Enclosure AA - RTO 2
View the file
Other files for this federal contract opportunity
Show all 50
Space Exploration Networks Services and Evolution (SENSE) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SPACE | EXPLORATION | AND | NETWORK | SERVICES | EVOLUTION | (SENSE) |
| Contract | Number | TBD |
Task Order Statement of Work
| Task | Order | Number: | RTO | 2 | ||||||
| Modification: | 0 | |||||||||
| Task | Name: | New | Ka-band | Station | – | Phase | 1 | |||
| Task | Period | of | Performance: | April | 9, | 2018 | – | October | 8, | 2019 |
| Modification | Period | of | Performance: | N/A |
| The | Exploration | and | Space | Communications | (ESC) | Division | has | determined | a | new | station | ||||
| located | within | the | continental | United | States | is | required | to | support | a | new | set | of | NASA | missions |
| requiring | S- | and | Ka-band | support. | This | Task | Order | (TO) | Statement | of | Work | (SOW) | defines | the | |
| requirements | for | the | contractor | to | complete | Phase | 1 | of | the | new | station | project, | concluding | ||
| with | a | successful | Preliminary | Design | Review | (PDR). | After | successful | completion | of | a | PDR, | the | ||
| project | will | be | completed | under | a | separate | Phase | 2 | task | order. |
| I. Technical | Task | Requirements | ||||||||||||||
| The | contractor | shall | complete | Phase | 1 | of | the | new | Near | Earth | Network | (NEN) | station | project | ||
| including | planning, | definition | of | the | architecture, | operations | concept, | requirements, | external | |||||||
| interfaces, | and | preliminary | design. | The | new | station | shall | be | compliant | with | top | level | ||||
| requirements | located | in | Appendix | A | of | this | Statement | of | Work, | as | well | as | design | goals | of | open |
| architecture | solutions | and | life | cycle | costs | that | represent | best | value | to | the | Government | over | the | ||
| expected | operational | lifetime | of | the | station. | The | Task | Implementation | Plan | (TIP) | shall | discuss, | ||||
| at | a | minimum, | the | major | system | internal | and | external | interfaces, | trades | and | IT | Security | |||
| considerations. | The | contractor | may | assume | that | NASA | has | obtained | land | for | the | site, | ||||
| agreements, | and | environmental | assessments | necessary | to | build | the | station. |
| Materials | costs | should | be | excluded | from | the | RTO | response. | Any | long | lead | items | required | to | be | ||
| procured | prior | to | the | completion | of | Phase | 1 | should | be | identified | in | the | TIP, | and | can | be | assumed |
| to | be | procure | under | a | separate | materials | only | task. |
II. Government Furnished Facilities, Equipment, Software, and Other Resources
Land for the station development will be provided by the Government.
Enclosure AA – RTO 2
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
III. Deliverables
| The | contractor | shall | provide | the | following | deliverables. | The | contractor | shall | deliver | and | archive | |
| all | relevant | reports, | briefings, | analyses, | assessments, | and | other | information | as | specified | by | the |
government.
| Deliverable | Description | Due | |||
| Schedule | Include | all | activities | required | to |
| complete | the | Station | project | |||
| (including | Phase | 2). | The | schedule | ||
| completed | as | part | of | this | Phase | 1 |
| task | order | shall | include | critical | ||
| milestones, | dependencies | both | ||||
| within | the | task | and | other | related | |
| activities, | and | the | critical | path | for | |
| the | project. |
| Final | schedule | due | at |
| task | start | plus | 6 |
months.
| Work | Breakdown | Structure | |
| (WBS) | and | WBS | dictionary |
| Description | of | the | work | products | ||
| and | functions | necessary | to | |||
| accomplish | the | project | though | |||
| completion | and | consisting | of | 3 | levels | |
| at | a | minimum. | The | WBS | shall | |
| include | separate | Level | 2 | elements | ||
| for | Project | Management, | System | |||
| Engineering, | Operations | |||||
| preparation, | and | one | for | each | ||
| subsystem, | and | others | as | deemed |
appropriate.
