MP19_XS.pdf

PDF 1 MB Posted

Attached to
OR FS ERFO 2017(1)-18(6), ROGUE RIVER REPAIRS 2017
Solicitation number
69056720B000021
Issued by

About this file

This document package includes cross section drawings and specifications for a federal solicitation for Rogue River repair work. The solicitation number 69056720B000021 was issued by the Department of Transportation Federal Highway Administration for OR FS ERFO 2017(1)-18(6), ROGUE RIVER REPAIRS 2017. The attached solicitation and documents provide details on the river repair work required at multiple mile points along the Rogue River as depicted in the cross section drawings in the MP19_XS.pdf file. Contractors should respond with pricing and plans to perform repairs and restoration work on sections of the riverbank and riverbed at the identified locations no later than the response date specified in the solicitation documents.

View the file

Other files

File Type Posted
BidSum Rogue River.pdf PDF
QA_03-12-2021.pdf PDF
Amendment A002.pdf PDF
QA_03-11-2021.pdf PDF
Amendment A001.pdf PDF
QA_03-10-2021.pdf PDF
MP 20_XS.pdf PDF
IFB Rogue River.pdf PDF
MP13_XS.pdf PDF
Plan_Rogue R OR FS ERFO 2017(1) 2018(6).pdf PDF
GM 09-20 OR FS ERFO 2017(1)-18(6) Rogue River ERFO 2017 Final.pdf PDF
GM 8-20 OR FS ERFO 2017(1)-18(6) Lateral Earth Pressures Memo REV1a.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CROSS SECTIONS COVER SHEET

OR ERFO FS 2017(1)-18(6)

Rogue River Repairs 2017

MP 19 Cross Sections

OR ERFO FS 2017(1)-18(6) 2+80.00

OR ERFO FS 2017(1)-18(6) 2+90.00

OR ERFO FS 2017(1)-18(6) 3+20.00

OR ERFO FS 2017(1)-18(6) 3+40.00

OR ERFO FS 2017(1)-18(6) 3+50.00

OR ERFO FS 2017(1)-18(6) 3+70.00

OR ERFO FS 2017(1)-18(6) 3+80.00

OR ERFO FS 2017(1)-18(6) 3+90.00

OR ERFO FS 2017(1)-18(6) 4+00.00

OR ERFO FS 2017(1)-18(6) 4+10.00

OR ERFO FS 2017(1)-18(6) 4+20.00

OR ERFO FS 2017(1)-18(6) 4+30.00

OR ERFO FS 2017(1)-18(6) 4+40.00

OR ERFO FS 2017(1)-18(6) 4+50.00

OR ERFO FS 2017(1)-18(6) 4+60.00

OR ERFO FS 2017(1)-18(6) 4+70.00

OR ERFO FS 2017(1)-18(6) 4+80.00

OR ERFO FS 2017(1)-18(6) 4+90.00

OR ERFO FS 2017(1)-18(6) 5+00.00

5+20.00

OR ERFO FS 2017(1)-18(6) 5+40.00

OR ERFO FS 2017(1)-18(6) 5+60.00

OR ERFO FS 2017(1)-18(6) 5+80.00

OR ERFO FS 2017(1)-18(6) 6+00.00

OR ERFO FS 2017(1)-18(6) 6+20.00

OR ERFO FS 2017(1)-18(6) 6+50.00

File details come from the government source that posted it. Updated .