NAVFAC_4330_-_PROPOSAL_ESTIMATE_-_GPT.xls

XLS spreadsheet 35 KB Posted

Attached to
BLDG 445 CEILING FANS, NCBC GULFPORT, MS
Solicitation number
N6945014Q3563
Issued by

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Past_Performance_questionnaire.doc DOC document
Amendment_0001.pdf PDF
Application_for_Access_CBC_FILLABLE.pdf PDF
TECH_PKG.pdf PDF
N69450-14-Q-3563.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC 4330 (FRONT)

PROPOSAL/ESTIMATE FOR CONTRACT MODIFICATION NAVFAC 4330/43 (8/88)DATE:
CONTRACT TITLE: BLDG 445 CEILING FAN INSTALLSOLICITATION NO.: N69450-14-Q-3563
NAVFAC SE OFFICE: FEAD GULFPORT
DESCRIPTION OF CHANGE:N/A
PRIME CONTRACTOR'S WORKRev/Comments
1.Direct Materials
2.Sales Tax on Materials (N/A)
3.Direct Labor$0.00
4.Insurance, Taxes, and Fringe Benefits (% of line 3)$0.00
5.Rental Equipment
6.Sales Tax on Rental Equipment (% of line 5)7.00%$0.00
7.Equipment Ownership and Operating Expenses
8.SUBTOTAL (add lines 1-7)$0.00
9.Field Overhead (10% of line 8)10.00%$0.00
10.SUBTOTAL (add lines 8 & 9)$0.00
Prime Contractor Remarks:
SUB-CONTRACTOR'S WORK
11.Direct Materials
12.Sales Tax on Materials (N/A)
13.Direct Labor
14.Insurance, Taxes, and Fringe Benefits (% of line 13)$0.00
15.Rental Equipment
16.Sales Tax on Rental Equipment (% of line 15)$0.00
17.Equipment Ownership and Operating Expenses
18.SUBTOTAL (add lines 11 - 17)$0.00
19.Field Overhead (10% of line 18)$0.00
20.SUBTOTAL (add lines 18 & 19)$0.00
21.Home Office Overhead (3% of line 20)$0.00
22.Profit (% of line 20)$0.00
23.SUBTOTAL (add lines 20 - 22)$0.00
Subcontractor Remarks:
SUMMARY
24.Prime Contractor's Work (from line 10)$0.00
25.Sub-contractor's Work (from line 23)$0.00
26.SUBTOTAL (add lines 24 & 25)$0.00
27.Prime Overhead on sub-contractor (5% of line 25)5.00%$0.00
28.Prime's Home Office Overhead (3% of line 24)3.00%$0.00
29.Prime's Profit (% of line 26)$0.00
30.SUBTOTAL (add lines 26 - 29)$0.00
31.Prime Contractor's Bond Premium (% of line 30)$0.00
32.TOTAL COST (Add Lines 30 & 31)$0.00
MS State Tax (3.5% of line 32)3.50%$0.00
TOTAL PRICE (Total Cost plus MS State Tax)$0.00
Estimated Time Extension and Justification:
Prime Contractor's Name:
Signature of Preparer:DATE:
Title of Preparer:

NAVFAC 4330 (BACK)

INSTRUCTIONS FOR PREPARING PROPOSAL/ESTIMATE FOR CONTRACT MODIFICATION
All Contract Modification Proposals shall be addressed to the Resident Officer in Charge of Construction. Proposals must
clearly state the conditions and scope of the modification and shall be accompanied by a breakdown of cost, as indicated.
Lump sum costs will not be accepted in either the prime or sub-contractor's breakdown of direct cost. The total cost for
labor, material and equipment rental (or ownership) for each item shall be transferred to the corresponding item on the
front of this form. At the contractor's option, the overhead rates printed on the front of this form may be used for proposals
under $500,000 in lieu of detailed itemized estimates of overhead costs. The proposal should also include a request
for an extension of time, in calendar days, only if overall completion of the contract is impacted by the proposed modification.
The contractor shall not proceed with any of the work included in the modification prior to receipt of an executed modification
of contract (SF 30).
BREAKDOWN OF DIRECT COSTSContract No.:Date:
ITEMS OF WORK FORMATERIALLABOREQUIPMENT
Sub-contractorQTYUNITUnit CostTotal CostUnit CostTotal CostDaysRateTotal
Direct Prime Contractor's TOTALS:$0.00Total Rental
Total Owned
ITEMS OF WORK FORMATERIALLABOREQUIPMENT
Prime ContractorQTYUNITUnit CostTotal CostUnit CostTotal CostDaysRateTotal
Direct Prime Contractor's TOTALS:$0.00Total Rental
Total Owned
NAVFAC 4330/43 (Back)