Q A-1.pdf
PDF 23 KB Posted
- Attached to
- Remove and Replace B4820 125KVA Uninterruptable Power Supply Federal contract opportunity
- Solicitation number
- NND16571098E
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A-2.pdf | ||
| Amendment_05.pdf | ||
| Amendment_04.pdf | ||
| Revised_SOW_R2.pdf | ||
| Amendment_03.pdf | ||
| Revised_SOW.pdf | ||
| Questions_and_Answers.pdf | ||
| Amendment_02.pdf | ||
| SF1442.pdf | ||
| Site_Visit_Presentation.pptx | PPTX presentation | |
| Amendment_01.pdf | ||
| Sign-in_Sheet.pdf | ||
| Attachment_2_-_Specifications.pdf | ||
| NND16571098E_Solicitation_Document.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_3_-_Floor_Plan_and_Pictures.pdf | ||
| Attachment_4_-_General_Decision_Number_CA160031.pdf | ||
| Attachment_5_-_AFRC_form_10735 _Visit_Request_-_U.S._Citizens.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Q.1: Q and A document PDF has a new drawing E4. This drawing indicates new equipment and work not identified in summary of work are the note #1, #2, and #3 applicable to this project? If so see below:
A.1: The notes #1, #2 and #3 on drawing E4 do not apply to this project. The intent of the drawing E4 is to show that the existing UPS is fed from the main distribution panel PP1-B6.
Q.2: Unit 6 2500 amp panel, note #3 indicates new 800 amp feed to PP1-B6, not in SOW
A.2: The new 800 amp feed to the main distribution panel PP1-B6 indicated in note #3 does not apply to this project.
Q.3: Main Dist. Swbd PP1-B6, indicates new 1200a board note#1, not in SOW
A.3: The new 1200 amp board indicated in note #1 does not apply to this project.
Q.4: Breakers/ Circuits from this new PP1-B6, 1, 3, 10, 14, 16 and 17 all indicate note #1 as new equipment, not in SOW
A.4: The breakers/ circuits from the new PP1-B6, 1, 3, 10, 14, 16 and 17 indicated in note #1 do not apply to this project.
Q.5: General question: all of the work on E4 noted by keyed notes 1,2, and 3 are part of this proposal?
A.5: No, all the keyed notes on E4 are not part of this solicitation.
Q.6: Is there going to be another job walk to determine requirements to add temporary feeders per the new SOW?
A.6: No. There is not going to be another site visit for the temporary feeders requirement.