This solicitation requests proposals for a Land-Based Mobile Electric Power Plant (LMEPP). The Naval Air Warfare Center Aircraft Division intends to award a fixed-price indefinite delivery indefinite quantity contract with a minimum of four pilot production units in the first delivery order. The contract will include technical data, testing, logistics, and production units over four ordering years with a maximum of 575 total units. The solicitation is set aside for small businesses and posted to SAM under number N68335-19-R-0105. Offerors must register in SAM and proposals will be evaluated for technical merit, past performance, and price to determine best value. The LMEPP will replace legacy power units and provide 120kVA AC and 270VDC/28VDC electric power for naval aircraft maintenance for at least 25 years. The government anticipates award by January 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0006_ LMEPP.doc | DOC document | |
| Amendment 0005_ LMEPP.doc | DOC document | |
| Amendment 0004_ LMEPP.doc | DOC document | |
| Amendment 0003_ LMEPP.doc | DOC document | |
| Amendment 0002 - LMEPP.doc | DOC document | |
| N6833519R0105 LMEPP SECTION B.doc | DOC document | |
| Amendment 0001 - LMEPP.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section A - Solicitation/Contract Form
POINTS OF CONTACT
Contracts POC is Gianna Gatto, 732-323-1270, fax 732-323-2359, email: gianna.gatto@navy.mil Technical POC: TBD
1. In order to receive copies of the Statement of Work, System Specification, and Contract Data Requirements Lists, interested offerors must be U. S. DoD Contractors. Interested offerors must provide the office point of contact identified below with a copy of their current form DD2345, 'MILITARILY CRITICAL TECHNICAL DATA AGREEMENT'.
Once received and current JCP certification verified by NAVAIR, the documents listed above will be transmitted to you from NAVAIR via the DoD SAFE system, to the data custodian you have identified on the DD Form 2345. Contractors must be registered in the System for Award Management (SAM), which can be accessed at www.sam.gov. Contractors must request the copies in writing from Ms. Gianna Gatto at e-mail: gianna.gatto@navy.mil.
2. THE ISSUANCE OF PRODUCTION DELIVERY ORDERS AND RELEASE FOR PRODUCTION ARE SEPARATE EVENTS. BOTH MUST HAVE OCCURRED BEFORE PRODUCTION MAY COMMENCE.
3. REFER TO NAVAIR CLAUSE 5252.216-9506 MINIMUM AND MAXIMUM QUANTITIES (MARCH 1999), LISTED IN SECTION F, FOR THE MINIMUM AND MAXIMUM CONTRACT QUANTITIES.
4. THE UNIT PRICING FOR THE PRODUCTION UNITS SHALL INCLUDE THE COST FOR THE PRODUCTION ACCEPTANCE TESTING.
5. REFER TO DFARS CLAUSE 252.216-7006 ORDERING, LISTED IN SECTION I, FOR THE ORDERING PERIODS. SPECIFICALLY:
· Delivery Orders for CLINs 0001- 0006 and 0011 - 0039 may be issued from date of award through Government release for production;
· Delivery Orders for Production Year One (CLIN 0007) may be issued from date of award through 365 days after Government release for production;
· Delivery Orders for Production Year Two (CLIN 0008) may be issued from 366 days after Government release for production through 730 days after Government release for production;
· Delivery Orders for Production Year Three (CLIN 0009) may be issued from 731 days after Government release for production through 1,095 days after Government release for production;
· Delivery Orders for Production Year Four (CLIN 0010) may be issued from 1,096 days after Government release for production through 1,460 days after Government release for production.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
LMEPP Pilot Production Units
FFP
Land-Based Mobile Electric Power Plant (LMEPP) Pilot Production Units in accordance with System Specification paragraphs 4.3 and 4.4, and Statement of Work paragraph 3.1.
FOB: Destination
PSC CD: 6115
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Contractor testing
Contractor Testing in accordance with System Specification paragraphs 4.3 and 4.4, and Statement of Work paragraph 3.3.2.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Contractor Test Support
Contractor Test Support in accordance with Statement of Work paragraph 3.3.2.2.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Contractor Test Training
Contractor Test Training in accordance with Statement of Work paragraph 3.4.12.2, and Contract Data Requirements List L00B.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
PPU Refurbishment of Units
Pilot Production Unit (PPU) Refurbishment of the four PPUs that go through DT-C1 and DT- C2 testing in accordance with Statement of Work paragraph 3.3.5.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Warranty Performance Report
Warranty Performance Report in accordance with Statement of Work paragraph 3.3.5.2 and Contract Data Requirements List L00D.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 575 |
| Each |
LMEPP Production Units Year One
Land-Based Mobile Electric Power Plant (LMEPP) Production Units in accordance with Statement of Work paragraph 3.3.5. Any orders issued within a 60 day period shall be cumulative and subject to the quantity discounted rate (Step-Ladder Pricing). Quantities Unit Price
1-29 each
30-100 each
101-200 each 201-300 each 301-400 each
401-575 each
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 575 |
| Each |
LMEPP Production Units Year Two
Land-Based Mobile Electric Power Plant (LMEPP) Production units in accordance with Statement of Work paragraph 3.3.5. Any orders issued within a 60 day period shall be cumulative and subject to the quantity discounted rate (Step-Ladder Pricing). Quantities
101-200 each 201-300 each
301-400 each
401-575 each
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 575 |
| Each |
LMEPP Production Units Year Three
Land-Based Mobile Electric Power Plant (LMEPP) Production Units in accordance with Statement of Work paragraph 3.3.5. Any orders issued within a 60 day period shall be cumulative and subject to the quantity discounted rate (Step-Ladder Pricing). Quantities
101-200 each 201-300 each 301-400 each
401-575each
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 575 |
| Each |
LMEPP Production Units Year Four
Land-Based Mobile Electric Power Plant (LMEPP) Production Units in accordance with Statement of Work paragraph 3.3.5. Any orders issued within a 60 day period shall be cumulative and subject to the quantity discounted rate (Step-Ladder Pricing). Quantities
11-29 each
101-200 each
201-300 each 301-400 each
401-575 each
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Physical Configuration Audit
Physical Configuration Audit in accordance with Statement of Work paragraph 3.4.13 and Appendix C - PCA Guidelines.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Design Change Notices
Design Change Notices in accordance with Statement of Work paragraph 3.2.9, and Contract Data Requirements List A001.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Pilot Production Test Plan and Procedure
Pilot Production Test Plan and Procedures in accordance with Statement of Work paragraph 3.3.2.5, and Contract Data Requirements List A002.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Pilot Production Test Report
Pilot Production Test Report in accordance with Statement of Work paragraph 3.3.2.6 and Contract Data Requirements List A003.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Production Acceptance Test Plan & Proc.
