This document provides details on a federal contract opportunity to renovate Building 15. The solicitation number is 36C25522R0046_1 to renovate Building 15 under Project #657A-18-111. The opportunity is being offered by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The description specifies renovating Building 15 but does not include additional details on products, services, pricing, or response dates required to complete the renovation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AL STOREFRONT
PARTITION AS
SCHEDULED
4" LT. GA. MTL.
STUD (TYP)
502 SF
PROJECT
ENGINEERS
WORKSTATIONS
56 SF/ 100 SF
PROJECT
ENGINEER
SUPERVISOR
100 SF/
SPANDREL GLASS - SEE EXTERIOR BLDG ELEV
CAULK (TYP)
J-BEAD (TYP)
WINDOW SILL
(TYP)
FILL VOID IN WINDOW OPENING W/
FIBERGLASS BATT INSUL W/ VAPOR
BARRIER BETWEEN GWB/FRAMING
F.O. EXT
WALL (TYP)
F.O.
FURRED
WALL (TYP)
SEE FLOOR PLAN
FOR WALL TYPE
CG-1
3 1/8" 3 1/8"
VINYL CORNER GUARD W/
CONTINUOUS RETAINER
ATTACHED
TO METAL STUDS, TYP.
VINYL CORNER GUARD W/
CONTINUOUS RETAINER
ATTACHED
TO METAL STUDS, TYP.
SEE FLOOR PLAN
FOR WALL TYPE
CG-2
3/
4"
0.
08CONC
RESILIENT
FLOORING
TRANSITION STRIP
AS SCHEDULED
1 1/8"
CONC
0' - 1 5/16" 3/
8"
QUARRY TILE
C-L DOOR
TRANSITION
STRIP AS
SCHEDULED
CONC
0' - 1 1/4"
1/ 8"
CERAMIC TILE
C-L DOOR
TRANSITION
STRIP AS
SCHEDULED
SEE FLOOR PLAN
FOR WALL TYPE
CG-3
2 1/8"
VINYL CORNER GUARD W/
CONTINUOUS RETAINER
ATTACHED
TO METAL STUDS, TYP.
FIRST FLOOR
458'-4"
PROJECT
ENGINEERS
460'-0"
PARTITION AS SCHEDULED
EXTEND GWB TO FINISH FLOOR -
LAMINATE TO WALL AND SHIM AS
REQ'D TO PLUMB
PROJECT ENGINEERS
121A
PLAN ROOM
CONC LEVELING TOPPING /
PATCHING - SEE STRUCT &
DEDUCT ALTERNATE #4
EXIST CONC FLOOR
SEE STRUCT FOR EXTENTS OF CONCRETE FLOOR & WALL REMOVAL-REPLACEMENT FOR
UNDERFLOOR WORK - COORDINATE W/ MECH & ELECT
EXIST CONC WALL
PATCH AND REPAIR FLOOR
WHERE CLAY TILE/PLASTER
WALL REMOVED
BASE AS SCHEDULED (TYP)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 POC:
AH. INZ
6910 Pacific St #310
Omaha, NE 68106
Phone: 402.553.0234 POC:
IMEG Corp.
2882 106th Street
Des Moines, Iowa
Phone: 515.334.4303
POC:
AMI Enviromental
8802 S 135th Street
Omaha, NE 68138
Phone: 402.397.5001
POC:
BID SET
07/17/2019
Dwg. Of
C
L H
D C
\H o m e \a ta s t\
R
-2
B U
IL
D
IN
G
A lt e rn a te a ta s t.
rv t
/1
/2
:0
:4
P
M
15-AE503
INTERIOR DETAILS RENOVATE BUILDING 15
VAHCS MARION, IL
657A5-18-111
7/17/2019 AHT KRK/TJF
25 73
BID SET
SCALE: 1 1/2" = 1'-0"
B1
WALL DETAIL AT ALUM STOREFRONT
SCALE: 3" = 1'-0"
B3
CG-1 DETAIL
SCALE: 3" = 1'-0"
B5
CG-2 DETAIL
SCALE: 12" = 1'-0"
B8
FLOOR TRANSITION DETAIL- RESILIENT FLOORING TO CONC. TR-1
SCALE: 12" = 1'-0"
C1
FLOOR TRANSITION DETAIL - CONC. TO QUARRY TILE, TR-2
SCALE: 12" = 1'-0"
C5
FLOOR TRANSITION DETAIL - CONC. TO CERAMIC TILE TR-3
SCALE: 3" = 1'-0"
B6
CG-3 DETAIL
Revisions: Date:
SCALE: 1 1/2" = 1'-0"
E1
WALL DETAIL - RMS 120-121A
FIRST FLOOR
458'-4"
P-1
(TYP.)
RB-1
RB-1
(TYP.)
P-1
(TYP.)
RAMP
S-1 S-1
FURRED WALL NEEDED ABOVE
WINDOWS TO B.O. ROOF DECK
3 3
B7
15-AE501
15-AE301
S-1
CG-1
7 7 7
15-AE201
FIRST FLOOR
458'-4"
P-4 P-4
RB-1
15-AE201
CORRIDOR
C02
CG-1 CG-1
RB-1
FIRST FLOOR
458'-4"
PROJECT
ENGINEERS
460'-0"
P-1
P-1
P-1 P-1
F1
15-AE501
F3
15-AE501
F7
15-AE501
15-AE201
15-AE301
P-1
21 2
CG-1
15-AE201
FIRST FLOOR
458'-4"
PROJECT
ENGINEERS
460'-0"
S-1S-1
P-1
S-1
15-AE501
F7
B3
15-AE501
15-AE201
P-1
P-1
RAMP - SEE
FLOOR PLAN
& DETAILS
15-AE301
CG-1
CG-1
FIRST FLOOR
458'-4"
P-4
P-4
CG-1CG-1
FIRST FLOOR
458'-4"
15-AE201
3' -0
MB-1
FIRST FLOOR
458'-4"
4' -0
P-1
TYP.
FIRST FLOOR
458'-4"
EP-1
5' -0
MS-1
QT-1 BASE
MOP SINK -
SEE PLBG.
FIRE EXT CABINET
SURROUND -
SEE SHT 15-AF501
FIRST FLOOR
458'-4"
EP-1
QT-1 BASE
FIRST FLOOR
458'-4"
EP-1
MOP SINK -
SEE PLBG
MS-1
(MOP SHELF)
5' -0
QT-BASE
FIRST FLOOR
458'-4"
P-4
CG-1 CG-1
FIRST FLOOR
458'-4"
P-1
CORR
C01
CG-2
CG-1
FIRST FLOOR
458'-4"
P-1
CG-1
100A 102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 POC:
AH. INZ
6910 Pacific St #310
Omaha, NE 68106
Phone: 402.553.0234 POC:
IMEG Corp.
2882 106th Street
Des Moines, Iowa
Phone: 515.334.4303
POC:
AMI Enviromental
8802 S 135th Street
Omaha, NE 68138
Phone: 402.397.5001
POC:
BID SET
07/17/2019
Dwg. Of
C
L H
D C
\H o m e \a ta s t\
R
-2
B U
IL
D
IN
G
A lt e rn a te a ta s t.
rv t
/1
/2
:0
:4
P
M
15-AE901
INTERIOR ELEVATIONS RENOVATE BUILDING 15
VAHCS MARION, IL
657A5-18-111
7/17/2019 AHT TJF/KRK
29 73
BID SET
SCALE: 1/4" = 1'-0"
B1
PROJECT ENGINEER WORKSTATIONS 121 - NORTH ELEVATION
SCALE: 1/4" = 1'-0"
B4
PROJECT ENGINEER WORKSTATIONS 121 - EAST ELEVATION
SCALE: 1/4" = 1'-0"
B6
PROJECT ENGINEER WORKSTATIONS 121A - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
C1
PROJECT ENGINEER WORKSTATIONS 121 - WEST ELEVATION
SCALE: 1/4" = 1'-0"
C4
ASST SECY 101A - EAST ELEVATION
GENERAL NOTES -
INTERIOR ELEVATIONS
1 REFER TO GENERAL ARCHITECTURAL NOTES ON
SHEET G-001 FOR ADDITIONAL ITEMS NOT
COVERED BY THESE NOTES.
3 REFER TO FPMET DRAWINGS FOR ADDITIONAL
WORK.
4 REMOVE WALL-MOUNTED ITEMS INCLUDING
LIGHT FIXTURES, TELECOMMUNICATIONS
EQUIPMENT, LOUDSPEAKERS, SENSORS,
SIGNAGE, ETC. SALVAGE AND STORE FOR REUSE
AS SHOWN IN THE CONSTRUCTION DOCUMENTS
OR AS DIRECTED BY THE COR. ITEMS
DESIGNATED FOR REUSE SHALL BE STORED IN A
LOCATION APPROVED BY THE COR. FOR ITEMS
NOT OTHERWISE IDENTIFIED WHICH ARE
REMOVED, REVIEW WITH THE COR FOR
DISPOSITION, I.E. SALVAGE AND RETURN TO VA
OR DISPOSAL.
5 PROTECT EXISTING WALL-MOUNTED ITEMS TO
REMAIN IN PLACE DURING CONSTRUCTION.
TEMPORARY REMOVAL MAY BE REQUIRED AS
PART OF THE WORK FOR RESTORATION OF
STUCCO.
6 REFER TO HAZARDOUS MATERIAL DRAWINGS
FOR PRESENCE AND HANDLING OF EXISTING
ASBESTOS-CONTAINING MATERIALS (ACM)
INCLUDING (BUT NOT LIMITED TO) WINDOW
CAULKING, ROOF FLASHINGS AND STUCCO
VENEER.
7 REFER TO COLOR AND ROOM FINISH SCHEDULES,
EQUIPMENT PLAN AND SCHEDULE FOR
ADDITIONAL ITEMS WHICH MAY NOT BE SHOWN
OR IDENTIFIED ON ELEVATIONS.
8 SEE EQUIPMENT SCHEDULE FOR IDENTIFICATION
OF TOILET ACCESSORIES.
9 PROVIDE 16 GA. SHEET METAL BACKING IN WALLS
FOR ALL WALL-MOUNTED ITEMS SHOWN.
10 PLACE ALL WALL-MOUNTED ITEMS AT
ADA-MANDATED HEIGHTS PER VA ACCESSIBILITY
GUIDELINES.
11 SEE SHEET G-001 FOR LIST OF DEDUCTS ALTS.
12 SEE COLOR SCHEDULE FOR HM DOOR & DOOR
FRAME PAINT COLOR.
KEY NOTES - INTERIOR
ELEVATIONS
1 DEDUCT ALT #3 - DELETE NEW WINDOW -
CONTINUE FURRED WALL/GWB TO COVER
OPENING.
2 NEW REPLICA HISTORIC ALUMINUM WINDOW
ASSEMBLY WITH SOLID-SURFACE SILL/APRON.
SEE DETAILS SHEET 15-AE702.
3 SOLID-SURFACE WINDOW SILL/APRON. SEE
DETAILS SHEET 15-AE702.
4 NEW RUBBER TREAD/RISER COVER. SEE COLOR
SCHEDULE.
5 STEEL CHANNEL GUARD WITH STEEL BAR
STANCHIONS AND STAINLESS STEEL AIRCRAFT
CABLE INFILL. SEE DETAIL F6//15-AE501.
6 BENT PLATE TOEKICK/POUR STOP. SEE DETAIL
F6/15-AE501.
7 NEW ALUMINUM STOREFRONT WINDOW
SYSTEM. SEE SHEET 15-AE702.
8 RAMP TO EXTERIOR DOOR THRESHOLD. SEE
DETAIL B7/15-AE501.
9 DOOR/FRAME AS SCHEDULED. SEE SHEET
15-AE701.
10 REFRIGERATOR – SEE EQUIPMENT
PLAN/SCHEDULE.
11 (NOT USED)
12 (NOT USED)
13 GWB/METAL STUD CEILING BULKHEAD TO 6”
ABOVE FINISH CEILING. SEE DETAIL C1/15-AC101.