Task start plus 2 months
| Basis | of | Estimate, | Cost |
| Estimate | and | Time-Phased | |
| Spending | Plan |
| The | spending | plan | shall | be | linked | to |
| the | WBS. | The | BOE, | cost | estimate, | |
| and | spending | plan | shall | cover | the | |
| entire | life | cycle | of | the | new | station |
| project, | including | phase | 2. | Phase | 2 | |
| cost | estimate | to | be | a | high | level |
| Rough | Order | of | Magnitude | estimate. |
Task start plus 14 months
| Project | Management | Plan | Description | of | the | management |
| activities | necessary | to | accomplish | |||
| the | project. |
Task start plus 3 months
| Concept | of | Operations | Outline | roles, | responsibilities, | and |
| agreements | with | support | providers. | |||
| Description | of | the | operational | and | ||
| support | environment, | including | ||||
| details | of | the | interaction | between | ||
| operators | and | subsystems, | including | |||
| internal | and | external | interfaces, | for |
SRR minus 14 days
Enclosure AA – RTO 2
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| normal | and | contingency | operations. |
| The | ConOps | also | describes |
| maintenance, | configuration | ||
| management, | security, | logistics, | |
| training, | and | other | support |
functions.
| Systems | Engineering |
| Management | Plan |
| Description | of | the | systems |
| engineering | approach, | including | |
| organizational | responsibilities, | ||
| engineering | management | structure | |
| and | configuration | control. |
Task start plus 7 months
System Requirements Document
| Document | the | new | station | |
| requirements | down | to | the | detailed |
| design | level. |
Task start plus 3 months
| System | and | Subsystem |
| Architecture | and | Requirement |
Documents
| System | architecture | description | and | |
| decomposition | of | all | system | and |
| interface | requirements | allocated | to | |
| the | system | and | subsystem | levels. |
SRR minus 30 days
Requirements Management Plan
| Description | of | methods | and | tools |
| used | to | decompose | requirements, | |
| manage | requirements, | waivers | and | |
| deviations | and | track | requirement |
verification.
Task start plus 5 months
System Requirements Review
(SRR)
| See | GPR | 7120.5a, | Systems |
| Engineering | and | GPR | 8700.6A, |
| Engineering | Peer | Reviews. |
Task start plus 9 months
| Trade | Studies | Identification | of | major | trade | items |
| which | include | considerations | for | |||
| station | technical | performance, | ||||
| obsolescence | issues, | maintainability, | ||||
| development | risk, | operational | ||||
| efficiencies, | lifecycle | cost, | and | other | ||
| factors | (including |
recommendations).
| List | of | planned | trades | |
| at | task | start | plus | 30 |
| days. | Studies | at | task | |
| start | plus | 11 | months |
| Software | Development | Plan | Describes | the | software | development |
| organization | structure, | safety | ||||
| criticality | and | classification | of | the | ||
| software | subsystems, | compliance | ||||
| matrix | for | NPR | 7150.2B | |||
| requirements, | software | engineering | ||||
| environment, | management | of | the | |||
| software | quality | characteristics, | ||||
| management | of | software | safety | and |
Task start plus 6 months
Enclosure AA – RTO 2
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| security, | software | engineering | |
| subcontractor | management, | ||
| software | verification | and | validation, |
| software | personnel | training, | |
| software | lifecycle, | software | |
| configuration | management, | ||
| software | inspection | process, | and |
| software | metrics. |
| Installation, | Integration | and |
| Test | Plan |
| Description | of | method | for | ||
| requirements | validation | and | |||
| compatibility | testing. | Description | of | ||
| any | needed | changes | to | house | the |
| station | down | to | the | Engineering | |
| Change | (EC) | level. |
Task start plus 12 months
| Documentation, | Training | and |
| Logistics | Plan |
| Description | of | the | types | of | |
| documentation | needed | for | the | ||
| operation | of | the | station, | the | training |
| required | (including | training | |||
| methodology) | and | logistics | support |
plans.
Task start plus 13 months
Status Reviews and Progress Reports
| Weekly | and/or | Monthly | meetings | |
| and | reviews | covering | cost, | technical |
| accomplishments, | status | of | ||
| deliverables | and | quantitative | ||
| description | of | overall | progress, | |
| risks/problems | and | possible | ||
| corrective | actions, | and | projected | |
| work | activities | for | following | month. |
| Weekly | and/or |
| Monthly, | as |
appropriate
| System | Security | Plan | Define | the | authorization | boundary |
| of | the | system, | describe | the | ||
| operational | environment | of | the | |||
| information | system, | capture | the | |||
| security | categorization | with | ||||
| rationale, | identify | the | security | |||
| requirements | of | the | system | in | ||
| compliance | with | NPR | 2810.1A, | and | ||
| describe | the | implementation | of | |||
| security | controls | including | any | |||
| tailoring | or | scoping | with | rationale | ||
| and | compensating | controls. |
Initial baseline by
PDR.
| Preliminary | Design | Review | See | GPR | 7120.5a, | Systems |
| Engineering | and | GPR | 8700.6A, | |||
| Engineering | Peer | Reviews. |
10/8/2019 (task end)
Enclosure AA – RTO 2
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
| Final | Task | Report | Comprehensive | explanation | of | |
| results | of | the | task | in | narrative | form. |
| Includes | tables, | graphs, | diagrams, | |||
| photographs, | and | drawings, | as | |||
| needed. | Recommendations | and | ||||
| conclusions, | and | final | incurred | task | ||
| order | cost | is | detailed. |
Task end plus 1 month
IV. Applicable Documents
| Document | Title | Document | Number | ||||
| Goddard | Procedural | Requirements | for | Systems | Engineering | GPR | 7123.1B |
| Goddard | Procedural | Requirements | for | Engineering | Peer |
Reviews
GPR 8700.6A
NASA Procedural Requirements for Security of Information Technology
NPR 2810.1A
| National | Industrial | Security | Program | Operating | Manual | NISPOM | |
| NASA | Procedural | Requirements | for | Software | Engineering | NPR | 7150.2B |
| NEN | User’s | Guide | 453-NENUG | ||||
| Users’ | Guide | for | Near | Earth | Network | Scheduling | 453-UG-NEN- |
Scheduling
| V. Reference | Documents | ||
| Document | Title | Document | Number |
NEN Ka-band Project ESC Overview
Enclosure AA – RTO 2
NNG17588638R
NASA Goddard Space Flight Center – Code 450 Exploration and Space Communications Division
RTO #2 APPENDIX A: New Station Top Level Requirements
| Ground | Support | Network | Station | ||||||||||||||
| Operational | wind | speed | 50 | miles | per | hour | (mph), | 70 | mph | gust | |||||||
| Acceptable | pointing | loss: | 0.9 | db | |||||||||||||
| Local | terrestrial | data | infrastructure | provides | bandwidth | of | 65Tbits/day | ||||||||||
| Local | commercial | power | capacity | is | sufficient | for | the | mission | need. | Estimated | commercial | ||||||
| power | failure | rate | is | 10 | days | per | year | with | an | average | expected | restoration | time | of | 2 | hours | with |
| a | worst | case | of | 12 | hours | twice | per | year. | |||||||||
| Expected | station | operational | life: | 30 | years. | ||||||||||||
| Use | NEN | Availability | and | Proficiency | Metrics | requirements | from | Appendix | B | of | the | contract |
SOW.
| Mission | Profiles: | |||||||
| Mission | 1 | |||||||
| Ka- | band | nominal | operations, | S-band | return | for | emergency | ops |
L2-orbit
| Required | Ka-band | G/T: | 46 | ||
| Required | S-band | G/T: | 21 | ||
| Required | S-band | output | power: | 26 | dBW |
| Data | volume: | 12 | Tbits/day, | Ka-band | |
| 7 | hours | of | contact/day | ||
| Space | Link | Extension | (SLE) | data | interface |
| NIST | FIPS | 200-designated | High | Impact | System |
| Mission | 2 | |||||||
| S-band | forward | and | return | service; | Ka-band | return | service | required |
| Polar | orbit | |||||||
| Required | S-band | G/T: | 18 | |||||
| Required | Ka-band | G/T: | 39 | |||||
| Data | volume: | 5 | Tbits/day | |||||
| Target | data | rate: | 1.2 | Gbps | ||||
| Required | S-band | output | power: | 23.13 | dBW | |||
| University | partnership | with | foreign | national | access | to | data |
| Mission | 3 | ||||||||||
| Polar | orbit | ||||||||||
| Data | volume: | peak | of | 50 | Tbits/day | (6 | hours). | Average | 33 | Tbit/day, | Ka-band |
| Data | rate: | 3.5Gbps | (dual | polarization) | |||||||
| Required | Ka-band | G/T: | 38 | ||||||||
| Standard | NASA | Earth | sciences | mission | with | a | MOCC | on | the | Open | IONet |