Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-19-R-0280_-_0004.docx | DOCX document | |
| N68335-19-R-0280_-_0003.docx | DOCX document | |
| ATTACHMENT-G2-GFM_for_4205AS01000-1.xlsx | XLSX spreadsheet | |
| SOW_-_Aircraft_Wiring_System_Repair_Tool_Set_-_0001.docx | DOCX document | |
| N68335-19-R-0280_-_0001.docx | DOCX document | |
| ATTACHMENT-G1-GFM_for_3919AS100-1.xlsx | XLSX spreadsheet | |
| Solicitation_N68335-19-R-0280.docx | DOCX document | |
| Self_Certification.docx | DOCX document | |
| Attachment_4_Contractor_Performance_Assessment_Questionnaire.pdf | ||
| Question_and_Response_Form.docx | DOCX document | |
| F18ANDV22DRAFT-CDRLS-TOOLSET-REBUY-041719-FINAL.docx | DOCX document | |
| Atachment_3_Past_Performance_Information_Form.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6833519R0280
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
The purpose of this amendment is:
1. Remove FAR Clause 52.209-4
2. Add FAR Clause 52.209-4 Alt II
3. Answer the following bidders question:
Q1. SOW, page 13 paragraph 1 instructs Contractor to order the BOM’s for all the tool sets to be manufactured under the terms of the contract “Immediately after the post award review teleconference is declared, “Passed” by the Government”
Section H, clause 52.209-4 First Article Approval notes:
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the government
Due to vendor minimum order quantities it would be in the Government’s best interest in both price and delivery to allow the contractor to order the BOM’s for all the tool sets to be manufactured after the post award review as the SOW notes.
Advise if SOW takes precedence over section H clause 52.209-4
A1. The Government has removed FAR clause 52.209-4 and replaced it with FAR clause 52.209-4 Alt II, which takes precedence.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
| 52.209-4 | FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989) - ALT II (SEP 1989) |
| (a) The Contractor shall deliver ___ unit(s) of Lot/Item ___ within ___ calendar days from the date of this contract to the Government at _________________________ [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract. | |
| (b) Within ___ calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval. | |
| (c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or |
select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
| (d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract. | |
| (e) Unless otherwise provided in the contract, the Contractor-- | |
| (1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and | |
| (2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense. | |
| (f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. | |
| (g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test. | |
| (h) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price. | |
| (i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver. |
The following have been deleted:
| 52.209-4 |
| First Article Approval--Government Testing |
| SEP 1989 |
(End of Summary of Changes) image1.wmf