This project manual contains bidding documents and contract specifications for the Wasatch Hollow Outfall Redesign project issued by the Salt Lake County Department of Public Works and Municipal Services, Flood Control Engineering Division. The project involves general contracting services located at 1499 S 1700 E, Salt Lake City, Utah, and includes modifying the existing outlet and overflow structure at the Wood Hollow detention pond, installing a new overflow and outlet storm drain pipe routing through the park, and connecting it to the existing system in 1700 S. The work encompasses improvements to components inside the outlet structure including new gates and linkage. The bid schedule includes 38 base bid items and 2 additive bid items covering mobilization, traffic control, construction survey, clearing and grubbing, pipe installation (30" reinforced concrete pipe for 456 linear feet), inlet structures, emergency spillway basin (43 cubic yards), slide gates, manhole installation (3 units), fencing, and electrical components for the gate actuators. Bidders must submit bids through the County's designated electronic system by the posted deadline; a pre-bid conference will be held via web conference with attendance required to receive connection information. The contract time will be established upon Notice to Proceed, with substantial completion required within the specified calendar days. Bid bonds equal to at least 5 percent of the total bid amount must accompany each submission, and the County reserves the right to reject any or all bids.
Bids will be evaluated on a lump sum and unit price basis, with the award going to the lowest qualified, responsible, and responsive bidder. Bidders are required to obtain required licensing from the Utah State Department of Commerce, provide performance and payment bonds equal to 100 percent of the bid amount, and submit certificates of insurance as specified in the Contract Documents. Subcontractors cannot represent more than 75 percent of the total contract value without prior written owner approval. The Bid Schedule identifies specific cost items for mobilization, with mobilization costs capped at 10 percent of the total bid and payment to be made on a percentage basis as work progresses. Liquidated damages for late contract completion and punch list completion are established, with the amount to be determined by the County prior to award. No geotechnical reports or subsurface exploration data are being provided, and bidders must satisfy themselves regarding subsurface and groundwater conditions. The project is funded by Salt Lake County, and all bid documents, plans, and specifications are incorporated into the Contract Documents by reference, including the current APWA Manual of Standard Specifications and Salt Lake County Engineering Standards & Drawings.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS REFERENCE
When reference is made to specifications, they refer to the CURRENT (at the time this invitation to bid is released to the public) Manual of Standard Specifications and Standard Plans, published by the APWA Utah Chapter. This reference shall control except for modifications and supplements contained in this project manual.
SALT LAKE COUNTY DEPARTMENT OF PUBLIC
WORKS AND MUNICIPAL SERVICES
FLOOD CONTROL ENGINEERING DIVISION
PROJECT MANUAL
PROJECT #
Title Page
00 01 01 - 1
SALT LAKE COUNTY
A Political Subdivision of the State of Utah
Salt Lake City, Utah
PROJECT MANUAL
FOR
PROJECT NO.
CONTRACT NO.
BIDDING NO.
PREPARED BY
Salt Lake County Flood Control Engineering Division 2001 South State Street, Suite N3-120
Salt Lake City, Utah 84190
Table of Contents
00 01 10 - 1
T A B L E O F C O N T E N T S
Project No.
Contract No.
Bidding No.
Document No. of
Number Title Pages
INTRODUCTORY INFORMATION
00 01 01 Title Page
00 01 10 Table of Contents
00 01 15 List of Drawings
BIDDING REQUIREMENTS
PRE-BID INFORMATION
00 11 16 Invitation to Bid
INSTRUCTIONS TO BIDDERS
00 21 13 Instructions to Bidders
00 22 03 Modifications to Instructions to Bidders
INFORMATION AVAILABLE TO BIDDERS
00 31 32 Geotechnical Data
BID FORMS
00 41 00 Bid Form
00 43 00 Bid Schedule
00 43 13 Bid Bond
CONTRACT FORMS
AGREEMENT FORMS
00 43 36 Subcontractor and Supplier Report
00 52 00 Agreement
BONDS AND CERTIFICATES
00 61 13.13 Performance Bond
00 61 13.16 Payment Bond
00 62 16 Certificate(s) of Insurance
CONDITIONS OF THE CONTRACT
GENERAL CONDITIONS
00 72 00 General Conditions
Document No. of Number Title Pages
Table of Contents 00 01 10 - 2
SUPPLEMENTARY CONDITIONS
00 73 03 Modifications to the General Conditions ..............................................................................._ 00 73 79 Environmental Compliance Practices
AMENDMENTS AND MODIFICATIONS
00 91 13 Amendments and Modifications 01 11 00 Summary of Work.................................................................................................................._ 01 31 13
Coordination ........01 33 00 Submittal Procedure
01 55 26 Traffic Control 01 57 00 Temporary Controls
01 71 34 Mobilization and Demobilization
END OF CONTENTS
01 71 13 Survey Referencing
List of Drawings 00 01 15 - 1
DOCUMENT 00 01 15
LIST OF DRAWINGS
WASATCH HOLLOW OUTFALL REDESIGN
PROJECT NO. EFCFP240001
CONTRACT NO.
BIDDING NO.
Sheet No. Title
1 COVER
2 TITLE SHEET
3 GENERAL NOTES
4 LINE LEGEND & DETAIL KEY
5 SYMBOLS & ABBREVIATIONS
6 SURVEY CONTROL
7 LIMITS OF DISTURBANCE AND ADDITIVE 1 - POWER TIE-IN PLAN
8 DEMOLITION PLAN
9 OVERALL SITE PLAN
10 EMERGENCY SPILLWAY PLAN AND PROFILE
11 TRAIL GRADING PLAN
12 EMERGENCY SPILLWAY BASIN GRADING PLAN
13 FULL OUTFALL CONTROL STRUCTURE SITE PLAN
14 FULL OUTFALL CONTROL STRUCTURE SECTION
15 MAIN OUTFALL CONTROL STRUCTURE SECTION VIEW
16 CIVIL SITE DETAILS
17 CIVIL SITE DETAILS
18 EMERGENCY SPILLWAY SECTIONS AND DETAILS
19 GENERAL STRUCTURAL NOTES
20 GENERAL STRUCTURAL NOTES
21 EMERGENCY SPILLWAY INLET STRUCTURE PLAN
22 EMERGENCY SPILLWAY INLET STRUCTURE SECTIONS
23 PRIMARY INLET STRUCTURE PLAN
24 PRIMARY INLET STRUCTURE SECTIONS
25 EMERGENCY SPILLWAY INLET GRATE DETAILS
26 STRUCTURAL DETAILS
27 PRIMARY INLET TRASH RACK DETAILS
28 TYPICAL STRUCTURAL DETAILS
Invitation to Bid
00 11 16 - 1
DOCUMENT 00 11 16
INVITATION TO BID
PART 1 GENERAL
1.01 CONSTRUCTION CONTRACT
A. Bidders are invited to bid on the Construction Contract titled:
Project No.
Contract No.
Bidding No.
B. For information about this Construction Solicitation, submit questions through the County’s designated electronic system.
1.02 DESCRIPTION OF WORK
A. The location of the work is:
B. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. Items of work are as follows:
1.03 BIDDERS' PRE-QUALIFICATION
A. Bidders
1.04 BASIS OF BIDS
A. Bids shall be on a basis.
1.05 CONTRACT TIME
A. The Work will be Substantially Completed within calendar days after the date of the
Notice to Proceed.
1.06 PRE-BID CONFERENCE
A. A pre-bid conference will not be held.
will be held at on , via web conference. All contractors intending to submit a bid are invited to attend to obtain relevant information concerning the project. To attend the pre-bid conference, send an email to on or before to receive an invitation and connection information. Bidders are advised that information affecting drawings, specifications, conditions, scope of work, etc. may be discussed. County assumes no obligation to disclose information discussed at the pre-bid conference to bidders who do not attend. Absent bidders assume all risk of failure to attend.
Invitation to Bid
00 11 16 - 2
1.07 BID BOND
A. Bid Bond in the amount of at least 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Bond will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract.
1.08 DEADLINE FOR BID SUBMISSION
A. Bids are to be submitted through the County’s designated electronic system by the date and time posted. No responses will be accepted after that date and time.
B. All costs associated with the preparation of the bid, as well as any other related materials, will be borne by the bidder. All bids become the property of Salt Lake County. Salt
Lake County reserves the right to stop the selection process at any time if it is considered to be in the best interest of the County.
1.09 RIGHT TO REJECT BIDS
A. The County reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed by the County to be in the public's best interest.
1.10 VALIDITY PERIOD FOR BIDS
A. In consideration for the opportunity to submit a bid for the project described herein, bidder agrees to hold its bid open and firm for days after the day bidding closes, whether or not bidder is identified as the apparent low bidder at said closing.
Bidders who withdraw their bid after close of bidding, but before expiration of the period specified above, shall forfeit their bid bond if award of a contract, based upon the bid, is subsequently made to them.
1.11 GOVERNING LAWS AND REGULATIONS
A. This project the payment of specific wage rates.
Payroll submittal required.
B. Bidders on this Work will be subject to the applicable provisions of all federal rules, laws and regulations or orders.
C. In compliance with Americans with Disabilities Act, (ADA) the following information is provided: FAX Number (385) 468-0320, TDD use 711, Contact (385) 468-0300 or
SLCo-Purchasing@slco.org.
END OF DOCUMENT
Revised August 2025 Instructions to Bidders
00 21 13 - 1
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
PART 1 GENERAL
1.01 DEFINED TERMS
A. Terms used in the Bid Documents which are defined in Article 1.1 of the General
Conditions (Document 00 72 00) will have the meanings indicated in the General
Conditions.
1.02 COPIES OF BID DOCUMENTS
A. Complete sets of Bid Documents must be used in preparing Bids. OWNER and
ENGINEER assume no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
B. Bid Documents are made available to Bidder only for the purpose of preparing Bids on the Work. A license or grant for any other use is not given.
C. Document copyrights shall remain with the OWNER.
1.03 PRE-BID CONFERENCE
A. If a pre-bid conference is held, representatives of OWNER and ENGINEER will be present to discuss the Project. Following the conference, OWNER will upload to the
County’s designated electronic system Addenda as OWNER and ENGINEER consider necessary in response to questions arising at the conference. Location and time of conference is identified in the Invitation to Bid (Document 00 11 16).
1.04 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A. In General: Any explanation desired by a Bidder regarding the meaning or interpretation of the Project documents must be requested through the County’s designated electronic system prior to the question date and time deadline specified therein. Answers to the questions will be posted in the County’s designated electronic system for anyone to view. If a question/answer changes the solicitation document, the change will be released in an addendum. Do NOT contact the Engineer, Project
Manager, Agency, Division, Department, or other County officers or employees for information.
B. Site, Access To: The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Bidder in performing the Work are identified in the Contract Documents. All additional off site lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Bidder.
C. Contract Documents: The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article
1.04; that without exception the Bid is premised upon performing and furnishing the
Work required by the Contract Documents; and, that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
D. Bidder's Obligations: The submission of a bid constitutes acknowledgement that
Bidder has complied with all bidding instructions. It is the responsibility of each Bidder before submitting a Bid, to:
00 21 13 - 2
1. Examine the Contract Documents thoroughly;
2. Visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work;
3. Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;
4. Study and carefully correlate Bidder's observations with the Contract Documents;
5. Identify and notify OWNER via the County’s designated electronic system of all specific conflicts, errors or discrepancies in the Contract Documents, or if Bidder doubts their meanings; and
6. Identify and notify OWNER via the County’s designated electronic system of all errors or omissions in estimates or statements of quantities or units specified in the plans, specifications or drawings, which are, or should be, reasonably apparent to a contractor qualified to perform the Work of the Project.
The failure or omission of any Bidder to receive or examine any form, instrument, Addendum or other document, visit the site and become acquainted with conditions there existing, or attend the pre-bid conference, shall in no way relieve any Bidder from obligations with respect to Bidder's bid or to the Construction Contract.
E. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement (Document 00 52 00) and the Contract Documents, except by Addendum or Change Order.
F. APWA Standard Specifications: Except for the modifications noted in this project manual, the project drawings, and the Salt Lake County Engineering Standards & Drawings, all provisions of the current (at the time this invitation to bid is released to the public) APWA “Manual of Standard Specifications” and “Manual of Standard Plans” are made a part of the Contract Documents by reference.
G. Standard Plans for Public Works Construction: All drawings and notes contained in the Salt Lake County Engineering STANDARDS & DRAWINGS book are made a part of the Contract Documents by reference. These standards are available at https://www.saltlakecounty.gov/globalassets/1-site-files/flood-control/niftic/links/salt-lake-county-standard-drawings.pdf
1.05 PHYSICAL CONDITIONS
A. In General: Before submitting a Bid, each Bidder will be responsible for review of
OWNER's explorations, tests and data concerning surface conditions, subsurface conditions and Underground Facilities at or contiguous to the site, or otherwise, which may affect cost, progress, performance or furnishing of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
B. Surface and Subsurface Conditions: Provisions concerning surface and subsurface conditions, if any, are set forth in the Geotechnical Data (Document 00 31 32). The document provides the identification of:
1. Those reports of explorations and tests of subsurface conditions at the site which have been utilized by ENGINEER in preparing the Contract Documents; and
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site which have been utilized by ENGINEER in preparing the Contract
Documents.
https://www.saltlakecounty.gov/globalassets/1-site-files/facilities/forms--documents/slcode signconstrstdproc.pdf http://slco.org/pweng/flood/pdf/Standard_Plans_2011_.pdf https://slco.org/uploadedFiles/depot/publicWorks/fFloodControl/Standard_Plans_2011_rev08102015.pdf https://www.saltlakecounty.gov/globalassets/1-site-files/facilities/forms--documents/slcodesignconstrstdproc.pdf
00 21 13 - 3
C. Underground Facilities: Information and data indicated in the Contract Documents regarding Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground
Facilities. The OWNER does not assume responsibility for the accuracy or completeness thereof other than as provided in Article 4.3A.2 of the General Conditions (Document 00
72 00) or unless expressly provided in the Modifications to General Conditions
(Document 00 73 03).
D. Additional Explorations: On request, OWNER will provide each Bidder access to the site to conduct any explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall obtain permits, fill all holes, clean up and restore the site to its former condition upon completion of such explorations. Bidder agrees to indemnify and save the OWNER harmless against and from all claims arising out of Bidder's activities during and after the performance of additional explorations.
E. Modifications to the Contract Documents: Provisions concerning the adequacy of the data furnished for subsurface structures and underground facilities, and the possibility of changes in the documents due to differing conditions appear in Articles 4.2 and 4.3 of the
General Conditions (Document 00 72 00).
PART 2 BIDDING PROCEDURES
2.01 INTERPRETATIONS AND ADDENDA
A. All requests for interpretation of the Contract Documents shall be made via the County’s designated electronic system no later than 7 calendar days prior to closing of Bids.
OWNER will post written interpretation on the County’s designated electronic system. If a Bidder's request for interpretation is not responded to by OWNER, Bidder shall not rely on Bidder's interpretation in the request contrary to the intent and terms of the Contract
Documents.
B. OWNER will not be responsible for any explanations or interpretations, except those duly issued on the County’s designated electronic system.
C. Addenda may also be issued to modify the Bidding Documents as deemed necessary.
D. Addenda issued during the time of bidding shall be deemed to be included in the Bid.
Bidder must acknowledge receipt of each Addenda on the County’s designated electronic system. All Addenda shall become a part of the Contract Documents.
E. Except to postpone the close of bidding, no Addenda shall be issued within 48 hours of the close of bidding.
2.02 EQUIPMENT AND MATERIAL OPTIONS PRIOR TO CLOSE OF BIDDING
A. If a Bidder or Supplier wishes to use items of equipment and materials other than those identified in the Contract Documents, said Bidder or Supplier shall email request for approval to the OWNER at least 7 days prior to the date set for close of bidding. All requests shall be sent to SLCo-Purchasing@slco.org.
B. The procedure for submission of any such product option shall be as set forth in Article
6.4 of the General Conditions (Document 00 72 00). It is the sole responsibility of the
Bidder or Supplier to submit complete descriptive and technical information so that
OWNER can make a proper appraisal.
C. OWNER's failure to act upon such a request within three days after delivery shall be deemed a denial thereof.
00 21 13 - 4
D. Any such approval is at the sole discretion of the OWNER and will be in the form of an
Addendum indicating that the additional equipment and materials are approved as equal to those specified for the Project.
2.03 BID BOND
A. Bid security: must be in the form of a Bid Bond, as discussed below. No other form will be accepted.
B. Amount of Bid Bond: The total amount of the Bid on which Bid Bond is to be based shall be the sum of all items of the Bid constituting the maximum amount of the possible award to the Bidder. The Bond amount must equal at least five (5) percent of the total amount of the Bid.
C. Bid Bond: The Bond shall accompany the Bid and shall be issued by a corporate surety company authorized to do business in the State of Utah. The Bond shall guarantee that the Bidder, if awarded the Work, will promptly enter into the Construction Contract to perform the Work in the manner required by the Contract Documents.
D. Bond Form: The Bid Bond must be submitted using the Bid Bond Form (Document 00
43 13).
E. The Bid Bond of a Bidder to whom contract has been awarded will be returned to Bidder within three days after all the acts, for the performance of which said Bid Bond is required, have been fully performed. The Bid Bonds of all bidders will be held until the
County Mayors’s Office has awarded the contract or rejected all bids.
F. Default: In the event of failure or refusal of the Bidder to enter into the Construction
Contract and deliver to the OWNER a Performance Bond, Payment Bond and any other
Bonds or documents required by the Contract Documents within ten days after award of the Work by the County Mayor’s Office, the Bidder shall forfeit the sum of the Bid Bond to the OWNER as liquidated damages.
2.04 CONTRACT TIME AND PUNCH LIST TIME
A. Provisions concerning Contract Time and Punch List Time are set forth in the Agreement
(Document 00 52 00).
2.05 LIQUIDATED DAMAGES
A. Provisions concerning liquidated damages are set forth in the Agreement (Document 00
52 00).
2.06 RETAINAGE
A. Provisions concerning OWNER retaining money are set forth in the Agreement
(Document 00 52 00).
2.07 BID FORM
A. The Bid Form (Document 00 41 00) identifies all forms comprising the Bid Documents.
B. Bids by corporations must be executed in the corporate name by the president, vice-president or other corporate officer authorized to sign and must be properly attested to as an official act of the corporation. At the OWNER's request, authority to sign shall be submitted.
C. Bids by partnerships must be executed in the partnership name and signed by a partner, whose title and official partnership address must be shown.
D. Where joint ventures are proposed by contractors, all parties concerned shall be pre-qualified. A letter asking permission to participate in a joint venture must be submitted by the contractors to Salt Lake County and permission granted before close of bidding.
00 21 13 - 5
E. All names must be typed or printed under or near the signature.
F. The Bidder's address and telephone number for communications regarding the Bid must be shown on the first page of the Bid Form.
G. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use only the Bid Form and Bid Schedules in the Contract Documents. The complete
Contract Documents should be submitted as the Bidder's Bid.
H. Anyone signing any of the Contract Documents as the agent of another, or others, must file with it legal evidence of his/her authority to do so. Such evidence must be either a notarized power of attorney or a certified court order.
2.08 BID SCHEDULE
A. Any work or material which is specified in the Contract Documents or which is necessary because of the nature of the Work, but which is not listed separately in the Bid Schedule
(Document 00 43 00) shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price.
B. All blanks on the Bid Schedule (Document 00 43 00) must be completed. If applicable, furnish both the unit and the total costs for each item. The Bid Schedule must not contain any erasures, interlineation or other corrections unless each such correction is suitably authenticated, by affixing in the margin immediately opposite the correction, the surname or initials of the person or persons signing the bid. Any corrections, alterations or erasures made by the Bidder on the Bid Schedule shall be initialed by the Bidder.
2.09 SUBMISSION OF BIDS
A. Bids are to be submitted through the County’s designated electronic system by the date and time posted. No responses will be accepted after that date and time.
B. Alternate bids, other than those called for in the Bid Form, will not be considered.
2.10 MODIFICATION AND WITHDRAWAL OF BIDS
A. At any time prior to the close of bidding, Bids may be modified or withdrawn via the
County’s designated electronic system.
B. Within 24 hours after bidding closes, any Bidder may file written notice with OWNER that there was a substantial mistake made in the preparation of its Bid. Bidder must thereafter promptly demonstrate Bidder's mistake to the reasonable satisfaction of the
OWNER. If OWNER agrees, Bidder may withdraw its Bid and the Bid security will be returned to the Bidder.
C. AT OWNER's option, Bidder may, after close of bidding, resubmit a bid withdrawn for mistake as permitted herein and the bid will be considered for award of the Work to the
Bidder on the following conditions: (1) If a mistake is attributable to an error in judgment, the bid may not be corrected. Bid correction or withdrawal by reason of an inadvertent, non-judgmental mistake or minor informality is permissible, but at the discretion of the purchasing agent and to the extent it is not contrary to the interest of the county or fair treatment of other bidders. (2) If a mistake is a matter of form rather than substance, evident from the bid document, or an insignificant mistake that can be waived or corrected without prejudice to other bidders, the OWNER may permit amendment.
(Examples include the failure of a bidder to return the number of signed bids required by the request for bids or sign the bid.) (3) If the mistake and the intended bid are clearly evident on the face of the bid document, the bid will be corrected to the intended bid and may not be withdrawn. (Examples include errors in extending unit prices, transposition
00 21 13 - 6 errors, and mathematical errors.) (4) Mistakes will not be corrected after the award of the contract, unless deemed to be in the OWNER’s best interest.
D. The OWNER will give written approval or denial of the Bidder’s request to correct or withdraw a bid. Such approval or denial may be indicated on the Bidder’s written request for correction or withdrawal.
2.11 FOLLOWING CLOSE OF BIDDING
A. Bid totals will be released on the County’s designated electronic system.
B. Award of the work shall not be made until after the bids have been reviewed by the
OWNER.
2.12 BIDS TO REMAIN FIRM FOR SPECIFIED TIME
A. All bids remain firm and subject to acceptance for _____ days after the day of the close of bidding. OWNER may, in its sole discretion, release any Bid and return the Bid security prior to expiration of that time period.
2.13 COMPLIANCE WITH EMPLOYMENT LAWS AND REGULATIONS
A. Bidders are advised that the Construction Contract and its performance are subject to the applicable provisions of all Laws and Regulations. Bidder will be obligated upon written request, to give all applicable assurances of compliance in connection therewith.
B. If federal nondiscrimination requirements are required, the Bidder shall be fully knowledgeable of, and comply with, such requirements.
PART 3 AWARD OF CONTRACT
3.01 QUALIFICATIONS OF BIDDERS
A. Upon request of OWNER, a Bidder whose bid is under consideration for award shall submit promptly to the OWNER the following information for the Bidder, or Bidder's
Subcontractors, or Bidder's Suppliers:
1. Evidence showing financial condition;
2. Experience in performing work on a similar type of project;
3. Present construction commitments;
4. Organizational structure;
5. Equipment which is to be used to do the Work;
6. Litigation or claims which are pending, threatened, settled or otherwise disposed of within the last 3 years;
7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified;
8. All matters consistent with federal, state and local Laws and Regulations; and
9. Such other data as may be called for in the Supplementary Instructions to Bidders
(Document 00 22 13).
3.02 EVALUATION OF BIDS
A. OWNER reserves the right to reject any and all Bids; to waive minor informalities in the
Bid Schedule and elsewhere so long as the informalities do not affect the Contract
Documents or render the bid non-compliant with Laws and Regulation pertaining to bidding requirements; to negotiate and agree to contract terms with the successful Bidder;
and to disregard non-conforming, non-responsive, unbalanced or conditional Bids.
00 21 13 - 7
B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or the OWNER to make an award to that Bidder. Such rejection may be because the Bid is not responsive; or the Bidder is unable, unqualified, or of doubtful ability; or the Bid or Bidder fails to meet any other pertinent standard or criteria established by OWNER in the Supplementary Instructions to Bidders (Document
00 22 13).
C. In determining Bidders' ability to fulfill the contract, if awarded, OWNER may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as provided in the Subcontractors and Supplier Report (Document 00 43 36).
D. OWNER may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Intent to
Award the Construction Contract.
E. To establish qualifications of Bidder, OWNER may request such data indicated in Article
3.01 hereinabove and conduct such investigations as OWNER deems appropriate.
F. If the Construction Contract is to be awarded, it will be awarded to the lowest, qualified, responsible and responsive Bidder as determined by the OWNER. Alternates may be accepted depending upon availability of OWNER funds. Bid alternates will be considered in determining the lowest, qualified, responsible, and responsive Bidder.
G. Bid Schedules will be evaluated as follows:
1. Discrepancies in the multiplication of quantities of Work items and unit prices will be resolved in favor of the unit prices.
2. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
3. Bids shall not contain any recapitulations of or changes in the work to be done.
3.03 SUBCONTRACTORS, SUPPLIERS AND OTHERS
A. Bidder shall not subcontract more than 75 percent of the dollar value of the total contemplated Work (except for the supply of materials and equipment) without
OWNER's prior written approval.
B. Conflict of interest pertaining to Subcontractors is described in Paragraph 6.5H of the
General Conditions (Document 00 72 00).
3.04 CONTRACT SECURITY AND OTHER SUBMITTALS
A. Performance Bond (Document 00 61 13.13) and Payment Bond (Document 00 61
13.16): The OWNER's requirements as to Performance and Payment Bonds are as set forth in part 5 of the General Conditions (Document 00 72 00). Specific requirements are set forth in the Performance Bond (Document 00 61 13.13) and the Payment Bond
(Document 00 61 13.16).
1. The form of the Bonds should be carefully examined by the Bidder.
2. When the successful Bidder delivers the executed Construction Contract to
OWNER, it must be accompanied by the required Performance and Payment
Bonds.
B. Subcontractor and Supplier Report (Document 00 43 36): One form is required for each schedule specified in the Bid Schedule (Document 00 43 00) within 24 hours of
OWNER's request. The Subcontractor and Supplier Report (Document 00 43 36) shall
00 21 13 - 8 list the name and address, of each Subcontractor who will perform work or labor or render service to the Bidder at the site of the Work, or a Subcontractor who, off the job site, will specially fabricate a portion of the Work or improvement according to detail
Drawings. In each instance, the nature and extent of the Work to be sublet in an amount in excess of 2 percent of the Bid sum shall be described.
C. Bidder Status Report (Document 00 43 38): One completed form shall be submitted.
D. Certificate of Insurance (Document 00 62 16): The OWNER's requirements as to insurance are as set forth in part 5 of the General Conditions (Document 00 72 00).
Certificate(s) of required insurance are to be submitted as attachments to Document 00 62
16.
E. Other Information: When a determination has been made to award the Construction contract, Bidder is required, prior to the award or after the award, or both, to furnish such other information as the OWNER requests.
3.05 ADJUSTMENTS TO THE COST OF THE WORK AFTER CLOSE OF BIDDING
A. The Contract Price identified in the Agreement (Document 00 52 00) represents the Cost of the Work which is to be paid by the OWNER to the CONTRACTOR. Adjustments to the Contract Price which are agreed to between the OWNER and the successful Bidder shall be effected by signing a Change Order concurrent with signing the Agreement.
3.06 SIGNING OF AGREEMENT
A. Within 10 days after OWNER gives Notice of Intent to Award the Construction Contract to the successful Bidder, the Bidder shall pick up, sign and deliver the Agreement
(Document 00 52 00) and attached documents to OWNER with the required Bonds. The executed original will be returned to the Bidder.
B. Transfers, delegations or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from the OWNER.
C. At the time of Bidding, close of Bidding, and the signing of the Agreement (Document
00 52 00), and at all times during the Work, Bidder shall be properly licensed to do the
Work and shall be in compliance with the contractor licensing laws of the State of Utah.
PART 4 MISCELLANEOUS
4.01 SUBSTITUTE OR "OR-EQUAL" ITEMS
A. The Contract, if awarded, will be on the basis of materials and equipment described in the
Drawings, Specifications and any Addenda.
B. No application for substitutions or "or equal" items will be considered after close of bidding until after CONTRACTOR signs the Agreement. If Bidder wishes to furnish or install a substitute or an "or-equal" item of material or equipment after the Effective Date of the Construction Contract, the procedure for submitting an application for substitution is set forth in Article 6.4 of the General Conditions (Document 00 72 00) and section 01
25 00 of the APWA Standard Specifications.
Modifications to Instructions to Bidders 00 22 03 - 1
DOCUMENT 00 22 03
MODIFICATIONS TO INSTRUCTIONS TO BIDDERS
Article 3.03 of the Instructions to Bidders (Document 00 21 13) is hereby amended. The following paragraph C is added.
3.03 SUBCONTRACTOR, SUPPLIERS AND OTHERS
C. The following firms have been under contract to the OWNER in the design phase of the
Work and therefore shall not be used as Subcontractors.
1. Design Consultant: _____________________________________________
2. Geotechnical Consultants: ________________________________________
3. Surveying Consultant: __________________________________________
4. Other: _______________________________________________________
5. Other: _______________________________________________________
Geotechnical Data
00 31 32 - 1
DOCUMENT 00 31 32
GEOTECHNICAL DATA
1.01 SUBSURFACE INFORMATION (NO GEOTECHNICAL REPORTS PROVIDED)
A. No geotechnical reports or subsurface exploration data are available or being provided for this Project. Bidders shall satisfy themselves as to subsurface and groundwater conditions that may be encountered and shall include in the Bid all costs associated with performing the Work under such conditions. If subsurface or latent physical conditions are encountered that differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents, or that differ materially from conditions indicated in the Contract Documents, the
Contractor shall promptly notify the Engineer and Owner in writing before the conditions are disturbed and in accordance with the Differing Site Conditions requirements of the
General Conditions.
END OF SECTION
Revised July 2025 Bid Form 00 41 00 - 1
DOCUMENT 00 41 00
BID FORM
PART 1 GENERAL
1.01 BIDDER
A. Legal name:
B. Doing business as (if applicable):
C. Address:
D. Contact person after contract award:
E. Contact email:
F. Telephone number:
G. IRS Tax identification number:
H. Bidder certifies that they hold license number , issued by the
Utah State Department of Commerce, Occupational and Professional Licensing Division, on the day of , 20 . Bidder is licensed to practice as a Contractor. License renewal date is the day of , 20 .
1.02 SURETY COMPANY
A. The following is the name and place of the surety company, which will sign the payment and performance bonds, each in the amount of one hundred percent (100%) of the bid, as surety if the work is awarded to the undersigned.
B. Surety Company Name:
C. Surety Email Address:
1.03 NOTICE
A. Pursuant to Section 58-55-501(8), Utah Code Annotated (UCA), 1953, as amended, it is unlawful to submit a bid for any work for which a license is required under Chapter 55 of Title 58, UCA, by a person or other business entity not licensed or excepted from licensure as a contractor under Chapter 55 of Title 58, UCA.
1.04 CONSTRUCTION CONTRACT
A. Name of Project: _________________
Project No. _________________ Contract No. _________________ Bidding No. _________________
1.05 SUBMITTALS
A. To bid for the Work, Bidder is required to attach in the County’s designated electronic system:
1. This document (Document 00 41 00)
2. Bid Schedule (Document 00 43 00)
3. Bid Bond (Document 00 43 13)
00 41 00 - 2
B. After receiving notice from OWNER that Bidder's Bid is under consideration for award, the following documents are to be submitted subsequent to the Notice of Intent to Award.
1. Document 00 43 36: Subcontractor and Supplier Report.
2. Document 00 52 00: Agreement.
3. Document 00 61 13.13: Performance Bond.
4. Document 00 61 13.16: Payment Bond.
5. Document 00 62 16: Certificate(s) of Insurance required by Contract Documents.
6.
1.06 DEFINITIONS
A. Bid Documents: The Bid Documents consist of the Invitation to Bid, the Instructions to
Bidders, any Supplementary Instructions to Bidders, this Bid form, any supplements (or post-bid supplements) attached to this Bid form, the Bid Schedule, and the Bid Bond.
B. Bid Bond: Document 00 43 13.
PART 2 COVENANTS
2.01 BIDDER TO ENTER INTO AN AGREEMENT
A. In General: Bidder agrees, if this Bid is accepted, to enter into a Construction Contract with the OWNER to perform and furnish all work specified or indicated in the Contract Documents and at the Contract Time and the Contract Price identified in the Agreement (Document 00 52 00).
B. Change Order: If it becomes necessary to further define the Work, Contract Price, Contract Time or some other portion of the Construction Contract prior to signing the Agreement (Document 00 52 00), ENGINEER shall prepare a Change Order describing such change. The necessity for preparing such a Change Order is the OWNER's sole option. If the Change Order is acceptable to the Bidder, the Bidder agrees to execute the Change Order concurrent with the execution of the Agreement.
2.02 BIDDER ACCEPTS TERMS AND CONDITIONS
A. Bidder accepts all of the terms and conditions of the Bid Documents, including without limitation those dealing with the disposition of Bid bond.
B. Bidder will pick up, sign and submit the Agreement (Document 00 52 00) with the Bonds and other documents required by the Agreement within 10 days after the date of OWNER's Notice of Intent to Award the Construction Contract.
2.03 REPRESENTATION OF BIDDER
A. In submitting this Bid, Bidder represents, as more fully set forth in the Instructions To
Bidders (Document 00 21 13), that:
1. Nature of the Work: Bidder has become familiar with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.
2. Surface and Subsurface Conditions: Bidder has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions which are identified in the Geotechnical Data (Document 00 31 32) (if any).
00 41 00 - 3
3. Underground Utilities: Bidder has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site.
4. Bidder Investigation: Bidder has correlated the results of all observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents.
5. Discrepancy Resolutions: Bidder has given OWNER written notice of all conflicts, errors or discrepancies that Bidder has discovered in the Contract Documents and acknowledges that all written resolutions thereof, issued by OWNER prior to close of bidding, are acceptable to Bidder.
2.04 OWNER'S RIGHTS AT BID AWARD
A. Bidder agrees OWNER has the right to reject this Bid, or to award the Work or any part thereof to the undersigned at the prices stipulated. Bidder agrees to make no claim for damages for such rejection or award.
B. If the Bid is rejected, then the Bid security shall be returned to the Bidder.
C. If the Bid is accepted, the OWNER will notify Bidder of OWNER's intent to award the
Construction Contract to the Bidder. The Bidder shall have 10 days to sign the Agreement (Document 00 52 00) and any negotiated Change Order issued pursuant to Article 10.1 of the General Conditions (Document 00 72 00), and to deliver the same, together with the required Performance Bond and Payment Bond, to the OWNER. If Bidder fails to sign and deliver the Agreement or negotiated Change Order and the required Bonds, as specified, the Bid security, at OWNER's option, shall be claimed and cashed and the amount thereof paid to OWNER as liquidated damages for the failure of the Bidder to comply with the terms of the Bid.
D. Bidder agrees the Bid may be rejected if the submittals required by this Document or the Notice of Intent to Award are not submitted within the time listed in the Notice of Intent to Award.
2.05 NON-COLLUSION
A. Any agreement or collusion among Contractors to fix a price or limit competition shall render the bid void. Such conduct is unlawful and subject to criminal sanction. Each Bidder shall attest that no one in its firm or company has either directly or indirectly restrained free and competitive selection, participated in any collusion, or otherwise taken any action unauthorized by County Purchasing Ordinances or applicable law.
B. Bidder agrees the Bid is genuine. The Bid is not made in the interest of or on behalf of any undisclosed person, firm or corporation.
C. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
D. Bidder has not solicited or induced any person, firm or corporation to refrain from bidding.
E. Bidder has not sought by collusion to obtain for itself any other advantage over any separate Bidder or over OWNER.
2.06 NON-DISCRIMINATION
A. Bidder and any agent of Bidder agree that they shall comply with all federal, state and county laws, rules and regulations governing discrimination and they shall not discriminate in the engagement or employment of any professional person or any other person qualified to perform the services required under this Agreement.
00 41 00 - 4
2.07 CAMPAIGN CONTRIBUTIONS
A. Salt Lake County campaign finance disclosure ordinance limits campaign contributions by Bidders to County candidates. Salt Lake County Code of Ordinances § 2.72A. Bidder acknowledges and understands those limitations on campaign contributions mean that any person, business, corporation or other entity that enters into a contract or is engaged in a contract with County is prohibited from making campaign contributions in excess of $100 to County candidates during the term of the contract and during a single election cycle as defined in the ordinance. Bidder further acknowledges that violation of those provisions governing campaign contributions may result in criminal sanctions as well as termination of this Agreement.
2.08 BID PRICING
A. Bidder will complete the Work for the prices listed in the Bid Schedule (Document 00 43
00). Bidder agrees that quantities for Unit Price Work are not guaranteed. (Refer to Article 11.7 of the General Conditions (Document 00 72 00)).
2.09 SUBSTANTIAL COMPLETION, PROJECT COMPLETION AND LIQUIDATED
DAMAGES
A. Bidder agrees that the Work will be Substantially Complete and ready for Final
Inspection on or before the expiration of the Contract Time indicated in the Agreement (Document 00 52 00).
B. Bidder agrees the Work will be complete and ready for final payment in accordance with Article 14.9 of the General Conditions (Document 00 72 00) on or before the expiration of the Punch List Time indicated in the Agreement.
C. Bidder accepts the provisions of the Agreement (Document 00 52 00) as to liquidated damages in the event of failure to complete the Work on time and in accordance with the Contract Documents.
PART 3 EXECUTION
3.01 EFFECTIVE DATE
A. Bidder executes this Bid and declares it to be in effect as of the day of , 20_____.
3.02 BIDDER'S SUBSCRIPTION
A. I certify that to the best of my knowledge the information contained in this bid is accurate and complete and that I have the legal authority to commit this organization to a contractual agreement. I realize the final funding for any service is based upon funding levels and the approval of the Mayor for Salt Lake County.
B. I declare, as bidder, that I have personally examined the site of the proposed Project, that the only persons or parties interested in this bid are those named herein, and that this bid is made without any connection with any other person or business entity making a bid for construction of the same Project.
C. Bidder has read the bid documents including, but not limited to, Invitation to Bid, Instructions to Bidders, General Conditions, Agreement, Payment and Performance Bond Forms, Specifications, Plans and Drawings, and any Amendments thereto.
D. Bidder agrees to all of the terms and conditions contained in said documents.
E. The undersigned also proposes and agrees that if its bid, as submitted in the attached schedule, is accepted by County, bidder will contract in the form specified in the
00 41 00 - 5
Invitation for Bids, perform all the work specified in the Project documents and complete the same within the time specified in the Invitation for Bids.
F. Bidder will furnish the required payment and performance bonds within ten days after the County has awarded and signed the Agreement or as approved by the Owner.
G. Bidder will accept in full payment for its satisfactory completion of the Project, the prices named in the Bid Schedule. Said prices are to include and cover the furnishing of all material, labor, tools, equipment and all other factors necessary to complete the entire work in a proper and workmanlike manner according to the plans identified and upon the terms and conditions and in the manner set forth, and under penalty of the bonds required, and to the full satisfaction and acceptance by the County.
H. It is hereby agreed that the County has the right to reject this bid, or to award the above-described work to the undersigned at the prices set forth in the Bid Schedule.
I. Bidder's Signature:
J. Print Bidder's name here:
K. Title of person signing:
END OF SECTION
BID SCHEDULE
00 43 00 - 1
DOCUMENT 00 43 00
1.01 BIDDER
A. Company Name ______________________
1.02 CONSTRUCTION CONTRACT
A. Name of Project: Wasatch Hollow Outfall Redesign
Project No. EFCFP240001
Contract No. XXX-XXX-XXXXX
1.03 RELATED REQUIREMENTS
A. APWA 01 29 00: Payment Procedure.
1.04 SCHEDULES TO BE ADDED TO THE AGREEMENT
A. This Bid Schedule contains the schedules of prices which will be incorporated into the Agreement (Document 00 52 00) by reference.
1.05 SCHEDULES OF PRICES
Base Bid Schedule (Structure and Spillway):
Item
No.
Specification Reference Number
Classification of Unit Price
Work
Quantity
Unit Unit Price Amount
1 Mobilization
Lump Sum
2 Traffic Control
Lump Sum
3 Construction Survey
Lump Sum
4 Prepare and Implement SWPPP
Lump Sum
Prepare and Implement
Dewatering Plan
Lump Sum
6 Clearing and Grubbing 0.1
Acre
Remove and Replace Topsoil and
Sod
2,848
Square Foot
Bid Schedule
00 43 00 -2
Item
No.
Specification Reference Number
Classification of Unit Price
Work
Quantity
Unit Unit Price Amount
Remove and Replace Asphalt
Pavement
Square Yard
9 Remove and Replace Sidewalk
Square Yard
Remove and Replace Driveway
Approach
Square Yard
Remove and Dispose of Existing
Inlet Structure
Lump Sum
12 Remove and Replace Tree
Each
Remove and Replace Curb and
Gutter
Linear Foot
Remove and Reinstall Fence and
Gate - Primary Intake
Linear Foot
Remove Existing Fence -
Emergency Spillway
Linear Foot
Remove and Replace Stamped
Concrete Trail
Square Yard
Remove and Replace Control
Structure Access Hatch
Lump Sum
Connect 30" Pipe to Existing
Storm Drain Manhole
Each
Furnish and Install 12" Culinary
Water Loop with Concrete Casing
Each
Furnish and Install 30" Reinforced
Concrete Pipe
Linear Foot
Furnish and Install Irrigation
Repairs
Lump Sum
00 43 00 - 3
Item
No.
Specification Reference Number
Classification of Unit Price
Work
Quantity
Unit Unit Price Amount
Furnish and Install 60" Diameter
Storm Drain Manhole
Each
Furnish and Install Emergency
Spillway Inlet Structure
Lump Sum
Furnish and Install Emergency
Spillway Basin
Cubic Yard
Furnish and Install Primary Inlet
Structure
Lump Sum
Furnish and Install 6” UTBC -
Trail Near Primary Intake
Cubic Yard
Furnish and Install Scour
Protection Plate
Lump Sum
28 Furnish and Install D-Ring
Each
Remove and Replace Manhole
Step
Each
Furnish and Install Level Sensor and Wireless Alarm System
Lump Sum
Furnish and Install 54" Slide Gate, Frame, Submersible Gear Boxes, Link Rods, and Non-Rising Stem
Lump Sum
Furnish and Install Stainless Steel
Protective Housing
Furnish and Install Link Rods, Stems, and Submersible Gear
Boxes.
Lump Sum
Furnish and Install Stainless Steel
Manual Operating Components
Each
35 Furnish and Install Orifice Closure
00 43 00 -4
No.
Specification Reference Number
Classification of Unit Price
Work
Quantity
Unit Unit Price Amount
Furnish and Install Tamperproof
Stainless Steel Enclosure
Each
Furnish and Install Post and Split
Rail Fence – Emergency Spillway
Linear Foot
Furnish and Install Double Swing
Gate – Emergency Spillway
Base Bid Total = $_____________
Additive Bid Schedule 1 (Power and Communications for the Gates):
No.
Specification Reference Number
Classification of Unit Price Work
Quantity
Unit
Unit Price Amount
1.1 Furnish and Install Electrical
Components
Lump Sum
1.2 Furnish and Install Stainless Steel
Slide Gate Actuator
Additive Bid 1 Total = $_____________
1.06 MEASUREMENT AND PAYMENT
Unless indicated otherwise within individual bid item descriptions, measurement and payment for bid items shall include only the WORK, which is associated with the applicable Bid Schedule.
1. Mobilization – Bid Item #1
a. Reference Specification: APWA 01 71 13.
b. Measurement: Lump Sum.
c. Payment Covers: All costs of mobilization and demobilization including, but not limited to: mobilization; demobilization; bonding and insurance costs; video
00 43 00 - 5 recording site conditions prior to construction; progress cleaning, temporary facilities; project signs; any additional permits not obtained by the owner;
Coordination with utilities, public agencies, property owners, schools, emergency services, etc.; Administrative incidentals such as Progress Schedules per APWA
01 32 16, and Submittals per APWA 01 33 00 (See project specification modification). This pay item shall constitute full compensation for all labor, equipment, tools, supplies and materials required to complete this portion of the work for as shown on the plans and as specified herein.
d. The lump sum cost of Mobilization shall not exceed 10% of the total bid schedule. Any bid proposal for mobilization that is greater than 10% of the total bid will be adjusted to the maximum amount of 10% of the total bid. The bid item so adjusted will be the Contractor’s bid for that item, and the contractor’s bid for the project will be recalculated and the revised total used to compare with other bidders to determine the low bid. The OWNER will pay the adjusted lump sum price for “Mobilization”."
e. Payment will be made on a percentage basis as follows:
Percent of Original Contract Amount Earned (Not Including Materials
Purchased) Percent of Amount Bid for
Mobilization to be Paid
5% 30%
15% 20%
40% 20%
50% 15%
*Original contract amount is defined as the dollar value of all awarded bids at the time notice to proceed is issued.
f. First mobilization payment will not be released until a copy of the pre-construction video recording is received and accepted by the engineer.
2. Traffic Control – Bid Item #2
a. Reference Specification: APWA 01 55 26.
b. Measurement: Lump Sum.
c. Payment Covers: Costs associated with all labor, materials, equipment, and appurtenances required for traffic control including but not limited to developing a traffic control plan; placing appropriate barriers, signs, and sandbags;
implementing flagging; acquiring permits; coordinating with local and state agencies; and all other incidentals as required to complete the work as…