NACS_Draft_RFP_NNA17554082R.pdf
PDF 2 MB Posted
- Attached to
- NASA Advanced Computing Services (NACS) Federal contract opportunity
- Solicitation number
- NNA17554082R
View the file
Other files for this federal contract opportunity
Show all 50
NASA Advanced Computing Services (NACS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 6/2014)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
1 112
NASA AMES RESEARCH CENTER
ATTN: VERONICA L. GUTIEREZ M/S 241-1
MOFFETT FIELD, CA 94035-0001
JAI
NASA AMES RESEARCH CENTER
NNA17554082R
VERONICA GUTIERREZ
B-1 C-1 D-1 E-1 F-1 G-1 H-1 M-1
L-1
J-1
I-1
650 604 5626
K-1
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS .................................................................... B-1
B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED ............................................................... B-1
B.2 ESTIMATED COST AND AWARD FEE (NFS 1852.216-85) (SEP 1993) ................................. B-6
B.3 SUMMARY OF CONTRACT VALUE FOR PHASE-IN, CORE CONTRACT MANAGEMENT AND
CORE TECHNICAL SERVICES ..................................................................................................... B-7
B.4 CONTRACT FUNDING (NFS 1852.232-81) (JUN 1990) ...................................................... B-8
B.5 LIMITATION ON PERIOD OF PERFORMANCE REGARDING TASK ORDERS ......................... B-9
B.6 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES (COST REIMBURSEMENT) .. B-9
B.7 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST REIMBURSEMENT) ................... B-10
B.8 ESTIMATED COST INCREASES ....................................................................................... B-10
SECTION C – DESCRIPTION/SPECIFICATION/STATEMENT OF WORK ................................................... C-1
C.1. SPECIFICATION/STATEMENT OF WORK .......................................................................... C-1
SECTION D – PACKAGING AND MARKING ......................................................................................... D-1
D.1 CLAUSES INCORPORATED BY REFERENCE .................................................................... D-1
D.2 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (NFS 1852.245-74)
(JAN 2011) .............................................................................................................................. D-1
SECTION E – INSPECTION AND ACCEPTANCE ..................................................................................... E-1
E.1 CLAUSES INCORPORATED BY REFERENCE ....................................................................... E-1
E.2 MATERIAL INSPECTION AND RECEIVING REPORT (NFS 1852.246-72) (APR 2015).......... E-1
SECTION F – DELIVERIES AND PERFORMANCE ................................................................................... F-1
F.1 CLAUSES INCORPORATED BY REFERENCE ....................................................................... F-1
F.2. PERIOD OF PERFORMANCE ............................................................................................ F-1
F.3 DELIVERY SCHEDULE...................................................................................................... F-3
F.4 DELIVERY OF REPORTS .................................................................................................. F-3
NNA17554082R TABLE OF CONTENTS
F.5 NOTICE OF DELAY (ARC 52.249-90) (FEB 1997) ............................................................... F-3
F.6 PLACE OF PERFORMANCE - SERVICES ............................................................................. F-4
SECTION G – CONTRACT ADMINISTRATION DATA ............................................................................. G-1
G.1 CLAUSES INCORPORATED BY REFERENCE .................................................................... G-1
G.2 AWARD FEE FOR SERVICE CONTRACTS (NFS 1852.216-76) (APR 2012) ............................ G-1
G.3 SUBMISSION OF VOUCHERS FOR PAYMENT (NFS 1852.232-80) (SEP 2016) ..................... G-2
G.4 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENATIVE
(NFS 1852.227-72) (APR 2015) ................................................................................................ G-4
G.5 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY (NFS 1852.245-71) (JAN 2011) .
.................................................................................................................................. G-4
G.6 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF CONTRACTORS (NFS
1852.245-73) (JAN 2011) ......................................................................................................... G-6
G.7 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1
(NFS 1852.245-76) (JAN 2011) ................................................................................................. G-8
G.8 OCCUPANCY MANAGEMENT REQUIREMENTS (NFS 1852.245–82) (JAN 2011)................. G-8
G.9 REPORTS OF CONTRACTOR ACQUIRED GOVERNMENT PROPERTY (GSFC 52.245-93)
(MAR 2014) ............................................................................................................................ G-9
SECTION H – SPECIAL CONTRACT REQUIREMENTS ........................................................................... H-1
H.1 CLAUSES INCORPORATED BY REFERENCE .................................................................... H-1
H.2 KEY PERSONNEL AND FACILITIES (NFS 1852.235-71) (MAR 1989) .................................... H-1
H.3 ADDITIONAL REPORTS OF WORK -- RESEARCH AND DEVELOPMENT (NFS 1852.235-74)
(FEB 2003) .............................................................................................................................. H-2
H.4 ORGANIZATIONAL CONFLICTS OF INTEREST, AND LIMITATION ON FUTURE CONTRACTING .
..................................................................................................................................... H-3
H.5 EMERGENCY PREPAREDNESS AND RESPONSE (ARC 52.223-90) (JAN 2012) .................. H-5
H.6 DISASTER ASSISTANCE AND RESCUE TEAM (DART) PARTICIPATION (ARC 52.223-91)
(JAN 2012) .............................................................................................................................. H-6
H.7 PATENT RIGHTS ............................................................................................................. H-7
H.8 DATA RIGHTS—SPECIAL WORKS .................................................................................... H-7
H.9 MANAGEMENT AND PROTECTION OF DATA ............................................................... H-8
H.10 INCORPORATION OF THE CONTRACTOR’S PROPOSAL ................................................. H-8
H.11 HANDLING OF DATA ................................................................................................... H-9
H.12 DATA RIGHTS AND SUBCONTRACTING...................................................................... H-10
H.13 INFORMATION INCIDENTAL TO CONTRACT ADMINISTRATION .................................. H-13
H.14 DEVELOPMENT AND USE OF OPEN SOURCE SOFTWARE ............................................ H-13
H.15 CONTRACTOR PURCHASING ..................................................................................... H-14
H.16 SEVERANCE PAY ....................................................................................................... H-15
H.17 NON-PERSONAL SERVICES ........................................................................................ H-15
H.18 CONTRACTOR PERSONNEL—IDENTIFICATION, ONSITE REPORTING, AND CHECKOUT
PROCEDURES ........................................................................................................................ H-15
H.19 GOVERNMENT PREMISES—PHYSICAL ACCESS AND COMPLIANCE WITH PROCEDURES
(GSFC 52.211-95) (AUG 2012) ................................................................................................ H-17
H.20 CONTRACT HISTORICAL DATA................................................................................... H-18
H.21 EXPORT LICENSES (NFS 1852.225-70) (FEB 2000) ....................................................... H-19
SECTION I – CONTRACT CLAUSES ........................................................................................................ I-1
I.1 CLAUSES INCORPORATED BY REFERENCE ........................................................................ I-1
I.2 ORDERING (FAR 52.216-18) (OCT 1995) .......................................................................... I-6
I.3 ORDER LIMITATIONS (FAR 52.216-19) (OCT 1995) ........................................................... I-6
I.4 INDEFINITE QUANTITY (FAR 52.216-22) (OCT 1995) ......................................................... I-7
I.5 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998) ............................... I-7
I.6 AUTHORIZED DEVIATIONS IN CLAUSES (FAR 52.252-6) (APR 1984) .................................. I-7
I.7 SECURITY CLASSIFICATION REQUIREMENTS (NFS 1852.204-75) (SEP 1989) ...................... I-8
I.8 TASK ORDERING PROCEDURE (NFS 1852.216-80) (OCT 1996) .......................................... I-8
I.9 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (DEVIATION) (NFS 1852.225-71)
(FEB 2012) ............................................................................................................................... I-9
SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ........................................ J-1
J.1 LIST OF DOCUMENTS, EXHIBITS, AND ATTACHMENTS (ARC 52.211-90) (FEB 1997) .......... J-1
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS ........... K-1
K.1 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FAR 52.204-8) (APR 2016)............... K-1
K.2 REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE
(FAR 52.227-15) (DEC 2007) .................................................................................................... K-4
K.3 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (FAR 52.230-1) (OCT 2015) .
..................................................................................................................................... K-5
K.4 PROPOSAL DISCLOSURE-COST ACCOUNTING PRACTICE CHANGES (FAR 52.230-7)
(APR 2005) ............................................................................................................................. K-7
K.5 RESTRICTION ON FUNDING ACTIVITY WITH CHINA --REPRESENTATION (NFS 1852.225-72) (FEB 2012) .............................................................................................................................. K-7
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ........................................... L-1
L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FAR 52.252-1) (FEB 1998) ... L-1
L.2 TYPE OF CONTRACT (FAR 52.216-1) (APR 1984) ............................................................... L-2
L.3 SERVICE OF PROTEST (FAR 52.233-2) (SEP 2006) ............................................................. L-2
L.4 PREPROPOSAL/PRE-BID CONFERENCE (NFS 1852.215-77) (APR 2015).............................. L-2
L.5 PROPOSAL PREPARATION--GENERAL INSTRUCTIONS ....................................................... L-3
L.6 PROPOSAL PAGE LIMITATIONS ....................................................................................... L-6
L.7 INSTRUCTIONS FOR ORAL PRESENTATIONS .................................................................... L-7
L.8 PROPOSAL PREPARATION--SPECIFIC INSTRUCTIONS ........................................................ L-9
(a) Mission Suitability (Volume I). ................................................................................................ L-9
(b) Past Performance (Volume II) ........................................................................................... L-17
(c) Cost (Volume III) ..................................................................................................................... L-21
L.9 DETERMINATION OF COMPENSATION REASONABLENESS (NFS 1852.231-71) (APR 2015) .
.................................................................................................................................... L-21
L.10 GOVERNMENT PROPERTY MANAGEMENT INFORMATION (NFS 1852.245-80) (JAN 2011) .
................................................................................................................................. L-22
L.11 LIST OF AVAILABLE GOVERNMENT PROPERTY (NFS 1852.245-81) (JAN 2011) ............. L-23
SECTION M – EVALUATION FACTORS FOR AWARD .......................................................................... M-1
M.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FAR 52.252-1) (FEB 1998) .
................................................................................................................................. M-1
M.2 EVALUATION APPROACH ........................................................................................... M-1
M.3 WEIGHTING AND SCORING ...................................................................................... M-14
NNA17554082R SECTION B
B-1
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED
(a) This will be a Single Award Cost-Plus-Award-Fee (CPAF) type contract with a Phase-in, Core Contract Management, Core Technical Services and Indefinite Delivery/Indefinite
Quantity (IDIQ) task orders for Technical Services. The Contractor shall provide all resources
(except as may be expressly stated in the contract as furnished by the Government) necessary to perform the requirements or furnish the items below in accordance with the
Description/Specification/Work Statement in Section C.
Item No. Description SOW Qty Unit
BASE PERIOD
01* NACS, Phase-In Period as set forth in Section F, Paragraph F.2(a)
5.1 1 Job
01A* NACS, Core Contract Management, Base Period as set forth in Section F, Paragraph F.2(a) 5.2
Job
01B* NACS, ARC Core Technical Services, Base Period as set forth in Section F, Paragraph F.2(a) 5.3-5.10 1 Job
01C NACS, ARC Indefinite Delivery/Indefinite Quantity
(IDIQ) Technical Services, Base Period as set forth in Section F, Paragraph F.2(a)
5.3-5.16 TBD
Based on
Task
Order
01D NACS, GSFC, Other Centers and JPL, Indefinite
Delivery/Indefinite Quantity (IDIQ) Technical
Services, Base Period as set forth in Section F, Paragraph F.2(a)
5.3-5.16 TBD
Based on
Task
Order
*Only CLINs 01, Phase-In, 01A, Core Contract Management, and 01B, Core Technical
Services, will be initiated at award. Line Item 01C and 01D may begin shortly thereafter upon award of IDIQ task orders.
(b) Option Periods
If Option Periods are exercised pursuant to Clause 52.217-9, “Option to Extend the Term of the Contract,” the Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to furnish the items below in accordance with the Description/Specification/Work Statement in Section C.
Item
No.
Description SOW Qty Unit
OPTION PERIOD 1
02A NACS, Core Contract Management, Option Period
1 as set forth in Section F, Paragraph F.2(b) 4.2
02B NACS, ARC Core Technical Services, Option
Period 1 as set forth in Section F, Paragraph F.2(b) 54.3-4.10 1 Job
B-2
02C NACS, ARC IDIQ Technical Services, Option
Period 1 as set forth in Section F, Paragraph F.2(b)
4.3-4.16 TBD
Based on Task
02D NACS, GSFC, Other Centers and JPL, Indefinite
Delivery/Indefinite Quantity (IDIQ) Technical
Services, Option Period 1 as set forth in Section F, Paragraph F.2(b)
4.3-4.16 TBD
Based on Task
Order
OPTION PERIOD 2
03A NACS, Core Contract Management, Option Period 2 as set forth in Section F, Paragraph F.2(c) 4.2
03B NACS, ARC Core Technical Services, Option
Period 2 as set forth in Section F, Paragraph F.2(c) 4.3-4.10 1 Job
03C NACS, ARC IDIQ Technical Services, Option
Period 2 as set forth in Section F, Paragraph F.2(c)
03D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 2 as set forth in Section F, Paragraph F.2(c)
4.3-4.16 TBD
Based on Task
Order
OPTION PERIOD 3
04A NACS, Core Contract Management, Option Period 3 as set forth in Section F, Paragraph F.2(d)
04B NACS, ARC Core Technical Services, Option
Period 3 as set forth in Section F, Paragraph F.2(d) 4.3-4.10 1 Job
04C NACS, ARC IDIQ Technical Services, Option
Period 3 as set forth in Section F, Paragraph F.2(d)
04D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 3 as set forth in Section F, Paragraph F.2(d)
B-3
OPTION PERIOD 4
05A NACS, Core Contract Management, Option Period 4 as set forth in Section F, Paragraph F.2(e) 4.2
05B NACS, ARC Core Technical Services, Option
Period 4 as set forth in Section F, Paragraph F.2(e) 4.3-4.10 1 Job
05C NACS, ARC IDIQ Technical Services, Option
Period 4 as set forth in Section F, Paragraph F.2(e)
05D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 4 as set forth in Section F, Paragraph F.2(e)
4.3-4.16 TBD
Based on Task
Order
OPTION PERIOD 5
06A NACS, Core Contract Management, Option Period 5 as set forth in Section F, Paragraph F.2(f)
06B NACS, ARC Core Technical Services, Option
Period 5 as set forth in Section F, Paragraph F.2(f)
4.3 1 Job
06C NACS, ARC IDIQ Technical Services, Option
Period 5 as set forth in Section F, Paragraph F.2(f)
06D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 5 as set forth in Section F, Paragraph F.2(f)
4.3-4.16 TBD
Based on Task
Order
OPTION PERIOD 6
07A NACS, Core Contract Management, Option Period 6 as set forth in Section F, Paragraph F.2(g) 4.2
07B NACS, ARC Core Technical Services, Option
Period 6 as set forth in Section F, Paragraph F.2(g) 4.3-4.10 1 Job
B-4
07C NACS, ARC IDIQ Technical Services, Option
Period 6 as set forth in Section F, Paragraph F.2(g)
07D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 6 as set forth in Section F, Paragraph F.2(g)
4.3-4.16 TBD
Based on Task
Order
OPTION PERIOD 7
08A NACS, Core Contract Management, Option Period
7as set forth in Section F, Paragraph F.2(h)
08B NACS, ARC Core Technical Services, Option
Period 7 as set forth in Section F, Paragraph F.2(h) 4.3-4.10 1 Job
08C NACS, ARC IDIQ Technical Services, Option
Period 7 as set forth in Section F, Paragraph F.2(h)
08D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 7 as set forth in Section F, Paragraph F.2(h)
4.3-4.16 TBD
Based on Task
Order
OPTION PERIOD 8
09A NACS, Core Contract Management, Option Period 8 as set forth in Section F, Paragraph F.2(i)
09B NACS, ARC Core Technical Services, Option
Period 8 as set forth in Section F, Paragraph F.2(i) 4.3-4.10 1 Job
09C NACS, ARC IDIQ Technical Services, Option
Period 8 as set forth in Section F, Paragraph F.2(i)
09D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 8 as set forth in Section F, Paragraph F.2(i)
4.3-4.16 TBD
Based
B-5
OPTION PERIOD 9
10A NACS, Core Contract Management, Option Period 9 as set forth in Section F, Paragraph F.2(j) 4.2
10B NACS, ARC Core Technical Services, Option
Period 9 as set forth in Section F, Paragraph F.2(j) 4.3-4.10 1 Job
10C NACS, ARC IDIQ Technical Services, Option
Period 9 as set forth in Section F, Paragraph F.2(j)
10D NACS, GSFC, Other Centers and JPL, Indefinite
Services, Option Period 9 as set forth in Section F, Paragraph F.2(j)
4.3-4.16 TBD
Based
(c) Contract Line Item Numbers (CLINs) 01, 01A, 01B, 02A, 02B, 03A, 03B, 04A, 04B, 05A, 05B, 06A, 06B, 07A, 07B, 08A, 08B, 09A, 09B, 10A, and 10B are performance-based Cost-Plus-
Award-Fee (CPAF). If requirements under the Core Contract Management or the Core Technical
Services decreases, or increases, the Government reserves the right to re-negotiate the Cost-Plus-
Award-Fee value.
(d) CLINs 01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D are Indefinite Delivery/Indefinite Quantity (IDIQ) items where Cost-Plus-
Award-Fee or Cost Plus Fixed Fee task orders will be issued in accordance with Clause H.2 (Task
Ordering Procedure) by the Contracting Officer at the rates set forth in Section J, paragraph J.1 (a), Attachment 11, Cost Template Workbook.
(END OF CLAUSE)
B-6
B.2 ESTIMATED COST AND AWARD FEE (NFS 1852.216-85) (SEP 1993)
(a) PHASE-IN
The estimated cost for CLIN 01 is $ TBD. The maximum available award fee, excluding base fee, if any, is $ TBD . The base fee is $ 0. Total estimated cost, base fee, and maximum award fee are $ TBD .
(b) BASE PERIOD
The estimated cost for CLINs 01A and 01B is $ TBD. The maximum available award fee, excluding base fee, if any, is $ TBD . The base fee is $ 0. Total estimated cost, base fee, and maximum award fee are $ TBD .
(c) OPTION PERIOD 1
The estimated cost for CLINs 02A and 02B is $ TBD. The maximum available award fee,
(d) OPTION PERIOD 2
The estimated cost for CLINs 03A and 03B is $ TBD. The maximum available award fee,
(e) OPTION PERIOD 3
The estimated cost for CLINs 04A and 04B is $ TBD. The maximum available award fee,
(f) OPTION PERIOD 4
The estimated cost for CLINs 05A and 05B is $ TBD. The maximum available award fee,
(g) OPTION PERIOD 5
The estimated cost for CLINs 06A and 06B is $ TBD. The maximum available award fee,
(h) OPTION PERIOD 6
The estimated cost for CLINs 07A and 07B is $ TBD. The maximum available award fee, B-7
(i) OPTION PERIOD 7
The estimated cost for CLINa 08A and 08B is $ TBD. The maximum available award fee,
(j) OPTION PERIOD 8
The estimated cost for CLINs 09A and 09B is $ TBD. The maximum available award fee,
(k) OPTION PERIOD 9
The estimated cost for CLINs 10A and 10B is $ TBD. The maximum available award fee, B.3 SUMMARY OF CONTRACT VALUE FOR PHASE-IN, CORE CONTRACT
MANAGEMENT AND CORE TECHNICAL SERVICES
Below is a summary of the Estimated Cost and Award Fee for the Base and Option Periods.
CONTRACT
VALUE
SUMMARY
Phase-In
CLIN 01
Year 1
Base
CLINs
01A &
01B
Year 2
Option 1
CLINs 02A
& 02B
Year 3
Option 2
CLINs 03A
& 03B
Year 4
Option 3
CLINs 04A
& 04B
Year 5
Option 4
CLINs
05A &
05B
Estimated
Cost
$ TBD
Unearned
Award Fee
Earned
Total
Cost &
B-8
CONTRACT
VALUE
SUMMARY
Year 6
Option 5
CLINs
06A &
06B
Year 7
Option 6
CLINs
07A &
07B
Year 8
Option 7
CLINs
08A &
08B
Year 9
Option 8
CLINs
09A &
09B
Year 10
Option 9
CLINs 10A
& 10B
TOTAL
Estimated
Cost
TBD
Unearned
Earned
Total
Cost &
B.4 CONTRACT FUNDING (NFS 1852.232-81) (JUN 1990)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to CLINs 01, 01A, and 01B is $TBD and covers the following estimated period of performance: date of award through TBD.
(b) An additional amount of $TBD is obligated under this contract for payment of fee.
SUMMARY OF CONTRACT
FUNDING
CLIN 01 Phase-In
CLIN 01A Contract Management
(CM)
CLIN 01B Technical Services (TS)
FROM
BY
TO
Phase-In $ TBD $ TBD $ TBD
CM Cost $ TBD $ TBD $ TBD
CM Award Fee $ TBD $ TBD $ TBD
CM Total Cost Plus Award Fee $ TBD $ TBD $ TBD
TS Cost $ TBD $ TBD $ TBD
TS Award Fee $ TBD $ TBD $ TBD
TS Total Cost Plus Award Fee $ TBD $ TBD $ TBD
(c) All IDIQ Task Orders will be issued separately.
B-9
B.5 LIMITATION ON PERIOD OF PERFORMANCE REGARDING TASK ORDERS
The period of performance for issuing task orders under this contract is twelve months from the start of the base period. This contract also includes nine, one-year option periods which, if exercised by the
Government, would increase the period of performance for issuing task orders through the exercised option period(s). Each individual task order will include its own period of performance.
Performance of orders placed within the contract ordering period may extend for up to one year past the end of the ordering period if the Contracting Officer determines that performance of the order cannot reasonably be deferred to any planned follow-on contract.
B.6 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES (COST
REIMBURSEMENT)
(a) The minimum total amount of supplies or services that shall be ordered, collectively, under
CLINS 01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D during the potential effective period of this contract is, in the aggregate, $100,000.00 (Estimated Cost, Award Fee and Fixed Fee). The maximum total amount of supplies or services that may be ordered, collectively, under CLINS 01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D during the potential effective period of this contract is, in the aggregate, $1,100,00,000.00 (Estimated Cost and Fixed Fee). The minimum and maximum specified in this paragraph apply only to orders placed under CLINS 01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D of this contract. Government orders for services in quantities specified above the minimum and below the maximum shall not constitute a basis for cost adjustments.
(b) The minimum total amount is satisfied when the aggregate sum of the dollar amounts of all ordered supplies or services under CLINS01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D, collectively, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals or exceeds the minimum amount of $100,000.00.
(c) The maximum total amount is reached when the aggregate sum of the dollar amounts of all ordered supplies or services under 01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D, collectively, except for any adjustments made pursuant to the
Limitation of Cost or Limitation of Funds clause, equals the maximum amount of $1,100,000,000.00.
(d) The maximum total amount, if reached, precludes the issuance of further orders for supplies or services under CLINS 01C, 01D, 02C, 02D, 03C, 03D, 04C, 04D, 05C, 05D, 06C, 06D, 07C, 07D, 08C, 08D, 09C, 09D, 10C, and 10D of this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the
Changes clause.
(e) The maximum amount of $1,100,000,000.00 may be adjusted unilaterally by the Government on an annual basis. Historic, current, and/or projected workload requirements will be used to determine
B-10 the amount of upward adjustment. In no event will the adjusted maximum amount exceed 10% of the original maximum amount of $1,100,000,000.00.
B.7 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST
REIMBURSEMENT)
(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in J.1(a), Attachment 15 to calculate the proposed estimated costs for all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.
(c) The Government and Contractor agree that the award fee and fixed fee percentage specified in Section J, J.1(a), Attachment 15 shall be used to calculate the award fee pool and the fixed fee dollars on all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract. The award fee pool is the award fee percentage multiplied by the negotiated labor cost of the task order. For task orders under this contract, the award fee associated with the task order shall be calculated by multiplying the award fee percentage, as adjusted pursuant to the award fee evaluation process specified in the Performance Evaluation Plan, against the award fee pool amount.
B.8 ESTIMATED COST INCREASES
(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order. Notification shall not be delayed pending preparation of a proposal.
(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.
(c)(1) The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:
B-11
Incurred costs to date
Projected cost to completion
Total cost at completion
Current negotiated estimated cost
Requested increase in estimated cost
(2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:
(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.
(ii) Supporting explanation for the increases and projections, sufficient for the
Government to understand the reasons for the increased estimated cost.
[END OF SECTION]
NNA17554082R SECTION C
C-1
SECTION C – DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1. SPECIFICATION/STATEMENT OF WORK
The Contractor shall furnish the personnel, services, materials, and facilities necessary for, or incidental to, performance of the requirements set forth herein. Work shall be accomplished in accordance with the Statement of Work, clause of this contract in accordance with the Statement of
Work, entitled “NASA Advanced Computing Services (NACS),” which is incorporated in Section J, paragraph J.1(a), Attachment 1.
NNA17554082R SECTION D
D-1
SECTION D – PACKAGING AND MARKING
D.1 CLAUSES INCORPORATED BY REFERENCE
Clause(s) at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of a clause can be located at the addresses contained in FAR 52.252-2, Clauses Incorporated by Reference, of this contract.
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
None Included By Reference
II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18)
CLAUSE NO. DATE TITLE
1852.211-70 SEP 2005
PACKAGING, HANDLING, AND
TRANSPORTATION
D.2 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (NFS
1852.245-74) (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA
Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard
(NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
NNA17554082R SECTION D
D-2
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA centers receiving activity listed below:
Ames Research Center
Building TBD
Moffett Field, CA 94035
Goddard Space Flight Center
Building 35, Code 279
Greenbelt, MD 20771
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
NNA17554082R SECTION E
E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 CLAUSES INCORPORATED BY REFERENCE
effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
CLAUSE NO.
52.246-3
DATE
MAY 2001
TITLE
INSPECTION OF SUPPLIES – COST REIMBURSEMENT
52.246-5 APR 1984 INSPECTION OF SERVICES – COST REIMBURSEMENT
52.246-8 MAY 2001 INSPECTION OF RESEARCH AND DEVELOPMENT
COST-REIMBURSEMENT
E.2 MATERIAL INSPECTION AND RECEIVING REPORT (NFS 1852.246-72)
(APR 2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as indicated on the Contract Data Requirements List, Section J, paragraph J.1(a), Attachment 2.
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement
1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
NNA17554082R SECTION E
E-2
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD
Form 250, as additional information, the quantity of packages and the package numbers. The
Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.
NNA17554082R SECTION F
F-1
SECTION F – DELIVERIES AND PERFORMANCE
F.1 CLAUSES INCORPORATED BY REFERENCE
effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
52.242-15
52.242-17
AUG 1989
APR 1984
STOP WORK ORDER (ALT I) (APR 1984)
GOVERNMENT DELAY OF WORK
52.247-34 NOV 1991 F.O.B. DESTINATION
F.2. PERIOD OF PERFORMANCE
The performance period for this contract is set forth below. Each individual task order will include its own period of performance.
(a) BASE PERIOD (Including Phase-In)
The performance of the Base Period shall be for twelve (12) months from the effective date of the contract. Phase-In is included in the Base Period and is for one (1) month.
(b) OPTION PERIOD 1
If exercised, the period of performance of Option Period 1 shall be twelve (12) months from the end of the Base Period.
(c) OPTION PERIOD 2
If exercised, the period of performance of Option Period 2 shall be twelve (12) months from the end of Option Period 1.
F-2
(d) OPTION PERIOD 3
If exercised, the period of performance of Option Period 3 shall be twelve (12) months from the end of Option Period 2.
(e) OPTION PERIOD 4
If exercised, the period of performance of Option Period 4 shall be twelve (12) Months from the end of Option Period 3.
(f) OPTION PERIOD 5
If exercised, the period of performance of Option Period 5 shall be twelve (12) months from the end of the Option Period 4.
(g) OPTION PERIOD 6
If exercised, the period of performance of Option Period 6 shall be twelve (12) months from the end of Option Period 5.
(h) OPTION PERIOD 7
If exercised, the period of performance of Option Period 7 shall be twelve (12) months from the end of Option Period 6.
(i) OPTION PERIOD 8
If exercised, the period of performance of Option Period 8 shall be twelve (12) Months from the end of Option Period 7.
(j) OPTION PERIOD 9
If exercised, the period of performance of Option Period 9 shall be twelve (12) Months from the end of Option Period 8.
(k) Each individual task order will include its own period of performance. Performance of orders placed within the ordering period may extend for up to one year past the end of the contract’s effective period if the Contracting Officer determines that performance of the order cannot reasonably be deferred to any planned follow-on contract.
F-3
F.3 DELIVERY SCHEDULE
(a) The Contractor shall deliver the supplies and services as required by this contract and the individual task orders.
(b) Unless specified otherwise, all items shall be delivered to:
NASA Ames Research Center
Attn: TBD, Mail Stop TBD
Contract “TBD”
Moffett Field, CA 94035-0001
NASA Goddard Space Flight Center
Attn: TBD, Mail Stop TBD
Contract “TBD”
Greenbelt, MD 20771
(c) All reports and documentation shall be mailed in accordance with Paragraph F.4, Delivery of
Reports.
F.4 DELIVERY OF REPORTS
Unless otherwise specified, all reports shall be addressed to the recipients listed in Section J, paragraph
J.1(a), Attachment 2, “Contract Data Requirements List." Reports specific to task orders will be specified in the individual task order.
F.5 NOTICE OF DELAY (ARC 52.249-90) (FEB 1997)
If, because of technical difficulties, the Contractor becomes unable to complete the contract work at the time specified, notwithstanding the exercise of good faith and diligent efforts in performing the work called for under this contract, the Contractor shall give the Contracting Officer written notice of the anticipated delay and the reasons for it. The notice and reasons shall be delivered promptly after the condition creating the anticipated delay becomes known to the Contractor but in no event less than 45 days before the completion date specified in this contract, unless otherwise permitted by the Contracting Officer. When notice is given, the Contracting Officer may extend the time specified in the Schedule for such period as is deemed advisable.
F-4
F.6 PLACE OF PERFORMANCE - SERVICES
The Contractor shall perform the work under this contract at NASA Ames Research Center, Moffett Field, CA 94035-0001 and NASA Goddard Space Flight Center, Greenbelt, MD 20771, and at other locations as directed in writing by the Contracting Officer.
NNA17554082R SECTION G
G-1
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 CLAUSES INCORPORATED BY REFERENCE
by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
1852.223-71 APR 2015 AUTHORIZATION FOR RADIO FREQUENCY USE
1852.227-70 APR 2015 NEW TECHNOLOGY- OTHER THAN A SMALL BUSINESS
FIRM OR NONPROFIT ORGANIZATION
1852.227-71 APR 1984 REQUESTS FOR WAIVER OF RIGHTS TO INVENTIONS
1852.227-86 APR 2015 COMMERCIAL COMPUTER SOFTWARE—LICENSING
1852.242-73 NOV 2004 NASA CONTRACTOR FINANCIAL MANAGEMENT
REPORTING
1852.245-70 AUG 2015 CONTRACTOR REQUESTS FOR GOVERNMENT-PROVIDED
EQUIPMENT (ALT I) (AUG 2015)
1852.245-75 JAN 2011 PROPERTY MANAGEMENT CHANGES
1852.245-78 AUG 2015 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY
1852.245-79 JAN 2011 RECORDS AND DISPOSITION REPORTS FOR GOVERNMENT
PROPERTY WITH POTENTIAL HISTORIC OR SIGNIFICANT
REAL VALUE
1852.245-81 JAN 2011 LIST OF AVAILABLE PROPERTY
G.2 AWARD FEE FOR SERVICE CONTRACTS (NFS 1852.216-76) (APR 2012)
(a) The contractor can earn award fee from a minimum of zero dollars to the maximum stated in
NASA FAR Supplement clause 1852.216-85, "Estimated Cost and Award Fee" in this contract.
(b) Beginning 12 months after the effective date of this contract, the Government shall evaluate the Contractor's performance every 12 months to determine the amount of award fee earned by the contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the
G-2
Government in its evaluation. The Government's Fee Determination Official (FDO) will determine the award fee amounts based on the Contractor's performance in accordance with
Award Fee Plan. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.
(c) The Government will advise the Contractor in writing of the evaluation results. The NASA
Shared Services Center (NSSC) will make payment based on issuance of unilateral modification by Contracting Officer.
(d) The Contracting Officer may direct the withholding of earned award fee payments until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the
Government's interest relative to an orderly and timely closeout of the contract. This reserve shall not exceed 15 percent of the contract’s total potential award fee or $100,000, whichever is less.
(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth in the Contract Task Orders. Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.
(f)(1) Provisional award fee payments will be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a monthly basis. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of 80 percent or the prior period's evaluation score.
(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer.
(3) If the Contracting Officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the Contracting Officer deems appropriate. The
Contracting Officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate.
(4) Provisional award fee payments will be made prior to the first award fee determination by the Government.
(g) Award fee determinations are unilateral decisions made solely at the discretion of the
Government.
G.3 SUBMISSION OF VOUCHERS FOR PAYMENT (NFS 1852.232-80) (SEP 2016)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD
Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers electronically using the steps described at NSSC’s Vendor Payment information web site
G-3 at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods designated in the payment clause(s) contained in this contract will begin on the date a proper request for payment is received by the NSSC payment office specified in paragraph (b) of this section. Vouchers shall be prepared in accordance with the guidance provided by the NSSC at the following website: https://answers.nssc.nasa.gov/app/answers/detail/a_id/6643.
(2) Vouchers shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(ii) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(iii) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(d) Non-electronic payment. The Contractor may submit a voucher using other than the steps described at NSSC’s Vendor Payment information through any of the means described at https://www.nssc.nasa.gov/vendorpayment, if any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment when the Governmentwide commercial purchase card is used as the method of payment.
(2) The contract includes provisions allowing the contractor to submit vouchers using other than the steps prescribed at NSSC’s Vender Payment information website. In such instances the
Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher within seven calendar days of receipt by the NSSC
Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
https://www.nssc.nasa.gov/vendorpayment…