P09 Drawing Bid Set 21-04-21 7 of 7 Rev 12-22-21.pdf

PDF 6 MB Posted

Attached to
Z2DA--P/N 657A5-18-111, RENOVATE BUILDING 15
Solicitation number
36C25522R0046_1
Issued by

About this file

This solicitation is for renovation services at Building 15 at the Veterans Health Administration facility in Marion, Illinois. Key requirements include fully sprinklering the building, installing new HVAC, plumbing and electrical systems. Drawings and specifications are provided detailing the scope of work. The contract will be awarded on a firm-fixed price basis. The period of performance is 270 days. The solicitation was issued by the Department of Veterans Affairs and responses are due within 30 days.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SB

SS

0 HZ

0 SB

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

FIRE PROTECTION - DRY SYSTEMFPD

SERVICE WATER - POTABLEW

AIR PRESSURE MAINTENANCE DEVICE

AIR SUPERVISORY SWITCH

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO HATCH

ORDINARY HAZARD GROUP I COVERAGE AREA: 0.15 GPM/sq.ft OVER

A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND

COMBINED HOSE ALLOWANCE OF 250 GPM.

EXTRA GROUP 1

EXTRA GROUP 2

SPRINKLER - WALL MOUNTED

SPRINKLER

SPRINKLER - CONCEALED

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

A

SPRINKLER

A

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

COMPRESSED AIR - FIRE PROTECTIONCAF

PIPE CAP

PIPE DOWN

NEW CONNECTION

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DEMOLITION

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

ROUTE TO DRAIN

AREA BOUNDARY

LIGHT HAZARD COVERAGE AREA: 0.10 GPM/sq.ft. OVER A REMOTE

OPERATING AREA OF 1500 SQUARE FEET COMBINED HOSE

ALLOWANCE OF 100 GPM.

ORDINARY HAZARD GROUP II COVERAGE AREA: 0.20 GPM/sq.ft

OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND

COMBINED HOSE ALLOWANCE OF 250 GPM.

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

BFP BACKFLOW PREVENTER

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NC NEW CONNECTION

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

I.E. INVERT ELEVATION

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

LINE TYPE KEY:

NEW PARTITION KEY WALL RATING DESCRIPTION

2 HR

BUILDING SEPARATION:

FIRE BARRIER

1 HR

OCCUPANCY / AREA SEPARATION:

FIRE BARRIER

2 HR

OCCUPANCY / AREA SEPARATION:

FIRE BARRIER

2 HR

1 HR

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

2 HR

1 HR

EXIT PASSAGEWAY (HORIZ)

FIRE BARRIER

1 HR

HAZ / INCIDENTAL USE

FIRE BARRIER

NR-

RESIST

SMK

HAZ / INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

1 HR

1/2 HR

SUBDIVIDING SPACES

SMOKE BARRIER

NR

SUITE SEPARATION

SMOKE PARTITIONS

HORIZONTAL BUILDING SEPARATION

FIRE BARRIER

2 HR

FIRE/SMOKE BARRIER DESIGNATIONS

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR' SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS

WHETHER SHOWN OR NOT.

RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 03/28/2019

TEMPERATURE CONTROLS CONTRACTORT.C.C.

CIVIL CONTRACTORC.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. CONTRACTOR SHALL VERIFY

EXISTING CONDITIONS PRIOR TO BIDDING AND REPORT ANY CONFLICTS BEFORE

PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. VERIFY EXISTING DUCT AND PIPING CONDITIONS PRIOR TO

BIDDING. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR PIPING BEFORE FABRICATION. RISES AND

DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

5. EACH CONTRACTOR SHALL CUT AND PATCH WALLS ASSOCIATED WITH HIS WORK.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. ALL SYSTEM SHUTDOWNS WILL REQUIRE 3 WEEKS NOTICE PRIOR TO THE

SHUTDOWN EVENT. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL

NEW SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO RETAIN A LICENSED FIRE PROTECTION ENGINEER AND CONTRACTOR,

AS REQUIRED, TO COMPLETE THE FIRE PROTECTION PLAN. THE PLAN SHALL CONFORM TO

ALL APPLICABLE REQUIREMENTS OF THE NFPA, IFC AND ANY OTHER AUTHORITIES HAVING

JURISDICTION. THE PLAN SHALL BE SUPPLIED TO ALL REQUIRED AUTHORITIES FOR REVIEW

AND APPROVAL PRIOR TO ANY WORK.

2. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

3. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

4. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH

2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

5. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE

SPRINKLERS IN UNPARTITIONED SPACES.

6. PROVIDE COVERAGE ABOVE AND BELOW FLOATING CEILINGS, REFER TO ARCHITECTURAL

PLANS.

FIRE PROTECTION GENERAL NOTES:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL WALL PENETRATIONS AIRTIGHT WHERE PIPING PENETRATE. PENETRATIONS

THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH WATERPROOFING

MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL AND PARTITION

ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO

ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

13. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

15. DO NOT SUPPORT EQUIPMENT OR PIPING FROM METAL DECKING OR OTHER NON-

STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

16. INSTALL PIPING AND DUCTWORK A MINIMUM OF 2" ABOVE CEILING TO ALLOW FOR CEILING

PANEL REMOVAL/INSTALLATION.

17. INSTALL ITEMS REQUIRING ACCESS SUCH AS EQUIPMENT, DAMPERS OR VALVES AT A

HEIGHT NO GREATER THAN WHAT CAN BE ACCESSED FROM A 10-FOOT TALL STEPLADDER.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS, PHASING SCHEDULES AND FOR

CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT

THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY

DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF

THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE AND INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS

NECESSARY TO KEEP ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF

THE PROJECT.

4. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

DEDUCT ALTERNATE NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING, AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR DEDUCT ALTERNATE INFORMATION.

CK-16

4" FP

AUTOMATIC DRAIN VALVE

GRADE

45° ELBOW

FIRE DEPARTMENT

CONNECTION, FDC-1

4" W

EXISTING 4"FP LINE IN

TUNNEL. CONNECT TO

EXISTING PIPING WITHIN

TUNNEL LOCATED IN

BUILDING 15.

BF-1

NC

P P

SYSTEM MAIN

DRAIN VALVE

AV-1

MS-1

MS-1

2" D

IT-1

BF-1 P

F

FS-1

TO FLOOR

SPRINKLERS

WATER

ENTRY

# KEYNOTES

1. ROUTE DISCHARGE TO EXTERIOR OF BUILDING. CAN

CONNECT TO COMBINED DRAIN LINE.

2. PROVIDE CONCRETE SPLASHBLOCK AT GRADE.

3. SEAL WALL PENETRATION WATERTIGHT.(TYPICAL)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V A

M a ri o n

B

R e n o

C a a ro n

.c .m e y e r.

rv t

/1

/2

:0

:2

A

M

15-FP001

FIRE PROTECTION COVER SHEET RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3. ALL SPRINKLERS SHALL BE UL AND FM LISTED.

4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING

PLAN AND NFPA 13 REQUIREMENTS.

5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON

THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

7. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE

SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA

HAZARD

SPRINKLER

TEMPERATURE

RATING

MANUFACTURER

& MODEL NOTES

TAG NAME

(NOTE 4 & 5)

SPRINKLER

TYPE

RESPONSE

CATEGORY FINISH

ROOMS WITH

CEILINGS

SEE PLANS SPR-1 RECESSED

PENDENT

QUICK CHROME 155 VIKING VK,

RELIABLE F1FR,

TYCO TY-FRB,

VICTAULIC V2708

NOTE 2, 3, 7

ROOMS WITH

OUT CEILINGS

SEE PLANS SPR-2 UPRIGHT QUICK ROUGH

BRASS

155 VIKING VK,

RELIABLE F1FR,

TYCO TY-FRB,

VICTAULIC V2704

NOTE 2, 3, 7

NO SCALE1

FIRE PROTECTION RISER DIAGRAM

Revisions: Date:

M & O

SUPERV.

OI+T

TOILET

PLUMBING SHOP

PROJECTS

SECTION

FILE

STORAGE

ELECTRIC

VAULT

MEN TOILET

TOILET

CHIEF ENGR.

WOMEN TOILET

ENGINEERING

CLERKS

MISC STORAGE

FACILITY

PLANNER

PROJECT

SUPERVISOR

ENERGY

MANAGER

CONFERENCE /

BREAKROOM

ASSIST

CHIEF

SHOWER

HAC

111A

105 105A

102A

109A 107A

104A

M & O

SUPERV.

OI+T

TOILET

PLUMBING SHOP

PROJECTS

SECTION

FILE

STORAGE

ELECTRIC

VAULT

MEN TOILET

TOILET

CHIEF ENGR.

WOMEN TOILET

ENGINEERING

CLERKS

MISC STORAGE

FACILITY

PLANNER

PROJECT

SUPERVISOR

ENERGY

MANAGER

CONFERENCE /

BREAKROOM

ASSIST

CHIEF

SHOWER

HAC

111A

105 105A

102A

109A 107A

104A

A

1 2

B

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

FP FP

F P

FP

F P

4"FP

F P

F P

REMOVE FIRE DEPARTMENT

CONNECTION AND PIPING AS

INDICATED AND PREPARE

FOR NEW CONNECTION.

FDC-E

REMOVE FIRE PROTECTION

PIPING DOWN INTO STEAM

TUNNEL AND PREPARE FOR

NEW CONNECTION.

REMOVE EXISTING HOSE

VALVE AND CABINET. REFER

TO ARCHITECTURAL FOR NEW

FIRE EXTINGUISHER CABINET.

REMOVE ALL SPRINKLER PIPING, SPRINKLER

HEADS, AND ALL BRACKETS, HANGERS,

ACCESSORIES, ETC. PIPING SHALL BE REMOVED

BACK TO MAIN IN STEAM TUNNEL CLOSET AND

PREPARE FOR NEW CONNECTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V A

M a ri o n

B

R e n o

C a a ro n

.c .m e y e r.

rv t

/1

/2

:0

:2

A

M

15-FD101

FIRST FLOOR PLAN - FIRE

PROTECTION DEMOLITION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

N

O R HT

1/4" = 1'-0"1

FLOOR PLAN - FIRE PROTECTION DEMOLITION

GENERAL SHEET NOTES:

1. REFER TO 15-FP-001 FOR MORE INFORMATION.

Revisions: Date:

TOILETWOMEN TOILET HAC

102A104 104A

TOILETWOMEN TOILET HAC

102A104 104A

0 SB 0 SB0 SB 0 SB 0 SB

S

B S

B S

B S

B S

B S

B

S

B S

B S

B S

B S

B S

B

SS SSSS SS SS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

A

1 2

99 SF

PROJECT

ENGINEER

SUPERVISOR

100 SF/

Not Enclosed

PLAN ROOM

200 SF/

203 SF

BREAK ROOM

319 SF

CONFERENCE

ROOM

300 SF/

41 SF

UNISEX STAFF

TLT

60 SF/

70 SF

UNISEX STAFF

TLT

80 SF/

102 SF

OI&T ROOM

101D

100 SF/

46 SF

HAC

60 SF/

27 SF

ALCOVE

101B

196 SF

MECHANICAL

101C

488 SF/

61 SF

STORAGE

60 SF/ 102 SF

ASST. CHIEF

ENGINEER

100 SF/ 102 SF

CHIEF ENGINEER

100 SF/ 100 SF

FACILITY

PLANNER

100 SF/ 96 SF

ENERGY

MANAGER

100 SF/

60 SF

MENS TOILET

60 SF/ 59 SF

WOMENS TOILET

60 SF/ 99 SF

M&O

SUPERVISOR

100 SF/

14 SF

CLOSET

96 SF

M&O

SUPERVISOR

100 SF/ 105 SF

M&O

SUPERVISOR

100 SF/ 103 SF

M&O

SUPERVISOR

100 SF/

154 SF

CORRIDOR

C01

56 SF

ADMIN OFFICE

ASST

56 SF/

117 SF

CORRIDOR

C01A

128 SF

CORRIDOR

C01B

196 SF

ELECTRICAL

105A

488 SF/

124 SF

CORRIDOR

C02

63 SF

VESTIBULE

Not Enclosed

STEAM TUNNEL

Not Enclosed

PROJECT

ENGINEERS

WORKSTATIONS

121A

116 SF

PROJECT

ENGINEERS

EGRESS

121B

9 SF

SHOWER

118A

32 SF

CORRIDOR

C01C

16 SF

STORAGE

C01D

B

172 SF

ENG.

CLERK/TRANS.MGR

101A

173 SF

LOBBY

496 SF

PROJECT

ENGINEERS

WORKSTATIONS

56 SF/

PROVIDE NEW PIPING AND SPRINKLER HEADS

FOR REVISED FLOOR PLAN. COORDINATE

ROUTING AND ELEVATION WITH NEW MEP AND

CEILING HEIGHT/LAYOUT.

PROVIDE NEW FIRE

DEPARTMENT CONNECTION.

SEAL BUILDING PENETRATION

WATERTIGHT WITH LINK SEAL.

PROVIDE DOUBLE CHECK

BACKFLOW PREVENTER IN

VERTICAL

PROVIDE RISER MAIN DRAIN AND PIPE TO

EXTERIOR. PROVIDE SPLASH BLOCK IF

TERMINATION POINT IS NOT OVER CONCRETE

ROUTE INSPECTOR TEST

DRAIN ALONG WALL AND TIE

INTO RISER DRAIN LINE PRIOR

TO EXTERIOR WALL

PENETRATION.

INSPECTOR TEST AND DRAIN

CHECK VALVE

BUTTERFLY VALVE WITH

MONITOR SWITCH

FLOW SWITCH

4"FP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V

A M a ri o n

B

R e n o

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:5

:2

A

M

15-FP101

FIRST FLOOR PLAN - FIRE

PROTECTION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

N O R

HT

1/4" = 1'-0"1

FLOOR PLAN - FIRE PROTECTION

GENERAL SHEET NOTES:

1. REFER TO 15-FP-001 FOR MORE INFORMATION.

SB

SS

0 HZ

0 SB

MINIMUM 16 GAGE GALVANIZED STEEL

PLATE 12"x48" [300x1200mm] MIN.

SECURED TO A MIN. 4 STUDS PER

LAVATORY

1/4" [6mm]∅ MOLLY BOLT HOLLOW WALL

ANCHOR (1 EA. SIDE OF LAV)

MIN. (3) 1/4" [6mm]

MACHINE BOLTS

W/DOUBLE LOCK NUTS

ON BACK SIDE

MIN. 5 1/4" [131mm]∅

GALV. MACHINE BOLTS

WELDED TO PLATE

1/4" [6mm]

TYP. 1/8"

TYP. [3mm]

A A

PLAN

SECTION A

STEEL HANGER BY LAV MFGR

STEEL WALL PLATE

WALL ANCHOR

STUDS

FOR FIXTURE

HEIGHT SEE

ARCHITECTURAL

DRAWINGS

[9 m m

T O

F L

O O

R

V A

R

IE

S

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

NEW CONNECTION

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

COLD WATER - POTABLECW

DT DRAIN TILE

SANITARY DRAINAGE (GREASE SANITARY DRAINAGE)GSAN

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

NON-POTABLE COLD WATERNCW

NON-POTABLE HOT WATERNHW

PUMPED DISCHARGEPD

SANITARY DRAINAGESAN

SOFT COLD WATERSCW

SOFT HOT WATERSHW

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

COMPRESSED AIRCA

STW SOFT TEMPERED WATER

TW TEMPERED WATER

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

GRV GAS REGULATOR VENT

PURE WATERPW

SERVICE WATER - POTABLEW

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

ROUTE TO DRAIN

PLUMBING SYMBOL LIST

BATHTUBBT

CO CLEANOUT

CLINICAL SINKCS

DRINKING FOUNTAINDF

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

GREASE INTERCEPTORGI

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

OIL SEPARATOROS

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WASH FOUNTAINWF

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NC NEW CONNECTION

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

EXISTINGE

FLOW METERFM

WATER SOFTENERWS

WATER METERWM

DIALYSIS BOXDB

CATCH BASINCB

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

NOT ALL SYMBOLS MAY APPLY.

