TECH_PKG.pdf

PDF 722 KB Posted

Attached to
BLDG 445 CEILING FANS, NCBC GULFPORT, MS
Solicitation number
N6945014Q3563
Issued by

About this file

SOW-Specification-Drawings

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Past_Performance_questionnaire.doc DOC document
Amendment_0001.pdf PDF
Application_for_Access_CBC_FILLABLE.pdf PDF
NAVFAC_4330_-_PROPOSAL_ESTIMATE_-_GPT.xls XLS spreadsheet
N69450-14-Q-3563.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT:

INSTALL FANS at FITNESS CENTER, BLDG 445

NAVAL CONSTRUCTION BATTALION CENTER

GULPORT, MS

SUBMITTED BY:

NAVFAC SE PWD GULFPORT

FMD REQUIREMENTS BRANCH

PREPARED BY:

Louis M. Borzik III

DATE:

31 July 2013

Project: Install Fans Fitness Center, Bldg 445 30 July 2013 NCBC Gulfport, MS

Statement of Work Page 1 of 1

STATEMENT OF WORK

FOR

INSTALL FANS FITNESS CENTER, BLDG 445

Work Order:B4WCZV

1 SCOPE:

1.1 The Work performed under this Contract shall consist of furnishing all labor, materials, and equipment necessary to install five ceiling mounted fans within room 114 of building 445 at NCBC Gulfport, MS.

1.2 Contractor is required to examine the site and make note of existing conditions and all requirements of the work before submitting a proposal or bid.

1.3 Work by all respective trades shall be performed in a neat and workmanlike manner and in accordance with accepted industry practices and standards.

2 COORDINATION:

The contractor’s point of contact shall be the Facilities Engineering Acquisition Division (FEAD). The Contractor shall contact the FEAD prior to starting any work. The FEAD is responsible for the scheduling and coordination of all the work to be accomplished.

3 PROJECT DECRIPTION:

3.1 Provide and install five ceiling-mounted ceiling fans complete with all mounting hardware, angle iron supports, electrical wiring, and controls as shown on the attached drawing sheet E101.

4 SCHEDULING:

4.1 Scheduling of all work shall be coordinated and approved by the Contracting Officer prior to the start of any work.

4.2 The facility will be occupied during the performance of work. All work shall be coordinated, scheduled and performed to minimize disruption to the facility operations.

5 COMPLETION TIME: The period of performance for the above work is 60 calendar days.

6 ATTACHMENTS:

The following attachments shall form a part of this statement of work:

a. General Requirements

b. Safety Requirements, Section 01 35 26 05 25

c. NCBC Environmental Requirements

d. Quality Control for Minor Construction, Section 01 45 00 10 20

e. Electrical Materials and Methods, Section 26 00 00 00.20

f. Construction Drawing Sheet E-1

--End of Section--

General Requirements Page 1 of 8

General Requirements (12Feb13/WAO)

1. DEFINITIONS: As used throughout the contract, the following terms shall have the meaning set forth below:

Contracting Officer (KO): The individual designated to administer the contract. Throughout this contract this individual will be responsible and possess the authority to act on behalf of the Government with respect to the specific contract.

Contracting Officer Representative (COR): The individual designated by the Contracting Officer as the authorized representative of the Contracting Officer. The COR is responsible for monitoring performance and technical management of the effort required and should be contacted regarding questions or problems of a technical nature.

Contractor: The term Contractor refers to both the prime Contractor and subcontractors, Including the Designer of Record.

Quality Control (QC): Contractor’s system to control the quality of design, material, equipment and construction.

Quality Assurance (QA) Program: Government’s program to evaluate the effectiveness of the Contractor’s quality control. The Government’s QA Program is not a substitute for the Contractor’s QC Program.

Federal Holidays: New Year’s Day; Martin Luther King Jr. Day; President’s Day; Memorial Day;

Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas Day.

Contract: Contract or task order.

2. PRE-WORK CONFERENCE: Prior to start of work under the contract, meet with representatives of the Contracting Officer to discuss and develop mutual understanding relative to the construction schedule, and the contractor’s management of the safety, quality control, and environmental programs. Additional topics of discussion will include, but are not limited to, base access requirements, base fire department regulations, environmental issues, safety of building occupants and surrounding area, hazardous materials, waste disposal, labor provisions and other contract procedures. Submittals requiring Government approval or acceptance prior to holding the pre-work conference are (as applicable): bonds, insurance, list of key contractor personnel, cost-loaded Critical Path Method schedule, accident prevention plan, quality control plan, and environmental protection plan.

The Contractor’s key personnel shall attend at the expense of the Contractor. Key personnel are defined as the Project Manager, Superintendent, CQC representative(s), SSHO, major subcontractors and specialized supplementary personnel.

Key personnel will meet to identify strategies to ensure the project is planned and executed throughout the contract period in order to meet the RFP and customer requirements stated `therein.

The CONSTRUCTION Manager will lead the meeting and guide the discussions based on an agenda provided by the Government. The CONSTRUCTION Manager shall develop a Plan of Action and Milestones (POAM) in conjunction with the Contractor.

3. QUALITY CONTROL: Reference UFGS-01 45 00.10 20 (February 2010) QUALITY CONTROL FOR MINOR CONSTRUCTION. The Quality Control Manager may serve as the Superintendent on this project and may serve as the Site Safety and Health Officer (SSHO) on this project, provided he/she meets those qualifications.

4. SUBMITTAL PROCESS: Administrative and technical submittals shall be submitted and approved prior to the pre-work conference (administrative submittals) or to the relevant Contract Line Item (CLIN). Use the form provided by the Contracting Officer. All administrative submittals and selected technical submittals (listed in the technical sections of the contract) shall be certified by the QC Manager as complying with the contract documents

General Requirements Page 2 of 8 and submitted for government approval by the CONSTRUCTION Manager. Technical submittals not specifically reserved for government approval shall be approved by the QC Manager and submitted to the CONSTRUCTION Manager for surveillance purposes. The government will retain three copies of each submittal approved by the government and will return all other copies to the contractor duly executed noting submittal disposition. The contractor shall adjust the number of copies submitted based upon how many copies are desired in return.

Submittals that are approved by the contractor and forwarded for government surveillance purposes must be submitted in duplicate with original QC Manager approvals on each copy. The government will retain both copies of such submittals.

a. Submittals prior to the Pre-work Conference

1) Insurance

3) List of key contractor personnel with emergency recall information

4) Cost-loaded Critical Path Method schedule (or equivalent, if applicable)

5) Accident Prevention Plan

6) Quality Control Plan

7) Environmental Protection Plan (including evidence of applicable permits/licenses)

8) Waste Management Plan (monthly reports are required)

b. Submittals prior to preparatory phase meetings: Technical submittals specified elsewhere in the contract

c. Submittals prior to Contract Close-Out:

1) Record Drawings or specifications indicating all changes during the contract duration

2) Operations and Maintenance Information, if applicable

3) Final test reports, if applicable.

4) Warranties, if applicable

5. SUPERVISION: The Contractor shall have a supervisor fluent in English on the job site at all times when work is being performed. The superintendent’s performance must remain at satisfactory levels or the Contracting Officer may require a replacement with no adjustment to contract price or time.

6. SCHEDULE: Provide a schedule adequate to efficiently manage the project and for the Government to efficiently manage QA and scheduling interfaces. Include any phasing and any work restrictions (such as occupied spaces, special hours, potential work disruptions). The schedule shall contain CLINs and dates for completion meeting the requirements of the RFP. Update the schedule as changes are made via modifications. Provide and use a 4-week look-ahead for each QC meeting. Requests for time extensions may be submitted to the Contracting Officer.

7. CONTRACTOR’S PRODUCTION REPORTS: Submit Contractor Production Reports on forms appropriate for this purpose. Complete the reports weekly unless otherwise requested by the Contracting Officer. Reports shall include:

a. Status of key personnel, move-on and move-off of major equipment furnished by the prime, subcontractor or the Government, and materials and equipment delivered to the site.

b. Safety meetings, checks and inspections

c. Disposition of Construction Waste Material (per the Environmental Protection Plan)

d. Design and Construction Services: Including, but not necessarily limited to:

1) Check all Contract Documents for correctness and correlation. If the Contractor notes any discrepancy or ambiguity, immediately notify the COR.

2) Examine the work site as to conditions affecting the work. Field verify the site and scope of work, including but not limited to the measurement and location of all significant items required to perform the work. Failure by the Contractor to familiarize oneself with available information regarding

General Requirements Page 3 of 8 these conditions shall not relieve the Contractor from the responsibility of successfully completing the work.

8. INVOICES: WAWF

a. All payments must be submitted via Wide Area Work Flow. https://wawf.eb.mil. See Clause 252.232.7006, Wide Area Workflow Payment Instructions (JUN 2012) in your contract. Payment requests should include form SOUTHDIV 7300/30 and any other documents as appropriate to support the invoice.

b. Submit Contractor invoices, certified by the QCM, on the form furnished by the Government, showing the basis for arriving at the amount of the invoice. Submit one original and number of copies as required.

c. The final invoice shall include a completed “Contractor’s Final Release Statement.”

d. This office does not accept invoices on any Fridays. If you submit an invoice after 12:00, Noon, Thursdays, the invoice will be date-stamped for Monday.

e. The Government will return for correction invoices not completed in accordance with contract requirements, including final invoices without final release statement.

f. Payment will be made on Contractor’s submission of itemized requests and will be subject to reduction for overpayments or increased for underpayments from previous payments. The Government may withhold payment or reduce payments for the following:

1) Defects in material or workmanship.

2) Claims the Government may have against the Contractor under or in connection with this contract.

3) Contractor’s failure to submit an updated schedule.

4) Payroll violations.

5) Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor.

g. Payments may be made for materials, stored off construction sites, under the following conditions:

1) Conditions described in Attachment A.

2) Materials adequately insured and protected from theft and exposure.

3) Materials not susceptible to deterioration or physical damage in storage or in transit to the job site are acceptable for progress payments. Items such as steel, machinery, pipe and fittings and electrical cable are acceptable, but items such as gypsum board; glass, insulation and wall covering are not.

4) Materials in transit to the job or storage site are not acceptable for payment.

5) Conditions specified in FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.

9. PROTECTION OF GOVERNMENT PROPERTY: Take special care to protect Government property. Return areas damaged as a result of construction under this contract to their original condition. In addition to FAR 52.236- 9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, perform the following:

a. Remove or alter existing work or facilities in such a manner as to prevent injury or damage to any portion of the existing work or facilities that remain.

https://wawf.eb.mil/�

General Requirements Page 4 of 8

b. Repair or replace portions of existing work altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

c. Preserve the natural resources in accordance with the approved environmental protection plan.

10. EXISTING UNDERGROUND UTILITIES: Verify on-site utilities and have them marked out by a utility locator service prior to the start of construction. Where existing piping, utilities, oil and gas lines, and underground obstructions of any type that are to remain are indicated in locations to be traversed by new piping, ducts, and other work provided herein, and such are not indicated or specified to be removed, the elevations of the existing utilities and obstructions shall be determined before the new work is laid closer than the nearest manhole or other structure at which an adjustment in grade could be made. Obtain required dig permits and notify the Contracting Officer 21 calendar days prior to any excavation. Refer to Attachment A for specific station requirements.

11. LICENSES/PERMITS: Obtain all appointments, licenses, and permits required to perform work under this contract at no additional expense to the Government. Comply with all applicable federal, state, and local laws, and base regulations and procedures. Provide evidence of such permits and licenses to the Contracting Officer before work commences and at other times as requested by the Contracting Officer (see FAR 52.236-7, Permits and Responsibilities). Coordinate permit applications with the CONSTRUCTION Manager and PWD environmental office.

12. CONTRACTOR WORK SITE: Limit use of the premises for work and for storage of material and equipment associated with the contract. Unless otherwise specified or separately agreed to, Government owned material handling equipment, transportation equipment or general tools will not be available for Contractor’s use. Clean work area daily, removing all loose debris and disposing of all non-permanent materials in accordance with the contractor’s Waste Management Plan. Upon completion of the work and before final inspection, the contractor shall leave the entire exterior work area “broom clean” and the interior work area shall be swept, mopped, vacuumed, dusted, cleaned, disinfected, etc., and shall in all respects be ready for move-in.

a. Temporary Facilities: The Contractor may provide his own office facilities; coordinate and obtain advance approval from the Contracting Officer. Provide and maintain suitable sanitary facilities within the construction limits of the contract. Dispose of sanitary waste in accordance with the applicable laws, and local regulation. The Government will provide metered electric and water. Natural gas and communications will not be provided by the base.

b. Contractor-Furnished Equipment: Equipment is subject to the inspection and approval of the Contracting Officer, prior to and during the life of the contract. All equipment and vehicles shall display readily visible Contractor identification markings. Relocate stored Contractor equipment which may interfere with operations of the Government or with others on-site.

c. Contractor-furnished Material: Protect and secure products stored at this site. All replacement units, parts, components, and materials to be used in the maintenance, repair and alteration of facilities and equipment shall be new and compatible with the existing equipment on which it is to be used, and shall comply with applicable Government, commercial, or industrial standards such as Underwriter’s Laboratories, Inc., and National Electrical Manufacturers Association.

13. TEMPORARY UTILITIES

a. The Government will provide water and power in reasonable quantities at the prevailing rates.

b. All labor, material, and equipment necessary to effect temporary utility tie-ins, including transformers if necessary, shall be at the expense of the Contractor and under the surveillance of the Contracting Officer.

The Contractor shall not operate any Government owned utilities.

c. The Contractor shall be responsible for any damages to Government, private or public facilities and property that may result from the installation and removal of these temporary utility tie-ins. Corrections and repairs shall be made at the Contractor’s expense.

General Requirements Page 5 of 8

d. The actual location and installation of the temporary tie-in, together with any interruptions of utilities systems, shall be identified and approved by the Contracting Officer prior to execution. Notify the CONSTRUCTION Manager and Station Utilities 15 calendar days prior to any tie-ins.

e. Permanent utility systems, when indicated, will be available for tie-in.

f. Telephone and Data Service: Make arrangements with local telephone company, NMCI and other pertinent base communication departments.

g. Maintain utility services to existing facilities surrounding the site at all times during construction.

h. Contractor shall install and certify back flow preventers on all connections to the potable water supply system. Backflow preventers shall have a certificate of full approval from FCCCHR-USC, University of Southern California, attesting that the design, size, and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval.

Certificate of Provisional Approval will not be acceptable.

14. ENVIRONMENTAL CONTROLS AND PROTECTION: Unforeseen Hazardous Conditions: Do not disturb hazardous materials and report immediately to the Contracting Officer potentially hazardous conditions that are uncovered or the Contractor becomes aware of that have not been identified in the contract documents. This includes conditions that are not only hazardous to humans but wildlife, marine life and the environment. Stop work in the area of the questionable material or condition until identification and direction is provided. The Contractor’s Superintendent and SSHO (and PM if there is a PM assigned) shall complete ECATTS training prior to starting respective phases of work. This training is web-based and can be accessed on the internet. Replacement personnel shall complete ECATTS training within 14 days of assignment to the propject. Submit an ECATTS certificate of completion. *****Recycled Content and Biobased Products: if applicable by the contract, material and product submittals for all recycled-content items should list the recycled and recovered materials used and the percentage content (by weight.) Submittals for bio-based products should describe the bio-based materials used and the percentage content (by weight.) These are required upon completion of the work.

15. WASTE MANAGEMENT: Develop a Waste Management Plan that identifies all recyclable material and disposal methods for all material. Contractor shall reduce, recycle or salvage as much waste material as possible with a goal of diverting at least 50% of construction waste from landfill. Address waste reduction, recycling and salvage as part of the waste management plan. Report actual volume or weight of disposed and recycled materials monthly, with a final overall contract report submitted and accepted before the final invoice is submitted. The Contractor is responsible for removing and disposing of all waste materials generated. Consider all material recyclable or reusable, unless clearly demonstrated the material requiring disposal is waste material.

16. RECORD DRAWINGS AND OPERATION & MAINTENANCE (O&M) DATA: Furnish hard copy and electronic format for all as-built and O&M information. Record drawings shall incorporate all changes to the approved final design. Submit two copies of half size as-built drawings, one copy of full-size as-built drawings, and two CDs containing as-built drawings (in both pdf and Autocad formats). O&M data shall be provided for all materials and equipment. O&M data shall include one complete copy of each approved construction submittal, certified manufacturer’s test reports and field test reports as specified in the technical sections of the contract, and manufacturer’s warranties (see paragraph 17). For all pieces of operating equipment, include a preventive maintenance schedule and list of spare parts suppliers including telephone numbers and web sites as applicable

17. WARRANTY: Warrant all materials and work for not less than one year after final acceptance of the work.

Warrant all remedial work performed under this warranty provision for an additional one year period commencing with the government’s acceptance of the remedial work. All manufacturer’s extended warranties shall run to the Government. Furnish the manufacturers’ original written warranty accompanied by a copy of the supplier’s receipt showing place of purchase, telephone number of supplier, address, delivery order number if applicable, and ticket number.

18. PERFORMANCE EVALUATIONS: The evaluation will take into account all aspects of the Contractor’s performance. Performance evaluations may be completed any time during the contract. The Government will provide a copy of the performance evaluation and an opportunity to discuss the evaluation. The performance evaluations will have an impact on the award of future contracts.

General Requirements Page 6 of 8

19. WORK HOURS, ACCESS AND PASSES: All Contractor employees, including subcontractors, and subcontractors’ employees, suppliers, and suppliers’ employees shall be required to comply with the Installation Security Requirements regarding personnel, vehicle, and equipment security passes and access the jobsite. Nothing in the contract shall be construed in any way to limit the authority of the Commanding Officer to prescribe new, or to enforce existing security regulations governing the admission or exclusion of persons and the conduct of persons while aboard the station, including but not limited to, the rights of search of all persons or vehicles aboard the station. Coodinate with the Contracting Officer’s Representative for specific security and access requirements.

a. Access to Buildings/Occupied Buildings: The Contractor may work in or around existing occupied buildings. The Contractor is responsible, via the Contracting Officer, to obtain access to building and facilities and arrange for them to be opened and closed. Do not enter the building(s) without prior approval of the Contracting Officer. Keep the existing buildings and their contents secure at all times.

Provide temporary closures as required to maintain security. Contract personnel will not be permitted in security-regulated buildings or areas unless cleared by the Security Officer.

b. Passes and Badges: Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents (status verified by prime contractor). All Contractor employees shall obtain the required employee and vehicle passes.

Failure to obtain security and base access passes shall not be a cause for contract performance time extension. The base participates in the RAPIDGate Program. With RAPID Gate implementation, access to NCBC may be obtained either by visiting the Pass and ID Office daily to obtain a “day pass,” or utilizing the RADPID Gate Program. The cost of the RAPIDGate program includes a fee for the Contractor's firm and a fee per Contractor employee for a one-year pass. For additional information, please check it out at www.rapidgate.com. Badges/passes shall be displayed as required by the Installation Security Department.

c. In addition to the RAPID Gate process, contractors are required to complete the attached two forms, “Base Access form” and “Personal Information Form.” This is required every six months. Check with the pass and ID Office to ensure all current, proper forms are completed.

d. Contractor Vehicles: All vehicles shall display a valid state license plate and safety inspection sticker, if applicable, and shall be maintained in good repair. The company name shall be displayed in a clearly visible manner and size on each Contractor vehicle used in the course of work. Registration, proof of insurance and driver’s licenses are required to obtain a station vehicle pass.

e. Work Hours: Unless otherwise indicated, work will be located on a Government compound, military installation, or station. Normal work hours are from 7:00 AM to 4:00 PM Monday through Friday, except federal Holidays. Obtain advance approval from the Contracting Officer’s Representative for contractor personnel to remain on site beyond normal working hours. Notify the Contracting Officer at least 48 hours in advance to obtain approval for access to the jobsite or work outside of normal working hours.

f. Contractor Personnel: Provide the Contracting Officer the name(s) of the supervisory person(s) authorized to act for the Contractor. Provide, and update as required, a list of the key personnel for the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency.

g. Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

Remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of National Security.

h. Under certain conditions, the contracting officer or security officials may limit access to the base or jobsite. Under these conditions, the contractor and sub-contractor personnel are required to comply with the conditions specified at no additional cost to the government.

20. SECURITY REQUIREMENTS: All security requirements apply to all subcontractors and suppliers associated with this contract. Do not publicly disclose any information concerning any aspect of the materials or services relating to this contract, without prior written approval of the Contracting Officer.

http://www.rapidgate.com/�

General Requirements Page 7 of 8

a. Do not disclose or cause to be disseminated any information concerning the operations of the activity’s security or interrupt the continuity of its operations.

b. Do not disclose any information to any person not entitled to receive it. Failure to safeguard any classified information that may come to the Contractor or any person under his control, may subject the Contractor, his agents or employees to criminal liability under 18 U.S.C., Sections 793 and 798.

c. Direct to the Contracting Officer and or Installation Security Officer for resolution all inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information.

d. Coordinate photography requirements with the Contracting Office. Some areas restrict or prohibit photographing Government property.

Deviations from or violations of any of the provisions of this paragraph, will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and withdrawal of the Government’s acceptance and approval of employment of the individuals involved.

21. REQUIRED INSURANCE: Within 15 calendar days after award, furnish the Contracting Officer a Certificate of

Insurance as evidence of the following insurance coverage amounts not less than the amount specified below in accordance with FAR Clause 52.228-5, Insurance Work On A Government Installation:

a. Comprehensive General Liability: $500,000 per occurrence.

b. Automobile Liability: $200,000 per person, $500,000 per occurrence for bodily injury; $20,000 per occurrence for property damage.

c. Worker's Compensation: As required by Federal and State Worker’s compensation and occupational disease and other laws.

d. Employer’s Liability Coverage: $100,000, except in states where worker’s compensation may not be written by private carriers.

e. Others as required by state law.

f. Above insurance coverages are to extend to Contractor personnel operating Government owned equipment and vehicles.

g. The Certificate of Insurance shall provide for 30 calendar days written notice to the Contracting Officer by the insurance company prior to cancellation or material change in policy coverage.

22. GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT: If applicable, the Government will furnish the materials and equipment for installation by the Contractor pursuant to contract clause FAR 52.245-2, Government Property (Fixed Price Contracts) or FAR 52.245-4, Government Furnished Property (Small Project).

Notify the Contracting Officer in writing at least 15 calendar days before the materials and equipment are required.

Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the prevailing rate. The Contracting Officer will specify the location of materials and equipment and the delivery location.

23. ORAL MODIFICATION: No oral statement by any person other than the Contracting Officer, as provided in the contract clause entitled, “CHANGES AND CHANGED CONDITIONS,” will in any manner or degree modify or otherwise affect the terms of this contract.

24. NO WAIVER BY THE GOVERNMENT: The failure of the Government in any one or more instances to insist upon strict performance to any of the terms of this contract or to exercise any option herein conferred shall not be

General Requirements Page 8 of 8 construed as a wavier or relinquishment to any extent of the right to assert or rely upon such terms or options on any future occasion.

25. EQUITABLE ADJUSTMENTS-WAIVER AND RELEASE OF CLAIMS:

a. Whenever the Contractor submits a claim for equitable adjustment under a clause which provides for equitable adjustment of the contract, such claim shall include all types of adjustments in the total amounts to which the clause entitles the Contractor, including, but not limited to, adjustment arising out of delays or disruptions.

b. Except as the parties may otherwise expressly agree, the Contractor shall be deemed to have waived: (1) any adjustments to which he otherwise might be entitled under the clause where such claim fails to request such adjustments; and (2) any increase in the amount of equitable adjustments additional to those requested in its claim.

c. The Contractor agrees that, if required by the Contracting Officer, it shall execute a release, in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement setting forth the aforesaid equitable adjustment. The Contractor further agrees that such release shall discharge the Government, including its officers, agents, and employees, from any further claims, including, but not limited to, further claims arising out of delays or disruptions caused by the aforesaid change.

26. SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS:

Reference UFGS-01 35 26.05 25 (April 2012), GOVERNMENT SAFETY REQUIREMENTS FOR DESIGN- BUILD, NAVFAC SE VERSION. (Applies design-bid-build as well as design-build projects.)

-- End of Section --

Project Title Work Order Number Project Location, City, State

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 1

SECTION 01 35 26.05 25

GOVERNMENT SAFETY REQUIREMENTS FOR DESIGN-BUILD

04/12

NAVFAC SE VERSION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI/HFES 100

(2007) Human Factors Engineering of Computer Workstations

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.32

(2004) Fall Protection systems for Construction and Demolition Operations

ASSE/SAFE A10.34

(2001; R 2005) Protection of the Public on or Adjacent to Construction Sites

ANSI/ASSE A1264.1

(2007) Safety Requirements for Workplace Walking/Working Surfaces and Their Access; Workplace Floor and Wall Openings; Stairs and Guardrails Systems

ANSI/ASSE Z359.0

(2007) Definitions and Nomenclature Used for Fall Protection and Fall Arrest

ASSE/SAFE Z359.1

Personal Fall Arrest System, Subsystems and Components

ANSI/ASSE Z359.2

(2007) Minimum Requirements for a Comprehensive Managed Fall Protection Program

ANSI/ASSE Z359.3

Positioning and Travel Restraint Systems

ANSI/ASSE Z359.4

Assisted-Rescue and Self-Rescue Systems, Subsystems and Components

ASME INTERNATIONAL (ASME)

ASME B30.22 (2010) Articulating Boom Cranes

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 2

ASME B30.3

(2009) Tower Cranes

ASME B30.5

(2011) Mobile and Locomotive Cranes

ASME B30.8

(2010) Floating Cranes and Floating Derricks

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)

IEEE C2

(2012) National Electrical Safety Code

DEPARTMENT OF DEFENSE (DoD)

MIL-STD-1472F

(1999) Military Standard, Human Engineering Design Criteria for Military Systems, Equipment and Facilities

DoD-HDBK 743A

(1991) Anthropometry of US Military Personnel

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10

(2010) Standard for Portable Fire Extinguishers

NFPA 241

(2009) Standard for Safeguarding Construction, Alteration, and Demolition Operations

NFPA 306

(2009) Standard for Control of Gas Hazards on Vessels

NFPA 51B

(2009; TIA 09-1) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work

NFPA 70

(2011; Errata 2 2012) National Electrical Code

NFPA 70E

(2012) Standard for Electrical Safety in the Workplace

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1

(2008; Errata 1-2010; Change 1-3 2010; Changes 4-6 2011) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

10 CFR 20

Standards for Protection Against Radiation

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 3

29 CFR 1910

Occupational Safety and Health Standards

29 CFR 1910.146

Permit-required Confined Spaces

29 CFR 1910.147

Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1915

Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment

29 CFR 1919

Gear Certification

29 CFR 1926

Safety and Health Regulations for Construction

29 CFR 1926.1400

Cranes and Derricks in Construction

29 CFR 1926.16

Rules of Construction

29 CFR 1926.500

Fall Protection

CPL 2.100

(1995) Application of the Permit- Required Confined Spaces (PRCS) Standards 29 CFR 1910.146

U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)

NAVFAC P307

(Dec 2009 with Change 1, Mar 2011, and Change 2, Aug 2011) Management of Weight Handling Equipment

1.2 SUBMITTALS

The use of a "G" following a submittal indicates that a Government approval action is required. Submit the following in accordance with Section 01 33

10.05 25 DESIGN SUBMITTAL PROCEDURES and Section 01 33 00.05 25

CONSTRUCTION SUBMITTAL PROCEDURES.

SD-01 Preconstruction Submittals

Accident Prevention Plan (APP); G

Activity Hazard Analysis (AHA); G

Crane Critical Lift Plan; G

Proof of Qualifications for Crane Operators; G

OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate; G

Experience Modification Rate (EMR); G

SD-06 Test Reports

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 4

Accident Notifications

Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Accident Notifications."

Accident Reports

Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Accident Reports."

Crane Reports

SD-07 Certificates

Confined Space Entry Permit

Hot Work Permit

License Certificates

Contractor Safety Self-Evaluation Checklist; G (Obtain copy from Contracting Officer)

[Third Party Certification of Barge-Mounted Mobile Cranes]

[Certificate of Compliance (Crane)]

Submit one copy of each permit/certificate attached to each Daily Production Report.

SD-11 Closeout Submittals

OSHA Form 300A Summary of Work-Related Injuries and Illnesses; G

OSHA Form Calculating Injury and Illness Incidence Rates; G

1.3 DEFINITIONS

a. Competent Person for Fall Protection. A person who is capable of identifying hazardous or dangerous conditions in the personal fall arrest system or any component thereof, as well as their application and use with related equipment, and has the authority to take prompt corrective measures to eliminate the hazards of falling.

b. High Visibility Accident. Any mishap which may generate publicity, high visibility¸ or is deemed high visibility by NAVFAC SE.

c. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician.

Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.

d. Operating Envelope. The area surrounding any crane. Inside this "envelope" is the crane, the operator, riggers and crane walkers, rigging gear between the hook and the load, the load and the crane's supporting structure (ground, rail, etc.).

e. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 5

(1) Death, regardless of the time between the injury and death, or the length of the illness;

(2) Days away from work (any time lost after day of injury/illness onset);

(3) Restricted work;

(4) Transfer to another job;

(5) Medical treatment beyond first aid;

(6) Loss of consciousness; or

(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

f. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.

g. Weight Handling Equipment (WHE) Accident. A WHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment; two-blocking; overload; and/or collision, including unplanned contact between the load, crane, and/or other objects.

A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.) Any mishap meeting the criteria described above shall be documented in both the Contractor Significant Incident Report (CSIR) and using the NAVFAC prescribed Navy Crane Center (NCC) form submitted within five days both as provided by the Contracting Officer. Comply with additional requirements and procedures for accidents in accordance with NAVFAC P-307, Section 12.

1.4 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST

Contracting Officer will provide a "Contractor Safety Self-Evaluation checklist" to the Contractor at the pre-construction conference. Complete the checklist monthly and submit with each request for payment voucher. An acceptable score of 90 or greater is required. Failure to submit the completed safety self-evaluation checklist or achieve a score of at least 90 may result in retention of up to 10 percent of the voucher.

Additionally, provide a Monthly Exposure Report and attach to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor. Failure to submit the report may result in retention of up to 10 percent of the voucher. The Contracting Officer will submit a copy of the Contractor Safety Self- Evaluation and Monthly Exposure Report to the local safety and occupational health office.

1.5 REGULATORY REQUIREMENTS

In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1, and federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 6 specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.

1.5.1 Subcontractor Safety Requirements

Neither Contractor nor any subcontractor shall enter into contract with any subcontractor who fails to meet the following requirements. The term subcontractor in the following paragraphs shall mean all subcontractors on the project, whether in contract with the Contractor or any subcontractor.

At least five days before any new subcontractors start work, or at least five days prior to the preparatory meeting regarding the subcontractor’s work, whichever is earlier, Contractor shall submit subcontractor’s proof of compliance with the requirements detailed blow for Experience Modification Rate and DART rates, for Government approval.

1.5.1.1 Experience Modification Rate (EMR)

No subcontractor on the project shall have an effective EMR greater than

1.10 when entering into a subcontract agreement with the prime contractor or a subcontractor at any tier as computed by the National Council on Compensation Insurance (NCCI) or if not available, as computed by the state agency’s rating bureau in the state where the subcontractor is registered.

Prime Contractor may submit a written request for additional consideration to the Contracting Officer where the specified acceptable EMR range cannot be achieved for a particular subcontractor whose performance is uniquely critical to the construction project. Relaxation of the EMR range shall only be considered and/or granted on a case-by-case basis for special conditions and shall not be anticipated as tacit approval. Contractor’s Site Safety and Health Officer (SSHO) shall collect and maintain certified EMR ratings for ALL subcontractors on the project and shall make them available to the Government at the Government’s request.

1.5.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART)

Rate

No subcontractor on the project shall have a DART rate calculated from the most recent, complete calendar year greater than 3.0 when entering into a subcontract agreement with the prime contractor or a subcontractor at any tier. The OSHA Dart Rate is calculated using the following formula:

(N/EH) x 200,000 where:

N = number of injuries and/or illnesses with days away, restricted work, or job transfer EH = total hours worked by all employees during most recent, complete calendar year 200,000 = base for 100 full-time equivalent workers (working 40 hours per week, 50 weeks per year)

Prime Contractor may submit a written request for additional consideration to the Contracting Officer where the specified acceptable OSHA Dart rate range cannot be achieved for a particular subcontractor whose performance is uniquely critical to the construction project. Relaxation of the OSHA DART rate range shall only be considered and/or granted on a case-by-case basis for special conditions and shall not be anticipated as tacit approval. Contractor’s Site Safety and Health Officer (SSHO) shall collect and maintain self-certified OSHA DART rates for ALL subcontractors on the project and shall make them available to the Government at the Government’s request.

1.6 SITE QUALIFICATIONS, DUTIES, PLAN, AND MEETINGS

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 7

1.6.1 Personnel Qualifications and Training Requirements

1.6.1.1 Site Safety and Health Officer (SSHO)

The SSHO must meet the requirements of EM 385-1-1 section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. The Contractor shall provide a Safety oversight team that includes a minimum of one (1) person at each project site to function as the Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs. [The only duties and responsibilities of the SSHO are to manage and implement the safety program on this contract.]

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor Quality Control Person can be the SSHO on this project.

1.6.1.2 Crane Operators

Meet the crane operator's requirements in USACE EM 385-1-1. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, designate crane operators as qualified by a source that qualifies crane operators(i.e., union, a government agency, or an organization that tests and qualifies crane operators). Provide proof of current qualification. In addition, the Contractor shall comply with Contractor Operated Crane Requirements included in the latest revision of document NAVFAC P-307 Section 1.7.2 "Contractor Operated Cranes," and Appendix P, Figure P-1 and with 29 CFR 1926, Subpart CC.

1.6.1.3 Competent Person for Confined Space Entry

Provide a competent person for confined space meeting the definition and requirements of EM 385-1-1. If work involves marine operations that handle combustible or hazardous materials, this person shall have the ability to understand and follow through on the air sampling, PPE, and instructions of a Marine Chemist, Coast Guard authorized persons, or Certified Industrial Hygienist. All confined and enclosed space work shall comply with NFPA 306, OSHA 29 CFR 1915, Subpart B, "Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment" or as applicable, OSHA 29 CFR

1910.147 for general industry.

1.6.2 Personnel Duties

1.6.2.1 Site Safety and Health Officer (SSHO)

Collect and maintain certified EMR ratings and DART rates for all subcontractors on the project and make them available to the Government at the Government's request.

In addition to duties required in EM 385-1-1, perform the following duties:

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 8

a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily production report.

b. Conduct mishap investigations and complete required reports. Maintain one OSHA Form 300 "Log of Work-Related Injuries and Illnesses" and one OSHA Form 300A "Summary of Work-Related Injuries and Illnesses" and document safety oversight work in the Daily Production Reports for prime and all subcontractors. Update OSHA Form 300A on a monthly basis and post it at the Contractor's construction trailer throughout the construction period.

Submit final OSHA Form 300A along with OSHA Form "Calculating Injury and Illness Incidence Rates," which includes the Total Recordable Cases Incidence Rate and DART Incidence Rate, at project closeout.

c. Maintain Daily Production Reports for prime and subcontractors..

d. Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.

e. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.

f. Implement and enforce accepted APPS and AHAs.

g. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.

h. Ensure sub-contractor compliance with safety and health requirements.

Failure to perform the above duties will result in dismissal of the superintendent, QC Manager, and/or SSHO, and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.

i. Maintain a list of hazardous chemicals on site and their material safety data sheets.

j. Within one calendar day after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1, section 01.A.06. Additional items required to be posted include:

1) Confined space entry permit.

2) Hot work permit.

1.6.3 Safety Plans and Submissions

1.6.3.1 Accident Prevention Plan (APP)

Use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are

RFP PART 2 - SECTION UFGS 01 35 26.05 25 - Page 9 described below.