About this file
Enclosure AA - RTO 4
View the file
Other files for this federal contract opportunity
Show all 50
Space Exploration Networks Services and Evolution (SENSE) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NNG1758863R
Enclosure AA – RTO 4
| SPACE | EXPLORATION | AND | NETWORK | SERVICES | EVOLUTION | (SENSE) |
| Contract | Number | TBD |
Task Order Statement of Work
| Task | Order | Number: | RTO | 4 | ||||||
| Modification: | 0 | |||||||||
| Task | Name: | Space | Geodesy | Network | Sustaining, | Operations, | and | Maintenance | ||
| Task | Period | of | Performance: | April | 4, | 2018 | – | October | 8, | 2019 |
| Modification | Period | of | Performance: | N/A |
| This | Task | Order | (TO) | Statement | of | Work | (SOW) | defines | the | requirements | for | the | contractor | to |
| operate | and | maintain | the | NASA | Space | Geodesy | Network | (NSGN) | of | Satellite | Laser | Ranging | (SLR) | |
| and | Very | Long | Baseline | Interferometry | (VLBI) | stations. | This | TO | also | defines | the | requirement | for | |
| the | contractor | to | provide | sustaining | engineering | to | the | NSGN | and | partner | stations. |
I. Scope of Work
| This | task | covers | the | operations, | maintenance, | and | sustaining | engineering | of | the | NASA | systems | ||
| at | the | Kokee | Park | Geophysical | Observatory | (KPGO) | on | Kauai, | Hawaii, | the | Goddard | Space | Flight | |
| Center's | Geophysical | and | Astronomical | Observatory | (GGAO) | in | Greenbelt, | Maryland, | the | |||||
| MOBile | LASer | station | (MOBLAS) | 4 | SLR | station | at | Monument | Peak, | CA, | and | the | SLR | Data |
| Operations | Center | (DOC) | at | GSFC. |
| NASA | cooperates | and | coordinates | with | a | number | of | international | partners | and | with | the | |
| international | geodetic | services, | including | the | International | Laser | Ranging | Service | (ILRS) | and | the | ||
| International | VLBI | Service | for | Geodesy | and | Astrometry | (IVS). | This | task | also | includes | sustainment | |
| engineering | of | the | partner | stations | shown | in | Table | 1. |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| Type | Name | Location | Operator | ||||
| Legacy | SLR | MOBLAS-7 | GGAO, | Greenbelt, | Maryland | SENSE | (NASA) |
| Legacy | SLR | MLRS | McDonald | Observatory, | Fort |
| Davis, | Texas | ||||
| NASA | Operated | (contractor | |||
| is | Univ. | of | Texas | at | Austin) |
Legacy SLR MOBLAS-4 Monument Peak, Mount Laguna, California
SENSE (NASA)
| Legacy | SLR | TLRS-4 | Haleakala, | Maui, | Hawaii | NASA | Operated | (contractor |
| is | Univ. | of | Hawaii) |
| Legacy | SLR | TLRS-3 | Arequipa, | Peru | NASA | Operated | (contractor |
| is | Universidad | Nacional | de | ||||
| San | Agustin) |
| Legacy | SLR | MOBLAS-8 | Tahiti, | French | Polynesia | Partner | Operated |
| (agreement | with | CNES, | at | ||||
| Univ. | of | French | Polynesia) |
| Legacy | SLR | MOBLAS-6 | Hartebeesthoek, | South | Africa | Partner | Operated |
| (agreement | with | NRF, | |||||
| Hartebeesthoek | Radio |
Observatory)
| Legacy | SLR | MOBLAS-5 | Yarragadee, | Australia | Partner | Operated |
| (agreement | with | |||||
| Geoscience | Australia) |
| VGOS | GGAO7108 | GGAO, | Greenbelt, | Maryland | SENSE | (NASA) | |
| Legacy | VLBI | WESTFORD | Westford, | Massachusetts | MIT, | Haystack | Observatory |
| Legacy | VLBI | KOKEE | KPGO, | Kauai, | Hawaii | SENSE | (NASA) |
| VGOS | KOKEE-VGOS | KPGO, | Kauai, | Hawaii | SENSE | (NASA) | |
| Legacy | VLBI | FORTLEZA | Fortaleza, | Brazil | Mackenzie | University |
Table 1: Current NASA VLBI and SLR stations as part of the NSGN.
II. Technical Task Requirements
1.1. Reporting
| The | Contractor | shall | compile | and | deliver | weekly | reports | [DRD | MGT-04]. | The | Contractor | |
| shall | participate | in | weekly | meetings | with | the | government | to | discuss | and | clarify | the |
| weekly | reports. |
The Contractor shall prepare, present, and deliver monthly status reviews [DRD MGT- 04].
| The | Contractor | report | task | financial | status | in | the | monthly | contract | financial | reports |
| [DRD | MGT-07]. |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| The | Contractor | shall | include | schedules | as | appropriate | in | management | reports | and |
| reviews | [DRD | MGT-04]. |
| The | Contractor | shall | provide | event | reports | [DRD | MGT-04] | to | notify | the | government | of |
| significant | events | such | as | service | outage, | mishaps, | close | calls, | successful | launches, | etc. |
The Contractor shall generate and deliver Safety Summary Reports [DRD MGT-04].
The Contractor shall develop, maintain, and deliver security reports and records [DRD
SEC-03].
1.2. VLBI
| 1.2.1. Sustaining | Engineering | ||||||||||
| The | Contractor | shall | perform | VLBI | sustaining | engineering | including | evaluating, | planning, | ||
| designing, | implementing, | testing, | verifying, | and | validating | system | and | configuration | |||
| changes | necessary | to | continue | VLBI | operations | and | to | minimize | lifecycle | costs. | The |
| Contractor | shall | conduct | sustaining | engineering | for | systems | at | Kokee | Park | Geophysical | |
| Observatory | and | Goddard | Space | Flight | Center's | Geophysical | and | Astronomical | |||
| Observatory | including | hydrogen | maser | frequency | standards, | low | noise | amplifier, | |||
| cryogenic | systems | and | low | noise | microwave | receivers. |
| The | Contractor | shall | participate | in | government | led | VLBI | sustaining | engineering | forums |
| and | provide | input | as | subject | matter | experts. |
| The | Contractor | shall | implement | a | VLBI | discrepancy | reporting | process | which | shall |
| prioritize | and | describe | operational | problems | and | resolution | history, | to | identify | and |
| diagnose | trends | and | systemic | problems. |
| The | Contractor | shall | perform | configuration | management | of | VLBI | components | in |
| accordance | with | SGP-MGMT-PROC-0002. |
| The | Contractor | shall | integrate, | test, | verify | and | validate, | and | transition | VLBI | system | and |
| configuration | changes | to | operations | in | accordance | with | the | SENSE | SEMP | [DRD | MGT-12]. |
1.2.2. Operations
| The | Contractor | shall | configure | VLBI | equipment | to | perform | observations | and | monitor |
| network | systems | during | operations | to | detect, | isolate, | resolve, | and | record | discrepancies. |
| The | Contractor | shall | conduct | approximately | two | 24 | hour | observing | sessions | plus | one, | |||
| one | hour | intensive | observation | session | per | week | at | the | Kokee | Park | VLBI | Station, | per | the |
| schedule | coordinated | with | the | IVS. | Contractor | personnel | shall | work | nights | or | irregular | |||
| shifts | as | necessary | to | support | the | observation | schedule. |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| The | Contractor | shall | operate | equipment | for | NASA's | VLBI | measurement | operations | and | ||
| other | geodetic | operations | (such | as | test | campaigns | and | performance | testing) | at | GGAO. | |
| The | Contractor | shall | also | provide | support | for | the | operation | of | the | DORIS, | GLObal |
| NAvigation | Satellite | System | (GNSS), | and | IGS | Global | Positioning | System | (GPS) | equipment. |
| The | Contractor | shall | provide | logistics | services | in | support | of | VLBI | activities | at | Table | 1 |
| sites. | The | Contractor | shall | provide | research, | procurement, | packing/receiving, | shipping, | |||||
| property | management, | and | inventory | control | of | property, | spare | parts, | tools | and | |||
| supplies | retained | for | use | in | support | of | the | systems | operation | and | maintenance, | and | |
| sustainment | requirements. |
The Contractor shall provide logistics services in accordance with:
| • NPR | 6000.1H: | Requirements | for | Packaging, | Handling, | and | Transportation | for |
| Aeronautical | and | Space | Systems, | Equipment | and | Associated | Components |
• MIL-STD-2073-1
• NPR 4100.1D: NASA Materials Inventory Management Manual
The Contractor shall conduct and deliver property inventories (DRD OPS-04).
1.2.3. Maintenance
| The | Contractor | shall | replace | failed | or | degraded | hardware | components | as | necessary | to | ||
| continue | operations | at | the | KPGO | and | GGAO | VLBI | stations. | The | Contractor | shall | ||
| maintain | low | noise | microwave | receiving | equipment, | cryogenic | systems, | S | and | X-band | |||
| receivers, | hydrogen | maser | frequency | standards | and | service | equipment, | including | |||||
| approximately | eleven | NR | Series | masers. | Maintenance | of | maser, | data | terminals, | and | |||
| recorders | at | Kokee | Park | is | the | responsibility | of | other | organizations | and | not | the | |
| responsibility | of | the | SENSE | contractor. | The | Contractor | shall | repair, | return | to | vendor | for | |
| repair, | or | dispose | of | failed | or | degraded | hardware | components | as | appropriate. |
| The | Contractor | shall | schedule | maintenance | activities | on | the | operational | VLBI | systems | in |
| accordance | with | the | operational | schedule. |
| The | Contractor | shall | provide | support | for | the | maintenance | of | the | DORIS, | GLObal | |
| NAvigation | Satellite | System | (GNSS), | and | IGS | GPS | equipment, | as | requested | by | the | IDS |
| and | IGS | Network | Operations | contacts. |
| The | Contractor | shall | support | maintenance | of | the | VLBI | partner | stations | when | support | is | |
| requested | by | partner | station | personnel. | The | Contractor | shall | recommending | responses | ||||
| to | operational | discrepancies | at | partner | stations | or | implementing | responses | to | ||||
| operational | discrepancies | at | those | sites. | The | Contractor | shall | repair | and | return | failed | or | |
| degraded | hardware | from | the | VLBI | partner | stations | listed | in | table | 1. |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| The | Contractor | shall | store | two | space | hydrogen | masers | in | contractor | provided | off-site |
| laboratory | space. |
1.3. SLR
The Contractor shall perform all work related to SLR in compliance with the following
• NSLR-06-0012: SLR Safety Logbook
• NSLR-06-0013: SLR Safety Handbook
| The | Contractor | shall | implement, | maintain, | and | deliver | updates | to | the | Laser | Safety |
| Manual | [DRD | SMA-15]. |
| 1.3.1. Sustaining | Engineering | ||||||||||||
| The | Contractor | shall | perform | SLR | sustaining | engineering | including | evaluating, | planning, | ||||
| designing, | implementing, | testing, | and | verifying | and | validating | system | and | configuration | ||||
| changes | necessary | to | meet | or | exceed | availability | requirements | and | to | minimize | lifecycle | ||
| costs. | The | Contractor | shall | sustain | the | SLR | network | to | achieve | or | exceed | 85% | |
| operational | availability. |
| The | Contractor | shall | provide | sustaining | engineering | for | the | following | types | of | systems: | |||
| mount-servo, | electro-optical, | low | energy | short | pulse | laser, | receiver/data | measurement, | ||||||
| IT, | power | conditioning, | timing, | radar | and | safety. | The | Contractor | shall | review | results | of | ||
| all | stations | operations | and | maintenance | reports, | quick-look | reports, | ILRS | ASC | |||||
| notifications, | ILRS | report | cards, | and | site | surveys | for | the | NASA | SLR | systems | (Table | 1) | for |
| anomalies | and | trends. | The | Contractor | shall | take | appropriate | action | and | report | results | |||
| [DRD | SUS-01]. | The | Contractor | shall | develop | repair | and | replacement | strategies | for | failed | |||
| or | degraded | equipment | at | each | station | and | shall | develop | work-around | strategies | when | |||
| replacement | part | delays | are | anticipated. |
| The | Contractor | shall | use | a | combination | of | contractor | provided | facility | space | and | the |
| MOBLAS-7 | at | GGAO | to | conduct | system | engineering | activities. | The | Contractor | shall | use | |
| the | MOBLAS-7 | station | when | available | for | testing | under | field | conditions. | The | Contractor | |
| shall | provide | any | additional | laboratory/test | facilities | needed | to | conduct | SLR | sustaining | ||
| engineering | activities. |
| The | Contractor | shall | perform | configuration | management | of | SLR | components | in |
| accordance | with | SGP-MGMT-PROC-0002. | The | Contractor | shall | register | station | changes | |
| with | the | ILRS. |
1.3.2. Operations
The Contractor shall operate MOBLAS-4 and MOBLAS-7 stations in accordance with the following
| • NSLR-05-0001 | - | Network | Operating | Procedures | ||
| • NSLR-05-0003 | - | MOBLAS-4 | through | -8 | Operating | Procedures |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| • NSLR-03-0003 | - | MOBLAS-4 | through | -8 | Technical | Manual | |
| • GSFC | 23-6L | - | Laser | Radiation | Source | Use | Approval |
| • GSFC | 23-35LU | - | Laser | Radiation | Source | Personnel | Approval |
| • DRD002402 | - | MOBLAS | 4 | Special | Use | Permit |
| The | Contractor | shall | operate | MOBLAS-4 | 80 | hours | per | week | and | operate | MOBLAS-7 | 120 |
| hours | per | week. | The | Contractor | shall | conduct | tracking | per | the | prioritization | established | |
| by | the | ILRS. |
| The | Contractor | shall | operate | the | SLR | Data | Operations | Center | functions | to | perform | the |
| functions | listed | below | and | in | accordance | with | SCNS-SLR-SRD-0001. |
Data Reception
Receive the flow of Consolidated Laser Ranging Data (CRD) via electronic media from:
| • Table | 1 | and | five | other | SLR | stations | on | an | hourly | basis |
| • the | EuroLAS | Data | Center | (EDC) | hourly | and | once | per | day | |
| • two | Lunar | ranging | stations | episodically |
Data Processing
| The | Contractor | shall | process | all | CRD | received | from | stations | in | accordance | with | |
| Consolidated | Laser | Ranging | Data | Format | version | 1.01 | 27 | October | 2009. | The | ||
| Contractor | shall | assess | the | quality | of | the | data. | The | Contractor | shall | compare | |
| tracking | statistics | between | the | stations | and | the | data | centers | monthly | to | identify | |
| any | lost | or | corrupted | data | and | effect | correction | and | retransmission. |
Data Quality Analysis
| The | Contractor | shall | screen | all | the | CRD | normal | point | data | directly | received | from | |||
| stations | to | determine | the | quality | of | the | data | prior | to | the | release | to | a | data | center |
| for | scientific | analysis, | ensuring | conformance | format | and | data | integrity | in | ||||||
| accordance | with | Normal | Point | Format | and | Data | Integrity | Algorithm. |
| The | Contractor | shall | notify | the | source | station | of | discrepancies | in | the | data | that |
| indicate | malfunctions | or | operator | error | within | 24 | hours. | The | Contractor | shall | ||
| further | assess | and | repair | or | flag | the | suspect | data | when | screening | indicates | out- |
| of-limit | problems | in | NASA | systems' | data. |
| The | Contractor | shall | assess | locally-generated | Consolidated | Prediction | Formats | ||||||
| (CPFs) | in | conjunction | with | station | performance | data | to | ensure | the | CPFs | are | of | a |
| quality | to | provide | direct | satellite | acquisition | by | SLR | ground | stations. |
Data Delivery
| The | Contractor | shall | deliver | CRD | files | to | the | ILRS | data | centers | (Crustal | Dynamics | |
| Data | Information | System | (CDDIS) | and | EDC) | at | minimum | once | per | day. | The | data |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| shall | be | delivered | electronically | in | dated | files | and | contain | all | data | received | since |
| the | previous | data | submission. |
| The | Contractor | shall | provide | logistics | services | in | support | of | SLR | activities | at | Table | 1 | sites. |
| The | Contractor | shall | provide | research, | procurement, | packing/receiving, | shipping, | |||||||
| property | management, | and | inventory | control | of | property, | spare | parts, | tools | and | ||||
| supplies | retained | for | use | in | support | of | the | systems | operation | and | maintenance, | and | ||
| sustainment | requirements. |
The Contractor shall provide logistics services in accordance with:
| • NPR | 6000.1H: | Requirements | for | Packaging, | Handling, | and | Transportation | for |
| Aeronautical | and | Space | Systems, | Equipment | and | Associated | Components |
| • MIL-STD-2073-1 | l | |||||
| • NPR | 4100.1D: | NASA | Materials | Inventory | Management | Manual. |
The Contractor shall conduct and deliver property inventories [DRD OPS-04].
1.3.3. Maintenance
| The | Contractor | shall | maintain | all | SLR | software | and | hardware | in | order | to | achieve | or |
| exceed | 85% | operational | availability | and | to | retain | government | property | value | to | the | ||
| extent | practical. |
| The | Contractor | shall | perform | preventative | and | corrective | maintenance | to | the | MOBLAS- |
| 4 | and | MOBLAS-7 | stations | in | accordance | with | the | following: |
| • NSLR-05-0002 | - | Station | Operating | Procedures | for | Transportable | Laser | Ranging |
| Station | (TLRS) | 3/4 |
| • NSLR-05-0004 | - | MOBLAS-4 | through | -8 | Preventative | Maintenance | Procedures |
| • NSLR-03-0001 | - | TLRS-3/4 | Technical | Manual | |||
| • NSLR-03-0003- | MOBLAS-4 | through | -8 | Technical | Manual |
| The | Contractor | shall | maintain | SLR | software | including | arranging | vendor | maintenance | ||
| agreements | for | commercial | off-the-shelf | (COTS) | products, | corrective | maintenance | of | |||
| operational | custom | software, | modifications | to | existing | operational | custom | software | |||
| systems, | supporting | test | and | integration | of | new | or | modified | software, | installation | of |
| software | products | and | patches, | maintaining | currency | of | software | licenses, | documenting | ||
| software | changes | and | problems, | maintenance | of | operational | parameter | databases, | and | ||
| control | of | software | system | configurations. |
| The | Contractor | shall | replace | failed | or | degraded | hardware | components | as | necessary | to | ||
| meet | or | exceed | contract | requirements. | The | Contractor | shall | repair, | return | to | vendor | for | |
| repair, | or | dispose | of | failed | or | degraded | hardware | components | as | appropriate. |
| The | Contractor | shall | make | available | MOBLAS-7 | for | guided | public | tour, | training, | and |
| testing | purposes. |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| The | Contractor | shall | support | maintenance | of | the | SLR | partner | stations | when | support | is | |
| requested | by | partner | station | personnel. | The | Contractor | shall | recommending | responses | ||||
| to | operational | discrepancies | at | partner | stations | or | implementing | responses | to | ||||
| operational | discrepancies | at | those | sites. | The | Contractor | shall | repair | and | return | failed | or | |
| degraded | hardware | from | the | SLR | partner | stations | listed | in | Table | 1. |
1.3.4. Facilities
| For | the | MOBLAS-4 | SLR | site, | the | Contractor | shall | maintain | the | site | in | accordance | with |
| MOBLAS-4 | infrastructure | requirements | document | M4FR1 | and | MOBLAS | 4 | Special | Use | ||||
| Permit | DRD002402. |
| The | Contractor | shall | maintain | the | GSFC | MOBLAS-7 | SLR | trailers/enclosure | including | |
| wiring, | lighting, | HVAC, | paint, | stairways | and | flooring. | Landscaping, | utilities | (power, | |
| internet), | janitorial | services | and | trash | removal | are | provided | by | NASA. |
| 1.4. Geodetic | Surveying | ||||||||||||||
| The | Contractor | shall | conduct | periodic | first | order | geodetic | surveys | at | NASA | and | non-NASA | |||
| sites, | both | new | and | existing, | inside | and | outside | the | U.S. | The | first | order | geodetic | surveys | |
| shall | include | full | survey | reports | [DRD | FAC-05] | on | the | survey | of: |
| o station | equipment/instruments | ||||||||
| o station | monuments | ||||||||
| o ground | calibration | targets | |||||||
| o system | relationships | to | station | monuments | and | local | area | control | networks |
| The | Contractor | shall | conduct | one | full | co-location | survey | GGAO | during | the | period | of |
| performance | of | this | task. |
III. Government Furnished Facilities, Equipment, Software, and Other Resources
See attached property and software lists.
| The | GGAO | at | Area | 200 | is | the | host | for | GGAO7108 | 5m | and | VGOS | 12m | antenna | systems | and |
| trailers, | and | MOBLAS-7 | trailers. |
| The | Kokee | Park | Geophysical | Observatory | (KPGO) | is | the | host | for | the | 20m | and | VGOS | 12m |
| antenna | systems, | the | Operations | Building, | and | the | Hydro-Mechanical | Building. |
IV. Applicable Documents
| Document | Title | Document | Number | |||
| MOBLAS | 4 | Special | Use | Permit | DRD002402 | |
| MOBLAS | 4 | Infrastructure | Requirements | M4FR1 | ||
| Laser | Radiation | Source | Use | Approval | GSFC | 23-6L |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| Laser | Radiation | Source | Personnel | Approval | GSFC | 23-35 | LU |
| SCNS | SLR | Operations | Center | System | Requirements | SCNS-SLR-SRD-0001 | |
| SCNS | SLR | Laser | Safety | Plan | SCNS-SLR-PLAN-0003 | ||
| Space | Geodesy | Project | Information | and | Configuration | ||
| Management | Procedure |
SGP-MGMT-PROC-
| NASA | Materials | Inventory | Management | Manual | NPR | 4100.1D |
| Requirements | for | Packaging, | Handling, | and | Transportation | |
| Equipment | and | Associated | Components |
NPR 6000.1H
| SLR | Safety | Logbook | NSLR-06-0012 | ||||
| SLR | Safety | Handbook | NSLR-06-0013 | ||||
| Network | Operating | Procedures | NSLR-05-0001 | ||||
| MOBLAS-4 | through | -8 | Operating | Procedures | NSLR-05-0003 | ||
| Station | Operating | Procedures | for | TLRS-3/4 | NSLR-05-0002 | ||
| MOBLAS-4 | through | -8 | Preventative | Maintenance | Procedures | NSLR-05-0004 | |
| MOBLAS-4 | through | -8 | Technical | Manual | NSLR-03-0003 | ||
| TLRS-3/4 | Technical | Manual | NSLR-03-0001 | ||||
| Standard | Practice | for | Military | Packing | MIL-STD-2073-1 | ||
| Consolidated | Laser | Ranging | Data | Format | (CRD) | version | 1.01 |
| 27 | October | 2009 |
CRD1.01
| VLBI | Pre-checks | and | Operations | Manual | IVS | TOW | 2105 |
| VLBI | KPGO | Antenna | System | Maintenance | Local | Operating |
Procedure
SCNS-VLBI-KP-LOP-
| SLR | Government | software | list |
| WeeklyLORsGen18 | RCH2014 |
StationFU15 RCH2014
Logistics RCH2014
Monitor 5.3
Sattrk (Tracking) 7.1
Servo 3.2
Skyplot 1.0
Slew 4.0
Star Cal (Calibration) 3.0 newgui.tcl (Laser Data Processing GUI) 1.6 laserdp_gui.tcl (upgrade to newgui.tcl)
GEODYN 2012
HAVAGO 90.07.1B
PolyQuick 1.0
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
GenerateNormalPoint (GNP) 2.7.4
Laser Data Processing System 1.5
LDP support 9.10.4 dlcpf.sh 1.7 dlbackcpf.sh dlonecpf.sh 1.8 cpf_split 1.6
Schedule 1.4
Controller Processor (CONPRO) 2.0
V. Reference Documents
| Document | Title | Document | Number | ||||
| Quicklook | Example | QE1 | |||||
| ILRS | ASC | notifications | example | ILRSASCN1 | |||
| ILRS | report | card | example | ILRSRC1 | |||
| SLR | site | survey | report | example | SLRSurvey1 | ||
| Normal | Point | Format | and | Data | Integrity | Algorithm | NPFormat1 |
VI. Work Breakdown Structure
1.0 Reporting
2.0 Very Long Baseline Interferometry (VLBI)
| 2.1 Sustaining | Engineering | |||
| 2.1.1 Engineering | Support | |||
| 2.1.2 Configuration | Management | |||
| 2.1.3 Integration | and | Transition | Engineering | Support |
2.2 Operations
| 2.2.1 Kokee | Park | VLBI | Station | ||
| 2.2.2 Geophysical | and | Astronomical | Observatory | VLBI | Station |
2.3 Maintenance
| 2.3.1 Kokee | Park | VLBI | Station | ||
| 2.3.2 Geophysical | and | Astronomical | Observatory | VLBI | Station |
| 2.3.3 Partner | Stations |
| 3.0 Satellite | Laser | Ranging | (SLR) |
| 3.1 Sustaining | Engineering |
| 3.1.1 Engineering | Support |
| 3.1.2 Configuration | Management |
Enclosure AA – RTO 4
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
3.1.3 Integration and Transition Engineering Support
3.2 Operations
| 3.2.1 MOBLAS-4 | Station | |
| 3.2.2 MOBLAS-7 | Station | |
| 3.2.3 Data | Operations | Center |
3.3 Maintenance
| 3.3.1 MOBLAS-4 | Station | |
| 3.3.2 MOBLAS-7 | Station | |
| 3.3.3 Partner | Stations |
3.4 Facilities
| 3.4.1 MOBLAS-4 | Station | |
| 3.4.2 MOBLAS-7 | Station |
4.0 Geodetic Surveying