SOW_-_Aircraft_Wiring_System_Repair_Tool_Set_-_0001.docx

DOCX document 28 KB Posted

Attached to
Aircraft Wiring System Repair Tool Sets
Solicitation number
N68335-19-R-0280
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
N68335-19-R-0280_-_0004.docx DOCX document
N68335-19-R-0280_-_0003.docx DOCX document
N68335-19-R-0280_-_0002.docx DOCX document
ATTACHMENT-G2-GFM_for_4205AS01000-1.xlsx XLSX spreadsheet
N68335-19-R-0280_-_0001.docx DOCX document
ATTACHMENT-G1-GFM_for_3919AS100-1.xlsx XLSX spreadsheet
Solicitation_N68335-19-R-0280.docx DOCX document
Self_Certification.docx DOCX document
Attachment_4_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Question_and_Response_Form.docx DOCX document
F18ANDV22DRAFT-CDRLS-TOOLSET-REBUY-041719-FINAL.docx DOCX document
Atachment_3_Past_Performance_Information_Form.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

DATE: 04/11/19

1.0 Scope

This SOW establishes the specified tasks and schedule, that must be accomplished by the contractor, in order to fulfill the requirements of the government solicitation to manufacture the specified quantities of the below listed Aircraft Wiring System Repair Tool Sets (hereafter referred to as tool sets). Each of the tool sets has a complete technical drawing or specification package, that is forwarded as part of this solicitation, detailing the design, related specifications and standards, and required methods to manufacture the tool sets. This contract effort entails the following tasks:

1.1Manufacture the following tool sets, for F-18 and V-22 aircraft platforms, based on the complete drawing packages provided with this solicitation for each tool set and the provision of specified government furnished material (GFM):
1.1.1P/N 3308AS100-2, F/A-18E/F Aircraft Wiring System Repair Tool Set
1.1.2P/N 3919AS100-1, EA-18G Aircraft Wiring System Repair Tool Set
1.1.3P/N 4205AS0100-1, EA-18G Supplemental Aircraft Wiring System Repair Tool Set

1.1.4 P/N 3329AS100-3, MV-22 Aircraft Wiring System Repair Tool Set

1.1.5 P/N 3948AS100-1, V-22 Supplemental Aircraft Wiring System Repair Tool Set

1.1.6 P/N 4026AS700-1, V-22 Supplemental-II Aircraft Wiring System Repair Tool Set

2.0Applicable Documents, guidance documents, government furnished information, equipment and material
2.1Applicable Documents
2.1.1MIL-STD-130 Identification Marking of US Military Property
2.2Guidance Documents
2.2.1MIL-HNDBK-61A Military Handbook: Configuration Management Guidance
2.3Government Furnished Information

Attachment (A): Drawing Package for P/N 3308AS100-2, F/A-18E/F Aircraft Wiring System Repair Tool Set Attachment (B): Drawing Package for P/N 3919AS100-1, EA-18G Aircraft Wiring System Repair Tool Set Attachment (C): Drawing Package for P/N 4205AS0100-1, EA-18G Supplemental Aircraft Wiring System Repair Tool Set

Attachment (D): Drawing Package for P/N 3329AS100-3, MV-22 Aircraft Wiring System Repair Tool Set; (also required for task (2)) Attachment (E): Drawing Package for P/N 3948AS100-1, V-22 Supplemental Aircraft Wiring System Repair Tool Set; (also required for task (2)) Attachment (F): Drawing Package for P/N 4026AS700-1, V-22 Supplemental-II Aircraft Wiring System Repair Tool Set; (also required for task (2)) Attachment (G): Spreadsheet detailing the utilization of the government furnished material (GFM - tools) provided as part of this contractual effort

2.4Government Furnished Material
2.4.1Government Furnished Materials for the P/N 3919AS100-1, EA-18G Aircraft Wiring System Repair Tool Set
2.4.2Government Furnished Materials for the P/N 4205AS0100-1, EA-18G Supplemental Aircraft Wiring System Repair Tool Set

3.0 Program Technical Task Descriptions and Reviews

The following technical tasks and reviews shall be conducted, as part of this contractual effort to manufacture the specified quantities of the Aircraft Wiring System Repair Tool Sets called out in paragraph 1.1 above

The contractor shall perform the following tasks to fulfill the requirements of this contractual effort:

3.1 Review GFI drawings

The contractor shall review the GFI drawings submitted as part of this solicitation. Any remaining questions about any aspect of the drawing packages, and/or their technical content, shall be addressed to the government at the Post Award Review teleconference.

3.2 Review the three Government Furnished Materials (GFM) lists for the three F-18 tool sets; Physically inspect the GFM, and prepare a report of any and all anomalies and discrepancies with the GFM (broken or out-of-specification tools); Contractor return ship anomalous tools to the government (if required); Government ship replacement tools (if required).

To complete this action, the contractor shall thoroughly review the GFM lists for the P/N 3919AS100-1 EA-18G Aircraft Wiring System Repair Tool Set and the P/N 4205AS0100-1, EA-18G Supplemental Aircraft Wiring System Repair Tool Set. Upon receipt of the GFM from the government, the contractor shall conduct a thorough inspection of each tool that comprises the GFM. The contractor shall prepare, and submit to the government a GFM Defective Items List Report listing the condition of all anomalous items including all broken, missing or incorrect (part number) tools that may be part of the GFM. Any remaining questions regarding the GFM condition report shall be discussed at the Post Award Review teleconference. If broken or incorrect tools are found in the GFM, then the contractor shall return ship only the broken or incorrect items to the government, by traceable means, not later that (NLT) 45 days after contract award. The government shall ship replacement tools, to the contractor, NLT 45 days after receipt of the anomalous tools from the contractor.

3.3 Post Award Review (PAR) Teleconference

The contractor shall host the government for a PAR teleconference NLT 21 days after contract award. During the PAR teleconference all of the terms of this contractual effort shall be reviewed. Any remaining areas of misunderstanding or concern shall also be addressed. The PAR shall be planned for one day. The meeting may be conducted by telephone only or video teleconference.

3.4 Order the Bill of Materials (BOM)

The contractor shall order the BOMs for all of the tool sets to be manufactured under the terms of this contract. The BOMs shall be ordered immediately after the Post Award Review teleconference is declared as “passed” by the government. The contractor shall subtract the GFM tools from the total BOM that is ordered (the contractor shall not purchase any tools that are included in the GFM since they are already provided by the government).

3.5 Fabricate First Article Tool Sets and conduct First Article Inspection (FAI) The contractor shall fabricate one first article for each of the six tool sets (a total of six separate first articles). The contractor shall host the government, at their facility, for a first article inspection of all six first article tool sets, NLT 150 days after contract award. The first article inspection shall be planned for two working days.

3.6 Tool Set Production

The contractor shall begin manufacturing of production quantities of each of the tool sets after each particular tool set is declared by the government to have passed first article inspection (the contractor is not required to wait for all six tool sets to pass the first article inspection to begin production of any particular tool set). The contractor shall deliver all of the tool sets, under the basic contract, to the government NLT 210 days after contract award. After production of the tool sets the contractor shall ship the tool sets to the government in accordance with the terms of the contract.

3.7 Design Change Notices (DCN), Request for Variance and response to government Quality Deficiency Reports (QDR) The contractor throughout the course of this contractual effort is authorized to submit a DCN or Request for Variance, to the government. Typically, these documents will be submitted to correct a drawing error or a part obsolescence issue, or as part of a Value Engineering Change Proposal. When submitting a DCN or Request for Variance the contractor shall clearly state the problem and the recommended solution. The government shall approve or disapprove the DCN or Request for Variance within ten working days. If the government fails to approve or disapprove the DCN or Request for Variance within ten days, then the tool set delivery dates shall slip one day for each day of delay until the DCN or Request for Variance is approved or disapproved. Also, the contractor shall respond to government QDRs after production delivery of the tool sets during the duration of this contract. The contractor shall respond to the QDR within ten days of receipt. The government shall approve or disapprove the contractor’s response within 7 days. MIL-HNDBK-61A Military Handbook: Configuration Management Guidance, may be used as guidance for these configuration control documents.

4.0 Program Technical Reviews

The following meetings and technical reviews shall be conducted, as part of this contractual effort to manufacture the specified quantities of the Aircraft Wiring System Repair Tool Sets called out in paragraph 1.1 above

4.1 Conduct System Engineering Technical Reviews (SETRs) with the government

a) Teleconference table-top Post Award Review (PAR) The contractor shall host a table-top post award review teleconference not later than (NLT) 21 days after contract award (DACA). The PAR meeting should be planned for a duration of one day. The objective of this meeting is to review the requirement of this contract effort, to address and resolve any areas of disagreement and to plan the program execution for the best probability of success. One of the key milestones for this review is the presentation by the contractor, and discussion and approval of the Integrated Master Schedule (IMS). Once the IMS is approved at the PAR it will be the official planning schedule for the project. Changes to the IMS after approval at the PAR must be mutually agreed upon between the contractor and the government. During the PAR the salient portions of the contract, including the SOW, the product specification, and all attachments shall be read and discussed. All of the discussions and action items shall be captured in meeting minutes. The minutes shall be prepared by the contractor in accordance with (IAW) Contract Data Requirements List (CDRL) A001.

Post Award Review Entry Requirements:

A) Contract Award B) Completion of Draft IMS Post Award Exit Criteria:

A) Conduct of Table-top Post Award Review B) Government approval of the contractor prepared PAR meeting minutes C) Contractor presentation of, and government approval of, the program IMS

b) Tool Set First Article Inspection A first article inspection shall be conducted in accordance with the direction detailed in paragraph 3.5 above.

c) Technical Interchange Meetings (TIM);

The contractor shall plan to conduct technical interchange meetings with the government during this contractual effort. The purpose of the TIM is for the contractor and the government to have technical meetings outside of the official SETRs. These TIMs shall be conducted as teleconferences and may be called by the government or by the contractor to discuss any important technical problem or issue related to this project. Over the life of this project the contractor shall plan to have a total of 6 hours of TIMs, with the government, with three contractor technical personnel present including the contractor project leader and the lead engineer.

5.0 Contract Data Requirements List (CDRL); The contractor shall perform development and timely delivery of contract CDRLs, DD1423-1 to the government. The CDRL are required as part of this contractual effort and shall be prepared and delivered in accordance with this SOW and the associated CDRLs.

5.1 Design Change Notice (CDRL A001)

The requirement may arise for the contractor to submit a Design Change Notice in order to correct, modify, enhance or improve the Tool Set designs, to replace an obsolescent part, correct a latent defect in the tool set design, as part of a Value Engineering Change Proposal or for other reasons. If required, the DCN shall be prepared and submitted in accordance with CDRL A001. The DCN shall completely and clearly describe the proposed design changes. Note that a DCN shall only be submitted for this contractual effort if required. Ideally no DCN will need to be submitted.

5.2 Request for Variance (CDRL A002)

The contractor has the option of submitting a Request for Variance in accordance with the CDRL A002. Refer to MIL-HDBK-61A Military Handbook: Configuration Management Guidance for guidance on requirements for content and processing Request for Variance. Note that a Request for Variance shall only be submitted for this contractual effort if required. Ideally no Request for Variance will need to be submitted.

5.3 Response to Government Generated Quality Deficiency Reports (CDRL A003)

The contractor shall prepare a response to a government generated Quality Deficiency Reports in accordance with CDRL A003. The QDR corrective action report shall attribute causes and propose corrective action to the observed or reported quality deficiency.

5.4 GFM Defective Items List (CDRL A004)

The contractor shall submit the GFM Defective Items List in accordance with paragraph 3.2 of this SOW and CDRL A004.

5.5 Meeting Agenda, CDRL A005

The contractor shall prepare a meeting agenda and submit it to the government for approval NLT 10 working days prior to the start of the PAR, FAI and TIMs. The Meeting Agendas shall be prepared in the contractor’s preferred format and shall clearly communicate the meeting start date and time, the meeting anticipated end date and time, the meeting location, the exact planned sequence of topics to be discussed and tasks to be accomplished, and the anticipated duration of each topic and task that is included in the agenda.

5.6 Meeting Minutes, CDRL A006

The contractor shall prepare meeting minutes and submit them to the government for approval NLT 5 working days after the completion of the PAR, FAI and TIMs. The meeting minutes shall be prepared in the preferred format of the contractor and shall clearly communicate topics of discussion, conclusions and decisions related to the discussion topics, results of task implementation during the meeting, all action items and the individuals to which they are assigned, project risk areas and risk mitigation plans.

5.7 Integrated Master Schedule (IMS), CDRL A007

The contractor shall develop and submit an IMS to the government for review and approval NLT 7 days prior to the start of the table-top teleconference PAR. The IMS will be discussed and approved as part of the PAR. This shall establish the baseline project schedule. The IMS shall be prepared in the preferred format of the contract and shall consist of the project work breakdown structure (WBS), schedule and task relationships (a priori and post a priori relationships). The IMS shall be presented in GANTT chart format for clarity. Future changes to the baseline IMS shall be by mutual agreement between the contractor and the government.

5.8 Bi-monthly Status Report, CDRL A008

The contractor shall prepare and submit status reports, every other month, throughout the duration of this contract. The report shall detail technical progress, highlight accomplishments and list upcoming program events for the next reporting period.

6.0 Special Requirements

6.1 Contractor configuration control management system

The contractor shall maintain an effective configuration control management system throughout the duration of this contract. The configuration control system shall result in configuration control of the first article and production hardware and configuration control of data deliverables. The configuration control system shall maintain tracking and control of document versions, revisions and hardware changes. MIL-HNDBK-61A Military Handbook: Configuration Management Guidance, may be used as guidance for these configuration control documents.

6.2 Contractor Quality assurance (QA) system

It is desired that the contractor maintain a QA system adhering to, or equivalent to ISO 9001 and AS9100.

6.3 Item Unique Identification (IUID) Marking of US Military Property In accordance with DFARS Clause 252.211-7003 Item Identification and valuation, the Contractor is required to mark and register all end items and their components meeting the requirements called out in MIL-STD-130N. These include components for which the Governments unit acquisition cost is $5,000 or greater, or any component, subassembly or embedded part that is serially managed, mission essential or a controlled inventory item.

a) Construct and Method Details on creating the UID and the marking method are contained in MIL-STD-130N. The UID may be either UID Construct #1 or Construct #2 with Construct #2 being the preferred method.

b) UID Location and Marking The locations and marking methods selected should result in no impact on the performance of the part and minimal configuration change(s) to the part. If the 2D matrix can't be incorporated onto the data plate, a 2D matrix sticker can be applied onto the main data plate provided it can be done without covering any critical data. If the above cannot be accomplished, a separate data plate can be attached which contains the 2D Matrix plus the human readable characters for the Part Number, Serial Number and CAGE. This added data plate should be attached in close proximity to the main data plate.

c) Permanency and Legibility The UID marking and identification plates, tags, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, or groups shall be permanent during the normal life expectancy of the item and be capable of withstanding the environmental test and cleaning procedures specified for the item. Legibility shall be as required for ready readability as per MIL-STD-130N.

d) UID Registration The prime Contractor has the responsibility to furnish Item Unique Identification (IUID) data to the IUID registry. Data submission of IUID data and acquisition cost should be via Wide Area Work Flow (WAWF), IUID XML file, IUID flat file or web entry. Additional information regarding data submission as well as the actual marking can be found at <http://www.acq.osd.mil/dpap/UID/>.

e) Records The Contractor shall maintain an accurate, current list of UIDs for all manufactured items on this contract and supply to the government upon request. The list shall include P/N, Serial #, CAGE, UID Location, Construct used, how it was marked and the registration method used.

6.4 Packaging, preservation and shipping

Packaging, preservation and shipping shall be in accordance with best commercial practices available and shall provide protection from normal climatic / weather conditions and incidental mishandling during shipping. The production tool sets shall be shipped to the following address:

NAVAIR

For F/A-18 EF

DODAAC: N68335

NAVAIR Lakehurst SE Staging Facility NAWCAD Lakehurst, Rt. 547 Bldg 195/Hangar 6 Joint Base MDL, NJ 08733

M/F: F-18 EF

ATTN: Jennie Kildare

(732) 323-2607

For F/A-18 G

DODAAC: N68335

NAVAIR Lakehurst SE Staging Facility NAWCAD Lakehurst, Rt. 547 Bldg 195/Hangar 6 Joint Base MDL, NJ 08733

M/F: F-18 EF

ATTN: Jennie Kildare

(732) 323-2607

For CV-22

DODAAC: N68335

NAVAIR Lakehurst SE Staging Facility NAWCAD Lakehurst, Rt. 547 Bldg 195/Hangar 6 Joint Base MDL, NJ 08733

MARK FOR: V-22 5C2

POC: Michelle Pierce

(732) 323-1042

For CMV-22

DODAAC: N68335

NAVAIR Lakehurst SE Staging Facility NAWCAD Lakehurst, Rt. 547 Bldg 195/Hangar 6 Joint Base MDL, NJ 08733

MARK FOR: CMV-22 5M2

POC: Michelle Pierce

(732) 323-1042