Attachment 1_Commercial Internet_Technical Sheet.xls
XLS spreadsheet 91 KB Posted
- Attached to
- Commercial Internet Service Provider in Somalia
- Solicitation number
- N6817122Q4026
About this file
This document contains an independent government cost estimate and technical specification proposal for a commercial internet services contract opportunity with the Department of the Navy Naval Supply Systems Command. The cost estimate provides pricing for 150MB internet connections at multiple sites in Somalia for a 12-month base period at a total cost of $648,000. The technical specification requires offerors to propose internet speeds of 150Mbps and unlimited data volumes at each site. It also includes an option for a six-month extension to one of the point of presence locations. Vendors are to complete the proposal form by inputting their technical offerings and certification. The independent government estimate was developed using current market pricing from multiple local Somali vendors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE for SUPPLIES
| Independent Government Cost Estimate - SERVICES | ||||
| Component Name: | JSOTF-SOM | Project Title: | Somalia Commercial Internet | |
| Date: | 7-Jun-22 | Project Manger: | MAJ Marion Hurley | |
| INSTRUCTIONS | ||||
| Labor Rates | Use loaed hourly labor rates which include allowable costs built into one price | |||
| Other Direct Costs | Itemize all applicable ODCs (such as supplies or special equipment). Not all requirements will have ODCs. | |||
| Travel | Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips. | |||
| Period of Performance | If your PoP for the base and/or option period(s) is less than 12 months - reflect actual month total in column header | |||
| Analysis Summary | All IGCEs must include a complete Analysis Summary. Complete form provided at template file tab with same name. | |||
| Internet Description | Months | Rate | Amount | |
| 150 MB Internet MOG Site 2 | 12 | $13,500.00 | $162,000.00 | |
| 150 MB Internet MOG Site 3 | 12 | $13,500.00 | $162,000.00 | |
| 150 MB Internet BMA | 12 | $13,500.00 | $162,000.00 | |
| 150 MB Internet KIS | 12 | $13,500.00 | $162,000.00 | |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| Item Subtotal | $648,000.00 | |||
| ODCs | $0.00 | |||
| Travel | $0.00 | |||
| ODC/Travel Subtotal | $0.00 | |||
| Period Total | $648,000.00 | |||
| Cumulative TOTAL | $648,000.00 | |||
| I certify that this estimate is a valid total cost of the services procured: |
&CVer:Apr 2013
Sheet1
| Attachment 1 for Solicitation for Offeror Statement of Technical Specification Proposal For Commercial Internet - SERVICES | ||||
| Company Name: | Solicitation Number: | N68171-22-Q-4026 | ||
| Location & Date: | Project Name: | Somalia Commercial Internet Services | ||
| INSTRUCTIONS | ||||
| Clause | Refer to FAR 52.212-2 - EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES in the solicitation for complete proposal submission requirements. | |||
| Speed of Internet | Speed of Internet must be indicated by offeror for each location below in Megabits per second (Mbps). Note: Only Speed of 150 Mbps is acceptable per technical specification. | |||
| Volume of Service | Volume of Service must be indicated by offeror for each location in terms of limited or unlimited. Note: Only unlimited volume of service is acceptable per technical specification. | |||
| Internet Description | Speed of Internet | Volume of Service | ||
| 0001 - 150 MB Internet MOG Site 2 | ||||
| 0002 - 150 MB Internet MOG Site 3 | ||||
| 0003 - 150 MB Internet BMA | ||||
| 0004 - 150 MB Internet KIS | ||||
| 0005 - 150 MB Internet MOG Site 2 | ||||
| 0006 - 150 MB Internet MOG Site 3 | ||||
| 0007 - 150 MB Internet BMA | ||||
| 0008 - 150 MB Internet KIS | ||||
| 0009 - Option to Extend POP (6 months) | ||||
| I certify that this technical specification meets the requirement of the solicitation: | ||||
| Name Signature Date |
Analysis Summary
| IGCE ANALYSIS SUMMARY (Ver: Apr 2013) | ||||
| Enter an "X" in the applicable answer block. Provide complete responses in the block below your yes/no responses. Expand answer blocks as needed. | ||||
| Did you utilize Current Market Pricing information in your Estimate? Current pricing is the prevailing price being offered in the marketplace - at the time this estimate is developed. | ||||
| No | Explain why not: | |||
| x | Yes | Explain what sources were used to obtain estimate information and how you used this information in your estimate below: | ||
| Sourced qouted from multiple vendors: Ereka, Ghedi Logistics, Tajir Business Communications. All are local vendors with the area in Mogadishu | ||||
| Is this a reprocurement action? | ||||
| x | No | This is a first time buy. Answer the following: | ||
| Did you consider pricing information from similar/like procurements by other agencies/sources? | ||||
| No | Why not? | |||
| x | Yes | Identify the sources of information, size and age comparative procurement, and how information was considered in your estimate |
Yes Identify the sources of information, size and age comparative procurement, and how information was considered in your estimate
| Received multiple qoutes (4) from vendors for vehicle lease options ranging from 2012 models to 2018 models | |||||
| x | Yes | Answer all of the following: | |||
| Did you research historical pricing information for your estimate? | |||||
| No | Explain why you did not consider historical pricing in your estimate | ||||
| x | Yes | Identify the purchase/contract number(s) and age of pricing data, if considered and/or used in your estimate | |||
| Shabeel contract for two armored vehicles with maintenance costs $33,000 per month. Used as a baseline to evaluate offers. | |||||
| How did the award pricing vary from the respective IGCE for the contracts identified? | |||||
| If the prior IGCE was unrealistic, how did you consider the causes and what impact did they have on your Estimate? | |||||
| Has the requirement changed in scope/quantity from past procurements? | |||||
| No | The requirement is exactly the same in scope/quantity as the historical purchase(s) reviewed and considered for this Estimate | ||||
| x | Yes | Identify the changes and explain how they were considered in your estimate | |||
| MCC vehicle requirement changed from 6 armored vehicles to 5 based personell on ground | |||||
| Did you escalate the price the price from the most recent procurement? | |||||
| x | No | Why not? | |||
| Last procurement was not cost effective for long term use in the environment based on demands placed on the vehicle | |||||
| Yes | Identify the rate used and how you determined it. (www.bls.gov/cpi/cpi1998d.htm, www.usinflationcalculator.com/inflation/current-inflation-rates/) | ||||
| What sources of information, other than Current Market Pricing and Historical, did you review and/or consider in your Estimate? | |||||
| Diplomat Armored Rentals (online) | |||||
| If your estimate includes Shipping, explain what factors you considered to arrive at your estimate | |||||
| No shipping requried (local area) | |||||
| If your Estimate includes Other Direct Costs (ODCs) - identify the individual costs included and the sources of information used to estimate the costs. | |||||
| No ODCs |
File details come from the government source that posted it. Updated .