Plan_Rogue R OR FS ERFO 2017(1) 2018(6).pdf
PDF 5 MB Posted
- Solicitation number
- 69056720B000021
About this file
This document package includes a solicitation for the OR FS ERFO 2017(1)-18(6) Rogue River Repairs 2017 federal contract opportunity issued by the Department of Transportation Federal Highway Administration. The solicitation requires construction services including clearing and grubbing, excavation, riprap, mechanically stabilized earth walls, soldier pile walls, drainage, paving, traffic control, and other items. Bids are due on September 14, 2020, with an estimated award date of August 2020. Pricing is to be provided using unit pricing for estimated quantities. The opportunity is set aside for small businesses. Accompanying documents include construction plans, specifications, and geotechnical reports providing additional details on the required scope of work which involves repairs to sections of the Rogue River in Curry County, Oregon.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum Rogue River.pdf | ||
| QA_03-12-2021.pdf | ||
| Amendment A002.pdf | ||
| QA_03-11-2021.pdf | ||
| Amendment A001.pdf | ||
| QA_03-10-2021.pdf | ||
| MP13_XS.pdf | ||
| MP 20_XS.pdf | ||
| IFB Rogue River.pdf | ||
| MP19_XS.pdf | ||
| GM 09-20 OR FS ERFO 2017(1)-18(6) Rogue River ERFO 2017 Final.pdf | ||
| GM 8-20 OR FS ERFO 2017(1)-18(6) Lateral Earth Pressures Memo REV1a.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2020.09.14 08:13:05 -07'00'
OR FS ERFO 2017(1)-18(6) A.2
Sheet and Description
SECTION D SECTION E SECTION F SECTION G -
PLAN &
PROFILE MSE WALL
TEMPORARY
TRAFFIC
CONTROL
SOLDIER
PILE WALL ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,080 120 1,200
A0140 20102-0000 CLEARING AND GRUBBING LPSM All ALL
A0160 20401-0000 ROADWAY EXCAVATION CUYD 1,831 169 2,000
A0180 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 18 18
A0200 25501-0000 MECHANICALLY STABILIZED EARTH WALL (GRS) SQFT 1,040 60 1,100
A0220 25601-0000 GROUND ANCHOR EACH 46 46
A0240 25605-0000 PERFORMANCE TEST EACH 6 6
A0260 30202-1000 ROADWAY AGGREGATE, METHOD 1 (SHOULDER) TON 200 30 230
A0280 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 2,045 175 2,220
A0300 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 564 61 625
A0320 41201-0000 TACK COAT TON 1.2 0.1 1.3
A0340 55505-0000 STRUCTURAL STEEL SOLDIER PILE LNFT 1,846 1,846
A0360 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED MFBM 26 26
A0380 56501-0300 DRILLED SHAFT, 30-INCH DIAMETER LNFT 822 822
A0400 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 270 10 280
A0420 61001-0000 HORIZONTAL DRAIN PIPE LNFT 245 245
A0440 61401-0000 LEAN CONCRETE BACKFILL CUYD 360 160 520
A0460 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0480 62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM
CAPACITY BACKHOE BUCKET, 90 HP MINIMUM FLYWHEEL HOUR 80
A0500 62301-0000 GENERAL LABOR HOUR 80
A0520 62401-0100 FURNISHING AND PLACING TOPSOIL, 2-INCH DEPTH SQYD 1,680 220 1,900
A0540 62516-1000 MULCHING, DRY METHOD SQYD 1,680 220 1,900
A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 3,120 300 3,420
A0580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 1,560 140 1,700
A0600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 2 2
A0620 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH EACH 33 33
A0640 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 10 10
A0660 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 466 466
A0680 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,200 1,200
MileStone: Signoff Date Completed: In Progress Report Date: 08/24/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 9-
S ep
-2
9:
A
M
Remarks and/or
Determination of Estimated
Quantity
Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1FS ERFO 2017(1)-18(6)OR
SHEET
NUMBER
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1.
18101 323639.775 3912799.568 180.749 42°29'34.401951"N 124°14'25.443059"W 93.8766 0.999959151 5/8" IR W/FHWA ALUM CAP
18102 323460.412 3912835.402 178.004 42°29'32.647704"N 124°14'24.858333"W 91.1336 0.999959382 5/8" IR W/FHWA ALUM CAP
18103 323292.762 3913054.849 166.812 42°29'31.090015"N 124°14'21.832203"W 79.9546 0.999960004 5/8" IR W/FHWA ALUM CAP
18104 322883.690 3913436.493 142.580 42°29'27.221313"N 124°14'16.499527"W 55.7526 0.999961381 5/8" IR W/FHWA ALUM CAP
18105 322652.343 3913674.652 130.661 42°29'25.043210"N 124°14'13.186094"W 43.8483 0.999962074 5/8" IR W/FHWA ALUM CAP
18106 322376.345 3913808.774 116.362 42°29'22.378604"N 124°14'11.233381"W 29.5579 0.999962908 5/8" IR W/FHWA ALUM CAP
18300 345727.893 3964966.694 277.735 42°33'34.815592"N 124°03'02.235563"W 194.0027 0.999941414 5/8" IR W/FHWA ALUM CAP
18301 345614.353 3965116.745 298.989 42°33'33.757825"N 124°03'00.168024"W 215.2623 0.999940452 5/8" IR W/FHWA ALUM CAP
18302 345541.486 3965273.825 316.984 42°33'33.104413"N 124°02'58.029693"W 233.2644 0.999939625 5/8" IR W/FHWA ALUM CAP
NOTE:
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
MP 20 coordinates approximate Oregon South SPCS but were determined from web based mapping to determine initial coordinates.There is no known correlation to true state plane positions.
MP 13
MP 19.3
PROJECT :Rogue River Repairs
DATE OF FIELD WORK : 4/2018
PROJECT UNITS : International foot COORDINATE SYSTEM : Oregon South SPCS NAD83 2011
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b
C
U se rs \T hi nh
.P ha n\ D es kt op \N ew fo ld er
7)
R og ue _R iv er
_R ep ai rs
_c on tr ol sh ee t.
xl sx ]S he et
-A ug -2
:0
W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.5
SHEET
NUMBER
FS ERFO 2017(1)-18(6)OR
SURVEY CONTROL
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
18201 334776.237 3937851.877 796.874 5/8" IR W/FHWA ALUM CAP
18202 335006.076 3937737.001 787.498 5/8" IR W/FHWA ALUM CAP
18203 335158.111 3937789.775 779.692 5/8" IR W/FHWA ALUM CAP
18204 335251.450 3938115.699 768.043 5/8" IR W/FHWA ALUM CAP
18205 335405.449 3938336.488 755.716 5/8" IR W/FHWA ALUM CAP
18206 335638.004 3938483.654 748.128 5/8" IR W/FHWA ALUM CAP
18207 335585.553 3938824.553 739.847 5/8" IR W/FHWA ALUM CAP
18208 335570.077 3939119.847 737.000 5/8" IR W/FHWA ALUM CAP
MP 20 assumed coordinaates
PROJECT COORDINATES
OR FS ERFO 2017(1)-18(6) F.4
OR FS ERFO 2017(1)-18(6) F.5
OR FS ERFO 2017(1)-18(6) F.6
OR FS ERFO 2017(1)-18(6) F.7
S. FEUZE B. ROBINSON N. MARSHALL
ELEVATION
L
37 Spa. @ 8'-0" = 296'-0"
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
1" = 10'
PLAN AND ELEVATION (MP 13)
N
PLAN
C Rdwy.L
Approximate ground
@ working line
Timber lagging (typ.)
Ground anchor (typ.)
30" Ø Drilled shaft (typ.)
Approximate finished grade in front of wall
Timber lagging (typ.)
Pile number (typ.)
C HP14 x 102 (typ.)
Working line for wall
L
L
Offset = 17.00' Lt.
C Rdwy. Sta. 17+74.00
Begin wall
L
L Offset = 17.00' Lt.
C Rdwy. Sta. 20+70.00
End wall
C HP14 x 102
C 30" Ø Drilled shaft &
Drawing No. Description
GENERAL NOTES
PLAN AND ELEVATION (MP 13) RG3183-A
RG3183-B
RG3183-C
RG3183-D
RG3183-E
RG3183-F
PLAN AND ELEVATION (MP 20)
ANCHOR DETAILS
1 A
SOLDIER PILE SCHEDULE (MP 13)
SOLDIER PILE SCHEDULE (MP 20)
the front face of the HP pile flange.
Note: Timber lagging is to be placed against
WALLS DRAWING INDEX
4'-0"
(typ.)
outlet pipe (typ.)
2" dia. weephole
Ground anchor (typ.)
G.1 ty p ty
LC HP Pile (typ.)
52'-0"4 spa. @ 48'-0"= 192'-0"52'-0"
30" Ø Drilled shaft & HP14 x 102 spacing
Horizontal drain pipe spacing ty p
35'-0" long horizontal drain pipe (typ.)
35'-0" long horizontal drain pipe (typ.)
Lean concrete backfill (typ.)
in future slide zone above structural concrete. See Note 2.
lagging if sloughing is observed.
2. Owner to maintain wall in future slide zone by adding
1. For Soldier Pile Schedule (MP 13) & details, see RG3183-D.
Notes:
NO.
PROJECT
STATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BY
DESIGNED BYREVISIONSBYDATENO.
REVISIONS
BY
DATE
N
F L
H
B r id g e
W F
L R
G
R o g u e
R iv e r
S o ld ie r
P il a ll R
G
C
A D e s D
G N
F il e s r g p e .d g n
RG3183- of
OR
ROGUE RIVER REPAIRS
ROGUE RIVER - SISKIYOU NATIONAL FOREST
FS ERFO 2017(1)-18(6)
SAMIR SIDHOM
CURRY COUNTY, OREGON
AUGUST 2020
'X 'X
ELEVATION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S. FEUZE B. ROBINSON N. MARSHALL
PLAN AND ELEVATION (MP 20)
1" = 10'
N
PLAN
Approximate ground
@ edge of wall
C Rdwy.L
Offset = 17.00' Lt.
C Rdwy. Sta. 201+52.00
Begin wall
L
Pile number (typ.)
LC HP14 x 102 (typ.)
Timber lagging (typ.)
30" Ø Drilled shaft (typ.)
Ground anchor (typ.)
L Offset = 17.00' Lt.
C Rdwy. Sta. 203+04.00
End wall
Approximate finished grade in front of wall
L
LC HP14 x 102
C 30" Ø Drilled shaft &
Working line for wall
Timber lagging (typ.)
Measured along C Rdwy.L 8'-0"5'-0"
3'-0" ty ty
2 B the front face of the HP pile flange.
Note: Timber lagging is to be placed against outlet pipe (typ.)
2" dia. weephole
3'-10"
(typ.)
Ground anchor (typ.)
G.2
LC HP Pile (typ.)
16'-0" 17 Spa. @ 8'-0" = 136'-0"
40'-0" pipe spa cingHoriz ont al d rain & H
P14 x 1
02 s pac ing
30" Ø D rille d sh aft ty p
35'-0" long horizontal drain pipe (typ.)
35'-0" long horizontal drain pipe (typ.)
36'-0"
48'-0"
Lean concrete backfill (typ.)
in future slide zone above structural concrete. See Note 2.
lagging if sloughing is observed.
2. Owner to maintain wall in future slide zone by adding
1. For Soldier Pile Schedule (MP 20) & details, see RG3183-E.
Notes:
FEDERAL HIGHWAY ADMINISTRATION
N
F id
L R
G
R o g u e
R iv e r
S o ld ie r
P ll R
G
C
A e s D
G N
F il e s r g p e .d g n
ROGUE RIVER - SISKIYOU NATIONAL FOREST
FS ERFO 2017(1)-18(6)
SAMIR SIDHOM
CURRY COUNTY, OREGON
AUGUST 2020
P C
.0
SPECIFICATIONS:
GENERAL NOTES:
Design:
Construction:
MATERIALS:
Ground Anchors:
Structural Steel:
Concrete:
Timber Lagging:
GEOTECHNICAL REPORT:
GENERAL NOTES
ItemItem No.
ESTIMATE
25601-0000
55505-0000
25605-0000
Drilled Shaft, 30-inch Diameter56501-0300 LNFT
55701-1000
LNFT
Performance Test
Structural Steel Soldier Pile
14 EACH
EACH
MFBM
B. ROBINSON NONES. FEUZE
(MP 20)
Quantity
(MP 13)
Quantity
(Total)
Quantity Unit
(2)
(1)
(3)
N. MARSHALL
544 278 822
1,236 610 1,846
Lean Concrete Backfill:
Notes
Highway Projects, FP-14 and Special Contract Requirements (SCR's)
Standard Specifications for Construction of Roads and Bridges on Federal
AASHTO M111 as applicable.
Galvanize all soldier piles after fabrication according to AASHTO M232 or
Conform all welding to AWS Structural Welding Code D1.1.
Furnish all other structural steel conforming to AASHTO M 270, grade 50.
Furnish soldier piles ( H-Piles) conforming to ASTM A572, grade 50.
" unless noted otherwise4 3Chamfer exposed edges of all concrete strength f'c = 4,500 psi..
Furnish Class A Concrete for drilled shafts with minimum 28-day compressive
3 C strength f'c =4,000 psi.
Provide grout according to subsection 725.13 of FP-14 with 7-day compressive recommended by the Post-Tensioning Institute.
Provide a Class 1 Corrosion Protection system for ground anchors as
Furnish ASTM A416, grade 270 high strength prestressing steel strands.
Structural Timber and Lumber, Treated
G.3
ESTIMATE NOTES:
Treat timber according to American Wood Protection Association standards for Use Category 4B (UC4B).
Modulus of Elasticity = 1600000psi
= 625psi
Bearing
Shear = 170psi
= 1350 psi
Bending
Minimum Nominal Design Strength:
" space between lagging.4 1(WWPA) Standards. Provide min.
Provide Douglas Fir, No. 1 graded according to Western Wood Products Association
Provide timber lagging per Section 557.
from leaking through timber lagging.
Seal timber lagging or use alternative methods to prevent lean concrete backfill
Provide lean concrete backfill per Section 614.
Horizontal Drain Pipe:
Provide 2" diameter, Schedule 80 PVC drain pipes.
Install horizontal drain pipe per Section 610.
61401-0000 240 360
Ground Anchor
Lean Concrete Backfill
61001-0000 Horizontal Drain Pipe 175 70 245 LNFT
CUYD120
(3) Includes cost for drilling holes and filling with Class A concrete to the elevations shown on the plans.
Includes payment for excavation under Section 209 required to install lagging.
1,000 sqft (MP 20).
(2) Includes the cost of furnishing and installing geocomposite sheet drain. Estimated quantity = 2,000 sqft (MP 13),
(1) Contract Quantity except seismic surcharges were not considered on this ERFO repair project.
AASHTO LRFD Bridge Design Specifications, 8th Edition, 2017, June 8, 2020.
No. 08-20, dated March 13, 2020 and Geotechnical Memorandum No. 09-20 dated
For boring logs and other geotechnical information, see Geotechnical Memorandum
FEDERAL HIGHWAY ADMINISTRATION
N
F id
L R
G
R o g u e
R iv e r
S o ld ie r
P ll R
G
C
A e s D
G N
F il e s r g g n .d g n
ROGUE RIVER - SISKIYOU NATIONAL FOREST
FS ERFO 2017(1)-18(6)
SAMIR SIDHOM
CURRY COUNTY, OREGON
AUGUST 2020
SOLDIER PILE SCHEDULE (MP 13)
C HP PileL
C RoadwayL
Not to Scale
TYPICAL ELEVATION
" = 1'-0"4
1SCALE:
OFFSET DETAIL
L C Ground anchor
C HP Pile
L shaft
30" Ø Drilled θ
L T O ff s e t r a d ia l to r o a d w a y
Elevation C
Elevation D
Elevation A
Elevation 1
HP Pile
SOLDIER PILE TOLERANCES
CL CL HP Pile
CL HP Pile
Not to Scale
3" 3"
Face of HP pile
Top of shaft
Bottom of shaft
S. FEUZE B. ROBINSON N. MARSHALL AS SHOWN
L
Working line
& C HP PileL7
4 D
Top of HP pile the front face of the HP pile flange.
Timber lagging is to be placed against
Elevation B
Bottom of Lagging
(Class A) Structural concrete backfill Lean concrete
G.4
P a y l im it f o r d r il le d s h a ft
Timber lagging (typ.)
Piles 1-3 & 36-38)
(Not required for backfill (in shaft)
Lean concrete
Note: See RG3183-E for backfill and drainage notes and details for MP 13 wall.
between piles, typ.)
(4’ wide centered Geocomposite sheet drain
FEDERAL HIGHWAY ADMINISTRATION
N
F id
L R
G
R o g u e
R iv e r
S o ld ie r
P ll R
G
C
A e s D
G N
F il e s r g s o ld ie r p il e s c h e d u le .d g n
ROGUE RIVER - SISKIYOU NATIONAL FOREST
FS ERFO 2017(1)-18(6)
SAMIR SIDHOM
C RoadwayL
Not to Scale
OFFSET DETAIL
L C Ground anchor
C HP Pile
L θ
L T O ff s e t r a d ia l to r o a d w a y
HP Pile
SOLDIER PILE TOLERANCES
CL CL HP Pile
CL HP Pile
Not to Scale
3" 3"
N
F id
L R
G
R o g u e
R iv e r
S o ld ie r
P ll R
G
C
A e s D
G N
F il e s r g s o ld ie r p il e s c h e d u le .d g n
SOLDIER PILE SCHEDULE (MP 20)
B. ROBINSON N. MARSHALLS. FEUZE AS SHOWN
C HP PileL
TYPICAL ELEVATION
" = 1'-0"4
1SCALE:
shaft
30" Ø Drilled
Elevation C
Elevation D
Elevation A
Elevation 1
Face of HP pile
Top of shaft
Bottom of shaft
L & C HP PileL
Working line
5 E
Ground anchor
Finished grade
Lean concrete backfill (in shaft)
Top of HP pile the front face of the HP pile flange.
Timber lagging is to be placed against
Not to Scale
Lean concrete backfill
Finished grade
Lean concrete backfill (in shaft)
Not to Scale
BETWEEN PILES
TYPICAL SECTION
NOTES:
See Notes 1 & 2.
2" dia. weephole outlet pipe.
Lean concrete backfill backfill Lean concrete
(Class A) Structural concrete
Existing backfill Existing backfill
G.5
C HP PileL C HP PileL
(Typical both walls) (Typical both walls. Ground anchors not shown for clarity)
P a y l im it f o r d r il le d s h a ft
Timber lagging (typ.)
Elevation B
Bottom of Lagging
Elevation B
Elevation B
Piles 1-3 & 18-20)
(Not required for backfill (in shaft)
Lean concrete approximate)
(horizontal location shown is
Existing deep patch reinforcement approximate)
(horizontal location shown is
Existing deep patch reinforcement
RG3183-A & B for locations.
Horizontal drain pipe, see reinforcement for wall installation.
4. Segments of wall may require disturbance of existing deep patch perforated pipe the remaining length.
non-perforated pipe for the first 10'-0" from wall face using
3. Extend horizontal drain pipes through timber lagging. Provide
¼”x ¼”mesh openings.
2. Cover weephole opening with 17 ga galvanized wire screen with geocomposite sheet drain per the manufacturer’s recommendations.
1. Connect the outlet pipe to a tee fitting attached to the bottom of the
Approximate finished grade Approximate finished grade between piles, typ.)
(4’ wide centered Geocomposite sheet drain
AT PILES
TYPICAL SECTION
or structure excavation face) existing deep patch reinforcement centered between piles, apply to
Geocomposite sheet drain (4'-0" wide sheet RG3183-F)
Typical Anchor Section on across back of beam (See
" steel angle 4 1Weld 2" x
FEDERAL HIGHWAY ADMINISTRATION
N
F id
L R
G
R o g u e
R iv e r
S o ld ie r
P ll R
G
C
A e s D
G N
F il e s r g s o ld ie r p il e s c h e d u le .d g n
ROGUE RIVER - SISKIYOU NATIONAL FOREST
FS ERFO 2017(1)-18(6)
SAMIR SIDHOM
"= 1'-0"2 1Scale: "= 1'-0"2
1Scale:
7'-2" min.
VIEW B-BTIMBER LAGGING
"2
CL
Unbonded length, 20' min.
N o l o a d z o n e
TYPICAL ANCHOR SECTION
" = 1'-0"2 1Scale:
A
A
B
B
PVC sheath
Smooth wall inhibitor sheath with corrosion
Seamless polypropylene
Wire tie
Grout
Grout tube
Grout tube centralizer
Sheath
SECTION A-A SECTION B-B
Not to Scale Not to Scale
Strand spacer sheath
Corrugated PVC
(Typ.)
7-wire Strand
Drill hole Ø = 6" Drill hole Ø = 6" seal
Flexible
C
"16
(Typ.)
"16
ANCHOR DETAIL
C Bearing plate
8'' Ø XS Pipe
Scale: 2" = 1'-0"
"16
Typ. top and bottom
Smooth wall PVC
Trumpet
Anti-corrosion grease
(completely fill anchor head cover)
Anchor head cover
Wedge plate
Typ. both ends
"16
"16
"16
SECTION C-C
(Anchor not shown for clarity)
Plate 34'' x 12'' x 1'-6''
(Typ. e.f.)
Scale: 2" = 1'-0"
Notes:
3.
2.
1.
M in
4'' x 12'' x 1'-6'' P
(Typ.)
L
HP Pile
Bonded length, 10' min.
CLL Anchor
H v a r ie s
L AnchorCL
ANCHOR DETAILS
S. FEUZE B. ROBINSON N. MARSHALL AS SHOWN
1"
1"
6 F capacities. All equipment and methods will be subject to approval by the CO.
adequate length and diameter to meet or exceed the required anchor
Select drilling equipment and methods that provide anchor bond zones of approval of the CO.
bond length in the field based on performance and proof test results and at the
See RG3183-D & E for estimated bond length. Adjust anchor
7-wire strand) per anchor. See RG3183-D & E for anchor design loads.
Provide 6 strands of ASTM A416 prestressing steel (nominal As=0.217 sq in per
(6'-10" min., MP 20: Piles 3-20)
16' (MP20)
15' (MP13)
below the roadway surface:
Construct bond zone to a depth
G.6
Top of Shaft
Lean concrete backfill
Structural concrete
Typ.
"4 x1'-0" centered on pile (Typ.)4 1L2x2x
FEDERAL HIGHWAY ADMINISTRATION
N
F id
L R
G
R o g u e
R iv e r
S o ld ie r
P ll R
G
C
A e s D
G N
F il e s r g d e ta il s .d g n
ROGUE RIVER - SISKIYOU NATIONAL FOREST
FS ERFO 2017(1)-18(6)
SAMIR SIDHOM
File details come from the government source that posted it. Updated .