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

LINE TYPE KEY:

NEW PARTITION KEY WALL RATING DESCRIPTION

2 HR

BUILDING SEPARATION:

FIRE BARRIER

1 HR

OCCUPANCY / AREA SEPARATION:

FIRE BARRIER

2 HR

OCCUPANCY / AREA SEPARATION:

FIRE BARRIER

2 HR

1 HR

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

2 HR

1 HR

EXIT PASSAGEWAY (HORIZ)

FIRE BARRIER

1 HR

HAZ / INCIDENTAL USE

FIRE BARRIER

NR-

RESIST

SMK

HAZ / INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

1 HR

1/2 HR

SUBDIVIDING SPACES

SMOKE BARRIER

NR

SUITE SEPARATION

SMOKE PARTITIONS

HORIZONTAL BUILDING SEPARATION

FIRE BARRIER

2 HR

FIRE/SMOKE BARRIER DESIGNATIONS

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR' SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS

WHETHER SHOWN OR NOT.

RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 03/28/2019

TEMPERATURE CONTROLS CONTRACTORT.C.C.

CIVIL CONTRACTORC.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

1. THE SYMBOLS AND SCHEDULES ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS, IF LISTED, SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER, IF MANUFACTURERS ARE LISTED, THE FIRST

MANUFACTURER LISTED IS THE BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE NOT AVAILABLE FROM EXISTING DRAWINGS. VERIFY ALL

ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES AND LOCATIONS PRIOR TO BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 11 FOR

ADDITIONAL DEMOLITION INFORMATION.

10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 11 FOR ADDITIONAL

INFORMATION.

PLUMBING GENERAL NOTES:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE PIPING PENETRATE.

PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE SEALED AIRTIGHT WITH

WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION,

FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION

FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

13. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

15. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

16. DO NOT SUPPORT EQUIPMENT OR PIPING FROM METAL DECKING OR OTHER NON-

STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

17. INSTALL PIPING AND DUCTWORK A MINIMUM OF 2" ABOVE CEILING TO ALLOW FOR CEILING

PANEL REMOVAL/INSTALLATION.

18. INSTALL ITEMS REQUIRING ACCESS SUCH AS EQUIPMENT, DAMPERS, OR VALVES AT A

HEIGHT NO GREATER THAN WHAT CAN BE ACCESSED FROM A 10-FOOT TALL STEPLADDER.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. CONTRACTOR SHALL VERIFY

EXISTING CONDITIONS PRIOR TO BIDDING AND REPORT ANY CONFLICTS BEFORE

PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. VERIFY EXISTING DUCT AND PIPING CONDITIONS PRIOR TO

BIDDING. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS AND FLOORS ASSOCIATED

WITH HIS WORK.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. ALL SYSTEM SHUTDOWNS WILL REQUIRE 3 WEEKS NOTICE PRIOR TO THE

SHUTDOWN EVENT. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL

NEW SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS, PHASING SCHEDULES AND FOR

CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT

THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY

DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF

THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE AND INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS

NECESSARY TO KEEP ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF

THE PROJECT.

4. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

DEDUCT ALTERNATE NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING, AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR DEDUCT ALTERNATE INFORMATION.

CW

HW

HWC

C W

H W

CIRCULATING

PUMP CP-1

SIZE AND ROUTE BYPASS

PER MIXING VALVE

MANUFACTURER'S REQUIRED

PIPING METHOD.

3/4" TEST VALVE

VACUUM BREAKER.

WATTS MODEL 8A OR EQUAL

WITH HOSE THREAD AND CAP.

THERMOMETER IN WELL (0-200° F)

VACUUM RELIEF VALVE.

WATTS N36 OR EQUIVALENT

EXPANSION TANK

MIXING VALVE LOCATE BELOW TOP OF

WATER HEATER OR PROVIDE HEAT

TRAP WITH DEPTH AS REQUIRED BY

MIXING VALVE MANUFACTURER. VERIFY

EXACT PIPING AND BALANCING

REQUIREMENTS WITH MANUFACTURER.

BALANCING VALVE IF

REQUIRED BY MIXING

VALVE MANUFACTURER'S

PIPING METHOD.

DRAIN

A.S.M.E. PRESSURE AND

TEMPERATURE RELIEF VALVE

UNION (TYP.)

PIPE DIRECTLY OVER

FLOOR DRAIN.

HOUSEKEEPING PAD

WH-1

SET AT 140º

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR

FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW

LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 07 84 00 FOR

SELECTION OF THROUGH PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL.

EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS

AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP

AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT,

CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE SIZE SHALL ALLOW ANNULAR SPACE

REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR

FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION

LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF

PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE

FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD

OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME.

SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM

CENTERS. MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED IN ONE FRAME.

NOTES: 1) SANITARY RISER UP IN WALL TO FIXTURE SHALL BE A MINUMUM OF 2". 2) 1/2" CW AND HW APPLIES ONLY TO THE FINAL VERTICAL RISE-DROP TO EACH FIXTURE, BRANCH PIPING TO VERTICAL RISE-DROP SHALL BE A MINIMUM OF 3/4" UNLESS NOTED OTHERWISE. 3) SIZES SHOWN ARE MINIMUMS.

SIZES SHOWN ON THE DRAWING THAT ARE LARGER THAN THE SIZES LISTED IN THE SCHEDULE SHALL

DICTATE THE ROUGH-IN SIZE.

PLUMBING FIXTURE ROUGH-IN SCHEDULE

FIXTURE DESCRIPTION

DOMESTIC

CW

(NOTE 3)

DOMESTIC

HW

(NOTE 3)

SANITARY

(NOTE 3)

VENT

(NOTE 3) REMARKS

EXISTING ELECTRIC WATER

COOLER

1/2" - 1 1/2" 1 1/4" NOTE 1 & 2

FLOOR DRAIN/FLOOR SINK - - 2" 1 1/2" -

FLOOR DRAIN/FLOOR SINK - - 3" 1 1/2" -

FUTURE BREAK ROOM SINK 1/2" 1/2" 1 1/2" 1 1/2" NOTES 1 & 2

HOSE BIBB P-801 3/4" - - - -

LAVATORY P-408 1/2" 1/2" 1 1/4" 1 1/4" NOTE 1 & 2

SHOWER 1/2" 1/2" 2" 1 1/2" NOTE 2

WATER CLOSET P-115 1" - 4" 2" -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V

A M a ri o n

B

R e n o

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:0

:2

P

M

15-P-001

PLUMBING COVER SHEET RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

NO SCALE3

LAVATORY MOUNTING DETAIL

FLOOR DRAIN FD-V

FLOOR DRAIN FD-C

FLOOR DRAIN FD-D

MOP SINK P-502

FLOOR DRAIN FD-W

HOSE BIBB P-804

HOSE BIBB P-805

SHOWER P-702

3/4"

3/4"

3/4"

3/4"

4"

3"

3"

2"

1 1/2"

1 1/2"

NO SCALE1

MIXING VALVE (AT SOURCE) PIPING DETAIL

NO SCALE2

RATED FIRE BARRIER PENETRATION

OI+T

TOILET

PLUMBING SHOP

PROJECTS

SECTION

FILE

STORAGE

ELECTRIC

VAULT

MEN TOILET

TOILET

CHIEF ENGR.

WOMEN TOILET

ENGINEERING

CLERKS

MISC STORAGE

FACILITY

PLANNER

PROJECT

SUPERVISOR

ENERGY

MANAGER

CONFERENCE /

BREAKROOM

ASSIST

CHIEF

SHOWER

HAC

111A

105 105A

102A

109A 107A

104A

FD

4" V UP

LAV

WC

CO

4" V UP

WC

2"SAN

EWC

LAV

WC

4" V UP

4"SAN

LAV

WC

4"SAN

2"CW

REMOVE ABANDONED 2"CW AND

ASSOCIATED METER/CONDUIT.

4" ST

3/4" G

4" ST

SAWCUT FLOOR AS

NECESSARY TO REMOVE

EXISTING SANITARY PIPING.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

A

B

1 2 3

REMOVE PIPING AS INDICATED UP

TO EDGE OF VAULT. FILL

EXISTING PIPING AND FLOOR

DRAIN WITH CONCRETE AND CAP.

PIPING TO BE ABANDONED.

PROVIDE TEMPORARY CONNECTION FROM EXISTING TO

NEW SANITARY PIPING TO KEEP EAST BATHROOMS

OPERATIONAL DURING PHASE 1. ONCE PHASE 2 IS

STARTED THEN PIPING UNDER VAULT CAN BE CUT,

CAPPED, AND FILLED AND REMAINING SECTION OF

FLOOR IN 101C CAN BE FILLED.

REMOVE 2"CW LINE BACK

INTO WALL AS FAR AS

POSSIBLE TO BE ABLE TO

MAKE A NEW CONNECTION.

FCO

FD

SAWCUT FOR NEW PLUMBING

FIXTURE SANITARY ROUTE.

4"SAN

FD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V

A M a ri o n

B

R e n o

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:0

:2

P

M

15-PD100

FIRST FLOOR PLAN - PLUMBING

UNDERFLOOR DEMOLITION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

N

O R HT

1/4" = 1'-0"1

FLOOR PLAN - PLUMBING UNDERFLOOR DEMOLITION

GENERAL SHEET NOTES:

1. EXISTING UNDERFLOOR PIPING SHOWN BASED

UPON SITE PLAN AND EXISTING FIXTURES.

CONTRACTOR TO VERIFY EXISTING SANITARY

ROUTING USING SCOPE OR OTHER METHODS

PRIOR TO DEMOLITION.

2. REFER TO 15-P-001 FOR MORE INFORMATION.

OI+T

TOILET

PLUMBING SHOP

PROJECTS

SECTION

FILE

STORAGE

ELECTRIC

VAULT

MEN TOILET

TOILET

CHIEF ENGR.

WOMEN TOILET

ENGINEERING

CLERKS

MISC STORAGE

FACILITY

PLANNER

PROJECT

SUPERVISOR

ENERGY

MANAGER

CONFERENCE /

BREAKROOM

ASSIST

CHIEF

SHOWER

HAC

111A

105 105A

102A

109A 107A

104A

M & O

SUPERV.

OI+T

TOILET

PLUMBING SHOP

PROJECTS

SECTION

FILE

STORAGE

ELECTRIC

VAULT

MEN TOILET

TOILET

CHIEF ENGR.

WOMEN TOILET

ENGINEERING

CLERKS

MISC STORAGE

FACILITY

PLANNER

PROJECT

SUPERVISOR

ENERGY

MANAGER

CONFERENCE /

BREAKROOM

ASSIST

CHIEF

SHOWER

HAC

111A

105 105A

102A

109A 107A

104A

A

1 2

B

FD-A

REMOVE PLUMBING FIXTURES

AND ALL BRACKETS, HANGERS,

ACCESSORIES, ETC. (TYP.)

REMOVE EXISTING WATER

HEATER , EXPANSION TANK

AND ALL BRACKETS, HANGERS,

CONTROLS, WIRING,

ACCESSORIES, ETC.

REMOVE AND STORE FOR RELOCATION EXISTING

ELECTRIC WATER COOLER AND ALL BRACKETS,

HANGERS, CONTROLS, WIRING, ACCESSORIES, ETC.

REFER TO 15-PL-101 FOR NEW LOCATION.

EWC

1/2"CA 1/2"CA

1/2"CA

3/4"CW

REMOVE EXISTING AIR

COMPRESSOR AND ALL WIRES,

CONTROLS, PIPING, VALVES,

BRACKETS, HANGERS,

ACCESSORIES, ETC.

TD-E

4"ST WITH TRANSITION

FOR DOWNSPOUT

CONNECTION BELOW

CONCRETE

P-801

4"ST WITH TRANSITION

FOR DOWNSPOUT

CONNECTION BELOW

CONCRETE

P-801

WH-E

ET-E

4"ST WITH TRANSITION FOR

DOWNSPOUT CONNECTION

BELOW CONCRETE

4" ST CLEANOUT

APPROXIMATELY 12" AFF.

EXISTING NATURAL GAS

PRESSURE REGULATOR,

METER AND VALVES WITH

BTU METER.

CO

2"SAN

4" SAN CO 12" AFF

2" SAN

CO

4"ST WITH TRANSITION FOR DOWNSPOUT

CONNECTION AT APPROXIMATELY 30" AFF.

CLEANOUT ON Y-FITTING AT

APPROXIMATELY 6" AFF

P-801

/2 "C

W /4

"H W

4" VTR

4" V

3/4"CW

/4

"H W

4" V

/2 "C

W

REMOVE EXISTING 2" CW LINE DOWN BELOW FINISHED

FLOOR. COORDINATE PIPING REMOVAL, SHUT DOWN,

AND TEMPORARY CONNECTIONS WITH OWNER. EAST

PORTION OF BUILDING TO REMAIN OCCUPIED DURING

FIRST PHASE OF CONSTRUCTION.

REMOVE PIPING AS

INDICATED AND PREPARE

FOR NEW CONNECTION.

REMOVE EXISTING HOSE BIBBS

AND ALL BRACKETS, HANGERS,

ACCESSORIES, ETC. (TYP.)

FILL EXISTING FLOOR DRAIN

WITH CONCRETE. REFER TO

UNDERFLOOR PLAN FOR

MORE INFORMATION.

REMOVE PORTION OF 2" GAS

LINE BETWEEN SHUT OFF

VALVE AND GROUND IN

VERTICAL. PREPARE FOR

NEW CONNECTION.

REMOVE EXISTING

2"V FROM MAIN UP

THROUGH ROOF.

FD

FCO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V

A M a ri o n

B

R e n o

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:0

:3

P

M

15-PD101

FIRST FLOOR PLAN - PLUMBING

DEMOLITION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

N

O R HT

1/4" = 1'-0"1

FLOOR PLAN - PLUMBING DEMOLITION

GENERAL SHEET NOTES:

1. REFER TO 15-P-001 FOR MORE INFORMATION.

REMOVE EXISTING 4" PLUMBING

VENTS THROUGH ROOF.

REMOVE EXISTING 4" PLUMBING

VENTS THROUGH ROOF.

A

B

1 2 3

REMOVE EXISTING 2" V.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V

A M a ri o n

B

R e n o

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:0

:3

P

M

15-PD102

ROOF PLAN - PLUMBING

DEMOLITION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

N

O R HT

1/4" = 1'-0"1

ROOF PLAN - PLUMBING DEMOLITION

GENERAL SHEET NOTES:

A

1 2

99 SF

PROJECT

ENGINEER

SUPERVISOR

100 SF/

Not Enclosed

PLAN ROOM

200 SF/

203 SF

BREAK ROOM

319 SF

CONFERENCE

ROOM

300 SF/

41 SF

UNISEX STAFF

TLT

60 SF/

70 SF

UNISEX STAFF

TLT

80 SF/

102 SF

OI&T ROOM

101D

100 SF/

46 SF

HAC

60 SF/

27 SF

ALCOVE

101B

196 SF

MECHANICAL

101C

488 SF/

61 SF

STORAGE

60 SF/

102 SF

ASST. CHIEF

ENGINEER

100 SF/ 102 SF

CHIEF ENGINEER

100 SF/ 100 SF

FACILITY

PLANNER

100 SF/ 96 SF

ENERGY

MANAGER

100 SF/

60 SF

MENS TOILET

60 SF/ 59 SF

WOMENS TOILET

60 SF/

99 SF

M&O

SUPERVISOR

100 SF/

14 SF

CLOSET

96 SF

M&O

SUPERVISOR

100 SF/

105 SF

M&O

SUPERVISOR

100 SF/

103 SF

M&O

SUPERVISOR

100 SF/

154 SF

CORRIDOR

C01

56 SF

ADMIN OFFICE

ASST

56 SF/ 117 SF

CORRIDOR

C01A

128 SF

CORRIDOR

C01B

196 SF

ELECTRICAL

105A

488 SF/

124 SF

CORRIDOR

C02

63 SF

VESTIBULE

Not Enclosed

STEAM TUNNEL

Not Enclosed

PROJECT

ENGINEERS

WORKSTATIONS

121A

116 SF

PROJECT

ENGINEERS

EGRESS

121B

32 SF

CORRIDOR

C01C

9 SF

SHOWER

118A

16 SF

STORAGE

C01D

B

2"CW

4" ST

3/4" G

4" ST

SAWCUT FROM DEMOLITION

WORK SHOWN FOR

REFERENCE

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

SAWCUT FOR NEW

PLUMBING FIXTURE

SANITARY ROUTE.

FCO

PROVIDE NEW 4" SANITARY MAIN.

CONTRACTOR SHALL FIELD VERIFY EXISTING

SYSTEM INVERT ELEVATION CONNECTION

POINT AND SLOPE NEW PIPING AS REQUIRED

PER CODE.

2" VENT UP FOR MAIN

VENTING

FCO

2" VENT UP FOR

SANITARY MAIN

VENTING

4"SAN

PROVIDE 4" PERFORATED DRAIN TILE ALONG

PERIMETER OF BUILDING.AT ELEVATION EQUAL TO

EXISTING FOOTING APPROXIMATELY 30" BELOW

GRADE. COORDINATE ROUTING WITH EXISTING

UNDERGROUND UTILITIES.

CONTRACTOR SHALL FIELD

VERIFY ROUTING OF DRAIN TILE

AND COORDINATE WITH EXISTING

UNDERGROUND UTILITIES.

YCO

CO

PROVIDE NEW 4" SANITARY MAIN. CONTRACTOR

SHALL FIELD VERIFY EXISTING SYSTEM INVERT

ELEVATION CONNECTION POINT AND SLOPE

NEW PIPING AS REQUIRED PER CODE.

FCO

2" SAN UP

SK

WC

WC

2" V UP

2" V UP

LAV

LAV

FD

FD

2" V UP

FD

EWC

FD

FD

WC

WC

LAVLAV

2" V UP

2" V UP

2" CW UP

NC

3" STANDPIPE

MB

PROVIDE TEMPORARY CONNECTION FROM

EXISTING TO NEW SANITARY PIPING TO KEEP

EAST BATHROOMS OPERATIONAL DURING

PHASE 1. ONCE PHASE 2 IS STARTED THEN

PIPING UNDER VAULT CAN BE CUT, CAPPED,

AND FILLED AND REMAINING SECTION OF

FLOOR IN 101C CAN BE FILLED.

CONNECT NEW 2"CW TO EXISTING

IN WALL. ROUTE PIPE AS CLOSE

AS POSSIBLE TO EXTERIOR WALL

WITHOUT CRUSHING INSULATION

STARTING INVERT ELEVATION

APPROXIMATELY 98.83' WITH

FINISH FLOOR AT 100.00'

STARTING INVERT ELEVATION

APPROXIMATELY 98.50' WITH

FINISH FLOOR AT 100.00'

PROVIDE 24" DIAMETER MINIMUM SUMP

PIT WITH GASKETED COVER AND VENT.

REFER TO SUMP PUMP SPECIFICATIONS

FOR SIZING INFORMATION.

ENDING INVERT ELEVATION

APPROXIMATELY 97.72' WITH

FINISH FLOOR AT 100.00'

FD

2" V UP

4"SA

N

4"SAN

"S

A N

4"

SA

N

2"SAN

4"SAN

2"SAN

4"SAN

2" V

4"SAN

2"SAN

4"

SA

N

"S

A N

"S

A N

"S

A N

4"SAN

4"SAN 3"SAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET 07/17/2019

Dwg. of 73

C R e v it L o c a l F ile s \M

E P

T

.0

V

A M a ri o n

B

R e n o

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:0

:3

P

M

15-PL100

FIRST FLOOR PLAN - PLUMBING

UNDERFLOOR

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

07/17/2019 IMEG IMEG

N

O R HT

1/4" = 1'-0"1

FLOOR PLAN - PLUMBING UNDERFLOOR

GENERAL SHEET NOTES:

0 SB 0 SB0 SB 0 SB 0 SB

S

B S

B S

B S

B S

B S

B

S

B S

B S

B S

B S

B S

B

SS SSSS SS SS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

A

1 2

99 SF

PROJECT

ENGINEER

SUPERVISOR

100 SF/

Not Enclosed

PLAN ROOM

200 SF/

203 SF

BREAK ROOM

319 SF

CONFERENCE

ROOM

300 SF/

41 SF

UNISEX STAFF

TLT

60 SF/

70 SF

UNISEX STAFF

TLT

80 SF/

102 SF

OI&T ROOM

101D

100 SF/

46 SF

HAC

60 SF/

27 SF

ALCOVE

101B

196 SF

MECHANICAL

101C

488 SF/

61 SF

STORAGE

60 SF/ 102 SF

ASST. CHIEF

ENGINEER

100 SF/ 102 SF

CHIEF ENGINEER

100 SF/ 100 SF

FACILITY

PLANNER

100 SF/ 96 SF

ENERGY

MANAGER

100 SF/

60 SF

MENS TOILET

60 SF/ 59 SF

WOMENS TOILET

60 SF/ 99 SF

M&O

SUPERVISOR

100 SF/

14 SF

CLOSET

96 SF

M&O

SUPERVISOR

100 SF/ 105 SF

M&O

SUPERVISOR

100 SF/ 103 SF

M&O

SUPERVISOR

100 SF/

154 SF

CORRIDOR

C01

56 SF

ADMIN OFFICE

ASST

56 SF/

117 SF

CORRIDOR

C01A

128 SF

CORRIDOR

C01B

196 SF

ELECTRICAL

105A

488 SF/

124 SF

CORRIDOR

C02

63 SF

VESTIBULE

Not Enclosed

STEAM TUNNEL

Not Enclosed

PROJECT

ENGINEERS

WORKSTATIONS

121A

116 SF

PROJECT

ENGINEERS

EGRESS

121B

9 SF

SHOWER

118A

32 SF

CORRIDOR

C01C

16 SF

STORAGE

C01D

B

172 SF

ENG.

CLERK/TRANS.MGR

101A

173 SF

LOBBY

496 SF

PROJECT

ENGINEERS

WORKSTATIONS

56 SF/

3/4"CW

4"ST WITH TRANSITION

FOR DOWNSPOUT

CONNECTION BELOW

CONCRETE

4"ST WITH TRANSITION

FOR DOWNSPOUT

CONNECTION BELOW

CONCRETE

4"ST WITH TRANSITION

FOR DOWNSPOUT

CONNECTION BELOW

CONCRETE

4" ST CLEANOUT

APPROXIMATELY 12" AFF.

EXISTING NATURAL GAS

PRESSURE REGULATOR,

METER AND VALVES

WITH BTU METER.

CO

4"ST WITH TRANSITION FOR DOWNSPOUT

CONNECTION AT APPROXIMATELY 30" AFF.

CLEANOUT ON Y-FITTING AT

APPROXIMATELY 6" AFF

TD-E

CONNECT TO EXISTING 2" CW

LINE LOCATED WITHIN 12" OF

THE FINISHED FLOOR.

FCO-1 PROVIDE 5 GALLON EXPANSION

TANK FOR DOMESTIC HOT

WATER SYSTEM

50 GALLON

ELECTRIC WATER

HEATER (WH-1)

CIRCULATION PUMP

FOR DOMESTIC HOT

WATER SYSTEM (CP-1)

3" FD-V

PROVIDE WITH TRAP

PRIMER (TP-2)

HOSE BIBB MOUNTED AT

APPROXIMATELY 18"

ABOVE GRADE

SUMP PUMP FOR

DRAIN TILE SYSTEM

2" FD-C

PROVIDE WITH TRAP

PRIMER (TP-2)

2" FD-C

PROVIDE WITH TRAP

PRIMER (TP-2)

PROVIDE ROUGH IN

INCLUDING ANGLE STOPS

FOR FUTURE SINK AT

THIS LOCATION.

HOSE BIBB MOUNTED AT

APPROXIMATELY 18"

ABOVE GRADE

HOSE BIBB MOUNTED AT

APPROXIMATELY 18"

ABOVE GRADE

FCO-1

2"V DOWN, 4"VTR

2"V DOWN, 4"VTR

FCO-1

4" VTR

2" V

2" V UP, 2 SAN DN

2" V

2"CW

2" V

BFP-1

2" V

4" FD-D

PROVIDE WITH TRAP

PRIMER (TP-2)

2" V

2"V UP,

2"SAN DN

0.5 GPM

2"CW

1 1/2"HW

3/4"CW 2"CW

4" VTR

P-804

3/4"CW UP TO HOSE

BIBB ON ROOF

2"V UP, 2"SAN DOWN

YARD CLEANOUT

TERMINATE 3" STANDPIPE

APPROXIMATELY 36" AFF.

ROUTE 2" PD TO STANDPIPE

AND TERMINATE WITH AIR GAP.

PROVIDE SHUT OFF

VALVES IN VERTICAL

COORDINATE MOUNTING

LOCATION AND ACCESS

PANEL REQUIREMENTS.

(TYP.)

PROVIDE HEAT TRACE FOR

CW LINE FROM INSIDE

BUILDING 15 INTO BUILDING

TO THE SOUTH.

COORDINATE WITH

ELECTRICAL CONTRACTOR.

PROVIDE SHUT OFF VALVE AND

WATER HAMMER ARRESTOR

PRIOR TO PIPING ENTERING WALL.

1 1/2"HW

2"CW

"C

W

/2 "H

W

"C

W

2"CW

2"CW

1 1/2"HW

2"CW

2"CW

1 1/2"CW

1 1/2"HWC

P-801

P-408

P-115

P-408

P-115

CONNECT NEW 1" GAS

LINE ON 2" GAS LINE

BETWEEN SHUT OFF

VALVE AND GROUND IN

VERTICAL.

P-801

3" FD-W

P-502

SUMP PUMP PANEL.

COORDINATE

LOCATION WITH

ELECTRICAL.

P-115

P-408

P-408

P-115

P-801

INSTALL EXISTING

WATER COOLER AT THIS

LOCATION.

2"CW

PROVIDE MASTER

THERMOSTATIC MIXING

VALVE SET TO 110°F

PROVIDE P-702 SHOWER TRIM WITH

THERMOSTATIC AND PRESSURE

MIXING VALVE AND FD-C 2" FLOOR

DRAIN FOR SHOWER DRAINAGE.

2" V

2" V FROM SUMP

BASIN COVER

PROVIDE SHUT OFF VALVE

F…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .