SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
NPS, MWR - Missouri MABO
ATTN: Kathryn Logsdon
413 S. 8th Street Springfield IL 62701
PMM
NPS, MWR Missouri MABO
ATTN: Kathryn Logsdon, Contracting Officer 413 S. 8th Street Springfield, IL 62701
KATHRYN LOGSDON 217-391-3225
1x 05/14/2015
P15PS00380
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
SOLICITATION NUMBER: Request for Proposal (RFP) P15PS00380
PROJECT TITLE: Beedle House HVAC Replacement and Geothermal Project
LOCATION: The Beedle House is located within a nationally significant historic neighborhood; Lincoln Home National Historic Site, at 411 S. 8th Street, Springfield, IL 62701. The Contractor must take care not to disturb or change important resources that may be located within the project area.
DESCRIPTION: The work of this contract consists of the Contractor furnishing all labor, qualified supervision, products, equipment, materials, tools, supplies, incidentals, and other services and expertise necessary, to modify from a gas fired heating and air conditioning (HVAC) system to a geo-thermal field HVAC system.
Remove existing gas meter and cap gas line, remove existing combustion air and vent piping and remove existing gas fired furnace, condensing unit and associated equipment. Design, furnish and install a geothermal well field, piping, manifolds, pumps and forced air equipment to complete a working geothermal system. Furnish and install digital controls that link with the parks existing network computer control system for the Beedle House.
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
7 90 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR Clause 52.211-10
06/19/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
DOI, NPS, MWR - Missouri MABO-LIHO 413 S. Eighth Street
Springfield IL 62701-1905
MM1
KATHRYN LOGSDON
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 40
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
P15PS00380
It is this agency's intent to require the successful offeror to utilize the subcontractor, Alpha Controls Services, LLC, 4104 Charles
Street, Rockford, IL 61108, for the sole source portion of this construction contract; that is, to provide those materials, labor, proprietary rights/information, and services to install DDC
(direct digital controls) which interfaces with the Park's existing complex building automation system.
The Contractor shall be responsible for and accomplish all work required by the contract documents, which are listed in Attachment J and included in this solicitation, even though minor items required may not be specifically mentioned in the aforementioned description. The building will be inhabited for the duration of the project. The work schedule must reflect the need to accommodate the Park Service employees working in the space during contract performance.
TYPE OF CONTRACT: This will be a single firm-fixed price construction contract and expected to be awarded early July 2015. Award will be made to only one successful offeror.
Davis Bacon Prevailing Wages will apply.
PERIOD OF PERFORMANCE: The period of performance will be ninety (90) calendar days from the date the Notice to Proceed is received by the
Contractor.
MAGNITUDE OF PROJECT: Between $25,000 and
$100,000.
SET ASIDE: Under the authority of the Small
Business Act (15 U.S.C. 637(m)) and FAR Part
19.15, this opportunity is set aside for
Economically Disadvantaged Women-Owned Small
Businesses (EDWOSB).
NAICS CODE: 238220
SMALL BUSINESS SIZE STANDARD: $15 million.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 40
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
P15PS00380
SITE VISIT: Only one site visit will be scheduled. The site visit date and time has been scheduled as follows:
LOCATION: Lincoln Home National Historic Site, Visitor Center, 426 S. 7th Street, Springfield, IL
DATE/TIME: Wednesday, May 27, 2015 @ 9:00 a.m.
central time
Offerors are encouraged and expected to attend the scheduled site visit, to inspect the site, and to satisfy themselves regarding the conditions that may affect the cost of the products and performance. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
PUBLICIZING: The official solicitation package
(RFP) and its attachments will be issued and available on or about May 15, 2015 and will be posted to the Federal Business Opportunities
(FBO) website at https://www.fbo.gov, and on the
FedConnect website at https://www.fedconnect.net.
The contracting officer will not provide hardcopies or email copies of the solicitation.
It is the responsibility of the offerors to monitor the FBO and FedConnect websites to download the solicitation, specifications and drawings, other attachments, and all amendments issued against the solicitation.
RESPONSE TIME AND AWARD: Response time for submission of all proposals shall be June 19, 2015 at 2:00 p.m. central time. All proposals are to be e-mailed so they are received by the
Contracting Officer by that date and time.
REGISTRATION: All offerors are to have a Dun &
Bradstreet number, be registered and active in the System for Award Management (SAM) at https://www.sam.gov, have a NAICS Code of 238220 listed in their SAM profile, and have completed their Online Representations and Certifications in order to be awarded a contract. If the aforementioned has not yet been completed in its entirety, it is advised that you do so at this time. Failure on the part of the successful offeror to fulfill these requirements by the time
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 40
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
P15PS00380
the Contracting Officer makes award may result in award of the contract being made to the next otherwise successful offeror.
In order to qualify as an EDWOSB firm, companies must meet the requirements and steps listed at the SBA's webpage at https://www.sba.gov/content/women-owned-small-busi ness-program, having current registration in the
System for Award Management (SAM) database and uploading / categorizing all required documents in the WOSB program repository through the SBA's
General Login System (GLS) at https://eweb.sba.gov/gls.
If you require assistance with acquiring a D&B number, completing your registration, Representations and Certifications, certifying as an EDWOSB, adding the assigned NAICS Code to your
SAM profile, or accessing the solicitation or its amendments, please contact the Procurement
Technical Assistance Center (PTAC) closest to you. PTAC locations can be found at http://www.aptac-us.org/new/.
POINT OF CONTACT: Kathryn M. Logsdon, Contracting Officer, can be reached by phone at
(217) 391-3225, or by e-mail at kathryn_logsdon@nps.gov.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 6 of 40
TABLE OF CONTENTS
SECTION A – SOLICITATION/CONTRACT FORM
SECTION B – SUPPLIES OR SERVICES AND PRICES
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 Inspection of Construction. (AUG 1996)
SECTION F – DELIVERIES OR PERFORMANCE
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
SECTION G – CONTRACT ADMINISTRATION DATA
1452.228-70 Liability Insurance. (JUL 1996) DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP). (April 2013)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
1452.201-70 AUTHORITIES AND DELEGATIONS. (SEPT 2011)
1452.203-70 Restriction on Endorsements (JUL 1996) 1452.204-70 Release of Claims. (JUL 1996) DOI TEXT MESSAGING Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (October 2009)
SECTION I – CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013) . 17 52.204-13 System for Award Management Maintenance. (JUL 2013) 52.204-19 Incorporation by Reference of Representations and Certificatins. (DEC 2014) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. (DEC 2014) 52.215-8 Order of Precedence—Uniform Contract Format. (OCT 1997) 52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013) 52.219-29 Notice of Set-Aside for Economincally Disadvantaged Women-Owned Small Business Concerns. (JUL 2013) 52.222-3 Convict Labor. (JUN 2003) 52.222-6 Construction Wage Rate Requirements. (MAY 2014) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (MAY 2014) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 7 of 40
52.222-12 Contract Termination—Debarment. (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-21 Prohibition of Segregated Facilities. (APR 2015) 52.222-26 Equal Opportunity. (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014) 52.222-37 Employment Reports on Veterans. (JUL 2014) 52.222-50 Combating Trafficking in Persons. (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2014) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997) – Alternate I
(JUL 1995)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-12 Refrigeration Equipment and Air Conditioners (May 1995) 52.223-15 Energy Efficienty in Energy-Consuming Products. (DEC 2007) 52.223-16 Acquisition of EPEAT®-Registered Personal Computer Products. (JUN 2014) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (MAY 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011) . 18 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-4 Patent Indemnity—Construction Contracts. (DEC 2007) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-5 Insurance—Work on a Government Installation. (JAN 1997) 52.228-11 Pledges of Assets. (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. (JUL 2013) . 19 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013) 52.233-1 Disputes. (MAY 2014) – Alternate I (DEC 1991) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 8 of 40
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-14 Availability and Use of Utility Services. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.242-14 Suspension of Work. (APR 1984) 52.243-5 Changes and Changed Conditions. (APR 1984) 52.244-6 Subcontracts for Commercial Items. (APR 2015) 52.246-21 Warranty of Construction. (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)
52.203-99, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (DEVIATION 2015-02) (MAR 2015) 52.222-35 Equal Opportunity for Veterans. (JUL 2014) 52.223-11 Ozone-Depleting Substances. (MAY 2001) 52.225-9 Buy American—Construction Materials. (MAY 2014) 52.228-13 Alternative Payment Protections. (JUL 2000) 52.236-26 Preconstruction Conference. (FEB 1995)
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR
RESPONDENTS
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
52.236-28 Preparation of Proposals—Construction. (OCT 1997) 52.204-8 Annual Representations and Certifications. (DEC 2014) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) 52.225-10 Notice of Buy American Requirement—Construction Materials. (MAY 2014) 52.203-98, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements—Representation (DEVIATION 2015-02) (FEB 2015)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 9 of 40
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) 52.204-7 System for Award Management. (JUL 2013) 52.204-16 Commercial and Government Entity Code Reporting. (NOV 2014) 52.204-18 Commercial and Government Entity Code Maintenance. (NOV 2014) 52.215-1 Instructions to Offerors—Competitive Acquisition. (JAN 2004) – Alternate I (OCT 1997) 1452.215-71 Use and Disclosure of Proposal Information-Department of the Interior. (APR 1984)
52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work. (MAY 2014) 52.236-27 Site Visit (Construction). (FEB 1995) – Alternate I (FEB 1995) 1452.210-70 Brand Name or Equal (JUL 1996) MO-MABO Electronic Proposals. (APR 2015)
SECTION M – EVALUATION FACTORS FOR AWARD
Evaluation Factors for Award
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 10 of 40
SECTION A – SOLICITATION/CONTRACT FORM
Request for Proposal P15PS00380 Beedle House HVAC Replacement and Geothermal Lincoln Home National Historic Site Springfield, Illinois 62701
(a) This solicitation is prepared using the Uniform Contract format as authorized by FAR
15.204 to facilitate preparation of the solicitation and contract as well as provide reference to and use of the documents by offerors, contractors and contract administrators.
(b) This project is being solicited as a Request for Proposal (RFP), and not an Invitation for
Bid.
(End of Section A)
SECTION B – SUPPLIES OR SERVICES AND PRICES
(a) Preparation of Proposal: The Government will not be responsible for any costs incurred by offeror in the research, preparation, or submission of its offer.
(b) Proposal Price:
(1) Offeror is to complete and submit with its proposal package, Attachment 4 -
Offeror’s Proposed Price Schedule, which is included in this solicitation. Include all information and pricing as categorized in the Attachment.
(2) The Offeror’s TOTAL price should then be recorded in Block 17 of the Standard Form
(SF) 1442 – Solicitation Offer and Award Form.
(c) Further pricing details and information may be requested by the Contracting Officer during the evaluation and preaward survey process.
(End of Section B)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 11 of 40
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Description: The work of this contract consists of the Contractor furnishing all labor, qualified supervision, products, equipment, materials, tools, supplies, incidentals, and other services and expertise necessary, to modify from a gas fired heating and air conditioning (HVAC) system to a geo-thermal field HVAC system. Remove existing gas meter and cap gas line, remove existing combustion air and vent piping and remove existing gas fired furnace, condensing unit and associated equipment. Design, furnish and install a geothermal well field, piping, manifolds, pumps and forced air equipment to complete a working geothermal system. Furnish and install digital controls that link with the parks existing network computer control system for the Beedle House.
It is this agency's intent to require the successful offeror to utilize the subcontractor, Alpha Controls Services, LLC, 4104 Charles Street, Rockford, IL 61108, for the sole source portion of this construction contract; that is, to provide those materials, labor, proprietary rights/information, and services to install DDC (direct digital controls) which interfaces with the Park’s existing complex building automation system.
The Beedle House is located within a nationally significant historic neighborhood; Lincoln Home National Historic Site, at 411 S. 8th Street, Springfield, IL 62701. The Contractor must take care not to disturb or change important resources that may be located within the project area. The building will be inhabited for the duration of the project. The work schedule must reflect the need to accommodate the Park Service employees working in the space during contract performance.
The Contractor shall be responsible for and accomplish all work required by the contract documents, which are listed in Section J and included in this solicitation, even though minor items required may not be specifically mentioned in the aforementioned description.
(End of Section C)
SECTION D – PACKAGING AND MARKING
Not Applicable
(End of Section D)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 12 of 40
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 Inspection of Construction. (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 13 of 40
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
(End of Section E)
SECTION F – DELIVERIES OR PERFORMANCE
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within seven (7) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ninety (90) calendar days. The time stated for completion shall include final cleanup of the premises.
(End of Section F)
SECTION G – CONTRACT ADMINISTRATION DATA
1452.228-70 Liability Insurance. (JUL 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 14 of 40 under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$100,000 each person $200,000 each occurrence $500,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice
Processing Platform (IPP). (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [CO to edit and include the documentation required under this contract]:
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Section G) https://www.ipp.gov/
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 15 of 40
SECTION H – SPECIAL CONTRACT REQUIREMENTS
1452.201-70 AUTHORITIES AND DELEGATIONS. (SEPT 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 16 of 40
1452.203-70 Restriction on Endorsements (JUL 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
(End of clause)
1452.204-70 Release of Claims. (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
DOI TEXT MESSAGING Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (October 2009)
Executive Order 13513, Federal Leadership On Reducing Text Messaging While Driving, was signed by President Barack Obama on October 1, 2009 (Ref: http://edocket.access.gpo.gov/2009/pdf/E9-24203.pdf). This Executive Order introduces a Federal Government-wide prohibition on the use of text messaging while driving on official business or while using Government-supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately bans text messaging while driving company-owned or rented vehicles, government owned or leased vehicles, or while driving privately owned vehicles while on official government business or when performing any work for or on behalf of the government.
(End of Section H) http://edocket.access.gpo.gov/2009/pdf/E9-24203.pdf
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 17 of 40
SECTION I – CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
For FAR Clauses – 52.: https://www.acquisition.gov/?q=browsefar
For DOI Clauses – 1452.: http://farsite.hill.af.mil/VFDIARA.HTM
(End of clause)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013)
52.204-13 System for Award Management Maintenance. (JUL 2013)
52.204-19 Incorporation by Reference of Representations and Certificatins. (DEC 2014)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment. (AUG 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. (DEC 2014)
52.215-8 Order of Precedence—Uniform Contract Format. (OCT 1997)
52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013)
52.219-29 Notice of Set-Aside for Economincally Disadvantaged Women-Owned Small
Business Concerns. (JUL 2013)
52.222-3 Convict Labor. (JUN 2003)
52.222-6 Construction Wage Rate Requirements. (MAY 2014)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (MAY 2014)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) http://farsite.hill.af.mil/VFDIARA.HTM
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 18 of 40
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination—Debarment. (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-21 Prohibition of Segregated Facilities. (APR 2015)
52.222-26 Equal Opportunity. (APR 2015)
52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)
52.222-37 Employment Reports on Veterans. (JUL 2014)
52.222-50 Combating Trafficking in Persons. (MAR 2015)
52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2014)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction
Contracts. (SEP 2013)
52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997) –
Alternate I (JUL 1995)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)
52.223-12 Refrigeration Equipment and Air Conditioners (May 1995)
52.223-15 Energy Efficienty in Energy-Consuming Products. (DEC 2007)
52.223-16 Acquisition of EPEAT®-Registered Personal Computer Products. (JUN 2014)
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction
Contracts. (MAY 2008)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG
2011)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 19 of 40
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.227-4 Patent Indemnity—Construction Contracts. (DEC 2007)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-5 Insurance—Work on a Government Installation. (JAN 1997)
52.228-11 Pledges of Assets. (JAN 2012)
52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014)
52.228-14 Irrevocable Letter of Credit. (NOV 2014)
52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts. (MAY 2014)
52.232-33 Payment by Electronic Funds Transfer-System for Award Management. (JUL
2013)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)
52.233-1 Disputes. (MAY 2014) – Alternate I (DEC 1991)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 20 of 40
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-14 Availability and Use of Utility Services. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.242-14 Suspension of Work. (APR 1984)
52.243-5 Changes and Changed Conditions. (APR 1984)
52.244-6 Subcontracts for Commercial Items. (APR 2015)
52.246-21 Warranty of Construction. (MAR 1994)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form).
(APR 1984)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)
(End of clauses incorporated by reference)
52.203-99, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (DEVIATION 2015-02) (MAR 2015)
(a) The contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such fraud, waste, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 21 of 40
(b) The contractor shall notify employees that the prohibition and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.
(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the contractor is not in compliance with the provisions of this clause.
(2) The Government may seek any available remedies in the event the contractor fails to comply with the provisions of this clause.
(End of clause)
52.222-35 Equal Opportunity for Veterans. (JUL 2014)
(a) Definitions. As used in this clause-
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.
The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.223-11 Ozone-Depleting Substances. (MAY 2001)
(a) Definition. “Ozone-depleting substance,” as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as-
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 22 of 40
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
Warning
Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
(End of clause)
52.225-9 Buy American—Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 23 of 40
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
P15PS00380 LIHO – Beedle House HVAC Replacement and Geothermal Page 24 of 40
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award.