SF30 Solicitation Amendment 00003.pdf

PDF 306 KB Posted

Attached to
Commercial Internet Service Provider in Somalia
Solicitation number
N6817122Q4026
Issued by

About this file

This SF-30 amendment modifies a solicitation for commercial internet service in Somalia. The Navy is seeking internet service of at least 150 Mbps download and upload speeds with unlimited data volumes for sites in Mogadishu, Baledogle, and Kismayo. Fiber optic connections are required for Mogadishu sites, while satellite connections are acceptable for Baledogle and Kismayo. Offerors must demonstrate meeting these technical requirements as well as having the lowest price to be eligible for award. Responses are due by the time and date specified in the original solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this SF-30 is to change Item 4a. Specif ic Requirement on the Statement of Work, and change FAR 52.212-2 EVALUATION, criteria Factor 1 - Inernet Services Technical Evaluation Specif ication.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6817122Q4026

X 9B. DATED (SEE ITEM 11)

21-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jun-2022

CODE

NAVSUP FLC SIGONELLA SITE DJIBOUTI

PSC 831

BOX 0013

FPO AE 09902-0001

N68171 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

LT Emmanuel E. Ehima, SC, USN

DSN: 311-824-6466 emmanuel.e.ehima.mil@mail.mil Contracting Officer, Navy Contracting Office - Somalia

N6817122Q4026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REVISED STATEMENT OF WORK

There are two changes to be made herein by removal and replacement as follows:

Change 1.

4. Specific Requirements:

REMOVE:

a.The contractor shall provide Downlink/Uplink Data at 150 Mbps Unlimited (monthly) at thelocations specified in Paragraph 3 above.

REPLACE WITH:

a. The contractor shall provide Downlink/Uplink Data at 150 Mbps Unlimited (monthly) at the locations specified in Paragraph 3 above. The acceptable Internet Service Provider (ISP) connection type will be Fiber Optic for MOG Sites and Satellite for BMA and KIS locations.

Change 2.

52.212-2 EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021)

REMOVE:

(1) Factor 1 – Internet Services Technical Specification The quote will be evaluated to determine if the quoter has submitted the internet speed and volume availablelisted in Attachment (1) Technical Specification Sheet the Technical Documentation Certification; the technical documentation shall include the following:

(1)Speed of Internet – 150 Mbps (Uplink and Downlink)

(2)Volume of internet service – Unlimited

This factor will be evaluated as Pass/Fail as stated in Table 1 below.

Table 1 - Technical Acceptable/Unacceptable Adjectival Ratings

Rating Description Acceptable Quote clearly meets the minimum technical requirements of the

RFQ

Unacceptable Quote does not clearly meet the minimum technical requirements of the RFQ

Basis of Evaluation:

The Quoter whose proposal submission who has earned an Acceptable rating for each of the service locations and each category of technical specification while also having the lowest price will be then considered for award pending a contracting officer’s determination of responsibility of the subject Quoter. Only Quoters whose technical submittal package is complete and rated Acceptable overal all wil be moved into the Price Evaluation phase per Factor 2.

REPLACE WITH:

(1) Factor 1 – Internet Services Technical Specification

The quote will be evaluated to determine if the quoter has submitted the internet speed and volume available listed in Attachment (1) Technical Specification Sheet the Technical Documentation Certification; the technical documentation shall include the following:

(1) Speed of Internet – 150 Mbps (Uplink and Downlink)

(2) Volume of internet service – Unlimited

(3) Connection Type: MOG Sites – Fiber Optic Connection BMA – Satellite Connection KIS – Satellite Connection

This factor will be evaluated as Pass/Fail as stated in Table 1 below.

Table 1 - Technical Acceptable/Unacceptable Adjectival Ratings

Rating Description

Acceptable Quote clearly meets the minimum technical requirements of the

RFQ

Unacceptable Quote does not clearly meet the minimum technical requirements of the RFQ

Basis of Evaluation:

The Quoter whose proposal submission who has earned an Acceptable rating for each of the service locations and each category of technical specification while also having the lowest price will be then considered for award pending a contracting officer’s determination of responsibility of the subject Quoter. An acceptable submission constitutes the following criterial:

(i) Minimum speed of 150 Mbps for each site;

(ii) Unlimited volume of internet for each sites; and

(iii) Internet service provider (ISP) connection type as specified in the SOW, are the only acceptable internet connection.

Only Quoters whose technical submittal package is complete and rated Acceptable overall will be moved into the Price Evaluation phase per Factor 2.

(End of Summary of Changes)

2022-06-26T17:03:35+0300
EHIMA.EMMANUEL.1381193078

File details come from the government source that posted it. Updated .