P09 Drawing Bid Set 21-04-21 3 of 7.pdf

PDF 10 MB Posted

Attached to
Z2DA--P/N 657A5-18-111, RENOVATE BUILDING 15
Solicitation number
36C25522R0046_1
Issued by

About this file

This document provides details on a federal contract opportunity to renovate Building 15. The solicitation number is 36C25522R0046_1 to renovate Building 15 under Project #657A-18-111. The opportunity is being offered by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The description specifies renovating Building 15 but does not include additional details on products, services, pricing, or response dates required to complete the renovation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AL STOREFRONT

PARTITION AS

SCHEDULED

4" LT. GA. MTL.

STUD (TYP)

502 SF

PROJECT

ENGINEERS

WORKSTATIONS

56 SF/ 100 SF

PROJECT

ENGINEER

SUPERVISOR

100 SF/

SPANDREL GLASS - SEE EXTERIOR BLDG ELEV

CAULK (TYP)

J-BEAD (TYP)

WINDOW SILL

(TYP)

FILL VOID IN WINDOW OPENING W/

FIBERGLASS BATT INSUL W/ VAPOR

BARRIER BETWEEN GWB/FRAMING

F.O. EXT

WALL (TYP)

F.O.

FURRED

WALL (TYP)

SEE FLOOR PLAN

FOR WALL TYPE

CG-1

3 1/8" 3 1/8"

VINYL CORNER GUARD W/

CONTINUOUS RETAINER

ATTACHED

TO METAL STUDS, TYP.

VINYL CORNER GUARD W/

CONTINUOUS RETAINER

ATTACHED

TO METAL STUDS, TYP.

SEE FLOOR PLAN

FOR WALL TYPE

CG-2

3/

4"

0.

08CONC

RESILIENT

FLOORING

TRANSITION STRIP

AS SCHEDULED

1 1/8"

CONC

0' - 1 5/16" 3/

8"

QUARRY TILE

C-L DOOR

TRANSITION

STRIP AS

SCHEDULED

CONC

0' - 1 1/4"

1/ 8"

CERAMIC TILE

C-L DOOR

TRANSITION

STRIP AS

SCHEDULED

SEE FLOOR PLAN

FOR WALL TYPE

CG-3

2 1/8"

VINYL CORNER GUARD W/

CONTINUOUS RETAINER

ATTACHED

TO METAL STUDS, TYP.

FIRST FLOOR

458'-4"

PROJECT

ENGINEERS

460'-0"

PARTITION AS SCHEDULED

EXTEND GWB TO FINISH FLOOR -

LAMINATE TO WALL AND SHIM AS

REQ'D TO PLUMB

PROJECT ENGINEERS

121A

PLAN ROOM

CONC LEVELING TOPPING /

PATCHING - SEE STRUCT &

DEDUCT ALTERNATE #4

EXIST CONC FLOOR

SEE STRUCT FOR EXTENTS OF CONCRETE FLOOR & WALL REMOVAL-REPLACEMENT FOR

UNDERFLOOR WORK - COORDINATE W/ MECH & ELECT

EXIST CONC WALL

PATCH AND REPAIR FLOOR

WHERE CLAY TILE/PLASTER

WALL REMOVED

BASE AS SCHEDULED (TYP)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET

07/17/2019

Dwg. Of

C

L H

D C

\H o m e \a ta s t\

R

-2

B U

IL

D

IN

G

A lt e rn a te a ta s t.

rv t

/1

/2

:0

:4

P

M

15-AE503

INTERIOR DETAILS RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

7/17/2019 AHT KRK/TJF

25 73

BID SET

SCALE: 1 1/2" = 1'-0"

B1

WALL DETAIL AT ALUM STOREFRONT

SCALE: 3" = 1'-0"

B3

CG-1 DETAIL

SCALE: 3" = 1'-0"

B5

CG-2 DETAIL

SCALE: 12" = 1'-0"

B8

FLOOR TRANSITION DETAIL- RESILIENT FLOORING TO CONC. TR-1

SCALE: 12" = 1'-0"

C1

FLOOR TRANSITION DETAIL - CONC. TO QUARRY TILE, TR-2

SCALE: 12" = 1'-0"

C5

FLOOR TRANSITION DETAIL - CONC. TO CERAMIC TILE TR-3

SCALE: 3" = 1'-0"

B6

CG-3 DETAIL

Revisions: Date:

SCALE: 1 1/2" = 1'-0"

E1

WALL DETAIL - RMS 120-121A

FIRST FLOOR

458'-4"

P-1

(TYP.)

RB-1

RB-1

(TYP.)

P-1

(TYP.)

RAMP

S-1 S-1

FURRED WALL NEEDED ABOVE

WINDOWS TO B.O. ROOF DECK

3 3

B7

15-AE501

15-AE301

S-1

CG-1

7 7 7

15-AE201

FIRST FLOOR

458'-4"

P-4 P-4

RB-1

15-AE201

CORRIDOR

C02

CG-1 CG-1

RB-1

FIRST FLOOR

458'-4"

PROJECT

ENGINEERS

460'-0"

P-1

P-1

P-1 P-1

F1

15-AE501

F3

15-AE501

F7

15-AE501

15-AE201

15-AE301

P-1

21 2

CG-1

15-AE201

FIRST FLOOR

458'-4"

PROJECT

ENGINEERS

460'-0"

S-1S-1

P-1

S-1

15-AE501

F7

B3

15-AE501

15-AE201

P-1

P-1

RAMP - SEE

FLOOR PLAN

& DETAILS

15-AE301

CG-1

CG-1

FIRST FLOOR

458'-4"

P-4

P-4

CG-1CG-1

FIRST FLOOR

458'-4"

15-AE201

3' -0

MB-1

FIRST FLOOR

458'-4"

4' -0

P-1

TYP.

FIRST FLOOR

458'-4"

EP-1

5' -0

MS-1

QT-1 BASE

MOP SINK -

SEE PLBG.

FIRE EXT CABINET

SURROUND -

SEE SHT 15-AF501

FIRST FLOOR

458'-4"

EP-1

QT-1 BASE

FIRST FLOOR

458'-4"

EP-1

MOP SINK -

SEE PLBG

MS-1

(MOP SHELF)

5' -0

QT-BASE

FIRST FLOOR

458'-4"

P-4

CG-1 CG-1

FIRST FLOOR

458'-4"

P-1

CORR

C01

CG-2

CG-1

FIRST FLOOR

458'-4"

P-1

CG-1

100A 102

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET

07/17/2019

Dwg. Of

C

L H

D C

\H o m e \a ta s t\

R

-2

B U

IL

D

IN

G

A lt e rn a te a ta s t.

rv t

/1

/2

:0

:4

P

M

15-AE901

INTERIOR ELEVATIONS RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

7/17/2019 AHT TJF/KRK

29 73

BID SET

SCALE: 1/4" = 1'-0"

B1

PROJECT ENGINEER WORKSTATIONS 121 - NORTH ELEVATION

SCALE: 1/4" = 1'-0"

B4

PROJECT ENGINEER WORKSTATIONS 121 - EAST ELEVATION

SCALE: 1/4" = 1'-0"

B6

PROJECT ENGINEER WORKSTATIONS 121A - SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

C1

PROJECT ENGINEER WORKSTATIONS 121 - WEST ELEVATION

SCALE: 1/4" = 1'-0"

C4

ASST SECY 101A - EAST ELEVATION

GENERAL NOTES -

INTERIOR ELEVATIONS

1 REFER TO GENERAL ARCHITECTURAL NOTES ON

SHEET G-001 FOR ADDITIONAL ITEMS NOT

COVERED BY THESE NOTES.

3 REFER TO FPMET DRAWINGS FOR ADDITIONAL

WORK.

4 REMOVE WALL-MOUNTED ITEMS INCLUDING

LIGHT FIXTURES, TELECOMMUNICATIONS

EQUIPMENT, LOUDSPEAKERS, SENSORS,

SIGNAGE, ETC. SALVAGE AND STORE FOR REUSE

AS SHOWN IN THE CONSTRUCTION DOCUMENTS

OR AS DIRECTED BY THE COR. ITEMS

DESIGNATED FOR REUSE SHALL BE STORED IN A

LOCATION APPROVED BY THE COR. FOR ITEMS

NOT OTHERWISE IDENTIFIED WHICH ARE

REMOVED, REVIEW WITH THE COR FOR

DISPOSITION, I.E. SALVAGE AND RETURN TO VA

OR DISPOSAL.

5 PROTECT EXISTING WALL-MOUNTED ITEMS TO

REMAIN IN PLACE DURING CONSTRUCTION.

TEMPORARY REMOVAL MAY BE REQUIRED AS

PART OF THE WORK FOR RESTORATION OF

STUCCO.

6 REFER TO HAZARDOUS MATERIAL DRAWINGS

FOR PRESENCE AND HANDLING OF EXISTING

ASBESTOS-CONTAINING MATERIALS (ACM)

INCLUDING (BUT NOT LIMITED TO) WINDOW

CAULKING, ROOF FLASHINGS AND STUCCO

VENEER.

7 REFER TO COLOR AND ROOM FINISH SCHEDULES,

EQUIPMENT PLAN AND SCHEDULE FOR

ADDITIONAL ITEMS WHICH MAY NOT BE SHOWN

OR IDENTIFIED ON ELEVATIONS.

8 SEE EQUIPMENT SCHEDULE FOR IDENTIFICATION

OF TOILET ACCESSORIES.

9 PROVIDE 16 GA. SHEET METAL BACKING IN WALLS

FOR ALL WALL-MOUNTED ITEMS SHOWN.

10 PLACE ALL WALL-MOUNTED ITEMS AT

ADA-MANDATED HEIGHTS PER VA ACCESSIBILITY

GUIDELINES.

11 SEE SHEET G-001 FOR LIST OF DEDUCTS ALTS.

12 SEE COLOR SCHEDULE FOR HM DOOR & DOOR

FRAME PAINT COLOR.

KEY NOTES - INTERIOR

ELEVATIONS

1 DEDUCT ALT #3 - DELETE NEW WINDOW -

CONTINUE FURRED WALL/GWB TO COVER

OPENING.

2 NEW REPLICA HISTORIC ALUMINUM WINDOW

ASSEMBLY WITH SOLID-SURFACE SILL/APRON.

SEE DETAILS SHEET 15-AE702.

3 SOLID-SURFACE WINDOW SILL/APRON. SEE

DETAILS SHEET 15-AE702.

4 NEW RUBBER TREAD/RISER COVER. SEE COLOR

SCHEDULE.

5 STEEL CHANNEL GUARD WITH STEEL BAR

STANCHIONS AND STAINLESS STEEL AIRCRAFT

CABLE INFILL. SEE DETAIL F6//15-AE501.

6 BENT PLATE TOEKICK/POUR STOP. SEE DETAIL

F6/15-AE501.

7 NEW ALUMINUM STOREFRONT WINDOW

SYSTEM. SEE SHEET 15-AE702.

8 RAMP TO EXTERIOR DOOR THRESHOLD. SEE

DETAIL B7/15-AE501.

9 DOOR/FRAME AS SCHEDULED. SEE SHEET

15-AE701.

10 REFRIGERATOR – SEE EQUIPMENT

PLAN/SCHEDULE.

11 (NOT USED)

12 (NOT USED)

13 GWB/METAL STUD CEILING BULKHEAD TO 6”

ABOVE FINISH CEILING. SEE DETAIL C1/15-AC101.

14 (NOT USED)

15 SHOWER HEAD - SEE PLUMBING.

16 SHOWER HEAD/CONTROL WALL. SEE PLUMBING

17 EXISTING OVERHEAD STRUCTURAL STEEL

MATERIAL DRAWINGS FOR LEAD-BASED PAINT

ABATEMENT.

18 (RESERVED).

19 (RESERVED).

20 SALVAGED MARBLE SHOWER STALL PANEL –

INSTALL ON EAST WALL OF SHOWER STALL.

INSTALL SALVAGED MARBLE THRESHOLD AT

OPENING. SEE DETAILS SHEET 15-AE501.

21 ACCESS CARD READER – SEE ELECT. & TECH.

DRAWINGS.

22 DRINKING FOUNTAIN W/ BOTTLE FILLER: SEE

PLUMBING.

23 EXISTING TACKBOARD: REINSTALL. SEE

EQUIPMENT PLAN.

24 EXISTING WALL-MOUNTED DISPLAY CASE:

REINSTALL. SEE EQUIPMENT PLAN.

SCALE: 1/4" = 1'-0"

E5

CONFERENCE ROOM 116 - EAST ELEVATION

SCALE: 1/4" = 1'-0"

E3

CONFERENCE ROOM 116 - SOUTH-EAST ELEVATION

SCALE: 1/4" = 1'-0"

D5

HAC 115 - NORTH ELEVATION

SCALE: 1/4" = 1'-0"

D7

HAC 115 - SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

E1

HAC 115 - WEST ELEVATION

SCALE: 1/4" = 1'-0"

C6

ENG. CLERK/TRANS. MGR 101A - SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

D1

ENG. CLERK/TRANS. MGR 101A - WEST ELEVATION

SCALE: 1/4" = 1'-0"

D3

ENG. CLERK/TRANS. MGR 101A - NORTH ELEVATION

P-1

TYP.

TV-1

X

EQ EQEQ EQ

Revisions: Date:

FIRST FLOOR

458'-4"

EP-1

PTD-1

CT-4

CT-3

CT-2

CT-3

M A

X 3'

-5

/8

PC-1

M A

X 2'

-1 0"

FIRST FLOOR

458'-4"

3' -6

EP-1

SD-1

GB-36

GB-18

GB-42

CT-3

M A

X 3'

-4

/8

M A

X 2'

-1 0"

M A

X

3' -0

FIRST FLOOR

458'-4"7 7/8"

M

IN

2'

-0

EP-1

GB-36

GB-42

GB-18

SND-1

PTD-1

CT-4

CT-3

CT-2

CT-3

MAX

1'-0 1/8"

MIN

3'-6"

1' -6

TP-1

4"

FIRST FLOOR

458'-4"

EP-1

PTD-1

MIR-1

M A

X 3'

-6

M A

X 2'

-1 0"

CT-3

CT-4

CT-3

CT-2 PC-1

FIRST FLOOR

458'-4"

GB-18

GB-42

TP-1

GB-36

SND-1

EP-1

CT-4

CT-2

CT-3

1'-0 1/8"3'-6"

CT-3

SND-2

8"

FIRST FLOOR

458'-4"

EP-1

MIR-1

SD-1

PTD-1

GB-18

GB-36

M A

X 2'

-1

3/ 4"

4"1' -6

3'-0"

M A

X 3'

-4

PC-1

GB-42

CT-3

CT-4

CT-3

M A

X

2' -1

0"

FIRST FLOOR

458'-4"

GB-18

GB-42

GB-36

TP-1

SND-2

EP-1

CT-3

CT-4

CT-3

M A

X 2'

-5

/4

8"

CT-2

FIRST FLOOR

458'-4"

M A

X

2' -1

0"

EP-1

SD-1

PC-1

CT-4

CT-3

CT-2

CT-3

3' -2

/8

FIRST FLOOR

458'-4"

M A

X

3' -4

M

A X

2'

-1 0"

EP-1

GB-18

GB-36

GB-42

TP-1

SND-1

MIR-1

SD-1

PC-1

CT-4

CT-3

M A

X

3' -0

PTD-13'-0"

CT-3

M A

X

3' -4

/8

3' -2

/8

FIRST FLOOR

458'-4"

M A

X

2' -1

0"

EP-1PTD-1

PC-1

3' -6

"CT-3

SD-1

CT-4

CT-3

CT-2

3' -2

/8

FIRST FLOOR

458'-4"

EP-1 20

GB-18

GB-36

SB-1

SC-1

CT-4

CT-3

CT-2

CT-3

FIRST FLOOR

458'-4"

EP-1

GB-18

GB-42

GB-36

TP-1

SND-1

WALL TO 6" ABOVE CEILING

4" 1'

-6

3'-6"

CT-2

8 1/8"

M

IN

2' -0

2' -6

/8

RH-1

TWB-1

CT-3

CT-3

FIRST FLOOR

458'-4"

M A

X

3' -4

EP-1

GB-18

GB-36

GB-42

TP-1

SND-1

MIR-1

M A

X 2'

-1 0"

3' -0

4" 1' -6

3'-0"

SD-1

PC-1

6"

FIRST FLOOR

458'-4"

EP-1

CT-4

CT-3

CT-2

CT-3

FIRST FLOOR

458'-4"

EP-1

6" 4'

-0

8"

3/ 8"

CT-4

CT-2

CT-3

SND-2

M A

X 3'

-6

CT-3

FIRST FLOOR

458'-4"

EP-1

CT-3

CT-3

CT-4

CT-2

FIRST FLOOR

458'-4"

116119

EQ EQ

T .O

. D

IS

P

LA

Y C

A S

E 7'

-2

CG-2

DC-1

CG-1

FIRST FLOOR

458'-4"

C1

15-AC101

CG-1

CG-1

CG-1

1'-6" 1'-6"

4' -0

" 5' -0

A D

A R

E Q

2'

-3

S-1

FIRE EXT SIGN -

SEE SHT 15-AF502

REINSTALLED DRINKING FOUNTAIN

W/ BOTTLE FILLER

FIRE EXT CABINET -

SEE SHT 15-AF501

GWB BULKHEAD

CORRIDOR

C02AALCOVE

101B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET

07/17/2019

Dwg. Of

C

L H

D C

\H o m e \a ta s t\

R

-2

B U

IL

D

IN

G

A lt e rn a te a ta s t.

rv t

/1

/2

:0

:4

P

M

15-AE902

INTERIOR ELEVATIONS RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

7/17/2019 AHT TJF/KRK

30 73

BID SET

SCALE: 1/4" = 1'-0"

A1

MENS TLT 104 - NORTH ELEVATION

SCALE: 1/4" = 1'-0"

A2

MENS TLT 104 - EAST ELEVATION

SCALE: 1/4" = 1'-0"

A4

MENS TLT 104 - SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

B1

WOMENS TLT 105 - NORTH ELEVATION

SCALE: 1/4" = 1'-0"

B4

WOMENS TLT 105 - SOUTH ELEVATION SCALE: 1/4" = 1'-0"

B6

WOMENS TLT 105 - WEST ELEVATION

SCALE: 1/4" = 1'-0"

C1

UNISEX TLT 117 - NORTH ELEVATION

SCALE: 1/4" = 1'-0"

C4

UNISEX TLT 117 - SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

C6

UNISEX TLT 117 - WEST ELEVATION

SCALE: 1/4" = 1'-0"

D1

UNISEX 118 - NORTH ELEVATION

SCALE: 1/4" = 1'-0"

D2

UNISEX 118 - EAST ELEVATION

SCALE: 1/4" = 1'-0"

D4

UNISEX 118 - SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

D6

UNISEX 118 - WEST ELEVATION

SCALE: 1/4" = 1'-0"

A6

MENS TLT 104 - WEST ELEVATION

SCALE: 1/4" = 1'-0"

B2

WOMENS TLT 105 - EAST ELEVATION

GENERAL NOTES -

INTERIOR ELEVATIONS

1. SEE SHEET 15-AE901 FOR GENERAL

NOTES - INTERIOR ELEVATIONS.

2. SEE FURNITURE & EQUIPMENT SCHEDULE

SHEET 15-QE601 FOR TOILET ACCESSORY

IDENTIFICATION CODES.

KEY NOTES - INTERIOR

ELEVATIONS

NOTE: SEE SHEET 15-AE901 FOR INTERIOR

ELEVATIONS KEY NOTES LEGEND.

SCALE: 1/4" = 1'-0"

C2

UNISEX TLT 117 - EAST ELEVATION

PTD-1

CT-4

CT-3

PC-1

X

SCALE: 1/4" = 1'-0"

E1

CORRIDOR C02 NORTH ELEVATION

SCALE: 1/4" = 1'-0"

E4

CORRIDOR C02 SOUTH ELEVATION

A

1 2 3

BREAK

ROOM

CONFERENCE

ROOM

STORAGE

ASST.

CHIEF

ENGINEER

CHIEF

ENGINEER

FACILITY

PLANNER

ENERGY

MANAGER

M&O

SUPERVISOR

M&O

SUPERVISOR

WOMENS

TOILET

MENS

TOILET

M&O

SUPERVISOR

M&O

SUPERVISOR

CLOSET

MECHANICAL

101C

OI&T

ROOM

101D

HAC

UNISEX

STAFF

TLT

UNISEX

STAFF

TLT

PLAN

ROOM

PROJECT

ENGINEER

SUPERVISOR

ALCOVE

101B

CORRIDOR

C02 ADMIN

OFFICE

ASST

CORRIDOR

C01B

CORRIDOR

C01A

CORRIDOR

C01

ELECTRICAL

105A

STEAM

TUNNEL

VESTIBULE

STRUCT

+9'-6" +9'-6"

+9'-6"

+9'-6"

+9'-0"

+9'-0"

+9'-0"

1 5

GWB

STRUCT

STRUCT

+9'-6" +9'-6" +9'-6"

+9'-6"

1 1

+9'-6"

BULKHEAD

+9'-5"

+9'-6" +9'-6"

+9'-6"

+9'-6"+9'-6"

BULKHEAD

+8'-11" AFF

+9'-6"

+9'-5" AFF

BULKHEAD

+8'-11"

PROJECT

ENGINEERS

EGRESS

121B

SHOWER

118A

VESTIBULE

C01C

STORAGE

C01D

+9'-5" AFF

+9'-0"

PROJECT

ENGINEERS

WORKSTATIONS

B

+9'-5" AFF +8'-11" AFF

15-AE201

15-AE201

15-AE201

15-AE201

15-AE301

15-AE301

15-AE301

15-AE301

15-AE301

15-AE301

GWB

GWB

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-0"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6" AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

GWB SUSP CLG

9'-0" AFF

GWB SUSP CLG

9'-0"

AFF

GWB SUSP CLG

9'-0"

AFF

Existing Concrete

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-0"

AFF

GWB SUSP CLG

9'-0"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-0"

AFF

GWB SUSP CLG

9'-0"

AFF

GWB SUSP CLG

9'-0"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

AFF

2' x 2' ACT

9'-6"

+8'-0" AFF

1 1

7 7

ALIGN

15-AE201

15-AE301

GRAY-SHADED

AREA INDICATES

EXTENTS OF

DEDUCT

ALTERNATE #5/

OPEN OFFICE AREA

6"

3 5/8" MTL STUD

@ 16" O.C.

3/ 4"

5/8" GWB

ACT TILE

S E

E R

C P

S E

E R

C P

V A

R

IE

S

5/8" GWB

5/8" GWB

CHANNEL MOLDING

ACT TILE

WIRE HANGER & CROSS RUNNER

@ 24" O.C. ATTACHED TO

STRUCTURE ABOVE (TYP

MAIN RUNNER @ 48" O.C. (TYP)

S E

E R

C P

45 D E G R E

ES

D

E G

R E

E S

D

E G

R E E S

D

E G

R E

E S

COMPRESSION POST / STRUT

LOCKING CLIP

3 TURNS IN

1 1/2" TYP.

MAIN RUNNER @

48" O.C.

CROSS RUNNER@

2'-0" O.C.

45 DEGREE SPLAY WIRE BRACING IN

PLANE OF MAIN RUNNER ALL WIRES

ATTACHED TO MAIN RUNNER (4) DIRECTIONS

SPLICE

12 GA. VERTICAL HANGER WIRE @ 4'-0"

ALONG EA. MAIN RUNNER, 3 TURNS MIN

IN 1 1/2" TYP.

GENERAL REFLECTED CEILING NOTES:

1. REFER TO GENERAL ARCHITECTURAL

NOTES ON SHEET G-001 FOR

ADDITIONAL ITEMS NOT COVERED BY

THESE NOTES.

2. GRAY-SHADED AREA WITH HEAVY

DASHED BOUNDARY INDICATES

EXTENTS OF DEDUCT ALTERNATE #5

FOR SINGLE ACOUSTICAL CEILING.

3. REFER TO FPMET DRAWINGS FOR

ADDITIONAL WORK.

4. REFER TO MECHANICAL DRAWINGS (V

SERIES) FOR QUANTITY AND TYPE

OF DIFFUSERS, RETURN AIR GRILLES,

AND EXHAUST GRILLES. SCRIBE

CEILING MATERIALS CAREFULLY FOR A

TIGHT FIT.

5. REFER TO ELECTRICAL DRAWINGS (E

SERIES) FOR QUANTITY AND TYPE OF

LIGHTS, SPEAKERS, DETECTORS,

POWER OUTLETS, ETC. SCRIBE CEILING

MATERIALS CAREFULLY FOR A TIGHT

FIT.

6. CONTRACTOR TO COORDINATE WITH

ALL TRADES.

TRUE

NORTH

PLAN

NORTH

REFLECTED CEILING LEGEND

SUPPLY AIR GRILLE - SEE

MECHANICAL

RETURN AIR GRILLE TO - SEE

MECHANICAL

RECESSED 2X2 LIGHT FIXTURE - SEE

ELECTRICAL

RECESSED 2X4 LIGHT FIXTURE - SEE

ELECTRICAL

GYPSUM WALL BOARD CEILING

SUSPENDED ACOUSTICAL CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET

07/17/2019

Dwg. Of

C

L H

D C

\H o m e \a ta s t\

R

-2

B U

IL

D

IN

G

A lt e rn a te a ta s t.

rv t

/1

/2

:0

:3

P

M

15-AC101

REFLECTED CEILING PLAN &

DETAILS - RENOVATION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

7/17/2019 AHT KRK/TJF

31 73

BID SET

SCALE: 1/4" = 1'-0"

REFLECTED CEILING PLAN- RENOVATION

KEY NOTES - REFLECTED

CEILING RENOVATION PLAN

1 NEW 2X2 ACOUSTICAL TILE CEILING/GRID, INCLUDING

LED LIGHTING FIXTURES, IN CORRIDOR, PER DETAILS

ON SHEET 15-AC101. SEE ROOM FINISH SCHEDULE

AND COLOR SCHEDULE FOR CEILING TILE/GRID.

2 OPEN TO STRUCTURE. SEE FINISH SCHEDULE FOR

PAINTING OF TRUSSES / FRAMING AND CONCRETE

ROOF DECK.

3 NEW GWB CEILING. SEE ROOM FINISH SCHEDULE FOR

FINISHES.

4 NEW GWB BULKHEAD TO 6” ABOVE FINISH CEILING.

SEE DETAIL C1/15-AC101.

5 SEE REFLECTED CEILING PLAN AND ROOM FINISH

SCHEDULE FOR USE OF AT(SP) CEILING TILE THIS

ROOM.

6 EXISTING CONCRETE CEILING. SEE ROOM FINISH

SCHEDULE FOR FINISHES.

7 DEDUCT ALT. #5 - DELETE WALLS & BULKHEADS -

INSTALL SINGLE ACOUSTICAL CEILING IN

GRAY-SHADED AREA FOR OPEN OFFICE AREA

ENCOMPASSING ROOMS 107, 108, 109, 110, 111, 112,

113, CORRIDORS C01A, CO1B AND PORTION OF

CORRIDOR C01.

8 SHOWER STALL CEILING W/ CERAMIC TILE OVER

MOISTURE/MOLD-RESISTANT GWB.

9 NEW GWB CEILING.

10 INSTALL CEILING AT END OF PHASE 2 AFTER

TEMPORARY CONSTRUCTION PARTITION REMOVED.

SEE PHASING PLANS.

11 DEDUCT ALT. #5 - PLACE NEW BULKHEAD ALIGNED

WITH PARTITION FOR SINGLE ACOUSITCAL CEILIING

FOR OPEN OFFICE AREA.

12 NOT USED

13 NOT USED

14 NOT USED

15 NOT USED

SCALE: 3" = 1'-0"

C1

TYP. BULKHEAD DETAIL

SCALE: 1 1/2" = 1'-0"

C3

LATERAL SEISMIC BRACE DETAIL FOR SUSPENDED CEILING

X GENERAL NOTES -

REFLECTED CEILING PLAN

DN

A

1 2 3

100 SF

PROJECT

ENGINEER

SUPERVISOR

100 SF/

202 SF

PLAN ROOM

200 SF/

203 SF

BREAK ROOM

318 SF

CONFERENCE

ROOM

300 SF/

41 SF

UNISEX STAFF

TLT

60 SF/

70 SF

UNISEX STAFF

TLT

80 SF/

102 SF

OI&T ROOM

101D

100 SF/

46 SF

HAC

60 SF/

26 SF

ALCOVE

101B

201 SF

MECHANICAL

101C

488 SF/

61 SF

STORAGE

60 SF/

102 SF

ASST. CHIEF

ENGINEER

100 SF/

102 SF

CHIEF ENGINEER

100 SF/ 100 SF

FACILITY

PLANNER

100 SF/

96 SF

ENERGY

MANAGER

100 SF/

60 SF

MENS TOILET

60 SF/ 63 SF

WOMENS TOILET

60 SF/

95 SF

M&O

SUPERVISOR

100 SF/

12 SF

CLOSET

100 SF

M&O

SUPERVISOR

100 SF/ 99 SF

M&O

SUPERVISOR

100 SF/ 98 SF

M&O

SUPERVISOR

100 SF/

154 SF

CORRIDOR

C01

54 SF

ADMIN OFFICE

ASST

56 SF/

114 SF

CORRIDOR

C01A

124 SF

CORRIDOR

C01B

177 SF

ELECTRICAL

105A

488 SF/

126 SF

CORRIDOR

C02

65 SF

VESTIBULE

17 SF

STEAM TUNNEL

118 101D

101C

104 105

112 111 110

108107103102

100A 106

C01CA

101CA

30 SF

VESTIBULE

C01C

105A

RT-1

TR-1

C-2

CG-2

CG-2

1 1

F1

15-AE501

F3

15-AE501

F7

15-AE501

B3

15-AE501

B7

15-AE501

D7

15-AE501

118 SF

PROJECT

ENGINEERS

EGRESS

121B

9 SF

SHOWER

118A

15 SF

STORAGE

C01D

C01D

502 SF

PROJECT

ENGINEERS

WORKSTATIONS

56 SF/

17 13 11

B

15-AE201

15-AE201

15-AE201

15-AE201

15-AE301

15-AE301

15-AE301

15-AE301

15-AE301

15-AE301

15-AE301

TR-3

CT-1

2 2

16 16 16 16

CP

TR-2

TR-3 TR-3

CG-3

15-AE201

15-AE301

CG-1

CG-1

CG-1 CG-1 CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1 CG-1 CG-1 CG-1 CG-1 CG-1

CG-1

CG-1 CG-1

CG-1

CG-1 CG-1

CG-1

C01C

121B

FEC

E1

15-AE503

GRAY-SHADED

AREA INDICATES

EXTENTS OF

DEDUCT

ALTERNATE #5/

OPEN OFFICE AREA

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET

07/17/2019

Dwg. Of

C

L H

D C

\H o m e \a ta s t\

R

-2

B U

IL

D

IN

G

A lt e rn a te a ta s t.

rv t

/1

/2

:0

:5

P

M

15-AF101

FINISH & SIGNAGE PLAN -

RENOVATION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

7/17/2019 AHT TJF/KRK

32 73

BID SET

SCALE: 1/4" = 1'-0"

FINISH & SIGNAGE PLAN - RENOVATION

KEY NOTES - FINISH &

SIGNAGE PLAN

1 BASE BID – POLISHED CONCRETE FLOOR.

2 BASE BID – POLISHED CONCRETE FLOOR. DEDUCT

ALTERNATE – NO COVERING / LEVELING TOPPING.

3 BASE BID – ACCENT PAINT P5.

4 RAMP: SEE DETAIL SHT 15-AE501.

5 EXISTING STEAM TUNNEL FLOOR ACCESS DOORS.

PAINT P3.

6 RESILIENT TREAD COVER / NOSING.

7 ANGLED CORNER GUARD CG-2 – SEE DETAIL SHT

15-AE503.

8 INSTALL SALVAGED EXISTING MARBLE SHOWER

PARTITION PANEL ON EAST WALL OF SHOWER.

9 FLOORING TRANSITION STRIP. SEE COLOR

SCHEDULE FOR TRANSITION APPLICATIONS.

10 ACCENT PAINT COLOR FULL WIDTH/HEIGHT OF

WALL - SEE ROOM FINISH SCHEDULE

11 DEDUCT ALTERNATE #5 - DELETE WALLS WITHIN

GRAY-SHADED AREA FOR OPEN OFFICE AREA.

12 STRUCTURE ABOVE TO BE PAINTED – SEE ROOM

FINISH & COLOR SCHEDULES SHEET 15-AE601.

13 DOOR NUMBER / ROOM SIGN - SEE SIGNAGE

SCHEDULE

14 RELOCATED DISPLAY CASE - SEE EQUIPMENT PLAN

15 RELOCATED TACK BOARD - SEE EQUIPMENT PLAN

16 DEDUCT ALTERNATE #3 - DELETE NEW WINDOWS

INDICATED & INFILL OPENINGS W/ CMU/EIFS/DEFS

AT EXTERIOR; CONTINUE GWB WALL OVER

OPENING AT INTERIOR.

17 AREA OF PATCHED OR EXTENDED CONC. FLOOR -

BLEND INTO ADJACENT EXISTING FLOOR.

GENERAL NOTES - FINISH &

SIGNAGE PLAN

1 REFER TO GENERAL ARCHITECTURAL NOTES

ON SHEET G-001 FOR ADDITIONAL ITEMS NOT

COVERED BY THESE NOTES.

2 REFER TO SPECIFICATIONS FOR SUSTAINABLE

DESIGN REQUIREMENTS INCLUDING DISPOSAL

AND SALVAGE OF EXISTING AND NEW BUILDING

MATERIALS.

3 REFER TO FPMET DRAWINGS FOR ADDITIONAL

WORK.

4 REFER TO FINISH SCHEDULE, FURNITURE AND

EQUIPMENT PLANS/SCHEDULES FOR

ADDITIONAL ITEMS RELATED TO WORK SHOWN.

5 REFER TO REFLECTED CEILING PLAN SHEET

15-AC101 FOR CEILING HEIGHTS AND TYPES.

6 PAINT WALLS TO 6” ABOVE FINISH CEILING

PRIOR TO INSTALLATION OF ACOUSTICAL TILE

CEILING GRID.

7 REFER TO COLOR SCHEDULE SHEET 15-AE601

FOR FINISH CODES.

8 SEE SHEET G-001 FOR LIST OF DEDUCT ALTS.

9 SEE SHEET 15-AF102 FOR SIGNAGE SCHEDULE

AND DETAILS

10 SEE EXTERIOR ELEVATIONS FOR EXTERIOR

SIGNAGE

11 REFER TO ROOM FINISH SCHEDULE FOR FLOOR

FINISHES.

X

R e fr ig e ra to r

DN

A

1 2 3

100 SF

PROJECT

ENGINEER

SUPERVISOR

100 SF/

202 SF

PLAN ROOM

200 SF/

203 SF

BREAK ROOM

318 SF

CONFERENCE

ROOM

300 SF/

41 SF

UNISEX STAFF

TLT

60 SF/

70 SF

UNISEX STAFF

TLT

80 SF/

102 SF

OI&T ROOM

101D

100 SF/

46 SF

HAC

60 SF/

26 SF

ALCOVE

101B

201 SF

MECHANICAL

101C

488 SF/

61 SF

STORAGE

60 SF/

102 SF

ASST. CHIEF

ENGINEER

100 SF/

102 SF

CHIEF ENGINEER

100 SF/

100 SF

FACILITY

PLANNER

100 SF/

96 SF

ENERGY

MANAGER

100 SF/

60 SF

MENS TOILET

60 SF/ 63 SF

WOMENS TOILET

60 SF/

95 SF

M&O

SUPERVISOR

100 SF/

12 SF

CLOSET

100 SF

M&O

SUPERVISOR

100 SF/ 99 SF

M&O

SUPERVISOR

100 SF/ 98 SF

M&O

SUPERVISOR

100 SF/

154 SF

CORRIDOR

C01

54 SF

ADMIN OFFICE

ASST

56 SF/

114 SF

CORRIDOR

C01A

124 SF

CORRIDOR

C01B

177 SF

ELECTRICAL

105A

488 SF/

126 SF

CORRIDOR

C02

65 SF

VESTIBULE

17 SF

STEAM TUNNEL

STL CHANNEL

CABLE RAILING

101D

101C

104 105

112 111 110

108107103102

100A 106

C01CA

101CA

30 SF

VESTIBULE

C01C

105A

18 18

19 19

18 18 18

19 19

10 10

32 32

2 (TYP.)

7 7

1 1 1

3 3 3

3 3 3

118 SF

PROJECT

ENGINEERS

EGRESS

121B

9 SF

SHOWER

118A

15 SF

STORAGE

C01D

C01D

5'-0"

5'-0"

10'-0 1/2"

10'-0 1/2"

5' -1

1/

8"

7'-2 1/2"

5'-9 1/2"

5' -0

2' -3

/2

11'-6"

4'-9" ø

'-6

3'-6"

502 SF

PROJECT

ENGINEERS

WORKSTATIONS

56 SF/

B

36 4036 4036 4036

36 36

36 42

34 14

36 36 36 36 36 36

41 41

12 29

8'-4"

14'-9 3/4"

5' -0

/8

C01C

100121B

ENG.

CLERK/TRANS.MGR

101A

GRAY-SHADED

AREA INDICATES

EXTENTS OF

DEDUCT

ALTERNATE #5/

OPEN OFFICE AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 POC:

AH. INZ

6910 Pacific St #310

Omaha, NE 68106

Phone: 402.553.0234 POC:

IMEG Corp.

2882 106th Street

Des Moines, Iowa

Phone: 515.334.4303

POC:

AMI Enviromental

8802 S 135th Street

Omaha, NE 68138

Phone: 402.397.5001

POC:

BID SET

07/17/2019

Dwg. Of

C

L H

D C

\H o m e \a ta s t\

R

-2

B U

IL

D

IN

G

A lt e rn a te a ta s t.

rv t

/1

/2

:0

:5

P

M

15-QE101

FURNITURE & EQUIPMENT PLAN -

RENOVATION

RENOVATE BUILDING 15

VAHCS MARION, IL

657A5-18-111

7/17/2019 AHT TJF

34 73

BID SET

SCALE: 1/4" = 1'-0"

FURNITURE & EQUIPMENT PLAN - RENOVATION

GENERAL NOTES -

FURNITURE & EQUIPMENT

PLAN

1 REFER TO GENERAL ARCHITECTURAL NOTES ON

SHEET G-001 FOR ADDITIONAL ITEMS NOT COVERED

BY THESE NOTES.

2 DEDUCT ALT #5 ROOMS 107,108,110,111,112 & 113

INTERIOR PARTITIONS TO REMOVE; PROVIDE OPEN

OFFICE AREA.

3 REFER TO FPMET DRAWINGS FOR ADDITIONAL

WORK.

4 REFER TO FINISH PLANS/SCHEDULES FOR

ADDITIONAL ITEMS RELATED TO WORK SHOWN.

5 REFER TO FURNITURE & EQUIPMENT SCHEDULE FOR

PROVIDED BY/INSTALLED BY.

6 MODULAR FURNITURE (WORK STATIONS, CUBICLE

PARTITIONS, ETC.), OFFICE EQUIPMENT, FILE

CABINETS, TABLES AND CHAIRS BY VA UNLESS

NOTED OTHERWISE.

7 FOR TOILET ACCESSORIES PLACEMENT REFER TO

INTERIOR ELEVATIONS

8 SEE SHEET G-001 FOR LIST OF DEDUCT

ALTERNATES.

24 RH-1 ROBE HOOK.

25 SB-1 BENCH, SHOWER, FOLDING.

26 SC-1 SHOWER CURTAIN/ROD/RINGS.

27 SD-1 SOAP DISPENSER (BY VA).

28 SND-2 DISPENSER, SANITARY NAPKIN.

29 SND-1 DISPOSAL, SANITARY NAPKIN.

30 TB-1 TACKBOARD (EXISTING).

31 TBL-1 LAYOUT TABLE, 24” X 60” (BY VA).

32 TBL-2 CONFERENCE TABLE, 24” X 60” (BY VA).

33 TBL-3 LAYOUT TABLE/FLAT FILES (EXISTING) (BY

VA).

34 TP-1 TOILET PAPER DISPENSER, 2-ROLL (BY VA).

35 TV-1 TV, FLAT-SCREEN, W/ WALL BRACKET (BY

VA).

36 WP-1 ROLLER WINDOW SHADE- DEDUCT

ALTERNATE #2 DELETE SHADES.

37 MS-1 MOP SHELF.

38 MB-1 MARKER BOARD (EXISTING).

39 SUMP PUMP - SEE PLBG.

40 DEDUCT ALT. #3 - DELETE WINDOWS & INSTALL

INFILL AT OPENING.

41 DEDUCT ALT. #5 - OPEN OFFICE AREA - SEE

DEDUCT ALTERNATE #5 NOTE.

42 WT-2 BLACKOUT ROLLER SHADE - DEDUCT

ALTERNATE #2 DELETE SHADES.

43 TWB-1, TOWEL BAR.

1 CH-1 CHAIR(S) – WORK STATIONS (BY VA).

2 CH-2 CHAIR(S) – CONFERENCE ROOM (BY VA).

3 CH-3 CHAIR(S) – WAITING AREA/OFFICES (BY VA).

4 COP-1 PHOTOCOPIER (EXISTING) (BY VA).

5 DC-1 WALL-MOUNTED DISPLAY CASE (EXISTING)

6 (NOT USED)

7 DK-1 DESK, 24” X 48” (BY VA).

8 FC-1 CABINET, LATERAL FILE (EXISTING) (BY VA).

9 FC-2 CABINET, FILE (EXISTING) (BY VA).

10 FC-3 CABINET, FLAT FILE (EXISTING) (BY VA).

11 FEC FIRE EXTINGUISHER CABINET – SEE DTL

#/15-AE501.

12 GB-18 GRAB BAR – 18”.

13 GB-36 GRAB BAR – 36”.

14 GB-42 GRAB BAR – 42”.

15 LFP-1 PRINTER, LARGE-FORMAT (EXISITNG) (BY

VA).

16 MIR-1 MIRROR/SHELF.

17 (NOT USED)

18 MWS-1 WORK STATION (MODULAR FURNITURE)

(BY VA).

19 MWS-2 CUBICLE PARTITION (MODULAR

FURNITURE) (BY VA).

20 PC-1 ADA UNDER-SINK PLUMBING LINE COVERS.

21 PTD-1 PAPER TOWEL DISPENSER (BY VA).

22 (NOT USED)

23 REF-1 REFRIGERATOR (EXISTING).

X

Revisions: Date:

KEY NOTES -

FURNITURE & EQUIPMENT PLAN

Sheets
X-001 - COVER SHEET & INDEX OF DRAWINGS
G-001 - GENERAL NOTES, ABBREVIATIONS & SYMBOLS
G-002 - WALL TYPES & PARTITION DETAILS
15-GI101 - LIFE SAFETY & CODE REVIEW PLAN
15-GI102 - LIFE SAFETY & CODE REVIEW
15-AD101 - FLOOR PLAN - DEMOLITION
15-AD102 - REFLECTED CEILING PLAN - DEMOLITION
15-AD103 - ROOF PLANS - DEMOLITION & RENOVATION
15-AE101 - FLOOR PLAN - RENOVATION
15-AE501 - ARCHITECTURAL DETAILS
15-AE502 - ARCHITECTURAL DETAILS - ROOF & LADDER
15-AE503 - INTERIOR DETAILS
15-AE901 - INTERIOR ELEVATIONS
15-AE902 - INTERIOR ELEVATIONS
15-AC101 - REFLECTED CEILING PLAN & DETAILS - RENOVATION
15-AF101 - FINISH & SIGNAGE PLAN - RENOVATION
15-QE101 - FURNITURE & EQUIPMENT PLAN - RENOVATION
X-001 Rev 21-05-25 Sig Block.pdf
Sheets
15-AC101 - REFLECTED CEILING PLAN & DETAILS - RENOVATION
15-AD101 - FLOOR PLAN - DEMOLITION
15-AD102 - REFLECTED CEILING PLAN - DEMOLITION
15-AD103 - ROOF PLANS - DEMOLITION & RENOVATION
15-AE101 - FLOOR PLAN - RENOVATION
15-AE501 - ARCHITECTURAL DETAILS
15-AE502 - ARCHITECTURAL DETAILS - ROOF & LADDER
15-AE503 - INTERIOR DETAILS
15-AE901 - INTERIOR ELEVATIONS
15-AE902 - INTERIOR ELEVATIONS
15-AF101 - FINISH & SIGNAGE PLAN - RENOVATION
15-GI101 - LIFE SAFETY & CODE REVIEW PLAN
15-GI102 - LIFE SAFETY & CODE REVIEW
15-QE101 - FURNITURE & EQUIPMENT PLAN - RENOVATION
G-001 - GENERAL NOTES, ABBREVIATIONS & SYMBOLS
G-002 - WALL TYPES & PARTITION DETAILS
X-001 - COVER SHEET & INDEX OF DRAWINGS

File details come from the government source that posted it. Updated .