Project_Manual_Vol._6_(PW#_2025-066).pdf

PDF 106 MB Posted

Attached to
Sewer MA Lining Contract 1
Solicitation number
PW#2025-066
Issued by
King County, Spokane City, Washington

About this file

This is a Project Manual document for the City of Seattle Department of Finance and Administrative Services related to a sewer mainline rehabilitation contract (PW# 2025-066) procured through a competitive sealed bid process. The project involves the rehabilitation of approximately 64,000 lineal feet of existing sanitary sewer, combined sewer, and storm pipes across 263 pipe segments located at various locations throughout Seattle using Cured-in-Place Pipe (CIPP) installation methods. The mainline pipes being rehabilitated range from 6 inches to 27 inches in diameter. Work scope includes traffic control, bypass pumping, pipe cleaning, pre-construction and post-construction closed circuit television (CCTV) video inspection, debris removal, removal of intruding lateral piping and obstructions, pre-liner installation, CIPP liner installation and molding utilizing either fiberglass with ultraviolet light curing or felt lining with steam or water thermal curing, and reinstatement of service laterals. The proposal due date is April 8, 2026, with a posting date of March 5, 2026. Bidders must demonstrate compliance with responsible bidder requirements under RCW 39.04.350, including possession of a Washington State contractor registration certificate, UBI number, and industrial insurance coverage. Bidders with an estimated project cost of $1,000,000 or more must submit a Bidder/Subcontractor List.

The Engineer's Estimate for this project is $10,130,000.00, funded through the Drinking Water Fund. The project is designated as a Covered Project subject to the City of Seattle's Community Workforce Agreement (CWA) and Priority Hire requirements under Seattle Municipal Code 20.37, which mandate workforce participation from economically distressed communities, women, and people of color. Bidders must submit a Women and Minority Business Inclusion Plan scoring a minimum of 10 points out of 16 available points to be deemed responsive, and must submit a bid guaranty equal to five percent of the total bid including retail sales tax through OpenGov. All work must comply with prevailing wage standards applicable to public works projects in Seattle, and contractors must demonstrate capacity to meet workforce diversity requirements throughout project execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .