This file consists of comprehensive construction plans and specifications for the Mala Boat Ramp Site Improvements project, prepared by the State of Hawaii Department of Land and Natural Resources, Division of Boating and Ocean Recreation, in conjunction with Maui County. The project encompasses demolition of existing pavement and structures, site grading, installation of asphalt and concrete pavements, reconstruction of the boat washdown area with subsurface infiltration drainage systems, installation of site lighting with solar-powered fixtures, parking lot resurfacing with designated stalls for standard vehicles and boat trailers, ADA-accessible parking areas, and comprehensive comfort station renovations including new restroom fixtures, doors, wall tile, flooring, roofing, and interior painting. The project is located at Mala Boat Ramp in Lahaina, Maui, Hawaii (TMK: 2-4-5-005:001), with an earthwork summary indicating approximately 150 cubic yards of cut and 180 cubic yards of fill across a 54,800 square-foot grading area. The plans include 26 sheets of detailed drawings covering site layout, drainage systems, water distribution, erosion and sediment control measures, and architectural details for the comfort station renovation.
Key specifications require the contractor to maintain public access to the boat ramp during construction with at least 14 days' written notice prior to any shutdown activities, coordinate work with the Harbor Master for staging area use at least 30 days in advance, and comply with all State of Hawaii Department of Transportation and Maui County Department of Public Works standard specifications. Best management practices for erosion and sediment control must be implemented with weekly inspections and maintenance per NPDES permit requirements, with potential liquidated damages up to $27,000 per day for noncompliance. The contractor is responsible for all utility coordination through the One Call Center at least 5 working days prior to excavation, temporary construction site utilities at no additional cost to the state, and protection of existing native plant species and Hawaiian hoary bats, with restrictions on tree removal from June 1 through September 15. Environmental compliance includes adherence to Hawaii Administrative Rules regarding water quality standards and pollution control, proper handling of hazardous materials with original labels and safety data sheets, and daily waste disposal in lidded metal dumpsters emptied at least twice weekly.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FR
ON
T
ST
RE
ET
HONOAPIILANI HIGHW
AY
ALA MOANA STREET
KAHOMA STREAM
UNAHIOLE STREET
STATE OF HAWAII
DIVISION OF BOATING AND OCEAN RECREATION
SHEET NO. 1 OF 26 SHEETS
DEPARTMENT OF LAND AND NATURAL RESOURCES
LAHAINA, MAUI, HAWAII
APPROVED: DATE:
MEGHAN L. STATTS
ADMINISTRATOR
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL RESOURCES
MALA BOAT RAMP SITE IMPROVEMENTS
DRAWING NO.
T-1
JOB NO. B48CM75A
KIHEI
WAILEA
LAHAINA
KAANAPALI
KAPALUA
KAHULUI
WAILUKU PAIA
HANA
TMK: (2) 4-5-005:001
LOCATION MAP
NOT TO SCALE
SITE MAP
NOT TO SCALE
INDEX OF DRAWINGS
SHT. NO DWG.NO DESCRIPTION
1 T-1 TITLE SHEET
2 G-1 GENERAL NOTES
3 G-2 GENERAL NOTES, LEGEND AND ABBREVIATIONS
4 G-3 PHASING, ACCESS AND STAGING PLAN
5 G-4 EROSION AND SEDIMENT CONTROL PLAN
6 G-5 EROSION CONTROL DETAILS
7 C-1 EXISTING SITE PLAN - SURVEY CONTROLS
8 C-2 DEMOLITION PLAN
9 C-3 SITE PLAN
10 C-4 GRADING PLAN
11 C-5 STRIPING AND SIGNAGE PLAN
12 C-6 SITE LAYOUT PLAN
13 C-7 BOAT RAMP ENLARGED PLAN
14 C-8 BOAT WASH ENLARGED PLAN AND PIPING PROFILE
15 C-9 CROSS SECTION
16 C-10 SITE DETAILS - 1
17 C-11 SITE DETAILS - 2
18 C-12 SITE DETAILS - 3
19 C-13 DRAINAGE DETAILS - 1
20 C-14 DRAINAGE DETAILS - 2
21 C-15 WATER DETAILS
22 C-16 SOLAR LIGHT DETAILS
23 A-1 COMFORT STATION GENERAL NOTES AND PLAN
24 A-2 COMFORT STATION RENOVATION PLAN
25 A-3 COMFORT STATION EXISTING SECTIONS
26 A-4 COMFORT STATION RENOVATED SECTIONS
PROJECT LOCATION
PROJECT SITE
MALA BOAT RAMP
LAHAINA,MAUI, HAWAII
TMK: (2) 4-5-005:001
ISLAND
OF MAUI
04/21/2026 https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAAmuCmjy-QVnMKFXjYfUTb-gbSi7X8rTmx
GENERAL CONSTRUCTION NOTES
1. ALL APPLICABLE CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST
REVISION OF THE FOLLOWING:
· STATE OF HAWAII, DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD
AND BRIDGE CONSTRUCTION", DATED 2005;
· THE COUNTY OF MAUI DEPARTMENT OF PUBLIC WORKS "STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION", DATED SEPTEMBER 1986
· "STANDARD DETAILS FOR PUBLIC WORKS CONSTRUCTION", DATED SEPTEMBER 1984, AS
AMENDED, OF THE DEPARTMENT OF PUBLIC WORKS, CITY AND COUNTY OF HONOLULU AND THE
COUNTIES OF KAUAI, MAUI, AND HAWAII, WHERE APPLICABLE
· THE APPLICABLE STATE BUILDING CODES AS ADOPTED BY THE STATE BUILDING CODE COUNCIL.
2. EXISTING TOPOGRAPHIC SURVEY WAS CONDUCTED ON APRIL 15, 2025 BY KN SURVEYING, LLC. THIS
TOPOGRAPHIC SURVEY WAS BASED ON THE BEST AVAILABLE INFORMATION AND ACCURACY MUST
BE VERIFIED PRIOR TO STARTING CONSTRUCTION.
3. VERIFY AND CHECK ALL DIMENSIONS AND DETAILS SHOWN ON THE DRAWINGS PRIOR TO THE
START OF CONSTRUCTION. ANY DISCREPANCY SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE ENGINEER FOR DIRECTION. COMMENCEMENT OF CONSTRUCTION SHALL
INDICATE CONTRACTOR'S ACCEPTANCE OF EXISTING SITE CONDITIONS.
4. DURING THE PERFORMANCE PERIOD OF THIS CONTRACT, THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE CONTROL AND RESPONSIBILITY OF THE JOBSITE. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE SITE SAFETY CONDITIONS FOR ALL PERSONS ENTERING THE JOBSITE, THE CONDITION OF THE SITE AND ALL EXISTING IMPROVEMENTS, AND FOR ALL MATERIAL AND
EQUIPMENT STORED AT THE PROJECT SITE.
5. NO HARD BASALT ROCK IS EXPECTED TO BE ENCOUNTERED NEAR OR AT THE SITE.
6. BLASTING IS NOT ALLOWED.
7. THE MALA BOAT RAMP SHALL REMAIN OPEN DURING THE CONSTRUCTION PERIOD. MAINTAIN SAFE
PEDESTRIAN AND VEHICLE ACCESS TO THE FACILITY AS REQUIRED. PROVIDE, INSTALL AND
MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, AND OTHER PROTECTIVE
DEVICES FOR THE PROTECTION, SAFETY AND CONVENIENCE OF THE PUBLIC, ACCORDING TO THE
LATEST VERSION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICE FOR STREETS AND
HIGHWAYS", AND TO THE RULES AND REGULATIONS GOVERNING THE USE OF TRAFFIC CONTROL
DEVICES AT WORKSITES AND/OR ADJACENT TO PUBLIC STREETS AND HIGHWAYS ADOPTED BY THE HIGHWAY SAFETY COORDINATOR AND THE U.S. FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES FOR HIGHWAY CONSTRUCTION AND MAINTENANCE
OPERATIONS".
8. EXISTING PEDESTRIAN WALKWAYS SHALL BE MAINTAINED IN A PASSABLE CONDITION OR PROVIDE FOR ALTERNATE/TEMPORARY ACCESSIBLE PEDESTRIAN ACCESS ROUTES AND FACILITIES PER THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN CHAPTER 2, ADAAG 201.3, AND ADAAG 206.1.
9. DO NOT PERFORM ANY CONSTRUCTION ACTIVITIES THAT CAUSE ROCKS, SOIL, OR DEBRIS IN ANY FORM TO FALL, SLIDE, OR FLOW ONTO ADJOINING PROPERTIES, STREETS, OR NATURAL WATER COURSES. FINES DUE TO VIOLATIONS AND ANY NECESSARY REMEDIAL ACTIONS SHALL BE BORNE
BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE STATE.
10. AS APPLICABLE, COORDINATE CONSTRUCTION ACTIVITIES WITH ADJACENT CONSTRUCTION SITE(S).
AVOID CAUSING ANY DELAYS OR HINDERANCE OF WORK OR PERFORMANCE TO THE ADJACENT
CONSTRUCTION SITE(S).
11. LOCATION OF ALL EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY. THE UNDERGROUND
PIPES, CABLES OR DUCTLINES KNOWN TO EXIST BY THE ENGINEER FROM HIS SEARCH OF
RECORDS ARE INDICATED ON THE PLANS. VERIFY THE LOCATIONS AND DEPTHS OF THE UTILITIES.
EXERCISE PROPER CARE AND CAUTION WHEN EXCAVATING. ANY AND ALL DAMAGES SHALL BE
IMMEDIATELY REPAIRED AND/OR RESTORED TO ITS ORIGINAL CONDITION BY THE CONTRACTOR AT
HIS/HER COST.
12. COORDINATE ALL SITE UTILITY WORK WITH “THE ONE CALL CENTER” AT (866) 423-7287 AT LEAST 5
WORKING DAYS PRIOR TO THE START OF EXCAVATION OR TRENCHING.
13. VERIFY AND COORDINATE THE ACTUAL LOCATION OF ALL SITE UTILITIES WITH THE RELATED
AGENCIES AND UTILITY COMPANIES IN THE PROJECT AREA PRIOR TO EXCAVATING.
14. WHEN CONNECTING NEW UTILITIES TO EXISTING, EXPOSE THE EXISTING UTILITY LINES AT THE DENOTED CONNECTION POINT TO VERIFY CHARACTERISTICS PRIOR TO COMPLETING EXCAVATION
FOR NEW UTILITIES.
15. IF WATER, SEWAGE OR ELECTRICAL SERVICES ARE PLANNED TO BE INTERRUPTED FOR MORE
THAN 1 HOUR, PROVIDE FOR TEMPORARY WATER, SEWAGE, AND ELECTRICAL SERVICES DURING
THE INTERRUPTION AT NO ADDITIONAL COST TO THE STATE.
16. MAKE ARRANGEMENTS FOR TEMPORARY CONSTRUCTION SITE UTILITIES SUCH AS ELECTRICITY, WATER, ETC. AT NO ADDITIONAL COST TO THE STATE.
17. ALL EXISTING UTILITIES, SHOWN ON THE PLANS OR UNCOVERED, SHALL BE PROTECTED AT ALL
TIMES DURING CONSTRUCTION.
18. ANY UTILITIES DAMAGED, AS A RESULT OF CONTRACTOR OPERATIONS WHETHER OR NOT SHOWN ON THE DRAWINGS, SHALL BE IMMEDIATELY REPAIRED AT NO ADDITIONAL COST TO THE STATE.
19. WHEN TRENCHING OR EXCAVATION IS ADJACENT TO OR UNDER EXISTING STRUCTURES OR
FACILITIES OR IN THE ROADWAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY
SHEETING AND BRACING THE EXCAVATION AND STABILIZING THE EXISTING GROUND TO RENDER IT
SAFE AND SECURE FROM POSSIBLE SLIDES, CAVE-INS AND SETTLEMENT AND FOR PROPERLY
SUPPORTING EXISTING STRUCTURES AND FACILITIES WITH BEAMS, STRUTS OR UNDER-PINNING TO
FULLY PROTECT THEM FROM DAMAGE.
20. ADJUST MANHOLE AND /OR VALVE BOX FRAMES AND COVERS AS REQUIRED BY THE UTILITY
COMPANIES AND AGENCIES.
21. CONFORM WITH THE APPLICABLE PROVISIONS OF CHAPTER 54, WATER QUALITY STANDARDS, AND CHAPTER 55, WATER POLLUTION CONTROL, OF TITLE 11, HAWAII ADMINISTRATIVE RULES OF THE
STATE DEPARTMENT OF HEALTH.
22. PLAN, CONSTRUCT AND UTILIZE ALL BEST MANAGEMENT PRACTICES (BMP) AS REQUIRED TO COMPLY WITH THE LAWS, STANDARDS, RULES, AND /OR POLICIES OF THE COUNTY, STATE, OR
FEDERAL REGULATORY AGENCIES.
23. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FROM THE APPROPRIATE GOVERNMENT AGENCIES.
24. RESTORE ALL AREAS DISTURBED OR DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITIES, TO
EQUAL OR BETTER CONDITION(S), INCLUDING BUT NOT LIMITED TO VEGETATION, PAVEMENTS, EMBANKMENTS, CURBS, SIGNS, LANDSCAPING, STRUCTURES, UTILITIES, WALKWAYS, WALLS, FENCES, ETC. AT NO ADDITIONAL EXPENSE TO THE STATE.
25. DO NOT START ANY GROUND DISTURBANCE UNTIL ALL REQUIREMENTS OF THE NPDES PERMIT, AS
REQUIRED, ARE MET. PROVIDE A WRITTEN COPY OF THE NPDES PERMIT TO THE APPROPRIATE
COUNTY OR STATE OR FEDERAL AGENCY PER THEIR REQUIREMENTS.
GENERAL CONSTRUCTION NOTES (CONT)
26. PROVIDE THEFT-RESISTANT FASTENERS FOR ALL MOUNTING ACCESSORIES.
27. PROVIDE STAINLESS STEEL , THEFT-RESISTANT FASTENERS IN ALL PUBLICLY EXPOSED AREAS.
28. PROVIDE ALL INCIDENTAL AND NECESSARY MATERIALS AND LABOR TO COMPLETE THE PROJECT.
29. THE JOB SITE SHALL BE LEFT IN A SAFE AND SECURE CONDITION AT THE END OF EACH WORKDAY.
CLEAN UP AND REMOVE ALL RUBBISH FROM THE JOB SITE ON A DAILY BASIS. MAINTAIN THE WORK
AREA AND PREMISES IN A CLEAN ORDERLY CONDITION AT ALL TIMES.
30. PRIOR TO ACCEPTANCE OF THE PROJECT BY THE STATE, CLEAN UP AND REMOVE ALL RUBBISH
AND DEBRIS FROM THE ENTIRE JOB SITE.
31. DUE TO LIMITED SPACE AT THE JOB SITE, THE STATE RECOGNIZES THE NEED FOR A
CONSTRUCTION STAGING AREA FOR TEMPORARY STORAGE OF CONSTRUCTION EQUIPMENT AND
MATERIAL. LOCATIONS OF POSSIBLE EQUIPMENT AND MATERIALS STAGING AREAS ARE SHOWN ON
THE OVERALL SITE PLAN - STAGING AREAS ON SHEET G-3. COORDINATE WITH THE HARBOR
MASTER FOR USE OF THE ONSITE STAGING AREAS(S) AT LEAST 30 DAYS PRIOR TO ANTICIPATED OCCUPANCY. THE STATE IS NOT OBLIGATED TO PROVIDE STAGING AREAS AS SPACE AVAILABILITY AT THE FACILITY WILL CHANGE FROM TIME TO TIME. SUBMIT A STAGING AREA(S) USE REQUEST AS
SOON AS POSSIBLE. THE HARBOR MASTER DETERMINES THE STAGING AREA'S CONDITIONS OF
USE. CONTRACTOR IS RESPONSIBLE FOR ARRANGEMENT OF ANY OFFSITE STAGING AREAS.
32. TAKE ALL MEASURES TO MINIMIZE DISTURBING OR DAMAGING EXISTING NATIVE PLANT SPECIES
DURING CONSTRUCTION.
33. PRIOR TO ENTERING THE JOB SITE, ALL EQUIPMENT AND FOOTWEAR SHALL BE WASHED WITH POTABLE WATER TO PREVENT EXOTIC PLANTS AND SEEDS FROM BEING INTRODUCED TO THE JOB
SITE/AREA.
34. INSPECT AND CLEAN ALL EQUIPMENT, GEAR, AND VEHICLES (PERSONAL AND PROJECT) THAT
ENTER OR EXIT THE JOB SITE.
35. ENSURE THAT ALL EQUIPMENT, GEAR, AND VEHICLES ARE FREE OF ANY PLANT, ANIMAL, OR EARTHEN MATERIALS PRIOR TO ENTERING THE JOB SITE. ALL EQUIPMENT, GEAR, AND VEHICLES SHALL BE INSPECTED AND CLEANED BEFORE ENTERING THE JOB SITE, AND BEFORE LEAVING ANY
WEED INFECTED/CONTAMINATED AREA TO PREVENT TRACKING IN HARMFUL ORGANISMS (E.G.:
WEEDS, INSECTS, PESTS). EQUIPMENT TO INSPECT AND CLEAN INCLUDE BUT IS NOT LIMITED TO:
35.1. ROACHES, ANTS AND OTHER PESTS ON EQUIPMENT & SUPPLIES-TOOLS, TOOL BAGS,
BACKPACKS & BAGS (FOLDS, POCKETS, VELCRO), WOOD AND BUILDING MATERIALS, FENCING
MATERIALS, BOTTOMS OF PLASTIC BUCKETS, CARDBOARD BOXES, OPEN FOOD AND WATER
CONTAINERS, TENTS, HAMMOCKS, TARPS, HELICOPTER SLING NETS, CHAINSAW BLADES.
35.2. VEHICLES - THE INSIDE OF THE VEHICLES SHOULD BE VACUUMED AND THE TRUCK BEDS
SWEPT OUT REGULARLY, ESPECIALLY IF USED OFF-ROAD. CLEAN PLACES SUCH AS THE
INSIDE LIP OF BUMPERS, SEATS, FLOORS, DASHBOARDS, DOOR JAMBS, TIRES (ESPECIALLY
TIRE TREADS), AND THE UNDERCARRIAGE.
35.3. HEAVY EQUIPMENT, TRUCKS, ALL TYPES OF EARTHMOVING CONSTRUCTION EQUIPMENT AND
GENERAL CONSTRUCTION EQUIPMENT AND SUPPLIES.
35.4. OTHER- ENSURE SOIL IS STERILE AND FREE OF INSECTS, WEEDS, AND PATHOGENS.
ANYTHING SUSPICIOUS SHOULD NOT BE TAKEN ONTO THE JOB SITE.
36. HAWAIIAN HOARY BATS OR ʻŌPEʻAPEʻA (LASIURUS CINEREUS SEMOTUS) ARE KNOWN TO RESIDE IN THE VICINITY OF THE PROJECT AREA AND MAY ROOST IN NEARBY TREES. ANY SITE CLEARING SHOULD BE TIMED TO AVOID DISTURBING THE BAT'S BIRTHING AND PUP REARING SEASON (JUNE 1 THROUGH SEPTEMBER 15). IF THIS CANNOT BE AVOIDED, WOODY PLANTS GREATER THAN 15 FEET
(4.6 METERS) IN HEIGHT SHOULD NOT BE DISTURBED, REMOVED, OR TRIMMED WITHOUT
CONSULTING DOFAW AND STATE'S CONSTRUCTION REPRESENTATIVE. BARBED WIRE IS NOT
ALLOWED DUE TO DOCUMENTED BAT MORTALITIES BY ENSNAREMENT.
37. NIGHT WORK REQUIRING OUTDOOR LIGHTING SHOULD BE AVOIDED DURING THE SEABIRD
FLEDGING SEASON FROM SEPTEMBER 15 THROUGH DECEMBER 15. ARTIFICIAL LIGHTING
DISORIENTS SEABIRDS RESULTING IN COLLISION WITH MANMADE ARTIFACTS OR CAUSE
GROUNDING. PROVIDE FULLY SHIELDED LIGHTS FOR ANY REQUIRED NIGHT WORK.
38. ON A DAILY BASIS, PACK AND REMOVE ALL TRASH, INCLUDING ANY DISCARDED FOOD, FROM THE
JOB SITE TO PREVENT NEGATIVELY AFFECTING THE FLORA AND FAUNA AT THE FIELD SITE.
(*DISCARDED FOOD MAY CONTAIN UNSEEN INSECTS, FUNGUS, BACTERIA, AND PARASITES; AND IS
AN ATTRACTANT FOR INVASIVE INSECTS).
39. FOLLOW METHODS OF CLEANING SPECIFIED IN HAWAII INTERAGENCY BIOSECURITY HANDOUT.
SPECIFIED METHODS OF CLEANING INCLUDE:
39.1. WATER & HOSE, BRUSH, TWEEZERS, CLEAN RAG, KNIFE EDGE, BLEACH RINSE AND/OR
INSECTICIDE.
39.2. CLEANING SHALL BE PERFORMED AWAY FROM THE FOREST IN A DOFAW DESIGNATED AREA
WITH A NEARBY RECEPTACLE FOR DISPOSAL.
39.3. LAUNDERING OF WASHABLE ITEMS SHALL BE PERFORMED AFTER EACH TRIP.
39.4. IF ITEMS CANNOT BE CLEANED, THEY CANNOT BROUGHT INTO THE FOREST.
39.5. IF CONTAMINATED SUPPLIES ARE DISCOVERED, THEY MUST BE IMMEDIATELY REMOVED AND
PROPERLY DISPOSED, AWAY FROM THE H.E.T.F.
40. CLEAN AND DISINFECT EQUIPMENT PRIOR TO MOBILIZATION TO JOB SITE.
PUBLIC HEALTH, SAFETY, AND CONVENIENCE NOTES
1. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS
REQUIRED FOR THE PROTECTION OF THE PUBLIC HEALTH AND SAFETY AND ENVIRONMENTAL
QUALITY.
2. THE CONTRACTOR, AT HIS OWN EXPENSE SHALL KEEP THE PROJECT AND ITS SURROUNDING
AREAS FREE FROM DUST NUISANCE. THE WORK SHALL BE IN CONFORMANCE WITH THE AIR
POLLUTION CONTROL STANDARDS AND REGULATIONS OF THE STATE DEPARTMENT OF HEALTH.
3. NO CONTRACTOR SHALL PERFORM ANY CONSTRUCTION ACTIVITY SO AS TO CAUSE FALLING ROCK, SOIL OR DEBRIS IN ANY FORM TO FALL, SLIDE OR FLOW ONTO ADJOINING PROPERTIES, STREETS
OR NATURAL WATERCOURSES. SHOULD SUCH VIOLATIONS OCCUR, THE CONTRACTOR SHALL
IMMEDIATELY MAKE ALL REMEDIAL ACTIONS NECESSARY.
4. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL
NECESSARY PRECAUTIONS FOR THE PROTECTION, CONVENIENCE AND SAFETY OF THE PUBLIC.
THE CONTRACTOR SHALL APPLY FOR A CONSTRUCTION PERMIT WITH A NOISE POLLUTION
CONTROL PLAN.
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO.
SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
2 26
GENERAL NOTES
G-1
AT
JL
JN NONE
WATER POLLUTION AND EROSION CONTROL NOTES
GENERAL:
1. THE CONTRACTOR IS REMINDED OF THE REQUIREMENTS OF SECTION 209-WATER POLLUTION AND
EROSION CONTROL, IN THE "HAWAII STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION" 2005, AS AMENDED. SECTION 209 DESCRIBES BUT IS NOT LIMITED TO: SUBMITTAL
REQUIREMENTS; SCHEDULING OF A WATER POLLUTION AND EROSION CONTROL CONFERENCE
WITH THE ENGINEER; CONSTRUCTION REQUIREMENTS; METHOD OF MEASUREMENTS; AND BASIS
OF PAYMENT. NO WORK SHALL COMMENCE WITHOUT A BMP PLAN APPROVED BY THE DEPARTMENT
OF HEALTH.
2. ALL WORK SHALL BE IN ACCORDANCE WITH CHAPTER 20 - ENVIRONMENTAL PROTECTION, OF THE
MAUI COUNTY CODE, AND AS SHOWN ON THE APPROVED PLANS.
3. THE CONTRACTOR SHALL KEEP A COPY OF THE APPROVED BMP, NOI, ETC. ON THE PROJECT SITE.
THE BMP SHALL BE UPDATED TO REFLECT ANY CHANGES MADE DURING THE COURSE OF
CONSTRUCTION FOR THE DURATION OF THE PROJECT.
4. THE STATE MAY ASSESS LIQUIDATED DAMAGES OF UP TO $27,000 FOR NONCOMPLIANCE OF EACH
BMP REQUIREMENT AND EACH REQUIREMENT STATED IN SECTION 209, FOR EVERYDAY OF
NON-COMPLIANCE. THERE IS NO MAXIMUM LIMIT ON THE AMOUNT ASSESSED PER DAY.
5. THE STATE MAY DEDUCT THE COST FROM THE PROGRESS PAYMENT FOR ALL CITATIONS RECEIVED
FOR NON COMPLIANCE, OR THE CONTRACTOR SHALL REIMBURSE THE STATE, AND/OR COUNTY
FOR THE FULL AMOUNT OF THE OUTSTANDING COST INCURRED BY THE STATE. WHICHEVER IS
GREATER.
WASTE DISPOSAL:
1. WASTE MATERIALS: ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A SECURELY
LIDDED METAL DUMPSTER THAT DOES NOT BREAK/LEAK. THE DUMPSTER SHALL MEET ALL LOCAL
AND STATE SOLID WASTE MANAGEMENT REGULATIONS. ALL CONSTRUCTION TRASH AND DEBRIS
FROM THE SITE SHALL BE DEPOSITED IN THE DUMPSTER. THE DUMPSTER SHALL BE EMPTIED A
MINIMUM OF TWICE PER WEEK OR AS OFTEN AS IS DEEMED NECESSARY. NO CONSTRUCTION
WASTE MATERIALS SHALL BE BURIED ONSITE. THE CONTRACTOR'S SUPERVISORY PERSONNEL
SHALL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES
STATING THESE PRACTICES SHALL BE POSTED IN THE OFFICE TRAILER AND THE CONTRACTOR
SHALL BE RESPONSIBLE TO SEE THAT THESE PROCEDURES ARE FOLLOWED.
2. SANITARY WASTE: ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS A
MINIMUM OF ONCE PER WEEK, OR MORE FREQUENTLY AS REQUIRED.
EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES:
1. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND WITHIN 24 HOURS
FOLLOWING ANY RAINFALL OF 0.5 INCHES OR GREATER.
2. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER. IF REPAIR IS NECESSARY, IT
SHALL BE INITIATED WITHIN 24 HOURS AFTER THE INSPECTION.
3. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT BARRIER AND FILTER SOCKS, WHEN IT HAS
REACHED ONE-THIRD THE HEIGHT OF THE BARRIER.
4. SILT BARRIER SHALL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, TO VERIFY THAT THE
FABRIC IS SECURED TO THE SANDBAGS.
5. TEMPORARY AND PERMANENT SEEDING AND PLANTING SHALL BE INSPECTED FOR BARE SPOTS, WASH OUTS AND HEALTHY GROWTH.
6. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A MAINTENANCE INSPECTION REPORT
PROMPTLY AFTER EACH WEEKLY INSPECTION.
7. THE CONTRACTOR SHALL SELECT A MINIMUM OF THREE PERSONNEL WHO SHALL BE RESPONSIBLE
FOR INSPECTIONS, MAINTENANCE AND REPAIR ACTIVITIES AND FILLING OUT THE INSPECTION AND
MAINTENANCE REPORT.
8. PERSONNEL SELECTED FOR THE INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL
RECEIVE TRAINING FROM THE CONTRACTOR. THEY SHALL BE TRAINED IN ALL THE INSPECTION AND
MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS
USED ONSITE IN GOOD WORKING CONDITIONS.
9. ALL SLOPES AND EXPOSED AREAS SHALL BE GRASSED OR PERMANENTLY STABILIZED AS FINAL GRADES HAVE BEEN ESTABLISHED. GRADING TO FINAL GRADE SHALL BE CONTINUOUS, AND ANY
AREA IN WHICH WORK HAS BEEN INTERRUPTED OR DELAYED OR EXPOSED FOR MORE THAN 15
DAYS SHALL BE GRASSED OR PERMANENTLY STABILIZED IN ORDER TO PREVENT DUST, EROSION, AND SILT RUNOFF. AREAS WITH IMPORTED SOILS SHALL BE GRASSED OR PERMANENTLY
STABILIZED NO MORE THAN 5 WORKING DAYS AFTER THE FINAL GRADES HAVE BEEN ESTABLISHED.
10. TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED BEFORE PERMANENT EROSION
CONTROLS ARE IN PLACE AND ESTABLISHED.
WATER POLLUTION AND EROSION CONTROL NOTES (CONT)
GOOD HOUSEKEEPING BEST MANAGEMENT PRACTICES
MATERIALS POLLUTION PREVENTION PLAN:
1. APPLICABLE MATERIALS OR SUBSTANCES LISTED BELOW ARE EXPECTED TO BE PRESENT
ONSITE DURING CONSTRUCTION. OTHER MATERIALS AND SUBSTANCES NOT LISTED BELOW
SHALL BE ADDED TO THE INVENTORY OR TO THE CONSTRUCTION CONTRACTOR'S
SITE-SPECIFIC BMP PLAN.
CONCRETE FERTILIZER
DETERGENTS PETROLEUM BASED PRODUCTS
PAINTS (ENAMEL AND LATEX) CLEANING SOLVENTS
METAL STUDS WOOD
TAR MASONRY BLOCKS
2. MATERIAL MANAGEMENT PRACTICES SHALL BE USED TO REDUCE THE RISK OF SPILLS OR
OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF.
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS AS IS REQUIRED TO DO THE
JOB.
3. ALL MATERIALS STORED ONSITE SHALL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR
APPROPRIATE CONTAINERS AND IF POSSIBLE UNDER A ROOF OR OTHER ENCLOSURE.
4. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL
MANUFACTURER'S LABEL.
5. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE
MANUFACTURER.
6. A PRODUCT SHALL BE USED UP COMPLETELY BEFORE DISPOSING OF THE CONTAINER.
7. MANUFACTURER'S RECOMMENDATION FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED.
8. THE CONTRACTOR SHALL CONDUCT A DAILY INSPECTION TO ENSURE PROPER USE AND
DISPOSAL OF MATERIALS ONSITE.
HAZARDOUS MATERIAL POLLUTION PREVENTION PLAN:
1. PRODUCTS SHALL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT REUSABLE.
2. ORIGINAL LABELS AND MATERIALS SAFETY DATA SHEETS (MSDS) SHALL BE RETAINED AND
MADE AVAILABLE TO ENGINEER UPON REQUEST.
3. SURPLUS PRODUCTS SHALL BE DISPOSED OF ACCORDING TO MANUFACTURER'S INSTRUCTIONS
OR LOCAL AND STATE RECOMMENDED ACTIONS.
ONSITE AND OFFSITE PRODUCT SPECIFIC PLANS:
1. PETROLEUM BASED PRODUCTS: ALL ONSITE VEHICLES SHALL BE MONITORED FOR LEAKS AND
RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE.
PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE
CLEARLY LABELED. ANY ASPHALT SUBSTANCES USED ONSITE SHALL BE APPLIED ACCORDING
TO MANUFACTURER'S RECOMMENDATION.
HISTORICAL PRESERVATION NOTES
1. IF CULTURAL MATERIALS ARE DISCOVERED DURING CONSTRUCTION, ALL EARTH-MOVING ACTIVITY
WITHIN AND AROUND THE IMMEDIATE DISCOVERY AREA SHALL BE DIVERTED UNTIL A QUALIFIED
ARCHAEOLOGIST CAN ASSESS THE NATURE AND SIGNIFICANCE OF THE FIND.
2. IF PREVIOUSLY UNIDENTIFIED NON-BURIAL HISTORIC PROPERTIES, OR UNANTICIPATED EFFECTS
ARE DISCOVERED, THE CONTRACTOR SHALL FOLLOW HAWAII ADMINISTRATIVE RULES (HAR)
§13-280 "RULES GOVERNING GENERAL PROCEDURES FOR INADVERTENT DISCOVERIES OF
HISTORIC PROPERTIES DURING A PROJECT COVERED BY THE HISTORIC PRESERVATION REVIEW
PROCESS."
3. IF HUMAN REMAINS ARE DISCOVERED, HAR §13-300 STATES THAT FURTHER DISTURBANCES AND ACTIVITIES SHALL CEASE IN ANY AREA OR NEARBY AREA SUSPECTED TO OVERLIE REMAINS AND
THE SHPD AND THE POLICE DEPARTMENT WILL BE CONTACTED. THE APPROPRIATE PROCESS
WOULD THEN PROCEED IN CONFORMANCE WITH HAR §13-300, SUBCHAPTER 4 "PROCEDURES FOR
PROPER TREATMENT OF BURIAL SITES AND HUMAN SKELETAL REMAINS."
4. IN THE EVENT HISTORIC REMAINS, SUCH AS ARTIFACTS, BURIALS, OR CONCENTRATIONS OF SHELL
OR CHARCOAL ARE ENCOUNTERED DURING CONSTRUCTION ACTIVITIES, WORK SHALL
IMMEDIATELY CEASE IN THE VICINITY OF THE ENCOUNTER. NOTIFY THE STATE HISTORIC
PRESERVATION DIVISION AT (808) 692-8015, FOR AN ASSESSMENT OF THE ENCOUNTER AND
RECOMMENDATIONS ON MITIGATION MEASURES.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
(NPDES)
1. THIS PROJECT DISTURBS ONE (1) ACRE OR MORE OF LAND. COMPLY WITH ALL REQUIREMENTS
OF THE NPDES GENERAL PERMIT FOR DISCHARGES OF STORM WATER ASSOCIATED WITH
CONSTRUCTION ACTIVITIES, AS ADMINISTERED BY THE DEPARTMENT OF HEALTH, STATE OF
HAWAII (DOH) PURSUANT TO HAR CHAPTER 11-55 APPENDICES A AND C.
1.1. DO NOT COMMENCE CONSTRUCTION UNTIL NOTICE OF GENERAL PERMIT COVERAGE
(NGPC) IS RECEIVED FROM DOH.
1.2. A SITE-SPECIFIC STORMWATER POLLUTION PREVENTION PLAN (SWPPP) HAS BEEN
DEVELOPED FOR THIS PROJECT. THE CONTRACTOR SHALL IMPLEMENT, MAINTAIN, AND
INSPECT ALL BEST MANAGEMENT PRACTICES (BMPS) AS DETAILED IN THE SWPPP AND
SHOWN ON THE EROSION AND SEDIMENT CONTROL PLANS.
1.3. A COPY OF THE NOTICE OF INTENT (NOI), NGPC, AND SWPPP SHALL BE KEPT ON-SITE AT
ALL TIMES AND MADE AVAILABLE UPON REQUEST.
1.4. DOCUMENT MODIFICATIONS TO BMPS AND CHANGES IN SITE CONDITIONS IN THE SWPPP IN
ACCORDANCE WITH PERMIT REQUIREMENTS.
1.5. THE CONTRACTOR SHALL ENSURE THAT NO UNAUTHORIZED NON-STORMWATER OR
POLLUTED STORM WATER DISCHARGES LEAVE THE PROJECT SITE.
2. PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL
ADDITIONAL DOH PERMITS REQUIRED DUE TO CONTRACTOR OPERATIONS. THESE MAY
INCLUDE, BUT ARE NOT LIMITED TO: NPDES NOTICE OF INTENT AND GENERAL PERMIT
COVERAGE FOR DISCHARGES OF HYDROTESTING WATERS AND DISCHARGES ASSOCIATED
WITH CONSTRUCTION ACTIVITY DEWATERING.
ABBREVIATIONS
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO.
SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
3 26
GENERAL NOTES, LEGEND AND ABBREVIATIONS
G-2
AT
JL
JN NONE
LEGEND
AC ASPHALT CONCRETE
ADA AMERICANS WITH DISABILITY ACT
APPROX APPROXIMATE
ARV AIR RELEASE VALVE
AWWA AMERICAN WATERWORKS ASSOCIATION
B BOLE / BOTTOM
BC BOTTOM OF CURB
BB BOTTOM BANK
BLDG BUILDING
BM BENCHMARK
BMP BEST MANAGEMENT PRACTICES
BOT BOTTOM
BV BOTTOM VERTICAL
BVC BEGIN VERTICAL CURVE
BW BOTTOM WALL
C / CONC CONCRETE
CCJ CRACK CONTROL JOINTS
℄ CENTERLINE
CF CUBIC FEET
CH CHORD LENGTH (CURVE)
CLF CHAIN LINK FENCE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CONT. CONTINUOUS
CP CONTROL POINT
CRM CONCRETE ROCK MASONRY
CY CUBIC YARD
Ø,DIA DIAMETER
DI DUCTILE IRON
DLNR DEPARTMENT OF LAND AND NATURAL RESOURCE
DOBOR DIVISION OF BOATING AND OCEAN RECREATION
DOFAW DIVISION OF FORESTRY AND WILDLIFE
DPW DEPARTMENT OF PUBLIC WORKS
DWG(S) DRAWINGS
DWS DEPARTMENT OF WATER SUPPLY
D/W DRIVEWAY
E EAST, EASTING
EA EACH
EC END CURVE
EG EXISTING GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV, EL ELEVATION
EM ELECTRIC METER
EPIM EDGE OF PAVEMENT MARKING
EVC END VERTICAL CURVE
EW EACH WAY
EXIST EXISTING
EXP JT EXPANSION JOINT
EQ EQUAL
FF FINISH FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FT FEET
G, GRD GROUND
GB GRADE BREAK
GP GUARD POST / BOLLARDS
GUY GUY WIRE ANCHOR
H HEIGHT
H= APPROXIMATE HEIGHT
HORIZ HORIZONTAL
IBX IRRIGATION BOX
ICV IRRIGATION CONTROL VALVE
ID INSIDE DIAMTER
IN INCH(ES)
INV INVERT
ISA INTERNATIONAL SYMBOL OF ACCESS
L LEFT, LENGTH
LB POUND
Lc LENGTH OF CURVE (CURVE LENGTH)
LF LINEAR FEET
LP LIGHT POLE
MAX MAXIMUM
MIN MINIMUM
MON MONUMENT
N NORTHING
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH/u OVERHEAD UTILITY
PAVT PAVEMENT
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVE
PORTLAND CEMENT CONCRETE
PI POINT OF INTERSECTION
PRC POINT OF REVERSE CURVE
PT POINT OF TANGENCY, POINT
PVI POINT OF VERTICAL INTERSECTION
PVC POLYVINYL CHLROIDE
PSI POUNDS PER SQUARE INCH
R RADIUS, RIDGE
RCJ REINFORCED CONCRETE JACKET
REINF REINFORCED
REQD REQUIRED
RP RADIUS POINT
RPM RAISED PAVEMENT MARKER
Rt RIGHT
ROW RIGHT-OF-WAY
S= SLOPE
SF SQUARE FEET
SMH SEWER MANHOLE
SN SIGN
STD STANDARD
STA STATION / CONTROL
SWPPP STORMWATER POLLUTION PREVENTION PLAN
SY SQUARE YARD
T TOP
TC TOP OF CURB
TD TOP DIRT
TMK TAX MAP KEY
TN TRUE NORTH
TRANS. TRANSITION
TS TOP OF STEM
TW TOP WALL
TYP TYPICAL
UBX UTILITY BOX
UL UNDERWRITERS LABORATORIES
UP UTILITY POLE
UPSL UTILITY POLE WITH STREET LIGHT
V, VER, VERT VERTICAL
VC VERTICAL CURVE
W WIDTH
W/ WITH
WD WOOD
WL WATERLINE
WM WATER METER
W.W.F. WELDED WIRE FABRIC
WV WATER VALVE
AC PAVEMENT
CONCRETE PAVEMENT
CONTOUR
BUILDING
BENCHMARK
PROPERTY LINE
9.50 PAVT
SPOT ELEVATION
SEWER LINE W/ SIZE
TREE
WATER SERVICE LINE W/ SIZE
BACKFLOW PREVENTER
WATER VALVE
WATER MANHOLE
SIGN
LIGHT POLE
SEWER MANHOLE
OVERHEAD
CONCRETE ROCK MASONRY WALL
FIRE HYDRANT
W1-1/2
D 6
EXISTING NEW
DRAIN LINE W/ SIZE
LIMITS OF WORK
GRADING NOTES
1. ALL GRADING WORK SHALL CONFORM TO CHAPTER 20.08 OF THE MAUI COUNTY CODE.
2. REMOVE ALL SILT AND DEBRIS DEPOSITED IN DRAINAGE FACILITIES, ROADWAYS AND OTHER AREAS
RESULTING FROM HIS WORK. THE COST INCURRED FOR ANY NECESSARY REMEDIAL ACTION BY THE
OWNER SHALL BE PAYABLE BY THE CONTRACTOR.
3. AT CONTRACTOR'S OWN EXPENSE, KEEP THE PROJECT AREA AND SURROUNDING AREA FREE FROM
DUST NUISANCE. THE WORK SHALL BE IN CONFORMANCE WITH THE AIR POLLUTION CONTROL
STANDARDS CONTAINED IN THE HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 60.1, " AIR
POLLUTION CONTROL".
4. ALL GRADING OPERATIONS SHALL BE PERFORMED IN CONFIRMATIVE WITH APPLICABLE PROVISIONS OF THE HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 55, WATER POLLUTION CONTROL AND CHAPTER 54, WATER QUALITY STANDARDS, AND THE SOIL EROSION AND SEDIMENTATION CONTROL
STANDARDS AND GUIDELINES OF THE DEPARTMENT OF PUBLIC WORKS, MAUI COUNTY.
5. INFORM DLNR OF THE LOCATIONS OF THE DISPOSAL AND/OR BORROW SITE(S) REQUIRED FOR THIS PROJECT. THE DISPOSAL AND/OR BORROW SITE(S) MUST ALSO FULFILL THE REQUIREMENTS OF THE
GRADING ORDINANCE.
6. NO GRADING WORK SHALL BE DONE ON SATURDAYS, SUNDAYS AND HOLIDAYS AT ANY TIME
WITHOUT PRIOR APPROVAL FROM THE DLNR DOBOR. GRADING WORK ON NORMAL WORKING DAYS
SHALL BE BETWEEN THE HOURS OF 7:00 AM TO 3:30 PM.
7. FILLS FOR ROADWAY SHALL BE COMPACTED TO 90 PERCENT (90%) OF MAXIMUM DENSITY PER ASTM
D1557 TEST.
8. VERIFY ALL LINES, LEVELS, ELEVATIONS, AND IMPROVEMENTS INDICATED ON THE DRAWINGS
BEFORE ANY CLEARING, EXCAVATION OR CONSTRUCTION BEGINS. ANY DISCREPANCY SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND ANY CHANGE SHALL BE MADE IN ACCORDANCE WITH HIS INSTRUCTION. STARTING OF CLEARING AND GRUBBING OPERATIONS SHALL
BE CONSTRUED TO MEAN THE CONTRACTOR AGREES THAT THE EXISTING GRADES AND
IMPROVEMENTS ARE ESSENTIALLY CORRECT AS SHOWN. THE CONTRACTOR SHALL NOT BE
ENTITLED TO EXTRA PAYMENT IF EXISTING GRADES AND IMPROVEMENTS ARE IN ERROR AFTER HIS VERIFICATION THEREOF, OR IF HE FAILS TO REPORT THE DISCREPANCIES BEFORE PROCEEDING
WITH ANY WORK WHETHER WITHIN AREA AFFECTED OR NOT.
DRAIN MANHOLE
HOSE BIBB
CONCRETE JERSEY BARRIER
TRENCH DRAIN
TMK: (2) 4-5-004: 063
TMK: (2) 4-5-005: 021
TMK: (2) 4-5-005: 021
TMK: (2) 4-5-005: 001
FRONT STREET (COUNTY OF MAUI)
UNAHIOLE STREET (COUNTY OF MAUI)
AL
A M
OA
NA
ST
RE
ET
(C
OU
NT
Y O F M
AU
I)
KAHOMA STREAM
COUNTY OF MAUI
COUNTY OF MAUI
DLNR: DIVISION OF OCEAN AND BOATING RECREATION
COUNTY OF MAUI
COUNTY OF MAUI
TMK: (2) 4-5-004: 011
PROPERTY LINE, TYP
TO LAHAINA
TO KAANAPALI
LIMITS OF WORK, TYP
POSSIBLE CONTRACTOR
STAGING AREA
POSSIBLE CONTRACTOR STAGING AREA
APPROXIMATE LIMITS
OF CEMETERY
APPROXIMATE LIMITS OF CEMETERY
POSSIBLE CONTRACTOR STAGING AREA, SEE NOTE 5
EXISTING BUILDING LEASED
TO LAHAINA YACHT CLUB
EXISTING BOAT RAMP
EXISTING BEACH ACCESS
EXISTING COMFORT STATION
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO. SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
4 26
PHASING, ACCESS AND STAGING PLAN
G-3
AT
JL
JN 1" = 40'
GRAPHIC SCALE
0" 40' 80' 120'
1" = 40'
20'
SCALE:
PHASING, ACCESS AND STAGING PLAN
1" = 40'
TRUE NORTH
SCALE: 1 IN = 40 FT
PHASING AND ACCESS NOTES:
1. PHASE AND SEQUENCE THE WORK TO MAINTAIN PUBLIC ACCESS
TO THE BOAT RAMP DURING CONSTRUCTION. MINIMIZE THE
EXTENT AND DURATION OF TIME THE BOAT RAMP WILL BE
INACCESSIBLE. PROVIDE AT LEAST 14 DAYS WRITTEN NOTICE TO
DLNR DOBOR PRIOR TO ANY SHUTDOWN ACTIVITY. PROPOSED
ACTIVITY SHALL NOT PROCEED WITHOUT WRITTEN ACCEPTANCE
FROM DLNR DOBOR.
2. SUBMIT A WRITTEN NARRATIVE AND CONSTRUCTION SCHEDULE
IDENTIFYING THE WORK SEQUENCE AT LEAST 30 DAYS PRIOR TO
COMMENCING WORK.
3. COORDINATE TEMPORARY STAGING AND LAYDOWN AREA(S)
WITH DLNR DOBOR DISTRICT MANAGEMENT.
4. RESTORE STAGING AND LAYDOWN AREAS TO EXISTING OR
BETTER CONDITION.
5. OBTAIN ANY REQUIRED APPROVALS AND PERMITS FOR USE OF
STAGING AND LAYDOWN AREA ON LAND NOT OWNED BY DLNR
DOBOR.
6. DURING COMFORT STATION RENOVATIONS WHEN RESTROOM
FACILITIES ARE UNAVAILABLE FOR PUBLIC USE, PROVIDE
TEMPORARY PORTABLE TOILETS FACILITIES AT THE DIRECTION
OF THE ENGINEER. COORDINATE WITH DLNR DOBOR DISTRICT
MANAGEMENT.
TMK: (2) 4-5-005: 021
TMK: (2) 4-5-005: 001
KAHOMA STREAM
FRONT STREET (COUNTY OF MAUI)
UNAHIOLE STREET (COUNTY OF MAUI)
AL
A M
OA
NA
ST
RE
ET
(C
OU
NT
Y O F M
AU
I)
DLNR: DIVISION OF OCEAN AND BOATING RECREATION
COUNTY OF MAUI
COUNTY OF MAUI
COUNTY OF MAUI
00 0 0 0 0 0
00 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0000000000000
000000000000000
00000 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0000000000000000 000000000000000000000000000
0000000000000000 000000000000000000000000
0000000 00 00 0 0 0 0 0 0 0 0 0 0 0
0000000 00 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
PROPERTY LINE
FILTER SOCK
OR SILT FENCE
DUST SCREEN
FILTER FABRIC
CONSTRUCTION
INGRESS / EGRESS
TO LAHAINA
TO KAANAPALI
LIMITS OF WORK, TYP
DOUBLE PERIMETER CONTROLS,
FILTER SOCK OR SILT FENCE
DOUBLE PERIMETER CONTROLS,
FILTER SOCK OR SILT FENCE
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO. SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
5 26
EROSION AND SEDIMENT CONTROL PLAN
G-4
AT
JL
JN 1" = 40'
GRAPHIC SCALE
0" 40' 80' 120'
1" = 40'
20'
SCALE:
EROSION AND SEDIMENT CONTROL PLAN
1" = 40'
0 0 0 0 0
LEGEND
PROPERTY LINE
EXISTING CONTOUR
PROPOSED DRAINAGE FLOW
AREA OF WORK / LIMITS OF
DISTURBANCE
STABILIZED CONSTRUCTION
ENTRANCE / EXIT
PERIMETER CONTROL
FILTER SOCK / SILT FENCE
DUST SCREEN FILTER FABRIC
EROSION & SEDIMENT CONTROL NOTES:
1. CONTRACTOR SHALL COORDINATE WITH DLNR DOBOR DISTRICT
MANAGEMENT TO ENSURE THE WORK AND EROSION AND
SEDIMENT CONTROL MEASURES ACCOMMODATE BOAT RAMP
OPERATIONS AND BEACH ACCESS.
2. ADD ADDITIONAL BMPS TO FACILITATE DIFFERENT PHASES OF
CONSTRUCTION OR TO ACCOMMODATE CONTRACTOR'S MEANS
AND METHODS. TRACK ADDITIONAL BMPS AND DIFFERENT
PHASES IN THE PROJECT'S SWPPP.
3. DURING CONSTRUCTION, PROVIDE INLET PROTECTION FOR THE
TRENCH DRAIN, SEE DETAIL
TRUE NORTH
SCALE: 1 IN = 40 FT
G-5
G-5
G-5
G-5
PLAN
SECTION
PROTECTED AREA
WORK AREA
WORK AREAPROTECTED AREA
PROTECTED AREA
WORK AREA
OVERLAP
6'-0" O.C. MAX
6" M
IN
ELEVATION
6" M
IN
6"18
SECTION
12"Ø FILTER SOCK
12"Ø FILTER SOCK
SANDBAG TO SECURE EACH END
SANDBAG
MIN. LENGTH = 18"
MIN. WIDTH = 12"
MIN. THICKNESS = 3"
PLACE EVERY 6'
TYP.
SANDBAG12"Ø FILTER SOCK
6" MIN. OVERLAP
LIMITS OF GRADING
EXISTING
GROUND
#6 REBAR W/CAP (TYP.)
FILL W/ NATIVE SOIL
AND COMPACT
LIMITS OF GRADING
GEOTEXTILE FABRIC (MIRAFI
100X OR EQUIVALENT) SILT
FENCE ANCHORED WITH REBAR
#6 REBAR W/ CAP (TYP.)
FASTEN SILT FENCE
TO REBAR (TYP.)EXISTING GROUND
GEOTEXTILE FABRIC
RUNOFF FLOW
SCALE:
G-5
SILT FENCE DETAIL
NTSSCALE:
G-5
FILTER SOCK DETAIL
NTS
RUNOFF FLOW
RUNOFF FLOW
RUNOFF FLOW
EXISTING
PAVEMENT
EXISTING
PAVEMENT
PLAN VIEW
NOTES:
1. STONE - 3"-6" COARSE AGGREGATE.
2. LENGTH - AS EFFECTIVE, BUT NOT LESS THAN 30 FEET.
3. WIDTH - AS EFFECTIVE, BUT NOT LESS THAN 20 FEET.
4. THICKNESS - NOT LESS THAN EIGHT (8) INCHES.
5. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE
SEDIMENT PRIOR TO ENTRANCE ONTO ADJACENT PAVED AREAS. WHEN
WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED
WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT
TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM
ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE
OF SAND BAGS, GRAVEL, BOARDS OR OTHER APPROVED METHODS.
6. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION
WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO
ADJACENT PAVED AREAS. THIS MAY REQUIRE PERIODIC TOP DRESSING
WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL
SEDIMENT OR CONSTRUCTION MATERIALS SPILLED, DROPPED, WASHED
OR TRACKED ONTO ADJACENT PAVED ROAD SURFACES MUST BE
REMOVED IMMEDIATELY.
30' MIN.
4"
MI
N.
' M
IN
30' MIN
8" THICK, 3" - 6"
COARSE AGGREGATE
EXISTING
GROUND
NON-WOVEN GEOTEXTILE FABRIC
USE SAND BAGS OR
BARRIER TO PREVENT
TRAFFIC SHORT CIRCUIT
8" THICK, 3" - 6"
COARSE AGGREGATE
SHAKER PLATES
(OPTIONAL)
PROFILE
EXISTING
GROUND
SCALE:
G-5
STABILIZED CONSTRUCTION ENTRANCE DETAIL
NTS
1'
MIN.
DUST SCREEN/FILTER FABRIC
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO.
SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
6 26
EROSION CONTROL DETAILS
G-5
AT
JL
JN NONE
TREE PROTECTION ZONE FENCE NOTES:
1. FOR TREES THAT ARE IN NARROW PLANTING STRIPS, THE ENTIRE PLANTING STRIP
SHALL BE ENCLOSED.
2. FOR TREE WELLS AND SMALL PLANTER AREAS THAT ARE FULL OF ROOTS, USE
PLASTIC TRAFFIC BARRICADES (WATER FILLABLE) MINIMUM (3) EACH, OR TYPE 1 OR
TYPE 2 BARRICADES, MINIMUM (4) EACH OR AS DETERMINED BY DLNR.
3. TREE WILL REQUIRE SUPPLEMENTAL WATERING.
4. IF THE FENCE IS INSIDE THE DRIP LINE, PLYWOOD BOARDS OR STEEL PLATES OR
HEAVY DUTY GROUND PROTECTION MATS OVER AN 8" MULCH LAYER WILL BE
REQUIRED TO PROTECT THE TREE ROOTS AND CONSTRUCTION EQUIPMENT
VEHICLES.
5. 2" GALVANIZED IRON POSTS, DRIVEN INTO THE GROUND TO MIN. 24" DEPTH, AT NO
MORE THAN 10' SPACING.
6. AVOID DAMAGING ROOTS DURING FENCE POST INSTALLATION.
PROTECTION
ZONE
EXIST
TREE
DIA OF FENCE TREE
PROTECTION ZONE
NO GRADING, COMPACTION,
OR CONSTRUCTION WITHIN
TREE DRIP LINE
TREE DRIP LINE
DIA OF FENCE TO THE
EDGE OF THE DRIP LINE OR
AS DETERMINED BY DLNR.
ORANGE PLASTIC
MESH
FINISH
GRADE
5'- 0"
T O
6'- 0"
TREE
PROTECTION
ZONE WARNING
SIGN (TYP)
SCALE:
G-5
TREE PROTECTION DETAIL
NTS
SILT SOCK (TYP.
ALL AROUND),
SEE DETAIL
TRENCH DRAIN
COMPOSITE GRATING
ENDS OF FILTER FABRIC
SANDWICHED BETWEEN
GRATE AND FRAME
NON-WOVEN
GEOTEXTILE FABRIC
NOTES:
1. INSTALL THE SEDIMENT CONTROL FILTERS ONE DAY PRIOR TO EXCAVATION
WORK NEAR THE TRENCH DRAIN AND WHEN THE TRENCH DRAIN MAY RECEIVE
RUNOFF FROM ANY GROUND DISTURBANCE WORK. REMOVE THE SEDIMENT
CONTROL FILTERS AFTER COMPLETION OF FINAL PAVING AND PERMANENT
SEDIMENT CONTROL MEASURES ARE COMPLETE AND GRASSING IS FULLY
ESTABLISHED.
2. CHECK THE CONDITION OF THE FILTER AT THE BEGINNING AND END OF EACH WORK
DAY AND REPAIR/CLEAN AS NECESSARY.
3. REMOVE FILTERS AT TIMES OF ABOVE NORMAL RAINFALL EVENTS AND REPLACE
THEM WHEN EVENT HAS PASSED.
SCALE:
G-5
TRENCH DRAIN INLET PROTECTION
NTS
G-5
TMK: (2) 4-5-005: 021
TMK: (2) 4-5-005: 001
TEMPORARY BENCHMARK
STA. 1341
1/2" PIPE
ELEV = 13.79
TEMPORARY BENCHMARK
STA. 100
1/2" PIPE W/ CAP
ELEV = 7.34
TEMPORARY BENCHMARK
STA. 104
ELEV = 8.64
"□" CUT
TEMPORARY BENCHMARK
STA. 734
MAG NAIL
ELEV = 7.54
7 8 9 11
12 13
EXIST CONCRETE BOAT RAMP
EXIST CONCRETE
BOAT WASH
EXIST COMFORT STATION
PROPERTY LINE, TYP
APPROX LOCATION OF UNDERGROUND
CONDUIT AND CONDUCTORS SERVING
LIGHT POLES
APPROX LOCATION OF UNDERGROUND
CONDUIT AND CONDUCTORS SERVING
LIGHT POLE
TEMPORARY BENCHMARK
STA. 103
MAG NAIL
ELEV = 9.25
TEMPORARY BENCHMARK
STA. 101
Y CUT
ELEV = 9.36
TEMPORARY BENCHMARK
STA. 102
1/2" PIPE W/ CAP
ELEV = 11.97
TEMPORARY BENCHMARK
STA. 108
ELEV = 7.10
"Y" CUT
APPROX LOCATION OF UNDERGROUND
WATER LATERALS PER 1977 MALA
BOAT LAUNCHING FACILITY DRAWINGS
SURVEY NOTES:
1. TOPOGRAPHIC AND UTILITY SURVEY FOR THIS PROJECT WERE
COMPLETED BY:
KN SURVEYING, LLC
1733 LILIHA STREET
HONOLULU, HI 96817
DATE OF SURVEY: 4/15/2025
2. AZIMUTHS REFERRED TO GOVERNMENT SURVEY TRIANGULATION
STATION "PUU LAINA"
ELEVATIONS REFERRED TO THE NATIONAL GEODETIC SURVEY
BENCHMARK "SOH 049" PID (DR4488)
BRASS DISK ELEVATION= 5.98 FT, MEAN SEA LEVEL
3. NO GUARANTEE IS MADE ON THE ACCURACY OR COMPLETENESS OF
UNDERGROUND UTILITIES SHOWN HEREON. THE CONTRACTOR MUST
EXERCISE CAUTION IN THE EXCAVATION OF THE PROJECT FOR ANY
SPECIFIC LOCATION.
4. UNDERGROUND UTILITIES AND/OR STRUCTURES, SHOWN, ARE
PROVIDED FOR INFORMATION ONLY AND ARE BASED ON
INFORMATION SHOWN ON PLANS/MAP PREPARED BY OTHERS. THE
INFORMATION SHOWN, THEREFORE, MAY OR MAY NOT BE
REPRESENTATIVE OF ACTUAL FIELD CONDITIONS. THE
UNDERGROUND UTILITY LINES AND/OR STRUCTURES MAY OR MAY
NOT BE PRESENT AT THE LOCATIONS SHOWN OR OTHER
UNDERGROUND UTILITY LINES AND/OR STRUCTURES NOT SHOWN
MAY BE PRESENT.
ANY DISCREPANCIES IN THE FIELD FROM WHAT IS SHOWN, THE
CONTRACTOR SHOULD CONTACT THE ENGINEER OF RECORD
IMMEDIATELY.
POINT TABLE
POINT NO.
DESCRIPTION
1/2" PIPE W/ CAP
Y CUT
1/2" PIPE
MAG NAIL
" " CUT
"Y" CUT
1/2" PIPE
1/2" PIPE
"Y" CUT
HUB W/ TACK
MAG NAIL
MAG NAIL
"Y" CUT
1/2" PIPE
1/2" PIPE
MAG NAIL
1/2" PIPE
MAG NAIL
ELEVATION
7.34
9.36
11.97
9.25
8.64
7.10
7.05
7.16
10.81
13.50
7.54
6.43
6.15
12.13
12.89
9.30
13.79
9.60
NORTHING
5000.00
5317.90
5480.00
5154.37
5025.05
4890.85
4964.79
4944.84
5427.02
5270.53
5215.97
5265.02
5357.87
5574.80
5346.73
5238.99
5478.54
5274.02
EASTING
5000.00
4669.22
5056.34
4829.37
4934.66
5142.29
4861.03
4893.82
4728.81
4869.00
4907.49
4996.30
4936.59
4882.18
4856.49
4728.76
4889.52
4820.41
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO. SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
7 26
EXISTING SITE PLAN - SURVEY CONTROLS
C-1
AT
JL
JN 1" = 30'
GRAPHIC SCALE
O' 30' 60' 90'
1" = 30'
15'
SCALE:
EXISTING SITE PLAN - SURVEY CONTROLS
1" = 30'
TRUE NORTH
SCALE: 1 IN = 30 FT
DEMOLITION NOTES:
1. PROTECT EXISTING IMPROVEMENTS AND TREES UNLESS OTHERWISE
NOTED.
2. THE CONTRACTOR SHALL REMOVE ALL PAVEMENT, STRUCTURES,
VEGETATION, SIGNS AND POSTS, RUBBISH AND OTHER
OBSTRUCTIONS WITHIN THE LIMITS OF WORK, AS NOTED.
3. FOR DEMOLITION OF STREET LIGHT AND ELECTRICAL CONDUITS, THE
CONTRACTOR SHALL COORDINATE WORK WITH RESPECTIVE UTILITY
COMPANY.
DEMOLITION LEGEND:
AC PAVEMENT DEMOLITION
(APPROX 3" AC / 6" BASE COURSE)
CONC PAVEMENT DEMOLITION
(APPROX 6" PCC / 6" BASE COURSE)
LANDSCAPE REMOVAL
REMOVE FEATURE, AS NOTED
REMOVE UTILITY LINE/ /
TMK: (2) 4-5-005: 001
REMOVE EXIST AC PAVEMENT
DEMOLISH AND REMOVE EXIST BOAT WASH
CONCRETE PAVEMENT, HOSE BIBBS, WATER
LATERALS, BOLLARDS, SIGNS, POSTS AND
POST FOUNDATION
DEMOLISH AND REMOVE EXIST
CONCRETE CURB, WHERE EXIST
DEMOLISH AND REMOVE LIGHT POLE
PROTECT EXIST CONCRETE
BOAT RAMP TO REMAIN
SAWCUT, DEMOLISH AND
REMOVE AC PAVEMENT
COORDINATE ACCESS WITH USERS
DEMOLISH AND REMOVE EXIST
AC CURB, WHERE EXIST
REMOVE ELECTRIC METER, PANEL
BOX, SUPPORTS AND GUARD POST
REMOVE "PARKING FOR BOAT
TRAILERS" SIGN, POST, AND
FOUNDATION, TYP OF 4
PROTECT EXIST UTILITY POLE, GUY
WIRE, CONC PAD, BOLLARDS, AND
PAYPHONE TO REMAIN
PROPERTY LINE, TYP
REMOVE SIGN, POST
AND FOUNDATION
DEMOLISH AND REMOVE EXIST CONCRETE
AND AC CURB, WHERE EXIST
LIMITS OF WORK, TYP
REMOVE UNDERGROUND
CONDUIT AND CONDUCTORS
SERVING LIGHT POLE, TYP
REMOVE UNDERGROUND
CONDUIT AND CONDUCTORS
SERVING LIGHT POLE, TYP
PROTECT EXIST
TREES TO REMAIN
PROTECT EXIST TREES
TO REMAIN (TYP OF 4)
PROTECT EXIST
TREES TO REMAIN
REMOVE CONCRETE
PILE, TYP OF 4
PROTECT EXIST BOULDER
PILE TO REMAIN
EXIST SIGN TO REMAIN
PROTECT EXIST UTILITY POLE
AND SIGN TO REMAIN
PROTECT BUILDING TO REMAIN IN PLACE
COORDINATE ACCESS WITH USERS
SALVAGE AND REINSTALL
WOOD PILE AND SIGN
PROTECT EXIST
TREES TO REMAIN
PROTECT EXIST CURB
REMOVE UNDERGROUND
WATER LATERALS
APPROX POINT OF CONNECTION
TO PROPOSED WATER LATERAL
PROTECT EXIST WATER LATERAL TO REMAIN
CONTRACTOR TO VERIFY LOCATION
PROTECT EXIST WATER LATERAL TO REMAIN
CONTRACTOR TO VERIFY LOCATION
TMK: (2) 4-5-004: 063
SAWCUT, DEMOLISH AND REMOVE AC PAVEMENTDEMOLISH AND REMOVE SPEED BUMP
PROPERTY LINE, TYP
REMOVE AND REPLACE
EXIST UTILITY COVERS
DEMOLISH AND REMOVE EXIST
CONCRETE CURB, WHERE EXIST
PROTECT EXIST WATER LATERAL
TO REMAIN, CONTRACTOR TO
VERIFY LOCATION
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO. SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
8 26
DEMOLITION PLAN
C-2
AT
JL
JN 1" = 20'
GRAPHIC SCALE
0' 20' 40' 60'
1" = 20'
10'
SCALE:
DEMOLITION PLAN
1" = 20'
TRUE NORTH
SCALE: 1 IN = 20 FT
MA
TC
H
LIN
E
- S
EE
B
EL
OW
MA
TC
H
LIN
E
- S
EE
A
BO
VE
TMK: (2) 4-5-005: 001
W 1-1/2
W 1-1/2
NO PARKING
NO
PARKING
NO
PARKING
FOR BOAT RAMP ENLARGED PLAN, SEE SHEET C-7
FOR BOAT WASH PLAN, SEE SHEET C-8
LIGHT POLE WITH TWO BOLLARDS, SEE NOTE 7
LIGHT POLE, SEE NOTE 7
LIGHT POLE, SEE NOTE 7
LIGHT POLE, SEE NOTE 7 LIGHT POLE, SEE NOTE 7
LIGHT POLE, SEE NOTE 7
.91
.66
(T
IE
.25
(T
IE
10.00'
(TIE)
72.03'
BARRIER CURB
.80
BA
RR
IE
R
CU
RB
36.00'
FLUSH CURB
90.00'
FLUSH CURB
SAWCUT AND CONNECT TO EXIST AC
PAVEMENT, PROVIDE SMOOTH RIDING
CONNECTION, SEE NOTE 5
.0'
AC PAVEMENT
SEE NOTE 4
AC PAVEMENT
SEE NOTE 4
CONCRETE PAVEMENT, SEE NOTE 2
52.00'
FLUSH CURB
44.15'
FLUSH CURB
55.56'
FLUSH CURB
34.20'
FLUSH CURB
45.00'
FLUSH CURB
19.09'FLUSHCURB
GRADE ADJUSTMENT WALL CURB
ALONG CURVE, SEE NOTE 8
.60
.97
LIGHT POLE WITH FOUR
BOLLARDS, SEE NOTE 7
.25
102.10'
FLUSH CURB
107.72'
FLUSH CURB
104.52'
FLUSH CURB
28.81'
FLUSH CURB
LIGHT POLE, SEE NOTE 7
10' LONG CONCRETE JERSEY
BARRIER, TYP OF 8
10' LONG CONCRETE JERSEY
BARRIER, TYP OF 21
C-9
20.00'
BARRIER
CURB
21.50'
BARRIER
CURB
18.00'
BARRIER
CURB
.28
BA
RR
IE
R
CU
RB
54.25'BARRIER CURB 66.48'
BARRIER CURB
LIMITS OF WORK, TYP
RELOCATE BOULDERS AS
NECESSARY AND REPLACE
AS DIRECTED WHEN WORK
IS COMPLETED
PROTECT EXIST BOULDER
PILE TO REMAIN
R=35.0'
R=
.0'
SALVAGE AND REINSTALL WOOD PILE AND SIGN
LIGHT POLE, SEE NOTE 7
LIGHT POLE, SEE NOTE 7
D 8
1-1/2" WATERLINE LATERAL
HOSE BIBB WITH ANTI-SIPHON
VACUUM BREAKER, SEE NOTE 9
20.00'
FLUSH CURB
19.00'
FLUSH
CURB
9.5 0'
FL
US
H
CU
RB
1C-9
.00
BA
RR
IE
R
CU
RB
R=10.0'
NOTES:
1. FOR STRIPING AND SIGNAGE PLAN, SEE SHEET C-5.
2. FOR CONCRETE PAVEMENT, SEE DETAIL
3. FOR CONCRETE CURBS, SEE DETAIL
4. FOR AC PAVEMENT, SEE DETAIL
5. FOR AC PAVEMENT TRANSITION, SEE DETAIL
6. FOR AC SPEED TABLE, SEE DETAIL
7. FOR SOLAR POWERED LIGHT POLE, SEE DETAIL
8. FOR GRADE ADJUSTMENT WALL CURB, SEE DETAIL
9. FOR HOSE BIBB, SEE DETAIL
C-10
C-10
C-10
C-16
C-10
C-10
C-10
C-10
C-10
C-15
TMK: (2) 4-5-004: 063
.00
SAWCUT AND CONNECT TO EXIST AC
PAVEMENT, PROVIDE SMOOTH RIDING
CONNECTION, SEE NOTE 5AC SPEED TABLE, SEE NOTE 6
AC PAVEMENT
SEE NOTE 4
COMFORT STATION
IMPROVEMENTS PER
ARCHITECTURAL SHEETS
REPLACE EXISTING
UTILITY COVERS AND
ADJUST TO GRADE
AC PAVEMENT, SEE NOTE 4
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO. SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
9 26
SITE PLAN
C-3
AT
JL
JN 1" = 20'
GRAPHIC SCALE
0" 20' 40' 60'
1" = 20'
10'
SCALE:
SITE PLAN
1" = 20'
TRUE NORTH
SCALE: 1 IN = 20 FT
MA
TC
H
LIN
E
- S
EE
A
BO
VE
MA
TC
H
LIN
E
- S
EE
B
EL
OW
1-1/2
W 1-1/2
TMK: (2) 4-5-005: 001
NO PARKING
NO
PARKING
NO
PARKING
3 4 6 7 8 9
10 91112
8 9
54 6 7 8 9
2 3 4 6 7 8
8 9
4.5%
4.5%
2.5%
2.2%
3.8%
4.8%
1.6
1.8
0.7%
4.3%
1.0%
FOR BOAT RAMP ENLARGED PLAN, SEE SHEET C-7
FOR BOAT WASH ENLARGED PLAN, SEE SHEET C-8
2.7%
1.6
1.4
0.4
2.2
0.8%
3.4
1.2
1.2
1.4
4.1 %4.2%
1.5
1.0%
1.0
2.8%
1.5%
6.63 PAVT
7.13 TC
12.43 TC/PAVT
9.56 TC
9.06 PAVT
9.64 TC
9.14 PAVT
10.30 PAVT
10.80 TC
LOW POINT
8.90 TC/PAVT
9.40 TC/PAVT
MATCH EXIST
9.30 TC/PAVT MATCH EXIST
8.89 PAVT
7.77 TC/PAVT
7.90 TC/PAVT
MATCH EXIST
9.29 TC/PAVT
2' TRANS.
9.50 TC/PAVT
9.20 TC/PAVT
MATCH EXIST
9.30 TC/PAVT
9.10 TC/PAVT
9.08 TC/PAVT
9.04 PAVT
9.44 PAVT
6.65 PAVT
9.44 PAVT
2' TRANS.
9.00 TC/PAVT
8.53 PAVT-R
8.38 PAVT
9.57 TC
9.07 PAVT
9.50 PAVT-GB
9.68 PAVT-R
9.68 PAVT-R 9.62 PAVT-R
10.60 TC/PAVT
10.97 PAVT-GB
9.11 PAVT-R
9.56 PAVT
10.06 TC
9.50 PAVT
10.00 TC
9.48 PAVT-GB
9.39 PAVT
6.79 TC
6.29 PAVT
GB
R
R
GB
GB
GB
9.05 TC/PAVT
1.8%
2.6
D 8
2%MAX CROSS SLOPE
9.80 TC/PAVT
2' TRANS.
8.50 TC
8.00 PAVT
4.2
4.0%
3.4%
9.18 TC
8.68 PAVT
GB
GB
9.80 PAVT-R
9.53 PAVT-GB
9.32 TC/PAVT
9.39 TC/PAVT
9.50 TC/PAVT
GB
R
GB
1.4
9.20 TC/PAVT10.00 TC/PAVT
11.17 TC/PAVT
11.44 TC/PAVT
12.25 TC/PAVT
12.50 TC/PAVT
10.72 PAVT-GB
10.09 PAVT-GB
9.55 PAVT-GB
9.73 PAVT-R
1.7%
1.4%
1.4%
0.8%
8.79 PAVT-R
2.2
9.75 PAVT-GB
9.75 PAVT-GB
R
1.0%
1.7
1.0%
5 6
54 6
GB0.5%
9.20 TC/PAVT
9.48 TC/PAVT
2' TRANS.
8.50 TC/PAVT
2' TRANS.
GB
8.35 PAVT-GB
1.2%
5'
1.8
2.9
1.6
1.5
1.8
2.5%
4.2
2.5%
2.9%
9.53 PAVT-GB
1.6
0.6 %1.8
5 6
5 6
3.1
2.3%
GB
1.6%
TMK: (2) 4-5-004: 063
0.6%
1.6
1.2
2.4
1.8
1.4
8.25 PAVT
MATCH EXIST
8.41 PAVT
MATCH EXIST
7.69 PAVT
8.25 PAVT-R MATCH EXIST
8.06 PAVT-R
MATCH EXIST
7.82 PAVT
MATCH EXIST
7.88 PAVT
7.93 PAVT
8.17 PAVT
8.01 PAVT
8.30 PAVT
8.45 PAVT-R
8.26 PAVT 8.06 PAVT-R
8.20 PAVT
8.15 PAVT
8.41 PAVT
SPEED BUMP
SPEED BUMP
8.33 PAVT
8.04 PAVT
MATCH EXIST
8.39 PAVT
SPEED BUMP
8.33 PAVT
7.98 PAVT
SPEED BUMP
8.40 PAVT-R
8.45 PAVT-R
SPEED BUMP
SPEED BUMP
8.29 PAVT
8.08 PAVT-R
R
MATCH EXIST
7.95 PAVT
0.3%
GB
1.2% 0.5%
0.7%
EARTHWORK SUMMARY:
CUT = 150 CY
FILL = 180 CY
GRADING AREA = 54,800 SF (1.3 ACRES)
NOTES:
1. EARTHWORK QUANTITIES SHOWN WERE TAKEN FROM EXISTING
GROUND TO FINISH GRADE. NO ADJUSTMENT FACTOR IS APPLIED TO
THE RAW CUT/FILL QUANTITIES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE THE
EXACT QUANTITIES FOR BIDDING PURPOSES. CONTRACTOR / BIDDER
SHALL NOT USE THE EARTHWORK QUANTITIES SHOWN ABOVE FOR
BIDDING PURPOSES.
3. REGARDLESS OF THE CUT AND FILL EARTHWORK QUANTITIES SHOWN
ABOVE, THE CONTRACTOR IS RESPONSIBLE TO IMPORT OR EXPORT
ALL NECESSARY MATERIALS TO COMPLETE THE GRADING WORK AT
NO ADDITIONAL COST TO THE OWNER.
MALA BOAT RAMP SITE IMPROVEMENTS
B48CM75A
FINAL SUBMITTAL
JOB NO.
REVISION
NO. SYM. DESCRIPTION SHT./OF DATE APPROVED
DESIGNED:
DRAWN:
CHECKED:
SUBMITTED:
DRAWING NO.APPROVED:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION.
EXPIRATION DATE OF THE LICENSE
BY:
DATE:
DATE:
SCALE:
ADMINISTRATOR DATE
SHEET NO. OF SHEETS
KAULA AE, LLC
APRIL 30, 2026
10 26
GRADING PLAN
C-4
AT
JL
JN 1" = 20'
GRAPHIC SCALE
MA
TC
H
LIN
E
- S
EE
A
BO
VE
0' 20' 40' 60'
1" = 20'
10'
SCALE:
GRADING PLAN
1" = 20'
TRUE NORTH
SCALE: 1 IN = 20 FT
MA
TC
H
LIN
E
- S
EE
B
TMK: (2) 4-5-005: 001
1-1/2
W 1-1/2
30.9'
D 8
TOW-AWAY
ZONE
NO PARKING OUT OF STALL
UNAUTHORIZED VEHICLES TRAILER WILL
BE TOWED AND HELD AT OWNER'S EXPENSE
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL RESOURCES
STATE OF HAWAII
VEHICLES TOWED TO:
PARKING FOR
BOAT TRAILERS
WITH VEHICLES
ATTACHED ONLY
TOW AWAY ZONE
NO PARKING
NO
PARKING
NO
PARKING
12 - VEHICLE PARKING STALLS
@ 9'-0" - 108.0 FEET
7 - VEHICLE PARKING STALLS @ 9'-0" - 63.0 FEET
6 - VEHICLE PARKING STALLS
@ 9'-0" - 54.0 FEET
ADA PARKING STALLS
SEE DETAIL 4, C-12
3 - VEHICLES WITH
BOAT TRAILER
PARKING STALLS
@ 10'-0" - 30.0 FEET
10.0'
45.0'
TYP
.0'
TY
P
9.0'
TYP
18.5'
TYP
9.0'
TYP
26.1'
6 - VEHICLES WITH BOAT
TRAILER PARKING STALLS
@ 11'-0" - 78.7 FEET
8 - VEHICLES WITH BOAT
TRAILER PARKING STALLS
@ 10'-0" - 92.5 FEET
45.
0'
TYP
3 - VEHICLES WITH BOAT
TRAILER PARKING STALLS
@ 12'-0" - 36 FEET
9.0'
TYP
18.5'
TYP
40.4'
PROTECTED BURIAL AREA SIGN ON POST, TYP OF 3
PROTECTED BURIAL AREA
SIGN ON POST
EXIST NO PARKING SIGN
PROTECTED BURIAL
AREA SIGN ON POST
RESTROOMS
RESTROOMS
RESTROOMS
RESTROOMS
RESTROOMS
NO
PARKING
ANY
TIME
TOW-AWAY
ZONE
NO
PARKING
ANY
TIME
15 MINUTE
TIME LIMIT
DO NOT WASTE WATER
ONLY FOR WASHING
VESSEL AND TRAILER
WITH VALID RAMP DECAL
NO OTHER USES ALLOWED
USE OF SPRING LOADED
NOZZLE REQUIRED
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL RESOURCES
STATE OF HAWAII
TOW-AWAY
ZONE
RESTROOMS
TOW-AWAY
ZONE
NO PARKING OUT OF STALL
UNAUTHORIZED VEHICLES TRAILER WILL
BE TOWED AND HELD AT OWNER'S EXPENSE
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL RESOURCES
STATE OF HAWAII
VEHICLES TOWED TO:
PARKING FOR
BOAT TRAILERS
WITH VEHICLES
ATTACHED ONLY
TOW AWAY ZONE
TOW-AWAY
ZONE
NO PARKING OUT OF STALL
UNAUTHORIZED VEHICLES TRAILER WILL
BE TOWED AND HELD AT OWNER'S EXPENSE
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .