Q_&_A_List_20181024.pdf
PDF 712 KB Posted
- Attached to
- Latent Print Support Services (LPSS)
- Solicitation number
- PR-19-00001
About this file
Questions and Answers List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_7_Office_of_Federal_Contract_Compliance_Form_rev_20181031.docx | DOCX document | |
| Additional_Questions_20181031.docx | DOCX document | |
| Attachment_8_Past_Performance_Questionnaire_rev_20181024.docx | DOCX document | |
| Attachment_1_Pricing_Table_rev_20181024.xlsx | XLSX spreadsheet | |
| Attachment_9_Task_Order__1_Statement_of_Work.pdf | ||
| Attachment_5_Labor_Categories_Descriptions.pdf | ||
| Attachment_7_Office_of_Federal_Contract_Compliance_Form.docx | DOCX document | |
| Attachment_8_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_10_Task_Order__2_Statement_of_Work.pdf | ||
| Attachment_4_Wage_Determination_Huntsville_AL.txt | TXT text file | |
| RFP_PR-19-00001_LPSS.pdf | ||
| Attachment_6_KMPL.xls | XLS spreadsheet | |
| Attachment_2_Ethics_Standards_Factsheet.pdf | ||
| Attachment_1_Pricing_Table.xlsx | XLSX spreadsheet | |
| SF_33.pdf | ||
| Attachment_3_Wage_Determination_Quantico_VA.txt | TXT text file |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LPSS Q&As
Number Page # Section # Section Title Question
What is the anticipated start date of work?
February 22, 2019, is the start date for the contract and for the 30 days transition plan.
Is this work currently being performed by an incumbent vendor? In both locations?
If so, will the government please provide the name of the company?
Yes, American Systems Corporation performing in both locations.
The government mentions that The
Laboratory is composed of five sections:
Biometric Analysis Section (BAS), Scientific
Analysis Section (SAS), Forensic Response
Section (FRS), Forensic Science Support
Section (FSSS), Terrorist Explosive Device
Analytical Center (TEDAC) yet the scope of the work in these two task orders is exclusively limited to TEDAC Latent print services. Is it the intent for the remaining areas to come out under different IDIQs or task orders at a later date?
Information regarding the LD Section structure was provided for background.
Most, if not all, task orders will be for the
TEDAC section.
The government states that this procurement is intended as a single award
IDIQ. Most IDIQs are intended to open competition to a broad spectrum of bidders and then a subset of bidding vendors can compete on future task orders at a later date. Does the government intend to release any additional Task Orders other than the scope listed in the two initial task orders?
The two initial task orders (TO #1 and 2) are the only ones guaranteed under this
IDIQ. There may be additional task orders awarded in the future, and they will be awarded as single source.
5 1 B.3.2 Minimum % Maximum Amounts, IDIQ
Please consider increasing the IDIQ ceiling from $20M to allow for the following possibilities: 1) The SCOPE (C.1.1) allows for the contract to staff up to 24/7/365.
This could rapidly consume the ceiling, particularly considering possible surge later in the program, would leave the
Government without an option for continuing the work at the necessary pace. 2) The contract is open to multiple organizations within the FBI, increasing
IDIQ ceiling allows for support to the other organizations without immediate concern of the primary needs of the contract being infringed upon in order to allocate ceiling to other organizations within the FBI.
There is no anticipated need for
24/7/365 contract support. However, should the scope of the work significantly increase during the course of the contract period of performance, the
Government will evaluate options/solutions at that point.
6 1 B.3.2 Minimum % Maximum Amounts, IDIQ
The ceiling for this IDIQ is listed as $20M;
the way this RFP is written, the government has set an artificial cap on pricing of the two task orders for approximately 18 FTE. Is the government open to increasing the total cap to allow for future growth?
The 18 FTE should be used for pricing and will be the initial number. Should needs change, the Government might then choose to increase the number of positions.
7 4 C.1.1 SOW The Government states that the
Contractor should be prepared to staff
Next Generation Identification (NGI)
Technicians. While there is a description for the NGI Technician in Attachment 5, it is not listed in the Attachment 1 Pricing
Table. Should offerors add this category to the Tab 1 IDIQ list with a rate but 0 hours?
At this time, there is not a need for the
NGI Technician, but it is a labor category that should be priced for the overall
IDIQ. Attachment 1 Pricing Table has been corrected to reflect the NGI
Technician under Tab 1 IDIQ with 0 hours in both Quantico and Huntsville and shall be priced in the proposal.
8 4 C.1.1 SOW The Government states that the
Contractor should be prepared to staff
Next Generation Identification (NGI)
Technicians. Will the Government confirm that this category will only be required for Huntsville, AL?
At this time, there is not a need for the
NGI Technician, but it is a labor category that should be priced for the overall IDIQ in both locations.
9 17 H3 Right of First Refusal
Right of First Refusal (ROFR), states that it does not apply to supervisory positions and Key Personnel. Based on the task order requirements, it appears there are 8
FTE that are not key personnel (4 casework file assistants, 3 biologist/LPT, and 1 photographer). Of these 8 FTE, how many are currently filled by the current
Contractor? Are there any other personnel on the current contract to whom the ROFR applies?
The Government currently has staff in similar roles to the casework file assistant and biologist/LPT; however, the position title is different. There is not currently a photographer filled by the incumbent.
No, there is no other personnel on the current contract to whom this applies.
10 18 H.5 Key Personnel This section identifies the Key Personnel as Program Manager, Latent Print Examiner, and Senior Latent Print Technician. Please confirm the “Latent Print Examiner (Non-Testifying)” is not considered Key Personnel.
The Latent Print Examiner (Non-testifying) is NOT considered Key Personnel.
11 18 H.6 Security Requirements
What does “contract documents” mean?
Contract documents refers to any form containing data associated with the latent print work being performed.
12 27 H6 VAR Procedure When sending VARs on classified networks, what level of encryption will be accepted since the VARs contain PII?
The FBI "Classified Systems" are a closed network rated at the "Secret" level and they can only be accessed upon contract award. Prior to award, VARs can be submitted via unclassified network UNET e-mail by password-protected PDF file.
13 27 H.6.4 Security and Suitability Requirements
Will the additional background investigation the FBI completes on all contractor personnel be of similar scope to the SSBI/T5 investigation for Top Secret
Clearances?
The FBI will conduct a Law Enforcement NCIC Check (criminal wants/warrants) and a Credit Report but not a full scope SSBI or equivalent. The FBI will verify internally as well to ensure contractor personnel have never failed an FBI
Polygraph, which is grounds for dismissal.
14 43 K.6 Reps and Certs Is this required even if we have a current
SAM registration?
Yes, reps and certs printout should accompany a signed acknowledgement of the solicitation’s SF33.
K.2, Attachment
Key Management Personnel Listing (KMPL)
Can the Government please provide guidance on which volume the offeror should submit the completed KMPL?
KMPL Attachment 6 shall be provided as part of Volume IV Security Plan.
K.2, Attachment
Key Management Personnel Listing (KMPL)
K.2 states “Offerors shall complete the
Acquisition Risk Questionnaire listed in
K.1 and Key Management Personnel
Listing (KMPL) (see Attachment 6) for the prime Contractor and all proposed subcontractors. Offerors shall submit this information with their proposal.
Submission should include identification of the proposal number, name of the assigned CO. Provision of false information shall be cause for default under the Default Clause of this contract.” Understandably, some subcontractors might not want to give this PII to the prime contractor. May subcontractor submit their completed
Acquisition Risk Questionnaires & Key
Management Personnel Listings
(KMPLs) directly to the Government via email? If so, can you please provide submission instructions?
Subcontractors may submit their completed Acquisition Risk
Questionnaires (ARQ) and & Key
Management Personnel Listings
(KMPLs) via e-mail directly to the CO by password-protected PDF file.
49 K10 (a) A2) Small Business Program Representations
The Small Business size standard listed is $15,0000,000. Should this be $15,000,000?
Yes, it is $15,000,000
56 L.1.1 Proposal Structure
The RFQ states, “Offerors shall also include this same statement in the proposal cover letter.” Is the cover letter excluded from the page count?
Also, please identify which volume should include the proposal cover letter.
Yes, the cover letter is excluded from the page count. It should be included in the Technical Volume.
56 L.1.1 Proposal Structure
Please confirm the submission letter
(referenced in paragraph 2, last sentence) and the cover letter (referenced in paragraph 1, last sentence) are the same.
Yes, the submission letter and cover letter are the same document.
57 L.2.1 Proposal Structure
Can the Government please confirm that the Table of Contents and Volume Cover Letters do not count against the page limitations?
They DO NOT count against page limitations.
21 57 - 58 L.2.1 Proposal Structure - Executive Summary, Management, & Technical
Would the Government consider adding 10 pages to the Volume 1 page count?
The Government will allow 5 additional pages to Volume I for a total of 25 pages.
58 L.2.2 Page Limitations & Format
Will the Government allow the use of size 8 font or higher for tables, charts, graphs, and figures?
Yes, the use of size 8 font or higher is allowed for tables, charts, graphs and figures.
58 L.2.2
Page Limitations & Format
Will the Government allow the use of size 10 font for tables and figures?
See above response.
58 L.2.2 Page Limitations & Format
The RFP states “The text size shall be
Times New Roman in a font size of 12 point.” Will the government please allow a smaller font size for graphics, tables, and charts?
See above response.
58 L.2.2 Page Limitations & Format
Will the Government allow the use of landscape page orientation for large tables or figures?
Yes.
L.2.4 and L.2.5
Page Limitations & Format
The RFP requires a table of contents and glossary of abbreviations and acronyms.
Please confirm that these do not count toward the page limits per volume?
Table of contents and glossary of abbreviations/acronyms DO NOT count toward the page limit per volume.
59 L.2.6 Binding and Labeling
May the offeror place the CD-Rs in the Original volumes when submitting hard copies?
Yes.
59 and 60 L.3.1 Management:
Staffing
Can the government please clarify the transition period? The government states that the Offeror shall ensure that 70% of proposed base year personnel are cleared and available to work on the first day following the end of the transition period.
Full staffing shall be in place 60 days after contract award. Is it the intent of the government to have a two phased transition period? 30 days for 70% of staff and remaining 30% at the 60 day mark?
Transition can be identified as a two-phase process encompassing the initial
30 days after contract award (starting
2/22/2019) to be proposed as a FFP cost.
During these 30 days, the awardee will work alongside the incumbent on current operations. During the following 30 days
(starting 3/22/2019) 70% of proposed base year personnel shall be cleared and available to work. Transition ends on
4/22/2019 when full staffing shall be in place and available to work.
59 and 60 L.3.1 and L.3.1.2
Program Management
The paragraph numbering goes from L.3.1 Management: Staffing to L.3.1.2 Program Management. Are there pages missing between these two paragraphs?
The numbering from L.3.1 to L.3.1.2 is an oversight and no pages are missing.
60 L.3.1.2 Program Management
Can the Government please confirm that the Key Personnel resumes are not included in the Volume I page limitation?
Key Personnel resumes ARE NOT included in Volume I page limitations.
60 L.3.2.1.1 Corporate Experience
The RFP requests “experience for previous work in forensic services that the organization has performed within the last five (5) years.” Please confirm that the projects cited here may be different from the contracts submitted in the Past
Performance volume?
Yes, the projects cited may be different from the contracts submitted in the Past
Performance volume and the work HAS to be forensic in nature.
60 L.3.2.1.2 Key Personnel Experience
Can the Government confirm that Key Personnel Resumes are not included in the page count?
Key Personnel resumes ARE NOT included in Volume I page limitations.
60 L.3.2.1.2 Key Personnel Experience
Given the 20 page limit for Volume I, please confirm the 3-page resumes are excluded from the page count.
See answer above.
60 L.3.2.1.2
Key Personnel Experience
Please confirm resumes are required for all personnel proposed for each key personnel position (Program Manager, Latent Print Examiners, and Senior Latent Print Technicians).
Yes, key personnel positions require resumes.
60 L.3.2.1.2 Key Personnel Experience
The RFP states that, “Letters of Intent must be provided for all Key Personnel who are not current employees of the Offeror.” Can the Government confirm that ‘the Offeror’ encompasses the prime contractor AND all fully executed teammates/subcontractors?
Yes, “the Offeror” encompasses the prime contractor AND all fully executed teammates/subcontractors.
60 L.3.2.1.2 Key Personnel Experience
The RFP states “The Offeror must submit resumes (maximum 3 pages each) for all Key Personnel....” Please confirm that these resumes are excluded from the overall page count of the Technical section.
Key Personnel resumes ARE NOT included in Volume I page limitations.
60 L.3.2.1.2 Key Personnel Experience
The RFP states: “The Offeror must submit resumes (maximum 3 pages each) for all
Key Personnel…” Please confirm that these resumes do not count toward the page limit for Volume I?
Key Personnel resumes ARE NOT included in Volume I page limitations.
60 L.4.0 Past Performance General
L.4.0 states “For the purpose of this evaluation, the term “Offeror” includes the prime Offeror and/or team members and subContractors as defined in Section
L.4.1.”. L4.1 states “Offeror’s should provide past performance information on three (3) contracts considered relevant in demonstrating their ability to perform the
TEDAC Latent Print requirements…… In the event a sub-Contractor(s) is proposed, references must be provided for subContractor(s) performing more than
25% of the proposed price of Task Order
#1 and #2.” Based on these statements, can an offeror’s past performance include a mixture of prime contractor and subcontractor/teammate past performance to make up the three required past performance write ups (i.e.
two prime PPs and one teammate PP) even if the teammate PP is from a company that makes up less than 25% of the proposed workshare?
Yes, if needed to make up the three required past performance references.
60 L.4.1
Relevance and Recency of Past Performance Information
The RFP states In the event a sub-
Contractor(s) is proposed, references must be provided for subContractor(s) performing more than 25% of the proposed price of Task Order #1 and #2.”
Please clarify if the subContractor past performance reference(s) are in addition to the 3 references provided by the prime offeror?
The Government has decided not to require past performance references for subContractors, regardless of the subContractors’ percentage of performance allocated to TO#1 and/or
#2.
61 L.4.1 Volume III Past Performance
For IDIQ contracts, it is common for multiple Task Orders (TO) to be awarded under a single IDIQ contract. Often the
TOs are different in size and scope and involve different end users. Under this scenario, would the FBI allow different
TOs on the same IDIQ to be submitted as separate Past Performances?
Yes, it can be allowed if the TOs under the same IDIQ were substantially different in size and scope.
41 61 L.4.1 Relevance and Recency of Past Performance Information
Section L.4.1 states “In the event a subcontractor(s) is proposed, references must be provided for subcontractor(s) performing more than 25% of the proposed price of Task Order #1 and #2.”
In addition to meeting the requirement above, can the offeror submit a past performance reference for a subcontractor that is performing less than 25% of the proposed price of Task Order #1 and #2?
See answer under question #39. Past performance references for subContractors are not required.
61 L.4.1
Relevance and Recency of Past Performance Information
L.4.1 states “In the event a sub- Contractor(s) is proposed, references must be provided for subcontractor(s) performing more than 25% of the proposed price of Task Order #1 and #2.”
Can the Government please clarify how many contract references are required per subcontractor?
See answer under question #39 and 41.
The Government has decided not to require past performance references for subContractors, regardless of the subContractors’ percentage of performance allocated to TO#1 and/or
#2.
61 L.4.1
Relevance and Recency of Past Performance Information
The Government states, “In the event a sub-
Contractor(s) is proposed, references must be provided for subContractor(s) performing more than 25% of the proposed price of Task
Order #1 and #2.”
See prior answer. The Government has decided not to require past performance references for subContractors, regardless of the subContractors’ percentage of performance allocated to TO#1 and/or
#2.
62 L.4.2 Submission Requirements
Can the Government please confirm that Past Performance Questionnaires (PPQs) are required for this submission? If so, can the Government please provide instructions for them? For example, are they to the Government by COB October 24, 2018 or COB November 01, 2018?
Please note, the PPQ incorrectly lists
“REFERENCE NUMBER: 12-P-LDQ005664”
on page 2.
Past Performance Questionnaires (PPQs) are required for this submission. They are to be provided NLT 4:00PM EST 29 October 2018. See corrected PPQ Attachment 8 with applicable RFP reference #.
62 L.4.2 Submission Requirements
L.4.2, Submission Requirements, states that “The Offeror shall furnish the following information for each contract provided as a Past Performance reference. Attachment 8 has been provided for use in submission of this information.” Attachment 8 is a PPQ.
If a contact reference is in CPARS, will the Government accept that in place of a
PPQ?
The Government requires a PPQ to be completed for each Past Performance reference included in the Past Performance Volume. The Government will not accept a CPARS in place of a PPQ.
62 L.4.2
Attachment 8 Past Performance Questionnaire
The Government states, “The Offeror shall furnish the following information for each contract provided as a Past Performance reference. Attachment 8 has been provided for use in submission of this information.
a. Company/Division Name
b. Contracting Activity
c. Brief description
d. Contract Number
e. Contract Type (FFP, T&M, CPFF, etc.)
f. Total Contract Value
g. Period of Performance
h. Up to date name, address, facsimile and telephone number of the CO and Program
Manager
i. Comments regarding any known problems/challenges in referenced contracts and how those problems were resolved”
As there is no requirement to include the Government-provided Attachment 8 form in the Offerors proposal response, can the Government confirm whether the listed information is only required on the provided Attachment 8 form or if it shall also be included elsewhere in the past performance volume?
The PPQs (Attachment 8) are part of the offerors’ proposal response, and have to be submitted directly to the CO. The Government requires a PPQ to be completed for each Past Performance reference included in the Past Performance Volume. PPQs do not count against the Past Performance Volume page limitation.
62 L.4.2
Attachment 8 Past Performance Questionnaire
Can the Government clarify whether Offerors shall submit the Government-provided Attachment 8 Past Performance Questionnaire form in their proposal response? If so, would this be counted against Volume II page limitations?
The PPQs (Attachment 8) have to be provided directly to the CO by the same deadline established for the Past Performance Volume. The PPQs DO NOT count against the Past Performance Volume page limitation.
62 L.4.2
Attachment 8 Past Performance Questionnaire
The government is not clear on what the past performance volume response entails. Does the government expect vendors to provide Past Performance citations using a specific template? Does the government want a 1 page introduction and 3 separate (3 page) write-ups?
The Government requires a PPQ to be completed for each Past Performance reference included in the Past
Performance Volume. PPQs do not count against the Past Performance Volume page limitation. The Past Performance
Volume citations are not required to follow any specific format or template.
PPQs are to be sent directly to the CO by the same deadline established for the
Past Performance Volume.
62 L.4.2
Attachment 8 Past Performance Questionnaire
What is the reason for a separate due date for the past performance volume
(October 24th) versus the remaining volumes?
This is based on internal scheduling requirements.
62 L.4.2
Attachment 8 Past Performance Questionnaire
The government provides PPQs in the appendix, but doesn’t provide any instructions on what to do with the documents? Do PPQs need to be sent back directly to the procurement CO?
When are these documents due?
The PPQs need to be sent directly to the
CO NLT 4:00PM EST 29 October 2018.
62 L.5.1.1 Labor Rates
The government states that bidders need to provide separate Sub and Prime rates.
Is it the intent that each subcontractor listed on a team provide separate sealed packages?
Prime and SubContractor rates can be provided under the same proposal and not under separate sealed packages.
62,63 L.5.1.1 and L.5.1.2
Labor Rates
Both paragraphs reference Attachments 10 and 11 for labor category descriptions. Would the Government confirm that the reference should be Attachment 5 as Attachment 10 is the Task Order 2 SOW and there is no Attachment 11?
Yes, the reference should be Attachment 5 Labor Category Descriptions. The same categories/positions are listed based on specific requirements under Attachment 9 and 10 Task Orders 1 and 2 SOWs Paragraph
4.1 Staffing.
63 L.5.1.3 Sub-Contractor Labor Rates
While Section L.5 states not to make changes to Attachment 1 except as might be required to accommodate accounting system requirements, Section L.5.1.3 will require adding rows to differentiate prime versus subcontractor rates as well as allocation of hours as applicable. Please confirm that offerors can adjust Attachment 1 to accommodate this requirement.
Attachment 1 can be adjusted to accommodate subcontractor number of hours and rates.
63 L.5.1.3 Sub-Contractor Labor Rates
Would the Government please clarify where offerors are to address the mix of effort by percentage for contractor and subcontractor hours? Are we to incorporate that data by modifying Attachment 1 Pricing Table? Are offerors permitted to add tabs to Attachment 1 Pricing Table?
Attachment 1 can be adjusted to accommodate subcontractor number of hours and rates.
63 L.5.2.3 Travel Costs
As it is difficult to estimate the number of trips and duration of trips for the two task orders, would the Government consider providing a Not-To-Exceed (NTE) value for all offerors to use in their cost proposal?
No, the Government will not provide a NTE value as Offerors may have varying approaches to program and resource management at the sites.
64 L6 Volume IV:
Security
L.6. The contractor is not providing a facility to perform work under this contract. Are b-d applicable to this RFP?
“b-d” are not applicable to this RFP;
however, the Government expects that all security applicable guidelines and policies required to operate in an FBI building will be followed.
64 L6 Volume IV:
Security
L.6.b details contractor practices for control and storage of classified material.
Will there be a facility safeguarding requirement on this contract and at which level? Can a draft DD254 be provided?
No facility safeguarding requirements is required. A draft DD254 will be provided at contract award.
64 L6 Volume IV:
Security
L.6.d. Can more detail be provided on the
Contractor Polygraph Program? Is this a program the Contractor must enter into upon award? Does this apply to all personnel?
Contractor personnel may be required to submit to a Counter Intelligence Polygraph (based on the scope of work i.e. SCI). If contractor personnel are unwilling to submit to the polygraph, they may be deemed ineligible to work.
64 L.6 Volume IV:
Security
Can the Government please confirm that there is no requirement for “e” in L.6, Volume IV: Security V? The requirements go from “d” to “f”.
There is no “e”, it’s an oversight.
64 L.6 Volume IV:
Security
Can the Government please confirm the page limit for the Security Volume? The text in L.6 states ‘twenty-five pages”.
The limit is twenty (20) pages for the security volume.
61 64 L.6 Volume IV:
Security
Can the Government provide a DD254 for this opportunity?
A draft DD254 will be provided at contract award.
62 71 M.2.2 Factor 2:
Technical
Can the Government please reorder the subfactors in this section? You are missing subfactor 2. Should ‘Casework Management’ be subfactor 2 instead of subfactor 4?
Yes, “Casework Management” should be Subfactor 2 instead of 4.
63 71 M.2.2.1 Subfactor 1:
Experience
The Government states that the Key Personnel are the 1) Program Manager, 2) Latent Print Examiners, and 3) Sr. Latent Print Technician. Page 18, Section H.5 Key Personnel lists the Program Manager, Latent Print Examiner, and Sr. Latent Print Technician. Page 71 has Latent Print Examiners plural as opposed to singular on Page 18. Does the Government intend for all Latent Print Examiners to be Key or only one?
ALL latent print examiners on the contract are Key Personnel.
64 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
If a single Program Manager is utilized, can the position be billed at different rates depending on work location or would a prevailing rate be established for their main office location?
A prevailing rate will be established for the PM main office location.
65 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
Does the current incumbent have separate PMs for each group at each location?
The incumbent has one PM for both geographic locations.
66 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
The hours on the Pricing Table for
Huntsville don’t appear to add up. There are FTEs and one PTE at 91,200 hours, not the 38,400 listed.
The total in the Pricing Table for
Huntsville has been corrected to 91,200 hours.
67 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
Tab 3 Task Order 2 shows 3,840 hours for a Latent Print Technician in Option Year 4 that are not in the Tab 1 IDIQ thus the total hours for TO2 are 95,040 vice the total in Tab 1 IDIQ which is 91,200. Which is correct?
Tab 1 IDIQ is correct – there are 0 hours in Tab 3 TO 2 for Latent Print Technician in OY 4.
The TAB 1 IDIQ is correct hence there are
0 hours under the Latent Print Technician category in OY 4
68 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
Cell Q28 does not tally all of the hours and should tally 91,200; similarly Cell R28 does not tally all of the prices.
Tab 3 (Task Order 2) includes 3,840 hours for a Latent Print Technician in Option
Year 4. This is not reflected on Tab 1. Is this correct?
Cells Q and R have been corrected. Also, see previous answer addressing Latent
Print Technician in OY4.
69 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
The Tab 1 IDIQ Total Lifecycle for
Huntsville, AL does not include rows 20-
24. Will the Government issue a revised template with the correction?
A revised template is provided with the amendment.
70 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
The Tab 2 Task Order 1 formula for Total
Lifecycle in Cell S16 overstates the total task order by the amount in Cell S14 as that amount is already included in the total in cell S12. Will the Government issue a revised template with the correction?
A revised template is provided with the amendment.
71 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
Tab 3 Task Order 2 formula for Total
Lifecycle in Cell S19 should only include rows 17 and 18 as is it double counting the individual labor categories. Cell S21 should equal S19 plus S20. Will the
Government issue a revised template with the correction?
A revised template is provided with the amendment.
72 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
The Government indicates that the Program Manager for each Task Order is half time. Can the Government please clarify if the half time FTE on each Task Order is the same person?
The ½ time is expressed to show PM location requirement - It is up to the offeror to propose their solution for the number and location of PMs.
73 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
The government states that a PM is optional for each location and also provides 960 hrs per location; Does each team (Quantico and Huntsville) need to have a part time, on-site PM? And do vendors need to provide resumes for each
PM? Or can we provide one named PM to manage both Task Orders?
It can be either or, as a preferred proposed solution by the offeror. If two part-time on-site PMs are proposed, then two resumes are required.
74 Attachment
Pricing Table IDIQ – Latent Print Support Services; Task Order #1; and Task Order #2
In the pricing template the government has provided the FFP transition costs are delineated as a single line item cost in the
TO #1 and TO #2 tabs, but these costs do not no roll-up to the IDIQ Total Evaluated
Price Tab.
There is no roll-up of transition costs to
TAB 1 IDIQ and no Total Evaluated Price for the IDIQ since Tab 1 IDIQ is only a reference summary of proposed rates for the life of the contract.
75 Attachment Labor Biologist/Latent Print Technician
(Huntsville): It appears that a Biologist would perform very different tasks/roles from a Latent Print Technician. Can you clarify what roles you are expecting this position to perform? Or is this to be at the Contractor’s discretion as to which individual/title needs to be hired and performed?
The Basic Latent Print Technician in the
Labor Category Descriptions Attachment
#5 provides a detailed description of the role. The Biologist/Latent Print
Technician role would perform all of the duties of the Basic LPT in addition to the collection of DNA samples from the applicable evidence. The Biologist will only be collecting the samples, other
Government personnel will be performing the DNA analysis. The
Government will dictate which positions are needed.
76 Attachment
Labor Category Descriptions
The list of Labor Categories includes a
Biologist Technician, a Next Generation
Identification Technician, and a Latent
Print Examiner (Non-testifying) for
Huntsville, but the Pricing Table does not list these positions. Which is correct?
The Labor Category Descriptions
Attachment 5 is correct. The Pricing
Table was revised accordingly.
77 Attachment
Labor Category Descriptions
For senior print technician, can the one year experience as a LPT be at accredited laboratories other than at the FBI?
No. The Senior Latent Print Technician should be well versed and knowledgeable in the procedures and workflow specific to the FBI.
78 Attachment
Labor Category Descriptions
The Latent Print Examiner (LPE) position requires previous qualification as a LPE in the FBI. Can this experience have been gained at any other accredited laboratories?
No. For this position category it is required that the qualification is through the FBI.
79 Attachment
Labor Category Descriptions
The Pricing Table allocates 0.5 FTE in
Quantico and 0.5 FTE in Huntsville while the Labor Category section states that an individual will perform program management duties ‘in a part time role’.
Please clarify whether the FBI envisions this being a full-time or part-time role. In the event that a Program Manager is stationed in either Quantico or Huntsville, will the FBI allow travel to the other location to be charged as an ODC?
See response provided under Question
#72. It is up to the Offeror to propose their solution for the number and location of PMs. In the event that a PM is stationed in either Quantico or
Huntsville, reasonable travel to the other location can be charged as an ODC and will be discussed at contract kick-off.
80 Attachment
Labor Category Descriptions
The document states: Prefer Bachelor of
Science (B.S.) degree in Physical Sciences and a Master in Business Administration
(MBA) degree or a Master’s degree in a related field. Please clarify the minimum education requirement for the Program
Manager.
The minimum education requirement is a
Bachelor of Science (B.S.) degree in
Physical Sciences.
81 Attachment
Labor Category Descriptions
For the Latent Print Examiner (LPE), the document states: “Experience: At least five (5) years of recent experience as a LPE and previous qualification as a LPE in the
FBI.” Please identify what is required to become qualified as a LPE in the FBI.
Successful completion of the FBI’s LPE training program.
82 Attachment
Labor Category Descriptions
Labor Category Section. Regarding the
NGI Technician, the preference is for 3 years of recent work experience in latent prints as an Examiner. Please confirm that this is correct as typically an Examiner does not become a Technician in a traditional career progression.
Yes, this is not a traditional career progression; however, it is a preference for the 3 years of recent work experience in latent prints as an Examiner.
83 Attachment
Labor Category Descriptions
The document states: “Certifications:
Qualification in the latent print discipline by the FBI.” Please identify what is required to “qualify” as an FBI LPE.
Successful completion of the FBI’s LPE training program.
84 Attachment
Past Performance Matrix
Please clarify the due date for the completed past performance questionnaires to the government.
Please confirm the Government requires a
Past Performance Questionnaire to be completed for each Past Performance reference included in the Past
Performance Volume by the customer.
Please confirm the past performance reference customer should return the questionnaires directly to the government.
Past Performance Questionnaires (PPQs) are to be sent directly to the CO and are due NLT 4:00PM EST 29 October 2018.
The Government requires a PPQ to be completed for each Past Performance reference included in the Past
Performance Volume. PPQs do not count against the Past Performance Volume page limitation.
File details come from the government source that posted it.