Production Acceptance Test Plan and Procedures in accordance with Statement of Work paragraph 3.3.5.3 and Contract Data Requirements List A004.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Production Acceptance Test Reports
Production Acceptance Test Reports in accordance with Statement of Work paragraph 3.3.5.4 and Contract Data Requirements List A005.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Key Performance Component Analysis
Key Performance Component Analysis in accordance with Statement of Work paragraph 3.3.3.3 and Contract Data Requirements List A006.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Product Drawings/ Models and Associated
Product Drawings/ Models and Associated Lists in accordance with Statement of Work paragraph 3.4.17 and Contract Data Requirements List A007.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Data Accession List
Data Accession List in accordance with Statement of Work paragraph 3.4.17 and Contract Data Requirements List A008.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Commercial Drawings/ Models & Associated
Commercial Drawings/ Models & Associated Lists in accordance with Statement of Work paragraph 3.4.17 and Contract Data Requirements List A009.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Source Control Drawing Approval Request
Source Control Drawing Approval Request in accordance with Statement of Work paragraph 3.4.17 and Contract Data Requirements List A00A.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Drawing Number Assignment Report
Drawing Number Assignment Report in accordance with Statement of Work paragraph 3.4.17 and Contract Data Requirements List A00B.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Engineering Drawing Tree
Engineering Drawing Tree in accordance with Statement of Work paragraph 3.4.17 and Contract Data Requirements List A00C.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
MBOM and DMSMS
Modified Bill of Materials (MBOM) and Diminishing Manufacturing Sources & Material Shortages (DMSMS) in accordance with Statement of Work paragraph 3.4.6 and Contract Data Requirements List L00C.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Integrated Master Schedule
Integrated Master Schedule in accordance with Statement of Work paragraph 3.1.2 and Contract Data Requirements List B001.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Requirements Traceability Matrix
Requirements Traceability Matrix in accordance with Statement of Work paragraph 3.3.3.4 and Contract Data Requirements List B003.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
System Safety Hazard Analysis Report
System Safety Hazard Analysis Report in accordance with Statement of Work paragraph 3.3.3.1 and Contract Data Requirements List B004.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
FMECA Report
Failure Modes, Effects, and Criticality Analysis (FMECA) Report in accordance with Statement of Work paragraph 3.3.3.2 and Contract Data Requirements List B005.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Logistics Product Data Candidate List
Logistics Product Data Candidate List in accordance with Statement of Work paragraph 3.4.5.1 and Contract Data Requirements List L001.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Logistics Product Data (LPD)
Logistics Product Data Report in accordance with Statement of Work paragraphs 3.4.5, 3.4.5.4 and Contract Data Requirements List L002.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Interim Support Items List
Interim Support Items List in accordance with Statement of Work paragraph 3.4.10 and Contract Data Requirements List L003.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Instructional Media Package
Instructional Media Package in accordance with Statement of Work paragraph 3.4.12.4.4 and Contract Data Requirements List L004.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
PHS&T Data Development
PHS&T Data Development in accordance with Statement of Work paragraph 3.4.16 and Contract Data Requirements List L005.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Technical Manuals
Technical Manuals in accordance with Statement of Work paragraphs 3.4.11, and 3.4.11.1, and Contract Data Requirements List L006.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Technical Manuals Validation Cert
Technical Manuals Validation Certification in accordance with Statement of Work paragraph 3.4.11 and Contract Data Requirements List L007.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Training Course Conduct Package
Training Course Conduct Package in accordance with Statement of Work paragraph 3.4.12.4.1 and Contract Data Requirements List L008.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Instructional Performance Requirements
Instructional Performance Requirements Document in accordance with Statement of Work paragraph 3.4.12.4.2 and Contract Data Requirements List L009.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Instructional Media Design Package
Instructional Media Design Package in accordance with Statement of Work paragraph 3.4.12.4.3 and Contract Data Requirements List L00A.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Course Conduct Information Package
Course Conduct Information Package in accordance with Statement of Work paragraph 3.4.12.3 and Contract Data Requirements List L00B.
MAX
Section C - Descriptions and Specifications
DESCRIPTIONS AND SPECIFICATION
The Contractor shall provide the supplies and/or services in accordance with Attachment 1, Statement of Work
(SOW) and Attachment 2, System Specification.
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
5252.247-9507
PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508
PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9509
PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998)
(a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract.
(b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows:
[The Contractor shall use the requirements for military packaging as per MIL-STD-2073-1E, “DoD Standard Practice for Military Packaging” dated 23 May 2008, to ensure all spare repairable and select maintenance significant consumable repair parts are properly preserved and packed to military standards. This encompasses protecting materiel from environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation whether during storage, multiple handling, or shipment through the Defense Transportation System. The contractor shall provide data per GEIA-HB-0007B for all Depot Level Repairables, Field Level Repairables and Maintenance Significant Consumables unique to the LMEPP system.]
(c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth.
(d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor.
5252.247-9514
TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Origin |
| Government |
| Origin |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Origin |
| Government |
| Origin |
| Government |
| 0008 |
| Origin |
| Government |
| Origin |
| Government |
| 0009 |
| Origin |
| Government |
| Origin |
| Government |
| 0010 |
| Origin |
| Government |
| Origin |
| Government |
| 0011 |
| Destination |
| Government |
| Destination |
| Government |
| 0012 |
| Destination |
| Government |
| Destination |
| Government |
| 0013 |
| Destination |
| Government |
| Destination |
| Government |
| 0014 |
| Destination |
| Government |
| Destination |
| Government |
| 0015 |
| Destination |
| Government |
| Destination |
| Government |
| 0016 |
| Destination |
| Government |
| Destination |
| Government |
| 0017 |
| Destination |
| Government |
| Destination |
| Government |
| 0018 |
| Destination |
| Government |
| Destination |
| Government |
| 0019 |
| Destination |
| Government |
| Destination |
| Government |
| 0020 |
| Destination |
| Government |
| Destination |
| Government |
| 0021 |
| Destination |
| Government |
| Destination |
| Government |
| 0022 |
| Destination |
| Government |
| Destination |
| Government |
| 0023 |
| Destination |
| Government |
| Destination |
| Government |
| 0024 |
| Destination |
| Government |
| Destination |
| Government |
| 0025 |
| Destination |
| Government |
| Destination |
| Government |
| 0026 |
| Destination |
| Government |
| Destination |
| Government |
| 0027 |
| Destination |
| Government |
| Destination |
| Government |
| 0028 |
| Destination |
| Government |
| Destination |
| Government |
| 0029 |
| Destination |
| Government |
| Destination |
| Government |
| 0030 |
| Destination |
| Government |
| Destination |
| Government |
| 0031 |
| Destination |
| Government |
| Destination |
| Government |
| 0032 |
| Destination |
| Government |
| Destination |
| Government |
| 0033 |
| Destination |
| Government |
| Destination |
| Government |
| 0034 |
| Destination |
| Government |
| Destination |
| Government |
| 0035 |
| Destination |
| Government |
| Destination |
| Government |
| 0036 |
| Destination |
| Government |
| Destination |
| Government |
| 0037 |
| Destination |
| Government |
| Destination |
| Government |
| 0038 |
| Destination |
| Government |
| Destination |
| Government |
| 0039 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 5252.246-9514 |
| INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION |
| FEB 1995 |
CLAUSES INCORPORATED BY FULL TEXT
52.246-11
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard selected below.
[The Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
Title Number Date Tailoring
ANSI/ISO/ASQ
Q9001-2015 most current revision or equivalent
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-- (i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
5252.246-9512
INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by the cognizant DCMA for source line items and the NAVAIR Program Team Lead, or designee, for Destination line items.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
Section F - Deliveries or Performance
DELIVERY INFORMATION
| ITEM NUMBER |
| MAX QTY |
| WITHIN DATE AFTER |
DELIVERY ORDER
DELIVERY ADDRESS
4 Each
Contractor Testing (see CLIN 0003) of 4 each LMEPP Pilot Production Units (PPUs) shall commence within 270 days After Receipt of Order (ARO).
390 days ARO the contractor shall deliver 2 each LMEPP PPU to Patuxent River, MD for Government Testing.
Government testing shall be completed 480 days ARO.
Contractor testing shall be completed within 460 days ARO.
The contractor shall incorporate any changes resulting from both the contractor and Government testing in the pilot production test units.
(PPUs are separate from production units and will not be counted as production units.)
Contractor’s facility (4 PPUs)
| 0002 |
| 1 Each |
| The contractor shall conduct development testing (DT-C1) on the 4 PPUs 270 days ARO and shall be completed within 460 days ARO. |
| Contractor’s facility |
| 0003 |
| 1 Each |
| The contractor support during both DT-C1 and DT-C2 shall begin upon the commencement of contractor testing, DT-C1, shall include support for Government testing, DT-C2, and shall end upon completion of all testing. |
| Contractor and Patuxent River, MD |
| 0004 |
| 1 Each |
| The contractor shall provide DT-C2 Testing training approximately 2 weeks prior to commencement of Government testing, DT-C2, approximately 370 days after ARO. |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423 |
| 0005 |
| 4 Each |
| After the completion of Contractor and Government testing, and subsequent acceptance of the PPUs, 4 PPUs will be returned to the contractor as Government Furnished Property (GFP) to be refurbished at the Contractor’s facility. The contractor shall incorporate any changes resulting from the contractor testing in the PPUs and return to Ready for Issue (RFI) condition. If ordered, the refurbished LMEPP PPUs shall be delivered within 30 days prior to the first production unit delivery. |
| Delivery is FOB Origin, and the delivery address is to be provided at a later date. |
| 0006 |
| 1 Each |
| In accordance with the applicable CDRL, DD Form 1423. |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423 |
| 0007 |
| 575 Each Max |
| Production Year One LMEPP units, if ordered, delivery shall commence within 150 days after award of the delivery order at a rate of 15 units per month, provided that release for production has been authorized. |
TBD
Delivery is FOB Origin
| 0008 |
| 575 Each Max |
| Production Year Two LMEPP units, if ordered, shall be delivered at a rate of 15 units per month commencing immediately after delivery of preceding orders or 150 days after award of the delivery order, whichever is later, provided that release for production has been authorized. |
| TBD |
Delivery is FOB Origin
| 0009 |
| 575 Each Max |
| Production Year Three LMEPP units, if ordered, shall be delivered at a rate of 15 units per month commencing immediately after delivery of preceding orders or 150 days after award of the delivery order, whichever is later, provided that release for production has been authorized. |
| TBD |
Delivery is FOB Origin
| 0010 |
| 575 Each Max |
| Production Year Four LMEPP units, if ordered, shall be delivered at a rate of 15 units per month commencing immediately after delivery of preceding orders or 150 days after award of the delivery order, whichever is later, provided that release for production has been authorized. |
| TBD |
Delivery is FOB Origin
| 0011 |
| 1 Each |
| The contractor shall conduct a Physical Configuration Audit within 60 days after the first production unit is complete, if ordered. |
| Contractor’s facility |
| 0014-0032 |
| 1 Each |
| In accordance with the applicable CDRL, DD Form 1423. |
| In accordance with the applicable CDRL, DD Form 1423 |
| 0033 |
| 1 Lot |
| In accordance with the applicable CDRL, DD Form 1423. |
| In accordance with the applicable CDRL, DD Form 1423 |
| 0034 - 0039 |
| 1 Each |
| In accordance with the applicable CDRL, DD Form 1423. |
| In accordance with the applicable CDRL, DD Form 1423 |
CLAUSES INCORPORATED BY REFERENCE
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-29 |
| F.O.B. Origin |
| FEB 2006 |
| 52.247-30 |
| F.O.B. Origin, Contractor's Facility |
| FEB 2006 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
5252.216-9506
MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999)
As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is [4 each Pilot Production Units]; the maximum quantity is [4 each Pilot Production Units, a total of 575 LMEPP production units, and all associated data items, support, and training].
5252.247-9505
TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit [A, B, and L], attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.
(1) PCO, Code [N68335].
(2) ACO, Code [TBD].
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses: [See CDRLs] Section G - Contract Administration Data
CLAUSES INCORPORATED BY REFERENCE
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DEC 2018 |
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
_Combo___________________________________________________________
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| See Block 12 of Contract |
| Issue By DoDAAC |
| N68335 |
| Admin DoDAAC** |
| See Block 6 of Contract |
| Inspect By DoDAAC |
| Destination - N68335, Origin - See Block 6 of Contract |
| Ship To Code |
| See Delivery Schedule |
| Ship From Code |
| ____ |
| Mark For Code |
| See Delivery Schedule |
| Service Approver (DoDAAC) |
| ____ |
| Service Acceptor (DoDAAC) |
| ____ |
| Accept at Other DoDAAC |
| ____ |
| LPO DoDAAC |
| ____ |
| DCAA Auditor DoDAAC |
| ____ |
| Other DoDAAC(s) |
| ____ |
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
_TBD________________________________________________________________
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
5252.201-9500
TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)
(a) The Technical Point of Contact (TPOC) for this contract is:[TBD]
(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).
(c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires.
(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.
5252.204-9503
EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
5252.232-9522
TRANSPORTATION ACCOUNT CODES (NAVAIR) (OCT 2005)
(a) The contractor is responsible for placing the Government assigned Transportation Account Code (TAC) on shipping documentation to enable payment of transportation bills by the U.S. Government under contracts with F.O.B. origin terms.
(b) The applicable TAC for this contract is as follows: [TBD].
(c) For shipments that will require use of military airlift, complete an Advance Transportation Control and Movement Document (ATCMD, DD Form 1384) and provide it to the cognizant Air Clearance Authority. Include the contract number and applicable TAC on the ATCMD. Also, ensure the ATCMD contains information for special requirements such as:
(1) Shipments to be accompanied by couriers or monitors;
(2) Shipments requiring special handling such as environmental control, hand-to-hand receipt, hazardous/dangerous cargo, short shelf life material, sensitive shipments and classified cargo;
(3) Shipments requiring expediting action or those that must move on a specific flight.
(d) The cognizant DCMA office may be contacted for additional information or assistance on preparation of shipping documents or other transportation concerns.
5252.242-9511
CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017)
(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.
(b) Special Instructions (see FAR 42.202(b) and (c)):
(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):
Functions Retained Retained for Performance By:
| [TBD] |
| [TBD] |
[Repeat as necessary.]
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
| Additional Functions |
| Retained for Performance By: |
| [TBD] |
| [TBD] |
[Repeat as necessary.]
(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.
G-TXT-PAY
PAYMENT INSTRUCTIONS (APR 2018)
For Government Use Only
| Contract/Order Payment Clause |
| Type of Payment Request |
| Supply |
| Service |
| Construction |
| Payment Office |
Allocation Method
52.212-4 (Alt I), Contract Terms and Conditions—Commercial Items
52.216-7, Allowable Cost and Payment
52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts
| Cost Voucher |
| X |
| X |
| N/A |
| Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested. |
| 52.232-1, Payments |
| Navy Shipbuilding Invoice (Fixed Price) |
| X |
| N/A |
| N/A |
| Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year. |
52.232-1, Payments;
52.232-2, Payments under Fixed-Price Research and Development Contracts;
52.232-3, Payments under Personal Services Contracts;
52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and
52.232-6, Payments under Communication Service Contracts with Common Carriers
| Invoice |
| X |
| X |
| N/A |
| Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested. |
| 52.232-5, Payments Under Fixed-Price Construction Contracts |
| Construction Payment Invoice |
| N/A |
| N/A |
| X |
| Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year. |
| 52.232-16, Progress Payments |
| Progress Payment* |
| X |
| X |
| N/A |
| Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3. |
52.232-29, Terms for Financing of Purchases of Commercial Items;
52.232-30, Installment Payments for Commercial Items
| Commercial Item Financing* |
| X |
| X |
| N/A |
| Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2). |
| 52.232-32, Performance-Based Payments |
| Performance-Based Payments* |
| X |
| X |
| N/A |
| Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2). |
| 252.232-7002, Progress Payments for Foreign Military Sales Acquisitions |
| Progress Payment* |
| X |
| X |
| N/A |
| Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer. |
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).
Section H - Special Contract Requirements
5252.211-9502
GOVERNMENT INSTALLATION WORK SCHEDULE (NAVAIR)(DEC 2014)
(a) The Holidays applicable to this contract are: New Year's Day, Martin Luther King's Birthday, Presidents' Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
(b) In the event that any of the above holidays occur on a Saturday or Sunday, or alternate Friday, then such holiday shall be observed as they are by the assigned Government employees at the using activity.
(c) The Naval Air Warfare Center Weapons Division works a 4/5/9 work schedule. Therefore alternate Fridays are not a part of the normal workweek for work performed on-site at a Naval Air Warfare Center Weapons Division site. The majority of the Government offices are closed on alternate Fridays.
(d) No deviation in the normal workweek will be permitted without express advance approval by the designated Contracting Officer with coordination of the using departments.
5252.211- 9510
CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011)
(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:
(1) Not by word or deed give the impression or appearance of being a Government employee;
(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;
(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;
(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and
(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.
(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.
(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.
5252.216-9512
PAPERLESS CONTRACTING (NAVAIR)(JUN 2009)
(a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern.
(b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods.
5252.246-9503 SIGNIFICANCE OF SYSTEMS ENGINEERING TECHNICAL REVIEWS REQUIRED UNDER THIS CONTRACT (NAVAIR) (JUL 2009)
(a) The effort to be performed under this contract includes a series of systems engineering technical reviews to review the design/development of the system and assess the progress towards meeting the technical and/or performance requirements set forth in this contract. The reviews will provide an independent assessment of the emerging design/development of the system against the contractual requirements and user’s capabilities requirements.
(b) Government express or implied approval of any particular technical approach or deliverable does not alter the Contractor's responsibility to meet the requirements of the contract. The contractor maintains design responsibility for the system at all times.
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2018 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.204-21 |
| Basic Safeguarding of Covered Contractor Information Systems |
| JUN 2016 |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. |
| JUL 2018 |
| 52.204-24 |
| Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. |
| DEC 2019 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| OCT 2018 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-13 |
| Subcontractor Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-19 |
| Notification of Ownership Changes |
| OCT 1997 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2018 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| OCT 2019 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| JAN 2019 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-11 |
| Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. |
| JUN 2016 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.226-1 |
| Utilization Of Indian Organizations And Indian-Owned Economic Enterprises |
| JUN 2000 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-3 |
| Patent Indemnity |
| APR 1984 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-16 |
| Progress Payments |
| APR 2012 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-25 |
| Prompt Payment |
| JAN 2017 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| OCT 2018 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.239-1 |
| Privacy or Security Safeguards |
| AUG 1996 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| AUG 2019 |
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-24 |
| Limitation Of Liability--High-Value Items |
| FEB 1997 |
| 52.248-1 |
| Value Engineering |
| OCT 2010 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7004 |
| Display of Hotline Posters |
| AUG 2019 |
| 252.204-7002 |
| Payment For Subline Items Not Separately Priced |
| DEC 1991 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 |
| Antiterrorism Awareness Training for Contractors. |
| FEB 2019 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| MAY 2019 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.211-7008 |
| Use of Government-Assigned Serial Numbers |
| SEP 2010 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program-- Basic |
| DEC 2017 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2017 |
| 252.225-7004 |
| Report of Intended Performance Outside the United States and Canada--Submission after Award |
| MAY 2019 |
| 252.225-7006 |
| Acquisition of the AmericanFlag |
| AUG 2015 |
| 252.225-7008 |
| Restriction on Acquisition of Specialty Metals |
| MAR 2013 |
| 252.225-7009 |
| Restriction on Acquisition of Certain Articles Containing Specialty Metals |
| OCT 2014 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| DEC 2017 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .