Phase Diagram.pdf

PDF 305 KB Posted

Attached to
Open Market Competitive Sealed Bidding IL|26-444DHS-DEVDI-P-98336
Contract number
26-444DHS-DEVDI-P-98336
Issued by
Illinois

About this file

Document Summary

This document is a site plan for the Jack Mabberley Sidewalk Project, illustrating a phased development approach across four distinct construction phases. The plan depicts the project layout with color-coded phases, infrastructure routes, and designated areas for various improvements including sidewalks, pathways, and landscaping features within what appears to be a residential or mixed-use development area.

The project is organized into four sequential phases as indicated by the color legend: Phase 1 (pink), Phase 2 (green), Phase 3 (purple), and Phase 4 (blue). Each phase identifies specific construction areas, pedestrian circulation routes, and landscape features. The plan includes measurements, lot designations, and reference markers throughout to guide construction sequencing and coordination. This phased approach suggests a managed implementation strategy designed to minimize disruption while systematically completing sidewalk and related infrastructure improvements across the entire project site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .