Amend_1 _Narrative.pdf

PDF 23 KB Posted

Attached to
Luther Ely Smith Square Federal contract opportunity
Solicitation number
P14PS01930
Issued by
Department of the Interior National Park Service

About this file

Narrative

View the file

Other files for this federal contract opportunity

Other files attached to Luther Ely Smith Square, newest first.
File Type Posted
sf-30_Amendment_No._1.pdf PDF
Amendment_No._3.pdf PDF
C5_E113A_154A_of_179.pdf PDF
C5_E300_157A_of_179.pdf PDF
C5_L313_75A_of_179.pdf PDF
C5_S101_172A_of_179.pdf PDF
C5_L312_74A_of_179.pdf PDF
C5_L756_100A_of_179.pdf PDF
C5_L613_90A_of_179.pdf PDF
C5_L445_81A_of_179.pdf PDF
129300_SITEIMPROVEMENTS_CAR2015_5_BID_AMENDMENT_2.pdf PDF
C5_L122_64A_of_179.pdf PDF
C5_COVER_1A.pdf PDF
C5_L650_95A_of_179.pdf PDF
C5_L112_61A_of_179.pdf PDF
C5_L212_69A_of_179.pdf PDF
033000_-_Cast-In-Place_Concrete_-_Revised_09-12-14.pdf PDF
C5_L213A_72A_of_179.pdf PDF
C5_L633_94A_of_179.pdf PDF
Amendment_2_pkg.pdf PDF
C5_L212A_70A_of_179.pdf PDF
C5_L113_62A_of_179.pdf PDF
C5_SP213_57A_of_179.pdf PDF
C5_L412_77A_of_179.pdf PDF
C5_G001_3A_of_179.pdf PDF
RFP _Pg_124 _Amend_1.pdf PDF
SF1442-Amendment_1.pdf PDF
Luther_Ely_Smith_Pre-Bid_Presentation_FINAL_-_1.pdf PDF
4b-Submission_Pkg_Vol_2.pdf PDF
7a_2011_0211__CAR_Phase_1_ESA_R1-1.pdf PDF
1e-JEFF180194_SHEET_121-179_of_179.pdf PDF
18a-ROADWAY_J6I2413.pdf PDF
16_TTC_accessible_zones_during_construction.pdf PDF
5_Subsurface_Exploration.pdf PDF
7c_2011_0211__CAR_Phase_1_ESA_R1-3.pdf PDF
14_Existing_Hydraulic_Bollards.pdf PDF
17_32_91_13_Soil_Blending_Spec.pdf PDF
11_Utility_Locating_Services.pdf PDF
10_Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
1b-JEFF180194_SHEET_31-70_of_179.pdf PDF
5c_Subsurface_Exploration_Addendum_3.pdf PDF
SF1442.pdf PDF
1c-JEFF180194_SHEET_71-90_of_179.pdf PDF
15_JEFF_Electrical_Site_Lighting.pdf PDF
1a-JEFF180194_SHEET_1-30_of_179.pdf PDF
1d-JEFF180194_SHEET_91-120_of_179.pdf PDF
13_JEFF__Archeological_monitoring_plan_FINAL.pdf PDF
5a_Subsurface_Exploration_Addendum_1.pdf PDF
7b_2011_0211__CAR_Phase_1_ESA_R1-2.pdf PDF
4a-Submission_Pkg _Vol_1.pdf PDF
Show all 50

Luther Ely Smith Square has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The purpose of this Amendment is to Change the Standard Form (SF) 1442 to reflect a contract completion date of October 1, 2015; reduce the amount of liquidated damages from $3060.00 to $2,300.00, and change the evaluation factors to require a schedule that reflects a contract completion date of October 1, 2015.

a. Solicitation, SF 1442, Blocks 10, Add:

“Reference Block 11: The Contract must be completed no later than October 1, 2015”

b. Solicitation, SF 1442, Blocks 11, delete: “365”

c. Solicitation, SF 1442, Blocks 11, is changed:

FROM:

FAR 52.211-10 Completion Date

TO:

Section F, Clause 52.211-10

d. Solicitation, Section F, 52.211-12 Liquidated Damages—Construction (Sept 2000), is changed

FROM:

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,060.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

TO:

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,300.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

e. Solicitation, Section L, Page 124 of 144, D. Sub-Factor D – Schedule and Project Management, Element 1, is changed as follows:

FROM:

Element 1 – Describe how offeror will maintain schedule, cost, and quality. The proposed schedule should show logical ties and clearly identify the critical path for the project. The schedule matches the proposed written approach presented in Subfactor B above. Demonstrate logical thought to project approach.

Element 1 – Describe how offeror will maintain schedule, cost, and quality. The proposed schedule should show logical ties and clearly identify the critical path for the project. The schedule matches the proposed written approach presented in Subfactor B above. Demonstrate logical thought to project approach based on a notice-to-proceed date no later than November 30, 2014 and a contract completion date no later than October 1, 2015.

f. Solicitation, Section L, Page 127 of 144, 10. Small Business Participation Plan, A, is changed as follows:

FROM:

A. Principal Types of Subcontracted Supplies or Services: List the supplies and/or services to be subcontracted and the corresponding socio-economic status of the businesses projected to receive these subcontracts. Complete the spreadsheet included in the Proposal Submission Package. Also, explain and provide supporting documentation regarding the level of SB commitments to use SB concerns (for example, what types of commitments, if any, are in place for this specific acquisition as a SB prime and/or written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.

A. Principal Types of Subcontracted Supplies or Services: List the supplies and/or services to be subcontracted and the corresponding socio-economic status of the businesses projected to receive these subcontracts. Complete the spreadsheet included in the Proposal Submission Package. Also, explain and provide supporting documentation regarding the level of SB commitments to use SB concerns. Explain types of commitments, if any, that are in place for this specific acquisition as a SB prime (i.e. written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc).

g. Solicitation, Section L, Page 124 of 144, D. Sub-Factor D – Schedule and Project Management, Element 1, is changed as follows:

FROM:

Element 1 – Describe how offeror will maintain schedule, cost, and quality. The proposed schedule should show logical ties and clearly identify the critical path for the project. The schedule matches the proposed written approach presented in Subfactor B above. Demonstrate logical thought to project approach.

TO:

Element 1 – Describe how offeror will maintain schedule, cost, and quality. The proposed schedule should show logical ties and clearly identify the critical path for the project. The schedule matches the proposed written approach presented in Subfactor B above. Demonstrate logical thought to project approach based on a notice-to-proceed date no later than November 30, 2014 and a contract completion date no later than October 1, 2015.

h. See Attached:

1. Replacement SF 1442 and pages associated with the above changes,

2. Presentation Slides, Pre-Proposal Conference, and

3. List of Attendees, Pre-Proposal Conference.

i. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .