manual J8646.pdf

PDF 6 MB Posted

Attached to
Repair Denial Barrier
Solicitation number
W50S8J-23-Q-0003
Issued by

View the file

Other files

File Type Posted
PWS - Repair Denial Barrier.pdf PDF
W50S8J23Q0003 Repair Denial Barrier.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTION MANUAL MODEL DSC501 HYDRAULIC PHALANX BARRIER

♦ TERMS AND CONDITIONS / WARRANTY

♦ INSTALLATION

♦ HOOKUP

♦ MECHANICAL THEORY

♦ STARTUP

♦ HYDRAULIC TROUBLE SHOOTING

♦ ELECTRICAL TROUBLE SHOOTING

♦ MAINTENANCE

♦ DRAWINGS

DOCUMENT A10040 DSC501 JOB J8646 – SCOTIA ANG, NEW YORK, REV A

2014 DELTA SCIENTIFIC CORPORATION

CORPORATE HEADQUARTERS

40355 Delta Lane Palmdale, California 93551 Phone: (661) 575-1100 Fax: (661) 575-1109 Email: info@deltascientific.com

EASTERN REGION U.S.A.

125 Wyatt Lane Fredericksburg, VA 22406 Phone: (703) 541-9114-5-6 Fax: (703) 541-9117 Email: deltava@aol.com

Copyright 2006 Delta Scientific Corporation Page 1 of 1 All Rights Reserved Document: Terms and Conditions 092706

TERMS AND CONDITIONS OF PRODUCT SALE

THIS PURCHASE CONTRACT (“CONTRACT”) SETS FORTH THE TERMS AND CONDITIONS FOR THE SALE BY DELTA SCIENTIFIC CORPORATION (“DELTA”) TO THE BUYER SPECIFICED HEREIN (“BUYER”) OF THE PRODUCTS SPECIFIED IN THE QUOTATION IDENTIFIED BELOW (THE “PRODUCTS”).

THIS CONTRACT DOES NOT CONSTITUTE ACCEPTANCE OF ANY OFFER BY BUYER, WHETHER ORAL OR WRITTEN, INCLUDING BUT NOT LIMITED TO ANY PURCHASE ORDER, LETTER, E-MAIL, MEMO, OR ANY OTHER FORM. SALES OF THE PRODUCTS ARE LIMITED SOLELY TO THIS CONTRACT.

Acceptance. Buyer accepts these terms and conditions when the first of the following occurs: Buyer (a) signs or makes a written acceptance of this Contract; (b) authorizes production or shipment of any part of the Products; or c) accepts Delta’s Product submittals. Acceptance is expressly limited to all terms and conditions hereof without any addition, modification or exception, and Delta expressly rejects any additional or inconsistent terms, conditions, contingencies or covenants previously or hereafter proposed by Buyer. This Contract, when accepted by Delta at its corporate offices in California, constitutes the entire agreement between Delta and Buyer, superseding any prior agreement or understanding between the parties with respect to the subject matter hereof.

1. Shipment and Delivery. Buyer acknowledges that this Contract, and any additional Buyer orders accepted by Delta hereunder, are firm and non--cancelable.

Deliveries of the Products will be made F.O.B. Delta’s plant at Palmdale, California. Delta will arrange for shipment. Buyer will bear all costs of shipment and insurance and will reimburse all such costs incurred by Delta when invoiced. Upon Delta’s delivery of the Products at Delta’s plant to any carrier or Buyer’s representative, Buyer assumes all risk of loss and damage with respect to the Products. Buyer shall promptly inspect each shipment upon receipt, and shall promptly inform Delta in the event all Products listed in Delta’s shipping documents do not arrive as scheduled or are damaged or defective.

2. Payment Terms. If credit is approved in advance by Delta, payment terms are net thirty (30) days from the date of invoice. If credit is not approved in advance, Buyer shall make payment in full prior to delivery. Delta’s invoice will be issued and dated upon date of shipment of Products. All payments shall be made at Palmdale, California. Unpaid invoices shall bear interest at the maximum lawful rate or 1.5% per month, whichever is less, commencing upon the date payment is due. Buyer shall be responsible for all costs of collection, including but not limited to reasonable attorneys’ fees and expenses.

3. Taxes and Similar Charges. Buyer shall bear all applicable federal, state, municipal and other taxes (such as sales, use, excise, ad valorem and similar taxes), customs duties and charges. The lack of any such tax or charge on the invoice shall not affect Buyer’s tax liability.

4. Use and Permits. Buyer will be responsible for operation of Products, including, but not limited to, obtaining all use and export permits, building permits, licenses, certificates and the like, required by any regulatory body for installation and use of the Products. If Buyer wishes for Delta to install any Products purchased hereunder, the terms and conditions of installation shall be set forth in a separate agreement.

5. Limited Warranty; Limitation of Liability. Delta warrants that during the warranty period applicable to the product, the Products will be free from defect in material and workmanship. Delta's sole obligation under this warranty shall be to repair (or at Delta's option, to replace), FOB Palmdale, California any defective product, without charge to Buyer, provided that: (a) Buyer gives Delta written notice of any claimed defect within the applicable limited warranty period; (b) the Products, if installed, were installed correctly and in accordance with any instructions provided by Delta, (c) the Products have not been altered, subjected to misuse, negligence or accident, or used with parts not authorized by Delta, (d) the Products have been properly and timely maintained by Buyer in accordance with the preventive maintenance instructions provided, and (e) the replaced Product(s) and or part(s) is/are properly removed and returned to Delta, using the Material Return Authorization (MRA) number and information provided by Delta. Product and Product part troubleshooting, diagnosis and/or replacement, and the cost of such replacement installation and/or related remedial services, are the sole responsibility of Buyer. The duration of the applicable Product warranty is ninety (90) days for guard booths, gates, traffic items and spare parts and one (1) year for Delta’s Barricade/Barrier Systems, from date of shipment. Primer, paint and other surface coatings are excluded from warranty. FAILURE BY BUYER TO MAKE TIMELY PAYMENT IN FULL FOR THE PRODUCTS, AND/OR FAILURE BY BUYER TO PROPERLY AND TIMELY CONDUCT PREVENTIVE MAINTENANCE, FAILURE TO FOLLOW DELTA’S INSTRUCTIONS FOR PROBLEM TROUBLESHOOTING AND/OR DIAGNOSIS, AND/OR FAILURE TO PROPERLY INSTALL, REMOVE AND/OR RE-INSTALL A PRODUCT OR PART THEREOF, INVALIDATES THIS WARRANTY. IN THE EVENT A PRODUCT PROBLEM IS NOT THE RESULT OF A PRODUCT DEFECT, BUYER SHALL BE RESPONSIBLE FOR MAINTENANCE CHARGES AT DELTA’S STANDARD TIME AND MATERIALS RATES. NO OTHER WARRANTY IS EXPRESSED AND NONE SHALL BE IMPLIED, INCLUDING WITHOUT LIMITATION THE WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR USE OR FOR A PARTICULAR PURPOSE. THE FOREGOING STATES DELTA'S ENTIRE LIABILITY WITH RESPECT TO THE PRODUCTS. IN NO EVENT SHALL DELTA BE LIABLE FOR ANY SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES WHICH RESULT FROM THE USE OF THE PRODUCTS BY BUYER OR ANY OTHER PARTY, AND IN NO EVENT SHALL DELTA'S LIABILITY EXCEED THE PRICE OF THE PARTICULAR PRODUCT UNIT(S) INVOLVED IN ANY CLAIM.

6. Disclaimer and Indemnification. Buyer acknowledges that the Products, designed for control of vehicular traffic, inherently involve a trade off of risk versus benefit. Buyer must devote careful consideration to the selection, placement and design of a barricade installation. To ensure approaching vehicles and pedestrians are fully aware of the Barricades and their operation, proper illumination, clearly worded warning signs, auxiliary devices such as semaphore gates, stop-go signal lights, audible warning devices, speed bumps, flashing lights, beacons, etc. should be considered. It is strongly recommended that the Buyer consult an architect and/or a traffic and/or safety engineer prior to installation of a Barricade/Barrier system. Delta does not purport to offer either architectural, traffic or safety engineering information. Buyer also concedes that, beyond its written installation, maintenance and operation instructions, Delta has no control as to how the Products will be utilized, or how persons in the vicinity of the Products, including but not limited to drivers, bicyclists and/or pedestrians, will act. Therefore, Buyer shall hold harmless, indemnify and defend Delta from and against all claims, demands, judgments and awards resulting from Buyer’s use or misuse of the Products, including, but not limited to, claims for personal injury, wrongful death and damage to real or personal property. However, in no event shall this indemnification provision apply where Delta’s sole negligence resulted in the claim, judgment or award. Each party shall give the other party prompt written notice of any claim or suit for which such other party is responsible hereunder. The responsible party shall control the defense and/or settlement of such claim; provided that neither party has the authority to enter into a settlement, make an admission, or undertake any obligation or liability without the other party’s written consent..

7. General. Delta shall not be liable for any delays or failure of performance, beyond the reasonable control of Delta, that affect Delta or any of Delta’s suppliers;

including, but not limited to, those caused by acts of God, acts of public enemy, acts or omissions of Buyer or its contractors and sub-contractors, fire, strike, riot, flood, governmental interference, unavailability or shortage of materials, labor, fuel or power through normal commercial channels, or failure or destruction of plant or equipment arising from any cause whatsoever. In the event of delay, the date of delivery shall be extended for a period equal to the time lost by such delay, and this Contract shall remain in full force and effect. This Contract may be modified only in writing. This Contract shall be governed by and construed in accordance with the laws of the state of California. Neither this Contract nor any rights or benefits hereunder are assignable by Buyer without prior written consent of Delta. Any such prohibited assignment shall be null and void. Notices shall be given in writing, via certified or overnight mail with proof of deliver, to an authorized representative or officer of a party.

ACCEPTED BY: ____________________________ DELTA SCIENTIFIC CORP QUOTE NO: _______________________ NAME: ____________________________ NAME: _____________________________ REV / DATE: ______________________

DATE: ____________________________ DATE: _____________________________

D E L T A www.deltascientific.com

40355 Delta Lane - Palmdale, California 93551, USA - Phone: (661) 575-1100 - FAX: (661) 575-1109 www.deltascientific.com

WARRANTY AND LIMITATION OF LIABILITY

Delta Scientific Corporation warrants that during the first year and a half (548) days from date of shipment, the Products will be free from defect in material and workmanship. Delta's sole obligation under this warranty shall be to repair (or at Delta's option, to replace), FOB: Palmdale, California, any defective product, without charge to Buyer, provided that, (a). Buyer gives Delta written notice of any such claimed defect within such period of one year and a half (548) days, (b). The Products, if installed, were installed by a Delta authorized installer, (c). The Products have not been altered, subjected to misuse, negligence or accident, or used with parts not authorized by Delta, and (d).

The Products have been maintained in accordance with the instructions provided. NO OTHER

WARRANTY IS EXPRESSED AND NONE SHALL BE IMPLIED, INCLUDING WITHOUT

LIMITATION THE WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR

USE OR FOR A PARTICULAR PURPOSE. THE FOREGOING STATES DELTA'S ENTIRE

LIABILITY WITH RESPECT TO THE PRODUCTS. IN NO EVENT SHALL DELTA BE LIABLE

FOR ANY SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES WHICH RESULT FROM

THE USE BY BUYER OR ANY OTHER PARTY, OF THE PRODUCTS, AND IN NO EVENT

SHALL DELTA'S LIABILITY EXCEED THE AMOUNTS PAID BY BUYER FOR THE PRODUCTS

HEREUNDER.

DISCLAIMER

Please note - careful consideration must be devoted to the selection, placement and design of a Barricade installation. Just as in the case of any Barricade system, perimeter security device or security gate that blocks a roadway or drive, care must be taken to ensure that approaching vehicles as well as pedestrians are fully aware of the Barricades and their operation. Proper illumination, clearly worded warning signs, auxiliary devices such as semaphore gates, stop-go signal lights, audible warning devices, speed bumps, flashing lights, beacons, etc. should be considered. Delta has information available on many such auxiliary safety equipment not specifically listed herein. It is strongly recommended that an architect and/or a traffic and/or safety engineer be consulted prior to installation of a Barricade system. Delta will offer all possible assistance in designing the operating equipment, controls and the overall system, but we are not qualified, nor do we purport to offer either traffic or safety engineering information.

INTELLECTUAL PROPERTY, DRAWINGS, SPECIFICATIONS AND TECHNICAL DATA

The drawings and/or data included with this equipment unless otherwise noted remain the confidential property and trade secret of Delta Scientific Corporation. They shall not be disclosed, reproduced or used for manufacture, design or construction without the express authorization of Delta Scientific Corporation. The recipient by accepting these drawings and/or data, assumes custody thereof and under the above terms agrees not to allow the use of by unauthorized persons.

Copyright 2011 Delta Scientific Corporation Page 1 of 1 All Rights Reserved Document Warranty 1-1/2.1

MECHANICAL

INSTALLATION INSTRUCTIONS

VEHICLE ARREST SYSTEM

COPYRIGHT 1991 DELTA SCIENTIFIC CORPORATION

ALL RIGHTS RESERVED

MFG. UNDER U.S. PATENT #4,097,170 4,158,514 4,318,079 4,354,771 4,490,068 4,576,508 4,715,742

U.K. PATENT # GB 2,127,893B 2,138,883B

40355 DELTA LANE • PALMDALE, CALIFORNIA 93551, USA • PHONE (661) 575-1100 • FAX (661) 575-1109

E-MAIL: info@deltascientific.com Doc #100-35 P-1

D E L TA

M E

C H

A N

IC

A

L

IN

S

TA

LLA

TIO

N

Copyright 2014 Delta Scientific Corporation Page 1 of 18 All Rights Reserved Document: AF10040.5

MECHANICAL INSTALLATION INSTRUCTIONS

DELTA MODEL DSC501 PHALANX® BARRIER SYSTEMS

Safety Precautions

At all times observe good safety practices when working on either the electrical or mechanical system. Particular attention should be paid to the danger of working on the Barrier when the power is on. Barriers are powerful hydraulic presses that can easily crush anything in their way.

Keep hands free of the mechanism when the power is on or the HPU is up to pressure. Turn off the electric power and bleed the hydraulic pressure down to zero before working on any part of the system. Traffic should be controlled around the Barrier during any work so that vehicular accidents do not occur if the Barrier should happen to rise. After work is complete, do not allow traffic over the Barrier until all control and safety functions have been verified to be properly working.

Barrier ramp braces are provided with each Barrier system. The Barrier ramp braces should be in place and firmly bolted in position when working under the Barrier ramp. The Barrier ramp braces are stowed in the Barrier frame when not in use. This makes them readily available for use at all times.

Particular attention should be paid to the rigging and lifting equipment used when installing, moving, removing, relocating or servicing any of the heavy elements of the Barrier system. The rigging and lifting gear should be properly sized and attached when lifting heavy components in all instances.

Each Barrier ramp has two attachment points (threaded 3/4"-10) that are located on opposite sides of the ramp and in line with the center of gravity of the ramp. The attachment means between the Barrier ramp and the lifting gear must be sized or designed to take into consideration both the vertical lift as well as side loading conditions. The use of properly sized spreader bars or dual vertical lifts are recommended.

The Barrier ramp attachment points cannot be used to lift the entire Barrier assembly.

Installation Scheme

The installation is best performed by removing the Barrier ramp prior to placing the foundation frame into position in the foundation excavation. See the above precautions about working under the Barrier ramp plate. Disassembly of the Barrier is outlined in the Maintenance section of this manual.

The Barrier foundation frame is to be cast in place. The outside of the Barrier foundation frame is the form; no additional flashing or forming should be necessary. The excavation for the foundation frame can be individual for each Barrier in a set or the foundation can be common for all Barriers if more than one is installed. We recommend the common foundation as providing the strongest Barrier system.

Copyright 2014 Delta Scientific Corporation Page 2 of 18

The front face (visibility panel) of the Barrier is to be mounted toward the direction of the vehicle threat (see Figure 1). Usually, when Barriers are mounted in inbound and outbound lanes, all Barriers will be facing outside the facility. Some special installations such as sallyports may have the inner Barrier facing towards the inside of the facility. Check with the security manager if there is any question as to the proper orientation of the Barriers.

Figure 1 - The visibility panel of the Barrier faces towards the vehicle threat.

The excavation for the foundation frame can be individual for each Barrier in a set or the foundation can be common for all Barriers if more than one is installed. We recommend the common foundation as providing the strongest Barrier system. See the appropriate foundation drawing in the Drawing Section of the manual. The foundations shown on Delta drawings, unless specially noted, are designed on a soil load bearing factor of 1.5 tons/ft2 [14,600 kg/m2]. Only a very boggy or migrating site would require additional foundation.

In multiple barricade installations where two or more units are cast into a common foundation, the inter unit spacing can be reduced from any desired spacing to zero if required by the layout (see Figure 2).

The 6 X 6 structural steel beam, which extends out each side of barrier, can be shortened on the side(s) adjacent to the unit(s) sharing the common foundation. Spacing between the shortened beams should be kept to a minimum. Reinforcement in the inter barrier area should be distributed uniformly while repeating the placement pattern described in the single barrier foundation design. Reinforcement of the central concrete beam running transverse of the barrier should be continuous through all barriers.

Copyright 2014 Delta Scientific Corporation Page 3 of 18

Figure 2 - Two Barriers shown side by side - any required distance between them is possible.

Care should be taken to mount the Barrier in an area that is not subject to flooding. It is not necessary for the Barrier to be level or plumb to operate. If the roadway is not level the Barrier may be placed to match the contour; however, be sure the appearance factor is considered. An installation where the equipment is not level even if it follows the terrain can be distracting (see Figure 3).

Figure 3 - Two Barriers shown side by side and following the slope of the road. While this is a satisfactory method of installation, the appearance factor should also be considered. Note that the drains must be placed in the low side of the Barriers.

The Barrier can be secured in the foundation by leveling with concrete blocks or if desired held to temporary wooden frames to assure alignment during the pour. Before the pour, the frame of the Barrier should be checked for straightness. This can be accomplished by using a string line along each side. Pouring concrete with the sides (especially the front) curved in can allow the barrier ram to hit the frame before obtaining full height. Call the factory if the string line detects the frame more than 0.20 inch [5 mm] out of line.

Copyright 2014 Delta Scientific Corporation Page 4 of 18

Figure 4 - The Barriers should be placed on a crown above the surrounding roadway to prevent excessive water from draining into the Barrier foundation frame.

Figure 5 - Cross-section through the Barrier frame. Note that in this case, the Barrier is sloped to the rear. The drain lines are installed in the rear cylinder bays, the water in the chain troughs will flow to the rear. Barriers that are level or front down will be drained at the chain trough. The water in the cylinder bays will flow forward.

Good Drainage – The Key to a Successful Installation

Poor drainage of the Barrier system is one of the top reasons for a poorly operating Barrier system. The steel structure of the Barrier deteriorates and the mechanical components fail.

Attention to drainage begins before the actual installation. The selection of the drainage method must be made with knowledge of the conditions that exist on the ground. Actual conditions must be known and not guessed.

Copyright 2014 Delta Scientific Corporation Page 5 of 18

Siting

Care should be taken to mount the Barrier in an area that is not subject to flooding. Do not allow the Barrier(s) to be the drainage for the surrounding roadway. If the Barrier(s) are mounted on a slope, a trench drain should be installed uphill of the Barriers to remove water flowing down the road (see Figure 6).

Drain Types

The best results will be had by providing hard drain lines to a sump well. The sump well can be connected directly to the storm drain or sewer system, or water in the well may be pumped to another location for disposal. The sump well also allows skimmers and other devices to remove tramp oil or contaminants from the water as needed. This type of drainage is mandatory where the water table is within the depth of the Barrier foundation. See Delta drawing 90900 for a suggested sump well design. Drain lines should be sized for the expected rainfall.

French drains or other gravel trench drains can only be used in areas of relatively light rainfall and with soils that have an ability to disperse water. Do not expect a French drain to function in clay or soils with an impervious layer of mineralized soil (hardpan) or relatively impervious rock layers underlying shallow soils.

Figure 6 - Delta Phalanx Barrier installed in roadway ramp. Note the trench drain in the rear to minimize the amount of water that the Barrier drainage must handle.

Copyright 2014 Delta Scientific Corporation Page 6 of 18

Barrier Placement

The roadway should be crowned in the area of the Barrier to prevent standing water from draining into the Barrier foundation frame. It is not necessary for the Barrier to be level or plumb to operate.

If the roadway is not level the Barrier may be placed to match the contour; however, be sure the appearance factor is considered. An installation where the equipment is not level even if it follows the terrain can be distracting (Figure 3).

Mount the Barrier above the surrounding roadway surface by 1 inch [25mm]. See Figure 4. By doing this, only the water falling in the immediate area of the Barrier can find its way to Barrier drains. (The slight bump is also desirable to help keep vehicle speeds low around the Barrier.) If the Barrier must be installed flush to the roadway for operational considerations, provide trench drains in a perimeter about the Barrier(s) to minimize roadway water from finding its way down into the Barrier (see Figure 6).

Environmental Control

Delta Scientific Corporation's vehicle Barrier systems can be used in all geographical areas. Since the early 1980's, Delta Barriers have been successfully installed in locations just south of the Arctic Circle (Oslo and Stockholm), in extremely cold areas of the United States such as Idaho Falls and Grand Forks, and in all the capital cities of Europe. Tropical installations include more than thirty locations within ten degrees latitude of the Equator. In between, installations run from temperate areas to Middle East desert sands.

Heating

Cold climate installations require the use of heaters to maintain proper oil viscosity and to eliminate the possibility of snow or ice blocking the Barrier mechanism. Depending on the hydraulic power unit size and rating, Delta supplies heaters ranging from 60 to 500 watts @ 120/240 volts for the oil reservoirs. The hydraulic hoses to the Barriers are to be run below the frost line where temperatures are a relatively constant 45 to 55ºF [7 to 13ºC]. If desired, the ducts carrying these hoses can be heat traced at time of installation.

The Barriers themselves may require heaters, the ratings of which are determined by the length of the Barrier and available operating voltage. Ratings in the range of 1,000 to 2,000 watts are common.

Delta strongly recommends that the entire roadway in the immediate vicinity of the Barriers be heat traced. This is to minimize the chance that a vehicle could lose control or traction in front of the Barriers. Also, in many cases, guard and/or inspection personnel will need to work on a vehicle in front of the Barriers. The heat tracing will reduce the personnel dangers of working on snow and ice.

Roadways containing Barriers cannot be plowed. The snow plows will shear top plate bolts and damage inspection covers. Only hand clear snow around the Barriers. Snow removing chemicals such as salt should also not be used around the Barriers, as the corrosion of the steel components will be greatly accelerated.

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

1021187883N Highlight

Copyright 2014 Delta Scientific Corporation Page 7 of 18

Drainage provisions in Barriers subject to freezing will also need some consideration. Heat tracing of the drain lines and/or sump well heaters may be needed to help remove the melted snow and ice from the Barrier foundations.

Cooling

Barrier installations in areas where the temperatures are frequently above 100ºF [38ºC] should have the hydraulic power units located in temperature controlled equipment rooms or be equipped with oil coolers. The simplest but least effective method is an air cooled heat exchanger. Very large surface areas are required to cool oil to 160ºF [71ºC] when only 130ºF [55ºC] cooling air is available. A more compact installation can be realized if a water cooled heat exchanger is located in the reservoir tank. Typically, less than one gallon per minute [4 liters per minute] of water at 100ºF [38ºC] or less is required. If the water stream can be returned to a cooling tower or other closed loop system, no waste of water is incurred.

Sand and Dust

Barrier locations in sand or dust areas require a few additional precautions. The hydraulic power units should be mounted in equipment rooms that can be pressurized to maintain positive air flow out of the room. This minimizes the accumulation of sand, dust and other abrasive materials on the hydraulic equipment where it could find its way into the oil and sensitive mechanical devices.

Filter and fluid changes may be more frequent than at other installations.

Barriers in sand swept areas may need to have the foundation tubes cleaned frequently. This is usually accomplished by using an industrial type vacuum to sweep out the accumulated debris.

Sand accumulation can be minimized by placement of suitable fences or walls around the Barrier area.

Drainage

Drainage and protection against subsurface water is important. A bed of aggregate under the Barrier(s) will handle rain water in most circumstances. Especially wet locations should have the Barrier provided with a drain line plumbed to a sump well or sewer as appropriate.

While the machine is designed for harsh environments, prolonged submersion will eventually cause both appearance and operating deterioration.

The location of the drain line is up to the installer. This allows the drain to be placed in the low point of the Barrier frame depending upon whether the Barrier is placed flat or sloped in any direction. The chain and cylinder bays are interconnected at the factory, so only one drain line is required. We recommend a 3" [75 mm] minimum drain size. The french drain (soak-a-way) should utilize a perforated pipe from the Barrier into the gravel bed. Otherwise plumb the drain to the sewer or a sump well using suitable materials.

Copyright 2014 Delta Scientific Corporation Page 8 of 18

Corrosion

Very occasionally a site is both wet and unfriendly, i.e., either highly acid or basic. In these cases, anodic protection is recommended. Delta will be happy to review specific job locations and make suitable recommendations where such protection is needed.

Interconnect

Provisions for electrical and hydraulic feed should be made prior to pouring the foundation of the Barrier.

The access box of the Barrier (furnished loose) is provided with multiple 3" knockouts. Locate the access box on the side of the Barrier that is nearest the HPU. We recommend that 3" PVC pipe be run from the hydraulic power unit to this sleeve to provide a conduit through which hoses can be pulled. Alternately, rigid steel pipe can be run from the HPU to the Barrier directly buried in the ground. See the Mechanical System section of this manual for a discussion of the various ways to interconnect the Barrier with the HPU. Block out the unused hydraulic connections on the side opposite the access box with Styrofoam or similar so that the piping can be removed if required in the future.

The (optional) fully up and fully down limit switch and front face light conduits are also located on the access box. Units with heaters will require a conduit for the Barrier heaters. Rigid metallic conduit or equal is to be run to these. Be sure that appropriate fittings are used that will allow wire to be pulled. It is too late to correct this error after the concrete is poured!

Concrete Notes and Specifications Note, these are minimum requirements only. You may exceed these requirements with no reduction in the rating of the equipment.

1) Contractor shall verify and be responsible for all dimensions and conditions at the job site.

2) Foundation concrete may be placed directly into neat excavations, provided the sides of the excavation are stable. Where caving occurs, provide shoring. Type and method of shoring shall be at the contractor's option.

3) The excavation shall be kept dry at all times. Groundwater, if encountered, shall be pumped from the excavation.

4) Concrete shall be laboratory designed, machine mixed, producing 3,000 psi [20,68 Mpa] at

28 days.

5) Cement shall be tested Portland cement conforming to ASTM C150, Type I or II.

6) Aggregates shall conform to ASTM C33. Maximum size of aggregate shall be 1.5 inch [38

MM].

7) Reinforcing steel shall be deformed bars conforming to ASTM A615, Grade 60 (60,000 psi

[413,7 Mpa]).

Copyright 2014 Delta Scientific Corporation Page 9 of 18

8) Hooks and bends shall conform to ACI Standard 318, latest revision. Inside diameter of hooks and bends shall be at least 6 bar diameters.

9) Provide spacer bars, chairs, spreaders, blocks, etc, as required to positively hold the steel in place. All dowels shall be firmly wired in place before concrete is poured.

10) Concrete shall be conveyed from the mixer to final deposit by methods that will prevent separation or loss of materials. Troughs, buckets or the like may be used to convey concrete. In no case shall concrete be allowed to free drop more than 5 feet [1,5 M].

11) Concrete shall be thoroughly consolidated by suitable means during placement and shall be thoroughly worked around reinforcement, embedded fixtures and into corners of forms.

12) Concrete shall be maintained above 50ºF [10ºC] and in a moist condition for at least 7 days after placement. Adequate equipment shall be provided for heating concrete materials and protecting concrete during freezing or near freezing weather.

13) Where exterior wall face requires shoring and/or forming, the forms shall be substantial and sufficiently tight to prevent leakage. Forms shall not be removed until the concrete is 7 days old.

14) Backfilling shall be done by depositing and tamping into place clean sand or pouring lean concrete. Water jetting shall not be allowed.

15) Conduits and pipes of aluminum shall not be embedded in concrete unless effectively coated or covered to prevent aluminum/concrete reaction or electrolytic action between aluminum and steel.

16) Construction joints not indicated on the drawings shall not be allowed. Where a construction joint is to be made, the surface of concrete shall be thoroughly cleaned and all laitance and standing water removed.

17) Contractor shall be responsible for the protection of all adjacent areas against damage and shall repair or patch all damaged areas to match existing improvements.

18) Contractor shall keep the construction area clean at all times and at completion of work remove all surplus materials, equipment and debris and leave the premises in a clean condition acceptable to the owner or owner's representative.

Copyright 2014 Delta Scientific Corporation Page 10 of 18

Excavation for four DSC501 Phalanx Barriers with an island between pairs

Copyright 2014 Delta Scientific Corporation Page 11 of 18

Preformed DSC501 rebar cage being lifted to place in foundation

Copyright 2014 Delta Scientific Corporation Page 12 of 18

First DSC501 installed in foundation and blocked into place (Note that the road plate has been removed to provide access to the Barrier interior)

Copyright 2014 Delta Scientific Corporation Page 13 of 18

DSC501 rebar placement (note #6 diagonals on #4 rectangular grid) (Reference Drawing 90995)

Copyright 2014 Delta Scientific Corporation Page 14 of 18

All DSC501's are placed in foundation, rebar installed and ready for concrete

Copyright 2014 Delta Scientific Corporation Page 15 of 18

Trenches are cut from the Barriers to the HPU for hose ducts and electrical conduits Run the hoses from the Barrier to the HPU as directly as possible for best performance

Copyright 2014 Delta Scientific Corporation Page 16 of 18

DSC501's are in place, concrete is just poured

Copyright 2014 Delta Scientific Corporation Page 17 of 18

DSC501 road plate reinstalled and work site cleaned up

Copyright 2014 Delta Scientific Corporation Page 18 of 18

Delta Model DSC501 Phalanx in guard position

ELECTRICAL & CONTROLS

INSTALLATION INSTRUCTIONS

VEHICLE ARREST SYSTEM

COPYRIGHT 1991 DELTA SCIENTIFIC CORPORATION

ALL RIGHTS RESERVED

MFG. UNDER U.S. PATENT #4,097,170 4,158,514 4,318,079 4,354,771 4,490,068 4,576,508 4,715,742

U.K. PATENT # GB 2,127,893B 2,138,883B

40355 DELTA LANE • PALMDALE, CALIFORNIA 93551, USA • PHONE (661) 575-1100 • FAX (661) 575-1109

E-MAIL: info@deltascientific.com Doc #100-35 P-2

D E L TA

E

LE

C

TR

IC

A

L C

O N

TR

O

LS

-H

O O

K U

P

DELTA SCIENTIFIC CORPORATION PHONE (661)257-1800

24901 WEST AVENUE STANFORD FAX (661)257-0617

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 1 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

NUMBER OF BARRICADES: ONE OR TWO MODEL DSC501 SERIES PHALANX

BARRIERS OPERATING INDEPENDENTLY

CONTROL AND OPTIONS: STANDARD 24 VDC CONTROL

MASTER CONTROL PANEL

SLAVE CONTROL PANEL

EMERGENCY OPERATE CIRCUIT

ANNUNCIATOR CIRCUIT

SAFETY LOOP DETECTOR, MODEL 3546-DCNP

STOP/GO SIGNAL LIGHTS, MODEL MPL-10

REFERENCE CIRCUIT DRAWINGS:

AF90501 HYDRAULIC POWER UNIT, SINGLE BARRIER (REFERENCE)

AF90502 HYDRAULIC POWER UNIT, DUAL BARRIER (REFERENCE)

AF90610-2 CONTROL CIRCUIT AND MOTOR STARTER, 120-240/24 VDC, DUAL

AFAF90605 MAIN BOARD LOGIC DIAGRAM

AF90732-2 MASTER CONTROL PANEL, DUAL BARRIER

AF90832-2 SLAVE CONTROL PANEL, DUAL BARRIER

AF90094-2 SYSTEM INTERCONNECT DIAGRAM, DSC501 SERIES PHALANX BARRIERS

The following charts have been prepared to assist in the ELECTRICAL INTERCONNECT of the

HYDRAULIC POWER SYSTEM, THE SYSTEM CONTROL CIRCUITS, THE REMOTE

CONTROL/STATUS PANELS (MASTER AND SLAVE), AND VARIOUS OPTIONS offered with DELTA BARRICADE SYSTEMS. These CHARTS are designed to supplement the detailed circuit drawings which are furnished with each system.

The voltage carried by each conductor, unless otherwise specified, is 24 VDC. These conductors are indicated by this symbol ">>>>>>>>>". The maximum power at this voltage is 250 watts for hot/neutral wires, 1 watt for device wires. Where the voltage is other than 24 VDC, the conductor is indicated by this symbol ">>>>>> * >>>>>>" and a footnote specifies the voltage and current requirement. Either multi-conductor cable or single conductor wire can be used at the option of the installer. The wire size should be selected based on the pull length, current and voltage requirements and local codes and specifications.

Terminals are designated by a PCB board number followed by two letters followed by the terminal number, i.e. 1 CB 11. The first number is PCB Board number, in this case Barrier # 1, the first letter is the strip location, in this case "control circuit", while the second letter defines the terminal voltage. `A' and some 'C' codes are low voltage 24 VDC. Some 'B' & 'C' codes are the specified local control voltage.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 2 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

CONNECTION POINTS BETWEEN THE BARRIERS AND THE CONTROL CIRCUIT

(DRAWING NO. AF90610-2 & AF90605).

BARRIER CONTROL CIRCUIT

Limit Switch Barrier # 1 Common Terminal >>>>>>>>>>>>>>> 1 CA 11 Norm. Opened (Down) >>>>>>>>>>>>>>> 1 CA 12

Limit Switch Barrier # 2 Common Terminal >>>>>>>>>>>>>>> 2 CA 11 Norm. Opened (Down) >>>>>>>>>>>>>>> 2 CA 12

* Load per limit switch is 0.6 watts.

BARRIER FRONT FACE LIGHTS CONTROL CIRCUIT

Flashing Lights Barrier # 1 Hot Terminal >>>>>>>>>>>>>>> 1 CD 1 Common Neutral Terminal >>>>>>>>>>>>>>> 1 CD 2

Flashing Lights Barrier # 2 Hot Terminal >>>>>>>>>>>>>>> 2 CD 1 Common Neutral Terminal >>>>>>>>>>>>>>> 2 CD 2

* Load per Barrier Front Face Light Set is 5 watts at 12 VDC.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 3 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

CONNECTION POINTS BETWEEN THE LOOP SAFETY DEVICES AND THE CONTROL

CIRCUIT (DRAWING NO. AF90610-2, AF90605 & AF3546-DCNP SAFETY).

LOOP SAFETY DEVICE CONTROL CIRCUIT

Loop Detector, Barrier # 1 (Contact is shown for no vehicle 'call') Common Terminal 5 (Yellow) >>>>>>>>>>>>>>> 1 CA 5 N.C. Terminal 10 (Violet) >>>>>>>>>>>>>>> 1 CA 6

Note: Detector 24 VDC power is Terminals 1 and 2 (Black and White). Loop leads are terminals 7 and 8 (Grey and Brown twisted pair).

Loop Detector, Barrier # 2 (Contact is shown for no vehicle 'call') Common Terminal 5 (Yellow) >>>>>>>>>>>>>>> 2 CA 5 N.C. Terminal 10 (Violet) >>>>>>>>>>>>>>> 2 CA 6

Note: Detector 24 VDC power is Terminals 1 and 2 (Black and White). Loop leads are terminals 7 and 8 (Grey and Brown twisted pair).

* Load per loop detector safety device is 0.6 watts.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 4 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

STOP/FLASHING CAUTION SIGNAL LIGHTS

CONNECTION POINTS BETWEEN THE CONTROL CIRCUIT (DRAWING NO. AF90610-2 &

AF90605) AND ONE OR MORE STOP/GO TRAFFIC LIGHTS.

This circuit synchronizes the stop/flashing caution lights with either of the Barriers. As soon as a Barrier starts to rise the red "stop" light comes on and stays on until the Barrier has been lowered and is fully down. The flashing amber "caution" light comes on at this point.

STOP/GO SIGNAL LIGHTS CONTROL CIRCUIT

Signal Lights for Barrier # 1 Supply Voltage >>>> Note 2 >>>> AC Control Voltage Hot Supply Voltage >>>> Note 2 >>>> AC Control Voltage Neutral Common Terminal >>>> Note 2 >>>> 1 CB 3 Signal Amber Light >>>> Note 1 >>>> 1 CB 4 Signal Red Light >>>> Note 1 >>>> 1 CB 5

Signal Lights for Barrier # 2 Supply Voltage >>>> Note 2 >>>> AC Control Voltage Hot Supply Voltage >>>> Note 2 >>>> AC Control Voltage Neutral Common Terminal >>>> Note 2 >>>> 2 CB 3 Signal Amber Light >>>> Note 1 >>>> 2 CB 4 Signal Red Light >>>> Note 1 >>>> 2 CB 5

Note 1: These lines must be sized to handle one 40 Watts (maximum) incandescent bulb operating at the AC Control Voltage. If back to back lights are used, twice the current must be handled.

Note 2: If the commons are combined, the total of all currents must be considered.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 5 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

CONNECTION POINTS BETWEEN THE CONTROL CIRCUIT (DRAWING NO. AF90610-2 &

AF90605) AND THE MASTER CONTROL PANEL (DRAWING NO. 90732-2).

REMOTE CONTROL PANEL CONTROL CIRCUIT

1 MA 3 (+) >>>>>>> Note 2 >>>>>>> 1 CA 3 + (HOT) Note 1 1 MA 18 (-) >>>>>>> Note 2 >>>>>>> 1 CA 18 - (NEUTRAL) Note 1 1 MA 4 (#1 Close) >>>>>>>>>>>>>>>>>>>> 1 CA 4 1 MA 8 (#1 Open) >>>>>>>>>>>>>>>>>>>> 1 CA 8 1 MA 14 (#1 Emergency) >>>>>>> Note 2 >>>>>>> 1 CA 14 1 MA 15 (#1 Emerg. Reset) >>>>>>> Note 2 >>>>>>> 1 CA 15 1 MA 19 (#1 Clear) >>>>>>>>>>>>>>>>>>>> 1 CA 19 1 MA 20 (#1 Not Clear) >>>>>>>>>>>>>>>>>>>> 1 CA 20

For the second Barrier, add:

2 MA 3 (+) >>>>>>> Note 2 >>>>>>> 2 CA 3 + (HOT) Note 1 2 MA 18 (-) >>>>>>> Note 2 >>>>>>> 2 CA 18 - (NEUTRAL) Note 1 2 MA 4 (#2 Close) >>>>>>>>>>>>>>>>>>>> 2 CA 4 2 MA 8 (#2 Open) >>>>>>>>>>>>>>>>>>>> 2 CA 8 2 MA 14 (#2 Emergency) >>>>>>> Note 2 >>>>>>> 2 CA 14 2 MA 15 (#2 Emerg. Reset) >>>>>>> Note 2 >>>>>>> 2 CA 15 2 MA 19 (#2 Clear) >>>>>>>>>>>>>>>>>>>> 2 CA 19 2 MA 20 (#2 Not Clear) >>>>>>>>>>>>>>>>>>>> 2 CA 20

Note 1: Size neutral and hot for 11 watts (maximum). All other lines are 1 watts each.

Note 2: The terminals 1 MA and 2 MA for these lines are jumpered at the factory; 1 MA 3 to 2 MA 3, 1 MA 18 to 2 MA 18, etc. A jumper will be required between the circuit boards in the control circuit.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 6 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

CONNECTION POINTS BETWEEN THE SLAVE PANEL (DRAWING NO. AF90832-2) AND

THE MASTER PANEL (DRAWING NO. AF90732-2) OR THE CONTROL CIRCUIT (DRAWING

NO. AF90610-2 & AF90605). (See Note 1)

SLAVE REMOTE PANEL MASTER REMOTE PANEL CONTROL CIRCUIT

1 SA 4 >>>>>>>>>>>>>> 1 MA 4 >>>>>>>>>>>>> 1 CA 4

1 SA 8 >>>>>>>>>>>>>> 1 MA 8 >>>>>>>>>>>>> 1 CA 8

1 SA 14 >>>> Note 3 >>>> 1 MA 14 >>>>>>>>>>>>> 1 CA 14 1 SA 15 >>>> Note 3 >>>> 1 MA 15 >>>>>>>>>>>>> 1 CA 15 1 SA 18 >>>> Note 3 >>>> 1 MA 18 >>>>>>>>>>>>> 1 CA 18

1 SA 19 >>>>>>>>>>>>>> 1 MA 19 >>>>>>>>>>>>> 1 CA 19

1 SA 20 >>>>>>>>>>>>>> 1 MA 20 >>>>>>>>>>>>> 1 CA 20

1 SA 27 >>>> Note 3 >>>> 1 MA 27 Annunciator - Note 2 1 SA 28 >>>> Note 3 >>>> 1 MA 28 + Hot - Note 2

For the second Barrier, add:

2 SA 4 >>>>>>>>>>>>>> 2 MA 4 >>>>>>>>>>>>> 2 CA 4

2 SA 8 >>>>>>>>>>>>>> 2 MA 8 >>>>>>>>>>>>> 2 CA 8

2 SA 14 >>>> Note 3 >>>> 2 MA 14 >>>>>>>>>>>>> 2 CA 14 2 SA 15 >>>> Note 3 >>>> 2 MA 15 >>>>>>>>>>>>> 2 CA 15 2 SA 18 >>>> Note 3 >>>> 2 MA 18 >>>>>>>>>>>>> 2 CA 18

2 SA 19 >>>>>>>>>>>>>> 2 MA 19 >>>>>>>>>>>>> 2 CA 19

2 SA 20 >>>>>>>>>>>>>> 2 MA 20 >>>>>>>>>>>>> 2 CA 20

2 SA 27 >>>> Note 3 >>>> 2 MA 27 Annunciator - Note 2 2 SA 28 >>>> Note 3 >>>> 2 MA 28 + Hot - Note 2

Note 1: The Slave can be fed from either the Master or from the Control Circuit. If the Slave is fed from the Master, then connect as shown in the two left columns above.

If the Slave is fed from the Control Circuit use the left and right columns as shown above.

Note 2: These connections must be made directly from the Slave Remote to the Master Remote. The routing can be made through the Control Circuit on a spare terminal if this is more convenient.

Note 3: The terminals 1 SA and 2 SA for these lines can be commoned. A jumper will be required between the circuit boards in the control circuit.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 7 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

CONNECTION POINTS BETWEEN THE CONTROL CIRCUIT (DRAWING NO. AF90610-2 &

AF90605) AND THE HYDRAULIC POWER UNIT. NOTE: THESE CONNECTIONS HAVE

BEEN MADE AT THE FACTORY BUT ARE SHOWN HERE AS AN AID TO TROUBLE

SHOOTING.

CONTROL CIRCUIT HYDRAULIC POWER UNIT

BARRIER # 1 VALVE SOLENOIDS

1 CB 17 >>>> Note 1 >>>> UP 1 CB 18 >>>> Note 1 >>>> UP COMMON 1 CB 19 >>>> Note 1 >>>> DOWN 1 CB 20 >>>> Note 1 >>>> DOWN COMMON 1 CB 21 >>>> Note 2 >>>> EMERGENCY OPERATE 1 CB 22 >>>> Note 2 >>>> EO COMMON

BARRIER # 2

2 CB 17 >>>> Note 1 >>>> UP 2 CB 18 >>>> Note 1 >>>> UP COMMON 2 CB 19 >>>> Note 1 >>>> DOWN 2 CB 20 >>>> Note 1 >>>> DOWN COMMON 2 CB 21 >>>> Note 2 >>>> EMERGENCY OPERATE 2 CB 22 >>>> Note 2 >>>> EO COMMON

MOTOR CONTROL CIRCUIT

CC 18 >>>> Note 3 >>>> LEVEL SWITCH CC 19 >>>> Note 3 >>>> LEVEL SWITCH/PRESSURE SWITCH CC 20 >>>> Note 3 >>>> PRESSURE SWITCH

Note 1: These lines must be sized to carry 30 watts at 24 VDC.

Note 2: These lines must be sized to carry 20 watts at 24 VDC.

Note 3: Starter coil power consumption is less than 100 va inrush, and less than 10 va sealed.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 8 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

CONTROL CIRCUIT

The Control Circuit is fed from the customer's local AC control voltage supply (100-120/1/50-60).

Connection is to terminals CC 1(+) and CC 2(-). Supply should be adequate to provide a minimum of 750 Watts of power.

The control circuit contains a power supply, which reduces the local voltage to 24 VDC for use on the remote control panels. The feed out of the control circuit for these remotes is on terminal CA 1(+) and CA 2(-). Standard power capability is 150 watts. Battery back up to power supply is supplied.

Note: Use caution when installing the field conduits and wiring to the control circuit enclosure.

Shield metal chips and wire fragments from falling on to or in to components. Component failure can be caused by careless installation.

POWER UNIT MOTORS

The motor has been ordered and supplied to the actual site voltage. Please confirm before hookup. The motor is factory wired to an automatic starter controlled by the hydraulic power unit pressure switch and oil level switch. Thermal overload protection is integrally provided.

The customer should provide branch circuit protection as required by national and local code.

Care should be taken in arriving at the correct wire size for the length of cable provided.

HYDRAULIC POWER UNIT WIRING

The three phase power is brought into the HPU terminal box to the line side of the door mounted disconnect switch at L1, L2 and L3.

Confirm that the motor runs in the correct direction by checking rotation of the motor fan or output coupling with the decal direction arrow. If motor runs in the wrong direction, reverse any two incoming wires at L1, L2 or L3; motor should now run in the correct direction.

Power for the starter contactor coil is the same as the primary voltage of the control circuit. Coil voltage legend plates are on the starter so that this can be confirmed. Connection points for the coil power are 'CC 1(+)' and 'CC 2(-)'. Starter coil power consumption is less than 100 va inrush, and less than 10 va sealed.

VALENCIA, CALIFORNIA 91355 E-MAIL info@deltascientific.com

Copyright 2007 Delta Scientific Corporation Page 9 of 9 All Rights Reserved Document: AF10102.2

ELECTRICAL CONNECTION CHART

SNOW MELTING HEATERS

The Barrier system kit is be furnished with electric heaters for the purpose of melting snow and ice which may otherwise freeze the Barrier in either the up or down position. The heater thermostat dial should be set at 45 degrees. This allows for the melting of snow during cold weather as well as moisture and condensation control, The hydraulic oil reservoir is also provided with an immersion heater located within the oil level. It is equipped with a thermostat dial and should be set to a value between 60 to 75ºF [15 to 25ºC].

The electric feed to the tank heater is fused in the control circuit. See appropriate wiring diagram for the connections.

The Barrier heater connections are direct to the customer's power distribution panel.

Important: If the heater control circuits are turned off seasonally and before energizing the heater circuits at the start of each season, the elements must be megger tested.

This is typically done with a megger capable of delivering 500 volts to the circuit. A value in excess of 50,000 ohms to ground is acceptable for energizing the heater circuits. Call the factory if a lower reading is found.

NOTE: It is not recommended for the Delta Scientific DSC501 Phalanx system used by the USAF Vehicle Barriers Program that the heaters be turned off seasonally.

Failure of the elements will in no way cause the Barrier to malfunction unless there is an ice or snow build up inside the machine.

1021187883N Highlight

MECHANICAL

SYSTEM THEORY

VEHICLE ARREST SYSTEM

COPYRIGHT 1991 DELTA SCIENTIFIC CORPORATION

ALL RIGHTS RESERVED

MFG. UNDER U.S. PATENT #4,097,170 4,158,514 4,318,079 4,354,771 4,490,068 4,576,508 4,715,742

U.K. PATENT # GB 2,127,893B 2,138,883B

40355 DELTA LANE • PALMDALE, CALIFORNIA 93551, USA • PHONE (661) 575-1100 • FAX (661) 575-1109

E-MAIL: info@deltascientific.com Doc #100-35 P-3

D E L TA

M E

C H

A N

IC

A

L S

Y S

TE

M

TH

E

O R

Y

Copyright 2011 Delta Scientific Corporation Page 1 of 14 All Rights Reserved Document: AF10230.3

'DELTA' STYLE HYDRAULIC POWER UNITS

DSC501 SERIES PHALANX® BARRIERS

THEORY OF OPERATION

Power Source

Delta Scientific Corporation's barricade systems are powered by a hydraulic oil power unit (HPU).

This unit is typically mounted remote from the Barrier(s) and attached to them by hoses or steel pipes. The hydraulic power unit provides the tremendous lifting force necessary to raise the heavy steel weldments of the Barriers. The forces generated are in the range of 20,000 to 25,000 pounds for these large Phalanx® Barricades. An industrial grade electric motor drives the hydraulic gear pump to produce the HPU system pressure.

Power Storage

The HPU stores the pressurized hydraulic oil produced by the gear pump in an accumulator. The accumulator thus provides a high pressure reserve of oil available to move or maintain the position of the Barricade.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .