Bid_Schedule_-_RFP_xxx_-_Design_ _Construct_New_Braking_Pads_-_GRCA(1).docx
DOCX document 35 KB Posted
- Attached to
- Repair or Replace Concrete Braking Pads Federal contract opportunity
- Solicitation number
- P15PS01139
About this file
Bid Schedule Rev 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_P15PS01139_Amd_000001.pdf | ||
| Addendum_1.docx | DOCX document | |
| Conc_walk_improvments_plan.pdf | ||
| P15PS01139_Provisions_and_Clauses_rev_2.docx | DOCX document | |
| Hermit_Road_Site_Plans_2015.pdf | ||
| E1_ASBUILT2-Electrical_Drawings.pdf | ||
| Sol_P15PS01139.pdf | ||
| GRCA_113_41135B_ id169120 -As_Constructed.pdf | ||
| South_Entrance_Station_Conc_Braking_Pads_2015.pdf | ||
| Photo_Set_3-_Conc_Walk_Improv.docx | DOCX document | |
| General_Decision_Number.docx | DOCX document | |
| PRE-SOL_NOTICE_Concrete_Pads.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule Design & Construct New Braking Pads - GRCA
RFP# P15PS01139
| Item # |
| Description |
| Quantity |
| Unit |
| Unit Total Cost |
| 1 |
| Hermit Road Interchange (does not include Option A) |
| 1 |
| LS |
| $ |
| 2 |
| Hermit Interchange (Option A) |
| 1 |
| LS |
| $ |
| 3 |
| Trail View Shuttle Stop (Option B) |
| 1 |
| LS |
| $ |
| 4 |
| Maricopa Point Shuttle Stop |
| 1 |
| LS |
| $ |
| 5 |
| Powell Point Shuttle Stop (does not include Option C) |
| 1 |
| LS |
| $ |
| 6 |
| Powell Point (Option C) |
| 1 |
| LS |
| $ |
| 7 |
| Hopi Point Shuttle Stop |
| 1 |
| LS |
| $ |
| 8 |
| Mohave Point Shuttle Stop (Option D) |
| 1 |
| LS |
| $ |
| 9 |
| The Abyss Shuttle Stop |
| 1 |
| LS |
| $ |
| 10 |
| Monument Creek Vista Shuttle Stop |
| 1 |
| LS |
| $ |
| 11 |
| Pima Point Shuttle Stop |
| 1 |
| LS |
| $ |
| 12 |
| Hermits Rest (Option E) |
| 1 |
| LS |
| $ |
| 13 |
| South Entrance Station: Lanes 2, 3, and 4 |
| 1 |
| LS |
| $ |
| 14 |
| Hermit Road Striping (Option F) |
| 1 |
| LS |
| $ |
| 15 |
| South Entrance Station Conc. Walk Improvements (Option G) |
| Proposal Total |
| $ |
*** Individual line item total costs must include any / all pricing elements, and must be the complete designed and installed cost for the particular braking pad ***
File details come from the government source that posted it. Updated .