Proposal-B48CM75A Proposal.pdf

PDF 218 KB Posted

Attached to
Mala Boat Ramp Site Improvements
Solicitation number
B26002460
Issued by
Maui County, Hawaii

About this file

This is a proposal form for the State of Hawaii Department of Land and Natural Resources, Division of Boating and Ocean Recreation, Engineering Branch for the Mala Boat Ramp Site Improvements project (Job No. B48CM75A) located in Lahaina, Maui, Hawaii. The project encompasses comprehensive site improvements including demolition of existing pavement, boat washdown area, and comfort station building; installation of additional asphalt concrete and concrete pavement; parking lot resurfacing; reconstruction of the boat washdown area and drain field; installation of site lighting; and renovation of the restroom facilities including fixture replacement, roofing upgrades, and interior painting. The work scope is divided into 18 bid items, including mobilization/demobilization, surveys, temporary construction site installation, asbestos abatement, site demolition, utility improvements, drainage improvements, concrete and asphalt pavement installation, curbing, solar-powered street lights, comfort station demolition and improvements, archaeological monitoring, field office operations, and an allowance for additional directed work. The project contract period is 180 consecutive calendar days from the date of written notice to proceed, with liquidated damages assessed at $300 per calendar day for work extending beyond this timeline.

Bidders must submit proposals with total sum bids for all 18 items, with specific allowances pre-established for archaeological monitoring ($40,000), field office operations ($75,000), project signage ($5,000), and additional directed work ($100,000). The proposal accommodates Hawaii products preference (10% price reduction for Class I or 15% for Class II products), recycled products preference (10% price reduction), and apprenticeship agreement preference (5% price reduction). Bidders must provide a performance and payment bond as required by law and comply with all Hawaii state statutes governing contractors, including general excise tax, employment security, workers' compensation, temporary disability insurance, and pre-paid health care requirements. Bidders are required to identify all joint contractors and subcontractors with appropriate specialty contractor licenses and must perform at least 20 percent of the contract work with their own organization. Award will be made to the lowest responsible bidder based on total sum bid after applicable preferences are applied, with the Board of Land and Natural Resources reserving the right to reject any or all bids and to negotiate scope adjustments if bids exceed available funding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1

P R O P O S A L

FOR

STATE OF HAWAII

DEPARTMENT OF LAND AND NATURAL RESOURCES

DIVISION OF BOATING AND OCEAN RECREATION

ENGINEERING BRANCH

Job No. B48CM75A Mala Boat Ramp Site Improvements

Lahaina, Maui, Hawaii

__________________________, 2026

Engineering Branch Head Division of Boating and Ocean Recreation Department of Land and Natural Resources State of Hawaii Honolulu, Hawaii

Dear Sir:

The undersigned, having carefully examined the local conditions and all available records and information covering conditions which may affect the cost of the work to be performed, and having carefully examined the Plans and Specifications, and other contract documents, hereby proposes to furnish and pay for all materials, tools, equipment, labor and other incidental work necessary for the removal, hauling and disposal of the demolitions work from existing pavement, boat washdown area, site grading and comfort station building demolition work and installation of additional asphalt concrete (AC) pavement parking, additional concrete pavement, resurface the existing parking lot, reconstruct the existing boat washdown area and drain field, site lighting, and replacement of the restroom fixtures and doors, reroof and interior painting of the existing comfort station, and appurtenant work at Mala Boat Ramp, Lahaina, Maui, Hawaii as required or called for in this Proposal, all according to the true intent and meaning of the Notice to Bidders, Information and Instructions to Bidders, Proposal, Technical Specifications, Interim General Conditions, Plans, Permitting Documents, and any and all addenda for:

Job No. B48CM75A Mala Boat Ramp Site Improvements

Lahaina, Maui, Hawaii on file in the office of the Engineering Branch for the TOTAL SUM BID (Items 1 to 18) of:

Dollars ($_____________________) and will fully complete all work under this contract within 180 consecutive calendar days from the date of written notice to proceed, including date of said order, said total sum being itemized on the following pages.

P-2

PROPOSAL

Item No. Qty. Unit Description Unit Price Total

1. 1 L.S. Mobilization and Demobilization.

Not to Exceed 10% of the Sum of Bid Items 2 – 14. $___________

2. 1 L.S. Pre- and Post-Construction Surveys, including all labor, materials, equipment and incidentals as required.

3. 1 L.S. Temporary Construction Site Installation and Maintenance including, but not limited to: Erosion, Sediment and Dust Control BMPs; Staging Areas; Temporary Traffic Control as required during the period of construction including all submittals, agreements, permits, maintenance, monitoring and reporting, and all other incidentals, in place complete.

4. 1 L.S. Asbestos Report and Abatement, including but not limited to: asbestos investigation and written report identifying asbestos-containing materials (ACMs) on site, perform abatement(if required), including proper containment, removal, disposal, and all other incidentals. in place complete. $___________

5. 1 L.S. Site Demolition and Removal, including but not limited to:

removal/disposal of concrete curbs; a.c. and concrete pavement; pavement striping; signage; gravel/soil; street lights; trees; certain portions of water lateral and appurtenances; certain portions of electrical lines and appurtenances; and all other appurtenant work indicated on the drawings, in place complete. $___________

6. 1 L.S. Water Service Lateral and Utility Improvements, including all piping, fittings, valves, hose bibbs and bollards;

connection to existing water line; trench excavation and backfill; cushion material; compaction; existing utility cover replacements; and all other appurtenant work indicated on the drawings, in place complete. $___________

7. 1 L.S. Drainage Improvements, including but not limited to:

drain piping; trench drain; drain manhole; storm chambers;

inspection ports; excavation and backfill; cushion material;

geotextile fabric; geogrid; compaction; and all other appurtenant work indicated on the drawings, in place complete. $___________

8. 120 CY Concrete Pavement, including but not limited to: concrete pavement; reinforcing steel; aggregate base course;

geotextile fabric; joints; concrete pavement transitions;

excavation and backfill; and all other appurtenant work indicated on the drawings, in place complete. $__________ $___________

9. 1,205 LF Concrete Curb, including but not limited to: barriers; curb or flush curb, as shown on plans, in place complete. $__________ $__________

P-3

PROPOSAL

No. Qty. Unit Description Unit Price Total

10. 5,414 SY AC Pavement, including but not limited to: State Mix V pavement; compacted base course, prime coat; sawcutting;

speed bump; excavation and backfill; and all other appurtenant work indicated on the drawings, in place complete. $__________ $__________

11. 1 L.S. Striping, including but not limited to: 4" wide striping;

symbols; and all other appurtenant work indicated on the drawings, in place complete. $__________

12. 12 EA. Solar Powered Street Light, including, but not limited to:

entire assembly; wiring; grounding rod; reinforced concrete foundation; bollards; excavation and backfill; and all other appurtenant work indicated on the drawings, in place complete. $__________ $__________

13. 1 L.S. Existing Comfort Station Demolition and Removal, including but not limited to: removal/disposal water fixtures and piping; tiles; partitions; and all other appurtenant work indicated on the drawings, in place complete. $__________

14. 1 L.S. Existing Comfort Station Improvements, including but not limited to: piping; valves; water closet; lavatory;

partitions; refurbish interior; roofing upgrades; and all other appurtenant work indicated on the drawings, in place complete. $__________

15. 1 L.S. Allowance for Archaeological Monitoring Services. $40,000.00

16. 1 L.S. Allowance for Field Office, including but not limited to, obtaining all necessary permits, rights of entry, or other approvals; office equipment and furniture; window-type air conditioning unit(s); telephone service; internet and wifi; electrical service and lighting; miscellaneous equipment; and all other incidentals, in place complete. $75,000.00

17. 1 L.S. Allowance for Project Sign, in place complete. $5,000.00

18. 1 L.S. Additional work as directed and approved by the Engineer. Allowance $100,000.00

TOTAL SUM BID

(Items 1-18, Inclusive) $___________

P-4

HAWAII PRODUCTS PREFERENCE AND/OR USE OF HAWAII PRODUCTS

In accordance with Act 175, SLH 2009, the Hawaii products preference is applicable to this solicitation.

Hawaii products may be available for items noted on the Offer Form. The Hawaii Products List is available on the SPO webpage at http://hawaii.gov/spo. Click on Procurement of Goods, Services and Construction-Chapter 103D, HRS; under Procurement click on Preferences, Hawaii Products and select Hawaii Products List to view.

Bidder offering a Hawaii product (“HP”) shall identify the HP in the table below. Any person desiring a Hawaii product preference shall have the product(s) certified and qualified, if not currently on the Hawaii Products List, prior to the deadline for receipt of offer(s) specified in the procurement notice and solicitation. The responsibility for certification and qualification shall rest upon the person requesting the preference.

Persons desiring to qualify their product(s) not currently on the Hawaii Product List, shall complete Form SPO-38, Certification for Hawaii Product Preference, and submit the completed form to the Procurement Officer providing any additional information required by the Procurement Officer. One form shall be completed and submitted for each product. Form SPO-38 is available on the SPO webpage at http://hawaii.gov/spo, under the Quicklinks menu click on Forms for Vendors/Contractors/Services Providers.

For the purpose of selecting the low bid when a solicitation contains both HP and non-HP, the price offered for a HP item shall be decreased by subtracting 10% for the class I or 15% for the class II HP item(s) offered. The lowest total offer, taking the preference into consideration, shall be awarded the contract, unless the offer provides for additional award criteria. The contract amount of any contract awarded, however, shall be the amount of the price offered, exclusive of the preferences.

In the event of any change that materially alters the bidder’s ability to supply the Hawaii product(s), the bidder shall immediately notify the procurement officer in writing and the parties shall enter into discussions for the purpose of revising the contract or terminating the contract for convenience.

No.

Pre-Approved Hawaii Product Description & Manufacturer

Class (I or II) Quantity Unit

Measure Unit Price

Total Price http://hawaii.gov/spo http://hawaii.gov/spo

P-5

RECYCLED PRODUCTS PREFERENCE

This project allows a 10% price preference for recycled products in accordance with HRS 103D-1005.

Bidders are required to complete this section. FAILURE TO COMPLETE THIS SECTION MAY BE

SUFFICIENT CAUSE FOR REJECTION OF THE BID.

Only the following products are being considered for the recycled product preference. Please indicate your selection of recycled or non-recycled product by indicating its cost FOB jobsite unloaded in the schedule below, including applicable General Excise & Use Taxes.

RECYCLED NONRECYCLED

DESCRIPTION PRODUCT COST PRODUCT COST

The bidder requesting a recycled product preference by his selection above, shall also complete and submit the form “CERTIFICATION OF RECYCLED CONTENT” as shown in the Interim General Conditions and provide all supporting information with this proposal. Additional information may be requested to qualify a product.

The following definitions are applicable to the CERTIFICATION OF RECYCLED CONTENT form:

"Post-consumer recovered material" means any product used by a consumer, including a business that purchases the material, that has served its intended end use, and that has been separated or diverted from the solid waste stream for the purpose of use, reuse, or recycling.

"Product" includes materials, manufactures, supplies, merchandise, goods, wares, and foodstuffs.

"Recovered material” means waste material and by-products that have been separated, diverted, or removed from the solid waste stream after a manufacturing process for the purpose of use, reuse, or recycling.

Recovered material does not include those materials and by-products that are generated and normally reused on-site or within original manufacturing processes (such as mill broke, in the case of paper products).

"Recycled content” means the percentage of a product composed of recovered material, or post-consumer recovered material, or both.

"Recycled product” means a product containing recovered material, or post-consumer recovered material, or both.

The bidder agrees that preference for recycled products shall be taken into consideration to determine the low bidder in accordance with said Section and the rules promulgated, however, the award of contract will be in the amount of the bid offered exclusive any preference.

P-6

APPRENTICESHIP AGREEMENT PREFERENCE

1. If applicable to this project, any bidder seeking the preference must be a party to an apprenticeship agreement registered with the State Department of Labor and Industrial Relations (DLIR) at the time the bid is submitted for each apprenticeable trade the bidder will employ to construct the project. “Employ” means the employment of a person in an employer-employee relationship.

a. The apprenticeship agreement shall be registered with the DLIR and conform to the requirements of Hawaii Revised Statues Chapter 372.

b. Subcontractors do not have to be a party to an apprenticeship agreement for the bidder to obtain preference.

c. The bidder is not required to have apprentices in its employ at the time the bid is submitted to qualify for the preference.

2. A bidder seeking the preference must state the apprenticeable trade the bidder will employ for each trade to be employed to perform the work by submitting a completed signed original Certification Form 1 verifying the participation in an apprenticeship program registered with DLIR. “Apprenticeable trade” shall have the same meaning as “apprenticeable occupation” pursuant to Hawaii Administrative Rules (HAR) 12-30-5.

a. The Certification Form 1 shall be authorized by an apprenticeship sponser listed on the

DLIR list of registered apprenticeship programs. “Sponsor” means an operator of an apprenticeship program and in whose name the program is approved and registered with the DLIR pursuant to HAR 12-30-1.

b. The authorization shall be an original signature by an authorized official of the apprenticeship sponsor.

c. The completed signed original Certification Form 1 for each trade must be submitted with the bid. Previous certifications shall not apply.

d. When filling out the Certification Form 1, the name of Apprenticeable Trade and Apprenticeship Sponsor must be the same as recorded in the List of Contruction Trades in Registered Apprenticeship Programs that is posted on the DLIR website. “Registered apprenticeship program” means a construction trade program approved by the DLIR pursuant to HAR 12-301 and 12-30-4.

e. The Certification Form 1 and the List of Construction Trades in Registered Apprenticeship

Programs is available on the DLIR website at: http://hawaii.gov/labor/wdd.

3. Upon receiving the Certification Form 1, the Procurement Officer will verify that the apprenticeship program is on the List of Construction Trades in Registered Apprenticeship Programs and that the form is signed by an authorized official of the Apprenticeship Program Sponsor. If the programs and signature are not confirmed by the DLIR, the bidder will not quality for the preference.

4. If the bidder is certified to participate in an apprenticeship program for each trade which will be employed by the bidder for the project, a preference will be applied to decrease the bidder’s bid amount by five percent (5%) for evaluation purposes.

http://hawaii.gov/labor/wdd

P-7

5. Should the bidder qualify for other preferences (e.g. Hawaii Products), all applicable preferences shall be applied to the bid price.

CONTRIBUTIONS BY STATE AND COUNTY CONTRACTORS PROHIBITED

Contractors are hereby notified of the applicability of Section 11-355, HRS, which states that campaign contributions are prohibited from specified State or county government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body.

CONDITION OF AWARD

It is understood that the award of the contract will be made on the basis of the lowest responsible Total Sum Bid (Items 1 to 18) selected by the Board of Land and Natural Resources. Write the total of bid items 1 to 18 on page P-1.

In the event the low bid is below the available funds certified by the appropriate fiscal officer, the head of the purchasing agency responsible for the procurement in question is authorized to award Additives to the lowest bidder. The award of Additives may be in any order or combination such that the Base Bid plus Additives do not exceed the available funds.

It is understood and agreed that the Board of Land and Natural Resources reserves the right to reject any and/or all bids and waive any defects when, in the Board's opinion, such rejection or waiver will be for the best interest of the State of Hawaii.

In the event all bids exceed available funds certified by the appropriate fiscal officer, the head of the purchasing agency responsible for the procurement in question is authorized in situations where time or economic considerations preclude resolicitation of work of a reduced scope to negotiate an adjustment of the bid price, including changes in the bid requirements, with the low responsible and responsive bidder, in order to bring the bid within the amount of available funds. It is understood and agreed upon that the head of the purchasing agency may delete a portion or all of any item(s) in the proposal at the stated unit or lump sum price as necessary to stay within the available funding. The bidder is responsible to make an earnest effort to represent the actual cost of each item, including all materials, labor, equipment, overhead and profit in their bid proposal to preclude claims of anticipated profit or loss of profit because of an unbalanced bid proposal.

It is also understood that if a mutually agreeable cost for the reduced scope of work necessitated by a lack of available funds cannot be agreed upon between the bidder and the head of the purchasing agency within 14 calendar days after the bid opening, then the bid may be rejected in the best interest of the purchasing agency, and the head of the purchasing agency may negotiate in progressive order (lowest to highest) with the next lowest responsible and responsive bidder.

It is also understood and agreed that the award of the contract shall be conditioned upon funds being made available for this project and further upon the right of the Board of Land and Natural Resources to hold all bids received for a period of sixty (60) days from the date of the opening thereof, unless otherwise required by law, during which time no bid may be withdrawn.

It is also understood that Notice to Proceed may be delayed up to three hundred and sixty-five (365) days after the date of bid opening, and that no additional compensation will be provided for any claim for escalation or delay for issuance of Notice to Proceed on or before that date, plus the contract time allowed for performance of work noted on Page P-1 of the [Bid] PROPOSAL form. See SPECIAL PROVISIONS, Section 3.9 for additional requirements.

It is also understood and agreed that the quantities given herewith are approximate only and are subject to increase or decrease, and that the undersigned will perform all quantities of work as either increased or decreased, in accordance with the provisions of the Contract Specifications.

P-8

It is also understood and agreed that the estimated quantities shown for the items for which a UNIT PRICE is asked in this Proposal are only for the purpose of comparing on a uniform basis, bids offered for the work under this contract, and the undersigned agrees that he is satisfied with and will at no time, dispute said estimated quantities as a means of claims for anticipated profit or loss of profit, because of a difference between the quantities of the various classes of work done or the materials and equipment installed, and the said estimated quantities. On UNIT PRICE bids, payment will be made only for the actual number of units incorporated into the finished project at the contract UNIT PRICE.

After the proposals are opened and read, the figures will be extended and/or totaled in accordance with the bid prices of the acceptable proposals and the totals will be compared. In the comparison of bids, words written in the proposal shall govern over figures and unit prices will govern over totals. Until the award of the contract, however, the right will be reserved to reject any and all proposals and to waive any defects or technicalities as may be deemed best for the interest of the State.

It is also understood and agreed that liquidated damages in the amount of THREE HUNDERED DOLLARS AND NO/100 ($300.00) for each and every calendar day in excess thereof prior to completion of the contract shall be withheld from payments due to the Contractor.

It is also understood and agreed that if this bid is accepted, the successful bidder must enter into and execute a contract with the Board of Land and Natural Resources and furnish a Performance and Payment Bond, as required by law. These bonds shall conform to provisions of Section 103D-324 and 325, Hawaii Revised Statutes and any law applicable hereto.

It is also understood and agreed that the successful bidder will provide all necessary labor, materials, tools, equipment, and other incidentals necessary to do all the work and furnish all the materials specified in the contract in the manner and time herein prescribed, and according to the requirements of the Engineer as therein set forth.

It is understood that by submitting this proposal, the undersigned is declaring that his firm has not been assisted or represented on this matter by an individual who has, in a State capacity, been involved in the subject matter of this contract in the past two years.

It is understood that by submitting this proposal in accordance with HAR 3-122-192, the undersigned is declaring that the price submitted is independently arrived without collusion.

It is also understood that by submitting this proposal, a Certification for Safety and Health Programs for bids in excess of $100,000 (in accordance with HRS 396-18), the undersigned certifies that his organization will have a written safety and health plan for this project that will be available and implemented by the Notice to Proceed date of this project. Details of the requirements of this plan may be obtained from the Department of Labor and Industrial Relations, Occupational, Safety and Health Division (HIOSH).

It is further understood and agreed that the successful bidder shall comply with paragraph 3.1.a "SUBCONTRACTING" of the General Provisions which requires that the contractor shall perform with his own organization and with the assistance of workmen under his immediate superintendence, work of a value not less than twenty percent (20%) of the value of all work embraced in the Contract, except that certain contract items of work, if specifically referred to in the special provisions, will be exempted from said twenty percent requirement.

Compliance with §103-310 HRS. As a condition of award all bidders shall comply with all laws governing entities doing business in the State, including Chapter 237 HRS (general excise tax); Chapter 383 HRS (employment security – unemployment insurance); Chapter 386 HRS (workers compensation); Chapter 392 HRS (temporary disability insurance); and Chapter 393 HRS (pre-paid health care), and shall produce all

P-9 documents to the State (DLNR, Engineering Division) required to demonstrate compliance with these subsections. Any bidder making a false affirmation or certification under this subsection shall be suspended and may be debarred from further offerings or awards pursuant to §103D-702 HRS.

P-10

RECEIPT OF ADDENDA

The bidder also acknowledges receipt of any and all addenda issued by the Engineering Division, by recording the date of receipt of the respective addenda in the space provided below:

Addendum Date Received Addendum Date Received

No. 1 ___________ No. 5 ___________ No. 2 ___________ No. 6 ___________ No. 3 ___________ No. 7 ___________ No. 4 ___________ No. 8 ___________

It is understood that failure to receive any such addendum shall not relieve the Contractor from any obligation under this Proposal as submitted.

It is also understood and agreed that if this Proposal is accepted and the undersigned should fail or neglect to contract as aforesaid, the Board may determine that the bidder has abandoned the Contract, and thereupon, forfeiture of the security accompanying his proposal shall operate and the same shall become the property of the Board.

P-11

JOINT CONTRACTORS OR SUBCONTRACTORS

TO BE ENGAGED ON THIS PROJECT

The Bidder agrees that the following is a complete listing of all joint contractors or subcontractors covered under Chapter 444, Hawaii Revised Statutes (HRS), who will be engaged by the Bidder on this project to perform the required work indicated pursuant to Section 103D-302, HRS. It is the sole responsibility of the contractor to review the requirements of this Project and determine the appropriate licenses that are required to complete the Project. The Bidder certifies that the completed listing of joint contractors or subcontractors fulfills the requirements for the project and the Bidder, together with the listed subcontractors or joint contractors have all the specialty contractor’s licenses to complete the work, except as provided for in HRS §103D-302(b). Failure of the Bidder to comply with this requirement may be just cause for rejection of the bid.

“A” General Engineering Contractors and “B” General Building Contractors are reminded that due to the Hawaii Supreme Court’s January 28, 2002 decision in Okada Trucking Co., Ltd. v. Board of Water Supply, et al., 97 Haw. 450 (2002), they are prohibited from undertaking any work, solely or as part of a larger project, which would require the general contractor to act as a specialty contractor in any area in which the general contractor has no license. Although the “A” and “B” contractor may still bid on and act as the “prime” contractor on an “A” or “B” project (See, HRS §444-7 for the definitions of an “A” and “B” project.), respectively, the “A” and “B” contractor may only perform work in the areas in which they have the appropriate contractor’s license (An “A” or “B” contractor obtains “C” specialty contractor’s licenses either on its own, or automatically under HAR § 16-77-32). The remaining work must be performed by appropriately licensed entities.

General Engineering “A” Contractors automatically have these “C” specialty contractor’s licenses: C-3, C-9, C-10, C-17, C-24, C-31a, C-32, C-35, C-37a, C-37b, C-38, C-43, C-49, C-56, C-57a, C-57b and C- 61.

General Building “B” Contractors automatically have these “C” specialty contractor’s licenses: C-5, C-6, C-10, C-12, C-24, C-25, C-31a, C-32a, C-42a and C-42b.

In completing the Joint Contractors or Subcontractors List, describe the specialty contractor’s nature and scope of work to be performed for this project and provide the complete firm name of the joint contractor or subcontractor in the respective columns. If the Bidder is a general contractor providing the work of a required specialty contractor, whose license is not automatically held pursuant to HAR 16-77-32, fill in the Bidder’s (general contractor’s) name and nature and scope of work to be performed on this project.

List only one joint contractor or subcontractor per required specialty contractor’s classification, unless within the same specialty, the work of each joint contractor or subcontractor can be described so that there is no overlap in work descriptions.

If a contractor’s license is required by law for the performance of the work which is called for in this bid, the bidder and all subcontractors must have the required license before the submission of the bidder’s proposal in the case of a non-federal aid project, and for federal-aid projects, the bidder must have the required license prior to the award of the project and all subcontractors prior to the start of the subcontracted work.

Bidders shall list only one Joint Contractor or Subcontractor per required specialty contractor’s license.

P-12

Class Description License No.

Joint or

Subcontractor Firm Name

P-13

Enclosed herewith is a:

1. Surety Bond (*1) )

2. Legal Tender (*2) )

3. Cashier's Check (*3) )

4. Certificate of Deposit (*3) ) in the

5. Certified Check (*3) ) amount

6. Official Check (*3) ) of

7. Share Certificate (*3) )

8. Teller's Check (*3) )

9. Treasurer's Check (*3) ) (Cross Out Those Not Applicable)

____________________________________________________Dollars ($_______________) as required by law.

Respectfully submitted, Name of Company, Joint Venture or Partnership

Contractor's License No.

By ____________________________________

Signature (*4)

Title __________________________________ Print Name _____________________________ Date __________________________________ Address ________________________________

Telephone No. __________________________

E-Mail Address _________________________

NOTES:

1. Please attach to this page evidence of the authority of this officer to submit bids on behalf of the Company and also the names and residence addresses of all officers of the Company.

2. Fill in all blank spaces with information asked for or bid may be invalidated. PROPOSAL

MUST BE INTACT, MISSING PAGES MAY INVALIDATE YOUR BID.

End of Proposal

PROPOSAL
End of Proposal

File details come from the government source that posted it. Updated .