14 (NOT USED)
15 SHOWER HEAD - SEE PLUMBING.
16 SHOWER HEAD/CONTROL WALL. SEE PLUMBING
17 EXISTING OVERHEAD STRUCTURAL STEEL
MATERIAL DRAWINGS FOR LEAD-BASED PAINT
ABATEMENT.
18 (RESERVED).
19 (RESERVED).
20 SALVAGED MARBLE SHOWER STALL PANEL –
INSTALL ON EAST WALL OF SHOWER STALL.
INSTALL SALVAGED MARBLE THRESHOLD AT
OPENING. SEE DETAILS SHEET 15-AE501.
21 ACCESS CARD READER – SEE ELECT. & TECH.
DRAWINGS.
22 DRINKING FOUNTAIN W/ BOTTLE FILLER: SEE
PLUMBING.
23 EXISTING TACKBOARD: REINSTALL. SEE
EQUIPMENT PLAN.
24 EXISTING WALL-MOUNTED DISPLAY CASE:
REINSTALL. SEE EQUIPMENT PLAN.
SCALE: 1/4" = 1'-0"
E5
CONFERENCE ROOM 116 - EAST ELEVATION
SCALE: 1/4" = 1'-0"
E3
CONFERENCE ROOM 116 - SOUTH-EAST ELEVATION
SCALE: 1/4" = 1'-0"
D5
HAC 115 - NORTH ELEVATION
SCALE: 1/4" = 1'-0"
D7
HAC 115 - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
E1
HAC 115 - WEST ELEVATION
SCALE: 1/4" = 1'-0"
C6
ENG. CLERK/TRANS. MGR 101A - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
D1
ENG. CLERK/TRANS. MGR 101A - WEST ELEVATION
SCALE: 1/4" = 1'-0"
D3
ENG. CLERK/TRANS. MGR 101A - NORTH ELEVATION
P-1
TYP.
TV-1
X
EQ EQEQ EQ
Revisions: Date:
FIRST FLOOR
458'-4"
EP-1
PTD-1
CT-4
CT-3
CT-2
CT-3
M A
X 3'
-5
/8
PC-1
M A
X 2'
-1 0"
FIRST FLOOR
458'-4"
3' -6
EP-1
SD-1
GB-36
GB-18
GB-42
CT-3
M A
X 3'
-4
/8
M A
X 2'
-1 0"
M A
X
3' -0
FIRST FLOOR
458'-4"7 7/8"
M
IN
2'
-0
EP-1
GB-36
GB-42
GB-18
SND-1
PTD-1
CT-4
CT-3
CT-2
CT-3
MAX
1'-0 1/8"
MIN
3'-6"
1' -6
TP-1
4"
FIRST FLOOR
458'-4"
EP-1
PTD-1
MIR-1
M A
X 3'
-6
M A
X 2'
-1 0"
CT-3
CT-4
CT-3
CT-2 PC-1
FIRST FLOOR
458'-4"
GB-18
GB-42
TP-1
GB-36
SND-1
EP-1
CT-4
CT-2
CT-3
1'-0 1/8"3'-6"
CT-3
SND-2
8"
FIRST FLOOR
458'-4"
EP-1
MIR-1
SD-1
PTD-1
GB-18
GB-36
M A
X 2'
-1
3/ 4"
4"1' -6
3'-0"
M A
X 3'
-4
PC-1
GB-42
CT-3
CT-4
CT-3
M A
X
2' -1
0"
FIRST FLOOR
458'-4"
GB-18
GB-42
GB-36
TP-1
SND-2
EP-1
CT-3
CT-4
CT-3
M A
X 2'
-5
/4
8"
CT-2
FIRST FLOOR
458'-4"
M A
X
2' -1
0"
EP-1
SD-1
PC-1
CT-4
CT-3
CT-2
CT-3
3' -2
/8
FIRST FLOOR
458'-4"
M A
X
3' -4
M
A X
2'
-1 0"
EP-1
GB-18
GB-36
GB-42
TP-1
SND-1
MIR-1
SD-1
PC-1
CT-4
CT-3
M A
X
3' -0
PTD-13'-0"
CT-3
M A
X
3' -4
/8
3' -2
/8
FIRST FLOOR
458'-4"
M A
X
2' -1
0"
EP-1PTD-1
PC-1
3' -6
"CT-3
SD-1
CT-4
CT-3
CT-2
3' -2
/8
FIRST FLOOR
458'-4"
EP-1 20
GB-18
GB-36
SB-1
SC-1
CT-4
CT-3
CT-2
CT-3
FIRST FLOOR
458'-4"
EP-1
GB-18
GB-42
GB-36
TP-1
SND-1
WALL TO 6" ABOVE CEILING
4" 1'
-6
3'-6"
CT-2
8 1/8"
M
IN
2' -0
2' -6
/8
RH-1
TWB-1
CT-3
CT-3
FIRST FLOOR
458'-4"
M A
X
3' -4
EP-1
GB-18
GB-36
GB-42
TP-1
SND-1
MIR-1
M A
X 2'
-1 0"
3' -0
4" 1' -6
3'-0"
SD-1
PC-1
6"
FIRST FLOOR
458'-4"
EP-1
CT-4
CT-3
CT-2
CT-3
FIRST FLOOR
458'-4"
EP-1
6" 4'
-0
8"
3/ 8"
CT-4
CT-2
CT-3
SND-2
M A
X 3'
-6
CT-3
FIRST FLOOR
458'-4"
EP-1
CT-3
CT-3
CT-4
CT-2
FIRST FLOOR
458'-4"
116119
EQ EQ
T .O
. D
IS
P
LA
Y C
A S
E 7'
-2
CG-2
DC-1
CG-1
FIRST FLOOR
458'-4"
C1
15-AC101
CG-1
CG-1
CG-1
1'-6" 1'-6"
4' -0
" 5' -0
A D
A R
E Q
2'
-3
S-1
FIRE EXT SIGN -
SEE SHT 15-AF502
REINSTALLED DRINKING FOUNTAIN
W/ BOTTLE FILLER
FIRE EXT CABINET -
SEE SHT 15-AF501
GWB BULKHEAD
CORRIDOR
C02AALCOVE
101B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 POC:
AH. INZ
6910 Pacific St #310
Omaha, NE 68106
Phone: 402.553.0234 POC:
IMEG Corp.
2882 106th Street
Des Moines, Iowa
Phone: 515.334.4303
POC:
AMI Enviromental
8802 S 135th Street
Omaha, NE 68138
Phone: 402.397.5001
POC:
BID SET
07/17/2019
Dwg. Of
C
L H
D C
\H o m e \a ta s t\
R
-2
B U
IL
D
IN
G
A lt e rn a te a ta s t.
rv t
/1
/2
:0
:4
P
M
15-AE902
INTERIOR ELEVATIONS RENOVATE BUILDING 15
VAHCS MARION, IL
657A5-18-111
7/17/2019 AHT TJF/KRK
30 73
BID SET
SCALE: 1/4" = 1'-0"
A1
MENS TLT 104 - NORTH ELEVATION
SCALE: 1/4" = 1'-0"
A2
MENS TLT 104 - EAST ELEVATION
SCALE: 1/4" = 1'-0"
A4
MENS TLT 104 - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
B1
WOMENS TLT 105 - NORTH ELEVATION
SCALE: 1/4" = 1'-0"
B4
WOMENS TLT 105 - SOUTH ELEVATION SCALE: 1/4" = 1'-0"
B6
WOMENS TLT 105 - WEST ELEVATION
SCALE: 1/4" = 1'-0"
C1
UNISEX TLT 117 - NORTH ELEVATION
SCALE: 1/4" = 1'-0"
C4
UNISEX TLT 117 - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
C6
UNISEX TLT 117 - WEST ELEVATION
SCALE: 1/4" = 1'-0"
D1
UNISEX 118 - NORTH ELEVATION
SCALE: 1/4" = 1'-0"
D2
UNISEX 118 - EAST ELEVATION
SCALE: 1/4" = 1'-0"
D4
UNISEX 118 - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
D6
UNISEX 118 - WEST ELEVATION
SCALE: 1/4" = 1'-0"
A6
MENS TLT 104 - WEST ELEVATION
SCALE: 1/4" = 1'-0"
B2
WOMENS TLT 105 - EAST ELEVATION
GENERAL NOTES -
INTERIOR ELEVATIONS
1. SEE SHEET 15-AE901 FOR GENERAL
NOTES - INTERIOR ELEVATIONS.
2. SEE FURNITURE & EQUIPMENT SCHEDULE
SHEET 15-QE601 FOR TOILET ACCESSORY
IDENTIFICATION CODES.
KEY NOTES - INTERIOR
ELEVATIONS
NOTE: SEE SHEET 15-AE901 FOR INTERIOR
ELEVATIONS KEY NOTES LEGEND.
SCALE: 1/4" = 1'-0"
C2
UNISEX TLT 117 - EAST ELEVATION
PTD-1
CT-4
CT-3
PC-1
X
SCALE: 1/4" = 1'-0"
E1
CORRIDOR C02 NORTH ELEVATION
SCALE: 1/4" = 1'-0"
E4
CORRIDOR C02 SOUTH ELEVATION
A
1 2 3
BREAK
ROOM
CONFERENCE
ROOM
STORAGE
ASST.
CHIEF
ENGINEER
CHIEF
ENGINEER
FACILITY
PLANNER
ENERGY
MANAGER
M&O
SUPERVISOR
M&O
SUPERVISOR
WOMENS
TOILET
MENS
TOILET
M&O
SUPERVISOR
M&O
SUPERVISOR
CLOSET
MECHANICAL
101C
OI&T
ROOM
101D
HAC
UNISEX
STAFF
TLT
UNISEX
STAFF
TLT
PLAN
ROOM
PROJECT
ENGINEER
SUPERVISOR
ALCOVE
101B
CORRIDOR
C02 ADMIN
OFFICE
ASST
CORRIDOR
C01B
CORRIDOR
C01A
CORRIDOR
C01
ELECTRICAL
105A
STEAM
TUNNEL
VESTIBULE
STRUCT
+9'-6" +9'-6"
+9'-6"
+9'-6"
+9'-0"
+9'-0"
+9'-0"
1 5
GWB
STRUCT
STRUCT
+9'-6" +9'-6" +9'-6"
+9'-6"
1 1
+9'-6"
BULKHEAD
+9'-5"
+9'-6" +9'-6"
+9'-6"
+9'-6"+9'-6"
BULKHEAD
+8'-11" AFF
+9'-6"
+9'-5" AFF
BULKHEAD
+8'-11"
PROJECT
ENGINEERS
EGRESS
121B
SHOWER
118A
VESTIBULE
C01C
STORAGE
C01D
+9'-5" AFF
+9'-0"
PROJECT
ENGINEERS
WORKSTATIONS
B
+9'-5" AFF +8'-11" AFF
15-AE201
15-AE201
15-AE201
15-AE201
15-AE301
15-AE301
15-AE301
15-AE301
15-AE301
15-AE301
GWB
GWB
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-0"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6" AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
GWB SUSP CLG
9'-0" AFF
GWB SUSP CLG
9'-0"
AFF
GWB SUSP CLG
9'-0"
AFF
Existing Concrete
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-0"
AFF
GWB SUSP CLG
9'-0"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-0"
AFF
GWB SUSP CLG
9'-0"
AFF
GWB SUSP CLG
9'-0"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
AFF
2' x 2' ACT
9'-6"
+8'-0" AFF
1 1
7 7
ALIGN
15-AE201
15-AE301
GRAY-SHADED
AREA INDICATES
EXTENTS OF
DEDUCT
ALTERNATE #5/
OPEN OFFICE AREA
6"
3 5/8" MTL STUD
@ 16" O.C.
3/ 4"
5/8" GWB
ACT TILE
S E
E R
C P
S E
E R
C P
V A
R
IE
S
5/8" GWB
5/8" GWB
CHANNEL MOLDING
ACT TILE
WIRE HANGER & CROSS RUNNER
@ 24" O.C. ATTACHED TO
STRUCTURE ABOVE (TYP
MAIN RUNNER @ 48" O.C. (TYP)
S E
E R
C P
45 D E G R E
ES
D
E G
R E
E S
D
E G
R E E S
D
E G
R E
E S
COMPRESSION POST / STRUT
LOCKING CLIP
3 TURNS IN
1 1/2" TYP.
MAIN RUNNER @
48" O.C.
CROSS RUNNER@
2'-0" O.C.
45 DEGREE SPLAY WIRE BRACING IN
PLANE OF MAIN RUNNER ALL WIRES
ATTACHED TO MAIN RUNNER (4) DIRECTIONS
SPLICE
12 GA. VERTICAL HANGER WIRE @ 4'-0"
ALONG EA. MAIN RUNNER, 3 TURNS MIN
IN 1 1/2" TYP.
GENERAL REFLECTED CEILING NOTES:
1. REFER TO GENERAL ARCHITECTURAL
NOTES ON SHEET G-001 FOR
ADDITIONAL ITEMS NOT COVERED BY
THESE NOTES.
2. GRAY-SHADED AREA WITH HEAVY
DASHED BOUNDARY INDICATES
EXTENTS OF DEDUCT ALTERNATE #5
FOR SINGLE ACOUSTICAL CEILING.
3. REFER TO FPMET DRAWINGS FOR
ADDITIONAL WORK.
4. REFER TO MECHANICAL DRAWINGS (V
SERIES) FOR QUANTITY AND TYPE
OF DIFFUSERS, RETURN AIR GRILLES,
AND EXHAUST GRILLES. SCRIBE
CEILING MATERIALS CAREFULLY FOR A
TIGHT FIT.
5. REFER TO ELECTRICAL DRAWINGS (E
SERIES) FOR QUANTITY AND TYPE OF
LIGHTS, SPEAKERS, DETECTORS,
POWER OUTLETS, ETC. SCRIBE CEILING
MATERIALS CAREFULLY FOR A TIGHT
FIT.
6. CONTRACTOR TO COORDINATE WITH
ALL TRADES.
TRUE
NORTH
PLAN
NORTH
REFLECTED CEILING LEGEND
SUPPLY AIR GRILLE - SEE
MECHANICAL
RETURN AIR GRILLE TO - SEE
MECHANICAL
RECESSED 2X2 LIGHT FIXTURE - SEE
ELECTRICAL
RECESSED 2X4 LIGHT FIXTURE - SEE
ELECTRICAL
GYPSUM WALL BOARD CEILING
SUSPENDED ACOUSTICAL CEILING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 POC:
AH. INZ
6910 Pacific St #310
Omaha, NE 68106
Phone: 402.553.0234 POC:
IMEG Corp.
2882 106th Street
Des Moines, Iowa
Phone: 515.334.4303
POC:
AMI Enviromental
8802 S 135th Street
Omaha, NE 68138
Phone: 402.397.5001
POC:
BID SET
07/17/2019
Dwg. Of
C
L H
D C
\H o m e \a ta s t\
R
-2
B U
IL
D
IN
G
A lt e rn a te a ta s t.
rv t
/1
/2
:0
:3
P
M
15-AC101
REFLECTED CEILING PLAN &
DETAILS - RENOVATION
RENOVATE BUILDING 15
VAHCS MARION, IL
657A5-18-111
7/17/2019 AHT KRK/TJF
31 73
BID SET
SCALE: 1/4" = 1'-0"
REFLECTED CEILING PLAN- RENOVATION
KEY NOTES - REFLECTED
CEILING RENOVATION PLAN
1 NEW 2X2 ACOUSTICAL TILE CEILING/GRID, INCLUDING
LED LIGHTING FIXTURES, IN CORRIDOR, PER DETAILS
ON SHEET 15-AC101. SEE ROOM FINISH SCHEDULE
AND COLOR SCHEDULE FOR CEILING TILE/GRID.
2 OPEN TO STRUCTURE. SEE FINISH SCHEDULE FOR
PAINTING OF TRUSSES / FRAMING AND CONCRETE
ROOF DECK.
3 NEW GWB CEILING. SEE ROOM FINISH SCHEDULE FOR
FINISHES.
4 NEW GWB BULKHEAD TO 6” ABOVE FINISH CEILING.
SEE DETAIL C1/15-AC101.
5 SEE REFLECTED CEILING PLAN AND ROOM FINISH
SCHEDULE FOR USE OF AT(SP) CEILING TILE THIS
ROOM.
6 EXISTING CONCRETE CEILING. SEE ROOM FINISH
SCHEDULE FOR FINISHES.
7 DEDUCT ALT. #5 - DELETE WALLS & BULKHEADS -
INSTALL SINGLE ACOUSTICAL CEILING IN
GRAY-SHADED AREA FOR OPEN OFFICE AREA
ENCOMPASSING ROOMS 107, 108, 109, 110, 111, 112,
113, CORRIDORS C01A, CO1B AND PORTION OF
CORRIDOR C01.
8 SHOWER STALL CEILING W/ CERAMIC TILE OVER
MOISTURE/MOLD-RESISTANT GWB.
9 NEW GWB CEILING.
10 INSTALL CEILING AT END OF PHASE 2 AFTER
TEMPORARY CONSTRUCTION PARTITION REMOVED.
SEE PHASING PLANS.
11 DEDUCT ALT. #5 - PLACE NEW BULKHEAD ALIGNED
WITH PARTITION FOR SINGLE ACOUSITCAL CEILIING
FOR OPEN OFFICE AREA.
12 NOT USED
13 NOT USED
14 NOT USED
15 NOT USED
SCALE: 3" = 1'-0"
C1
TYP. BULKHEAD DETAIL
SCALE: 1 1/2" = 1'-0"
C3
LATERAL SEISMIC BRACE DETAIL FOR SUSPENDED CEILING
X GENERAL NOTES -
REFLECTED CEILING PLAN
DN
A
1 2 3
100 SF
PROJECT
ENGINEER
SUPERVISOR
100 SF/
202 SF
PLAN ROOM
200 SF/
203 SF
BREAK ROOM
318 SF
CONFERENCE
ROOM
300 SF/
41 SF
UNISEX STAFF
TLT
60 SF/
70 SF
UNISEX STAFF
TLT
80 SF/
102 SF
OI&T ROOM
101D
100 SF/
46 SF
HAC
60 SF/
26 SF
ALCOVE
101B
201 SF
MECHANICAL
101C
488 SF/
61 SF
STORAGE
60 SF/
102 SF
ASST. CHIEF
ENGINEER
100 SF/
102 SF
CHIEF ENGINEER
100 SF/ 100 SF
FACILITY
PLANNER
100 SF/
96 SF
ENERGY
MANAGER
100 SF/
60 SF
MENS TOILET
60 SF/ 63 SF
WOMENS TOILET
60 SF/
95 SF
M&O
SUPERVISOR
100 SF/
12 SF
CLOSET
100 SF
M&O
SUPERVISOR
100 SF/ 99 SF
M&O
SUPERVISOR
100 SF/ 98 SF
M&O
SUPERVISOR
100 SF/
154 SF
CORRIDOR
C01
54 SF
ADMIN OFFICE
ASST
56 SF/
114 SF
CORRIDOR
C01A
124 SF
CORRIDOR
C01B
177 SF
ELECTRICAL
105A
488 SF/
126 SF
CORRIDOR
C02
65 SF
VESTIBULE
17 SF
STEAM TUNNEL
118 101D
101C
104 105
112 111 110
108107103102
100A 106
C01CA
101CA
30 SF
VESTIBULE
C01C
105A
RT-1
TR-1
C-2
CG-2
CG-2
1 1
F1
15-AE501
F3
15-AE501
F7
15-AE501
B3
15-AE501
B7
15-AE501
D7
15-AE501
118 SF
PROJECT
ENGINEERS
EGRESS
121B
9 SF
SHOWER
118A
15 SF
STORAGE
C01D
C01D
502 SF
PROJECT
ENGINEERS
WORKSTATIONS
56 SF/
17 13 11
B
15-AE201
15-AE201
15-AE201
15-AE201
15-AE301
15-AE301
15-AE301
15-AE301
15-AE301
15-AE301
15-AE301
TR-3
CT-1
2 2
16 16 16 16
CP
TR-2
TR-3 TR-3
CG-3
15-AE201
15-AE301
CG-1
CG-1
CG-1 CG-1 CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1 CG-1 CG-1 CG-1 CG-1 CG-1
CG-1
CG-1 CG-1
CG-1
CG-1 CG-1
CG-1
C01C
121B
FEC
E1
15-AE503
GRAY-SHADED
AREA INDICATES
EXTENTS OF
DEDUCT
ALTERNATE #5/
OPEN OFFICE AREA
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 POC:
AH. INZ
6910 Pacific St #310
Omaha, NE 68106
Phone: 402.553.0234 POC:
IMEG Corp.
2882 106th Street
Des Moines, Iowa
Phone: 515.334.4303
POC:
AMI Enviromental
8802 S 135th Street
Omaha, NE 68138
Phone: 402.397.5001
POC:
BID SET
07/17/2019
Dwg. Of
C
L H
D C
\H o m e \a ta s t\
R
-2
B U
IL
D
IN
G
A lt e rn a te a ta s t.
rv t
/1
/2
:0
:5
P
M
15-AF101
FINISH & SIGNAGE PLAN -
RENOVATION
RENOVATE BUILDING 15
VAHCS MARION, IL
657A5-18-111
7/17/2019 AHT TJF/KRK
32 73
BID SET
SCALE: 1/4" = 1'-0"
FINISH & SIGNAGE PLAN - RENOVATION
KEY NOTES - FINISH &
SIGNAGE PLAN
1 BASE BID – POLISHED CONCRETE FLOOR.
2 BASE BID – POLISHED CONCRETE FLOOR. DEDUCT
ALTERNATE – NO COVERING / LEVELING TOPPING.
3 BASE BID – ACCENT PAINT P5.
4 RAMP: SEE DETAIL SHT 15-AE501.
5 EXISTING STEAM TUNNEL FLOOR ACCESS DOORS.
PAINT P3.
6 RESILIENT TREAD COVER / NOSING.
7 ANGLED CORNER GUARD CG-2 – SEE DETAIL SHT
15-AE503.
8 INSTALL SALVAGED EXISTING MARBLE SHOWER
PARTITION PANEL ON EAST WALL OF SHOWER.
9 FLOORING TRANSITION STRIP. SEE COLOR
SCHEDULE FOR TRANSITION APPLICATIONS.
10 ACCENT PAINT COLOR FULL WIDTH/HEIGHT OF
WALL - SEE ROOM FINISH SCHEDULE
11 DEDUCT ALTERNATE #5 - DELETE WALLS WITHIN
GRAY-SHADED AREA FOR OPEN OFFICE AREA.
12 STRUCTURE ABOVE TO BE PAINTED – SEE ROOM
FINISH & COLOR SCHEDULES SHEET 15-AE601.
13 DOOR NUMBER / ROOM SIGN - SEE SIGNAGE
SCHEDULE
14 RELOCATED DISPLAY CASE - SEE EQUIPMENT PLAN
15 RELOCATED TACK BOARD - SEE EQUIPMENT PLAN
16 DEDUCT ALTERNATE #3 - DELETE NEW WINDOWS
INDICATED & INFILL OPENINGS W/ CMU/EIFS/DEFS
AT EXTERIOR; CONTINUE GWB WALL OVER
OPENING AT INTERIOR.
17 AREA OF PATCHED OR EXTENDED CONC. FLOOR -
BLEND INTO ADJACENT EXISTING FLOOR.
GENERAL NOTES - FINISH &
SIGNAGE PLAN
1 REFER TO GENERAL ARCHITECTURAL NOTES
ON SHEET G-001 FOR ADDITIONAL ITEMS NOT
COVERED BY THESE NOTES.
2 REFER TO SPECIFICATIONS FOR SUSTAINABLE
DESIGN REQUIREMENTS INCLUDING DISPOSAL
AND SALVAGE OF EXISTING AND NEW BUILDING
MATERIALS.
3 REFER TO FPMET DRAWINGS FOR ADDITIONAL
WORK.
4 REFER TO FINISH SCHEDULE, FURNITURE AND
EQUIPMENT PLANS/SCHEDULES FOR
ADDITIONAL ITEMS RELATED TO WORK SHOWN.
5 REFER TO REFLECTED CEILING PLAN SHEET
15-AC101 FOR CEILING HEIGHTS AND TYPES.
6 PAINT WALLS TO 6” ABOVE FINISH CEILING
PRIOR TO INSTALLATION OF ACOUSTICAL TILE
CEILING GRID.
7 REFER TO COLOR SCHEDULE SHEET 15-AE601
FOR FINISH CODES.
8 SEE SHEET G-001 FOR LIST OF DEDUCT ALTS.
9 SEE SHEET 15-AF102 FOR SIGNAGE SCHEDULE
AND DETAILS
10 SEE EXTERIOR ELEVATIONS FOR EXTERIOR
SIGNAGE
11 REFER TO ROOM FINISH SCHEDULE FOR FLOOR
FINISHES.
X
R e fr ig e ra to r
DN
A
1 2 3
100 SF
PROJECT
ENGINEER
SUPERVISOR
100 SF/
202 SF
PLAN ROOM
200 SF/
203 SF
BREAK ROOM
318 SF
CONFERENCE
ROOM
300 SF/
41 SF
UNISEX STAFF
TLT
60 SF/
70 SF
UNISEX STAFF
TLT
80 SF/
102 SF
OI&T ROOM
101D
100 SF/
46 SF
HAC
60 SF/
26 SF
ALCOVE
101B
201 SF
MECHANICAL
101C
488 SF/
61 SF
STORAGE
60 SF/
102 SF
ASST. CHIEF
ENGINEER
100 SF/
102 SF
CHIEF ENGINEER
100 SF/
100 SF
FACILITY
PLANNER
100 SF/
96 SF
ENERGY
MANAGER
100 SF/
60 SF
MENS TOILET
60 SF/ 63 SF
WOMENS TOILET
60 SF/
95 SF
M&O
SUPERVISOR
100 SF/
12 SF
CLOSET
100 SF
M&O
SUPERVISOR
100 SF/ 99 SF
M&O
SUPERVISOR
100 SF/ 98 SF
M&O
SUPERVISOR
100 SF/
154 SF
CORRIDOR
C01
54 SF
ADMIN OFFICE
ASST
56 SF/
114 SF
CORRIDOR
C01A
124 SF
CORRIDOR
C01B
177 SF
ELECTRICAL
105A
488 SF/
126 SF
CORRIDOR
C02
65 SF
VESTIBULE
17 SF
STEAM TUNNEL
STL CHANNEL
CABLE RAILING
101D
101C
104 105
112 111 110
108107103102
100A 106
C01CA
101CA
30 SF
VESTIBULE
C01C
105A
18 18
19 19
18 18 18
19 19
10 10
32 32
2 (TYP.)
7 7
1 1 1
3 3 3
3 3 3
118 SF
PROJECT
ENGINEERS
EGRESS
121B
9 SF
SHOWER
118A
15 SF
STORAGE
C01D
C01D
5'-0"
5'-0"
10'-0 1/2"
10'-0 1/2"
5' -1
1/
8"
7'-2 1/2"
5'-9 1/2"
5' -0
2' -3
/2
11'-6"
4'-9" ø
'-6
3'-6"
502 SF
PROJECT
ENGINEERS
WORKSTATIONS
56 SF/
B
36 4036 4036 4036
36 36
36 42
34 14
36 36 36 36 36 36
41 41
12 29
8'-4"
14'-9 3/4"
5' -0
/8
C01C
100121B
ENG.
CLERK/TRANS.MGR
101A
GRAY-SHADED
AREA INDICATES
EXTENTS OF
DEDUCT
ALTERNATE #5/
OPEN OFFICE AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 POC:
AH. INZ
6910 Pacific St #310
Omaha, NE 68106
Phone: 402.553.0234 POC:
IMEG Corp.
2882 106th Street
Des Moines, Iowa
Phone: 515.334.4303
POC:
AMI Enviromental
8802 S 135th Street
Omaha, NE 68138
Phone: 402.397.5001
POC:
BID SET
07/17/2019
Dwg. Of
C
L H
D C
\H o m e \a ta s t\
R
-2
B U
IL
D
IN
G
A lt e rn a te a ta s t.
rv t
/1
/2
:0
:5
P
M
15-QE101
FURNITURE & EQUIPMENT PLAN -
RENOVATION
RENOVATE BUILDING 15
VAHCS MARION, IL
657A5-18-111
7/17/2019 AHT TJF
34 73
BID SET
SCALE: 1/4" = 1'-0"
FURNITURE & EQUIPMENT PLAN - RENOVATION
GENERAL NOTES -
FURNITURE & EQUIPMENT
PLAN
1 REFER TO GENERAL ARCHITECTURAL NOTES ON
SHEET G-001 FOR ADDITIONAL ITEMS NOT COVERED
BY THESE NOTES.
2 DEDUCT ALT #5 ROOMS 107,108,110,111,112 & 113
INTERIOR PARTITIONS TO REMOVE; PROVIDE OPEN
OFFICE AREA.
3 REFER TO FPMET DRAWINGS FOR ADDITIONAL
WORK.
4 REFER TO FINISH PLANS/SCHEDULES FOR
ADDITIONAL ITEMS RELATED TO WORK SHOWN.
5 REFER TO FURNITURE & EQUIPMENT SCHEDULE FOR
PROVIDED BY/INSTALLED BY.
6 MODULAR FURNITURE (WORK STATIONS, CUBICLE
PARTITIONS, ETC.), OFFICE EQUIPMENT, FILE
CABINETS, TABLES AND CHAIRS BY VA UNLESS
NOTED OTHERWISE.
7 FOR TOILET ACCESSORIES PLACEMENT REFER TO
INTERIOR ELEVATIONS
8 SEE SHEET G-001 FOR LIST OF DEDUCT
ALTERNATES.
24 RH-1 ROBE HOOK.
25 SB-1 BENCH, SHOWER, FOLDING.
26 SC-1 SHOWER CURTAIN/ROD/RINGS.
27 SD-1 SOAP DISPENSER (BY VA).
28 SND-2 DISPENSER, SANITARY NAPKIN.
29 SND-1 DISPOSAL, SANITARY NAPKIN.
30 TB-1 TACKBOARD (EXISTING).
31 TBL-1 LAYOUT TABLE, 24” X 60” (BY VA).
32 TBL-2 CONFERENCE TABLE, 24” X 60” (BY VA).
33 TBL-3 LAYOUT TABLE/FLAT FILES (EXISTING) (BY
VA).
34 TP-1 TOILET PAPER DISPENSER, 2-ROLL (BY VA).
35 TV-1 TV, FLAT-SCREEN, W/ WALL BRACKET (BY
VA).
36 WP-1 ROLLER WINDOW SHADE- DEDUCT
ALTERNATE #2 DELETE SHADES.
37 MS-1 MOP SHELF.
38 MB-1 MARKER BOARD (EXISTING).
39 SUMP PUMP - SEE PLBG.
40 DEDUCT ALT. #3 - DELETE WINDOWS & INSTALL
INFILL AT OPENING.
41 DEDUCT ALT. #5 - OPEN OFFICE AREA - SEE
DEDUCT ALTERNATE #5 NOTE.
42 WT-2 BLACKOUT ROLLER SHADE - DEDUCT
ALTERNATE #2 DELETE SHADES.
43 TWB-1, TOWEL BAR.
1 CH-1 CHAIR(S) – WORK STATIONS (BY VA).
2 CH-2 CHAIR(S) – CONFERENCE ROOM (BY VA).
3 CH-3 CHAIR(S) – WAITING AREA/OFFICES (BY VA).
4 COP-1 PHOTOCOPIER (EXISTING) (BY VA).
5 DC-1 WALL-MOUNTED DISPLAY CASE (EXISTING)
6 (NOT USED)
7 DK-1 DESK, 24” X 48” (BY VA).
8 FC-1 CABINET, LATERAL FILE (EXISTING) (BY VA).
9 FC-2 CABINET, FILE (EXISTING) (BY VA).
10 FC-3 CABINET, FLAT FILE (EXISTING) (BY VA).
11 FEC FIRE EXTINGUISHER CABINET – SEE DTL
#/15-AE501.
12 GB-18 GRAB BAR – 18”.
13 GB-36 GRAB BAR – 36”.
14 GB-42 GRAB BAR – 42”.
15 LFP-1 PRINTER, LARGE-FORMAT (EXISITNG) (BY
VA).
16 MIR-1 MIRROR/SHELF.
17 (NOT USED)
18 MWS-1 WORK STATION (MODULAR FURNITURE)
(BY VA).
19 MWS-2 CUBICLE PARTITION (MODULAR
FURNITURE) (BY VA).
20 PC-1 ADA UNDER-SINK PLUMBING LINE COVERS.
21 PTD-1 PAPER TOWEL DISPENSER (BY VA).
22 (NOT USED)
23 REF-1 REFRIGERATOR (EXISTING).
X
Revisions: Date:
KEY NOTES -
FURNITURE & EQUIPMENT PLAN
| Sheets |
| X-001 - COVER SHEET & INDEX OF DRAWINGS |
| G-001 - GENERAL NOTES, ABBREVIATIONS & SYMBOLS |
| G-002 - WALL TYPES & PARTITION DETAILS |
| 15-GI101 - LIFE SAFETY & CODE REVIEW PLAN |
| 15-GI102 - LIFE SAFETY & CODE REVIEW |
| 15-AD101 - FLOOR PLAN - DEMOLITION |
| 15-AD102 - REFLECTED CEILING PLAN - DEMOLITION |
| 15-AD103 - ROOF PLANS - DEMOLITION & RENOVATION |
| 15-AE101 - FLOOR PLAN - RENOVATION |
| 15-AE501 - ARCHITECTURAL DETAILS |
| 15-AE502 - ARCHITECTURAL DETAILS - ROOF & LADDER |
| 15-AE503 - INTERIOR DETAILS |
| 15-AE901 - INTERIOR ELEVATIONS |
| 15-AE902 - INTERIOR ELEVATIONS |
| 15-AC101 - REFLECTED CEILING PLAN & DETAILS - RENOVATION |
| 15-AF101 - FINISH & SIGNAGE PLAN - RENOVATION |
| 15-QE101 - FURNITURE & EQUIPMENT PLAN - RENOVATION |
| X-001 Rev 21-05-25 Sig Block.pdf |
| Sheets |
| 15-AC101 - REFLECTED CEILING PLAN & DETAILS - RENOVATION |
| 15-AD101 - FLOOR PLAN - DEMOLITION |
| 15-AD102 - REFLECTED CEILING PLAN - DEMOLITION |
| 15-AD103 - ROOF PLANS - DEMOLITION & RENOVATION |
| 15-AE101 - FLOOR PLAN - RENOVATION |
| 15-AE501 - ARCHITECTURAL DETAILS |
| 15-AE502 - ARCHITECTURAL DETAILS - ROOF & LADDER |
| 15-AE503 - INTERIOR DETAILS |
| 15-AE901 - INTERIOR ELEVATIONS |
| 15-AE902 - INTERIOR ELEVATIONS |
| 15-AF101 - FINISH & SIGNAGE PLAN - RENOVATION |
| 15-GI101 - LIFE SAFETY & CODE REVIEW PLAN |
| 15-GI102 - LIFE SAFETY & CODE REVIEW |
| 15-QE101 - FURNITURE & EQUIPMENT PLAN - RENOVATION |
| G-001 - GENERAL NOTES, ABBREVIATIONS & SYMBOLS |
| G-002 - WALL TYPES & PARTITION DETAILS |
| X-001 - COVER SHEET & INDEX OF DRAWINGS |
File details come from the government source that posted it. Updated .