About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Remove and Replace B4820 125KVA Uninterruptable Power Supply, newest first.
File Type Posted
Q A-2.pdf PDF
Amendment_05.pdf PDF
Amendment_04.pdf PDF
Revised_SOW_R2.pdf PDF
Amendment_03.pdf PDF
Revised_SOW.pdf PDF
Questions_and_Answers.pdf PDF
Amendment_02.pdf PDF
SF1442.pdf PDF
Site_Visit_Presentation.pptx PPTX presentation
Amendment_01.pdf PDF
Sign-in_Sheet.pdf PDF
Attachment_2_-_Specifications.pdf PDF
NND16571098E_Solicitation_Document.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_3_-_Floor_Plan_and_Pictures.pdf PDF
Attachment_4_-_General_Decision_Number_CA160031.pdf PDF
Attachment_5_-_AFRC_form_10735 _Visit_Request_-_U.S._Citizens.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Q.1: Q and A document PDF has a new drawing E4. This drawing indicates new equipment and work not identified in summary of work are the note #1, #2, and #3 applicable to this project? If so see below:

A.1: The notes #1, #2 and #3 on drawing E4 do not apply to this project. The intent of the drawing E4 is to show that the existing UPS is fed from the main distribution panel PP1-B6.

Q.2: Unit 6 2500 amp panel, note #3 indicates new 800 amp feed to PP1-B6, not in SOW

A.2: The new 800 amp feed to the main distribution panel PP1-B6 indicated in note #3 does not apply to this project.

Q.3: Main Dist. Swbd PP1-B6, indicates new 1200a board note#1, not in SOW

A.3: The new 1200 amp board indicated in note #1 does not apply to this project.

Q.4: Breakers/ Circuits from this new PP1-B6, 1, 3, 10, 14, 16 and 17 all indicate note #1 as new equipment, not in SOW

A.4: The breakers/ circuits from the new PP1-B6, 1, 3, 10, 14, 16 and 17 indicated in note #1 do not apply to this project.

Q.5: General question: all of the work on E4 noted by keyed notes 1,2, and 3 are part of this proposal?

A.5: No, all the keyed notes on E4 are not part of this solicitation.

Q.6: Is there going to be another job walk to determine requirements to add temporary feeders per the new SOW?

A.6: No. There is not going to be another site visit for the temporary feeders requirement.