RFP _Pg_122 _Amend_1.pdf

PDF 14 KB Posted

Attached to
Luther Ely Smith Square Federal contract opportunity
Solicitation number
P14PS01930
Issued by
Department of the Interior National Park Service

About this file

RFP 122

View the file

Other files for this federal contract opportunity

Other files attached to Luther Ely Smith Square, newest first.
File Type Posted
Amendmnt_4__SF30_-_LES.pdf PDF
sf-30_Amendment_No._1.pdf PDF
C5_E113A_154A_of_179.pdf PDF
C5_E300_157A_of_179.pdf PDF
C5_L313_75A_of_179.pdf PDF
C5_S101_172A_of_179.pdf PDF
C5_L312_74A_of_179.pdf PDF
C5_L756_100A_of_179.pdf PDF
C5_L613_90A_of_179.pdf PDF
C5_L412_77A_of_179.pdf PDF
C5_G001_3A_of_179.pdf PDF
C5_E112_151A_of_179.pdf PDF
C5_E112A_152A_of_179.pdf PDF
C5_L623_92A_of_179.pdf PDF
C5_E113_153A_of_179.pdf PDF
C5_L513_87A_of_179.pdf PDF
C5_SP212_56A_of_179.pdf PDF
C5_L995_139A_of_179.pdf PDF
265600_C5_Exterior_Lighting_AMENDMENT_2.pdf PDF
C5_L939_119A_of_179.pdf PDF
C5_L413_78A_of_179.pdf PDF
C5_L213_71A_of_179.pdf PDF
RFP _Pg_124 _Amend_1.pdf PDF
SF1442-Amendment_1.pdf PDF
Amend_1 _Narrative.pdf PDF
RFP _Page_11 _Amend_1.pdf PDF
Copy_of_Master_Contractor_List.xlsx XLSX spreadsheet
4b-Submission_Pkg_Vol_2.pdf PDF
7a_2011_0211__CAR_Phase_1_ESA_R1-1.pdf PDF
1e-JEFF180194_SHEET_121-179_of_179.pdf PDF
18a-ROADWAY_J6I2413.pdf PDF
16_TTC_accessible_zones_during_construction.pdf PDF
5_Subsurface_Exploration.pdf PDF
7c_2011_0211__CAR_Phase_1_ESA_R1-3.pdf PDF
14_Existing_Hydraulic_Bollards.pdf PDF
7b_2011_0211__CAR_Phase_1_ESA_R1-2.pdf PDF
4a-Submission_Pkg _Vol_1.pdf PDF
8_CAR_GeoArcheology.pdf PDF
18f-AB_PED_BARRIER_J612413.pdf PDF
18c-B_A8152_WALNUT_J6I2413.pdf PDF
5b_Subsurface_Exploration_Addendum_2.pdf PDF
18g-XS_J6I2413.pdf PDF
18e-AA_STEAM_J6I2413.pdf PDF
General_Decision.docx DOCX document
2-JEFF180194_Specifications.pdf PDF
18d-B_A15134_PINE_J6I2413.pdf PDF
6_AirKnife_Exploration.pdf PDF
12_Supplemental_Utility_Locating_Services.pdf PDF
18b-B_A8151_POTH_J6I2413.pdf PDF
RFP.pdf PDF
Show all 50

Luther Ely Smith Square has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. P14PS01930

Document Title

JEFF-180194 – Luther Ely Square

The proposed subcontracting plan shall demonstrate the contractor’s commitment to utilizing small disadvantaged business and will be evaluated to determine compliance with FAR 19.704 – Subcontracting Plan Requirements, and FAR 19.705-4 Reviewing the Subcontracting Plan. If an Offeror is a small business concern; submission of a subcontracting plan is not a requirement, and if not required for that Offeror, the Offeror will receive a neutral rating.

10. SMALL BUSINESS PARTICIPATION PLAN:

In keeping with the goals of this project and the interest of the involved partners for the revitalization of the Park and the District as described in Section C of this RFP, all offerors, both Small and Large business concerns, are required to submit a Small Business (SB) Participation Plan. The offeror shall propose the level of participation of SB concerns (as a SB prime and/or no lower than first-tier SB subcontractors) that GUARANTEES A MINIMUM OF 35 PERCENT OF THE TOTAL CONTRACT VALUE WILL GO TO SMALL BUSINESSES in performance of the acquisition.

Participation in performance of the contract includes joint ventures, teaming arrangements, and subcontracts. Note:

Small business offerors may include the work performed by its own company toward the Small Business Participation Plan.

At a minimum, the Small Business Participation Plan must address the elements listed below (paragraphs a thru d).

A. Principal Types of Subcontracted Supplies or Services: List the supplies and/or services to be subcontracted and the corresponding socio-economic status of the businesses projected to receive these subcontracts. Complete the spreadsheet included in the Proposal Submission Package. Also, explain and provide supporting documentation regarding the level of SB commitments to use SB concerns. Explain types of commitments, if any, that are in place for this specific acquisition as a SB prime (i.e. written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc).

B. Subcontracted Value: Provide the anticipated amounts and percentages in terms of total projected subcontracting dollars for each of the following Small Business (SB) socio-economic categories: Small Business (SB), HubZone (HZ), Small Disadvantaged Business (SDB), Woman-Owned (WO), Veteran- Owned (VO), and Service-Disabled Veteran-Owned (SDVO). The 35 Percent Requirement is based on the products and services to be subcontracted by the prime contractor (including affiliates). This Requirement is to be identified at only the first tier subcontract level (i.e. not what your subcontractors may be further subcontracting). Complete the spreadsheet included in the Proposal Submission Package.

C. Method of Identifying Sources: Describe the methods used to identify subcontracting sources. Explain the verification process used to assess the appropriate SB socio-economic status and how the capabilities of the SB concern were determined.

D. Equitable Opportunity: Describe efforts the offeror will make to assure each of the socio-economic categories have an equitable opportunity to compete for subcontracts. Examples include: Assisting small business concerns, providing counseling, participating in outreach programs, advertising, presenting workshops/seminars, establishing source list, attending small business conferences and trade fairs.

PROVISIONS

52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

(a) Definitions. As used in this provision— “Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc.

(D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award

File details come from the government source that posted it. Updated .