Amendment_0002.pdf

PDF 64 KB Posted

Attached to
BLDG 445 CEILING FANS, NCBC GULFPORT, MS
Solicitation number
N6945014Q3563
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Past_Performance_questionnaire.doc DOC document
Amendment_0001.pdf PDF
Application_for_Access_CBC_FILLABLE.pdf PDF
NAVFAC_4330_-_PROPOSAL_ESTIMATE_-_GPT.xls XLS spreadsheet
TECH_PKG.pdf PDF
N69450-14-Q-3563.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR3395693

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to provide Site Visit documents, clarif ications and technical revisions.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-14-Q-3563

X 9B. DATED (SEE ITEM 11)

09-Oct-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2013

CODE

NAVFAC SOUTHEAST

PWD GULFPORT FEAD

2401 UPPER NIXON ROAD, BLDG 322

GULFPORT MS 39501-5001

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

cara.morano@navy.milEMAIL:228-871-3335TEL:

CARA L MORANO / CONTRACT SPECIALIST

N69450-14-Q-3563

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

1. The purpose of this Amendment is to:

a. Provide the Pre-Proposal Conference/Site Visit Attendance Roster and Agenda.

b. Alert all bidders that registration in the System for Award Management (SAM) is required, as outlined in RFQ Clause 252.204-7004 Alt A (See RFQ page 22).

c. Alert all bidders that proposal evaluation will be based on compliance with the terms and conditions of the Request for Quote, including but not limited to Safety Responsibility Check information, Acknowledgement of all Amendments, past performance and price.

d. Make the following revisions to the Technical Statement of Work/Specifications/Drawings:

(1) Statement of Work:

Add paragraph 3.2. Contractor shall move existing equipment with the assistance of the facility owner to gain access to clear working space for the work to be performed during the off peak hours. Equipment moved shall be placed back following completion of work or at the end of each day. Facility owner will assist contractor by disconnecting equipment, reconnecting equipment and preparing equipment to be moved. For example, tread machines have wheels attached and the facility owner will activate them for use in moving the machines.

All equipment moves shall be coordinated and scheduled with the facility owner with a minimum of one work day of advance notice.

Add the following sentence to paragraph 4.2: All work requiring moving of equipment and disruption of occupants use of the area shall be performed during off peak hours of use. Off peak hours of use for this facility are between the hours of 8:30 a.m. and 3:00 p.m., Monday through Friday.

(2) Specification Section 26 00 00 00.20, Electrical Materials and Methods:

N69450-14-Q-3563

Add the following to paragraph 2.9: Alternative fans meeting the performance requirements equal to the fans specified within the basis of design may be approved. If an alternative fan is proposed, all technical information required to show an equal product in material, workmanship, performance and installation shall be submitted as part of the proposal. Design changes, including all load calculations and drawings shall be completed and stamped by a registered professional engineer and submitted as part of the proposal. All labor, material and equipment required to install the proposed alternative fans shall be included within the proposed price.

(3) Construction Drawing Sheet E-101 General Notes:

Add Note 11: All conduit exposed to view from below within the Fitness area shall be painted to closely match the existing wall paint. Paint on conduit and junction boxes shall be performed at time of installation after connectors are installed or after the complete installation of the conduit system to ensure proper metal to metal grounding connections. Paint color shall be matched by the contractor as close as possible to the original paint at the facility.

Add Note 12: Bottom of fan shall be mounted at 10’-0” above the existing finished floor.

2. All other terms and conditions remain unchanged.

(End of Summary of Changes)

Amendment 0002
20131022 Site Visit1