Draft_Section_B.docx
DOCX document 37 KB Posted
- Attached to
- Amendment 0008 Federal contract opportunity
- Solicitation number
- N66604-14-R-1120rev1
About this file
Draft Section B
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Section B - Supplies or Services and Prices (To be replaced by SPS generated material)
RAPID TECHNOLOGY INSERTION
PHASE I. TRANSITION STUDY
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| Total Price |
| 0001 BASIC AWARD, FFP |
| Phase 1: Firm Fixed Price: Transition Study |
FOB: Origin
| 1 |
| 1 Each |
| Tbs |
| tbs |
Data, Not Separately Priced
(NSP).
FOB ORIGIN
| 1 |
| Lot |
| NSP |
| NSP |
PHASE II. ASSESSMENT
1001 OPTION
CPIF
Phase II: Cost Plus Incentive Fee: Option 1, ASSESSMENT; Product Integration & Non-Recurring Engineering Share Ratio Above and Below Target: TBD (See NOTE A)
| 1 |
| Lot |
| Tbs |
| tbs |
FOB: Origin
| 1002 OPTION CPIF |
| Preproduction Test Article |
Cost Plus Incentive Fee Share Ratio Above and Below Target: TBD (See Note A) FOB: Origin
| tbs |
| Each |
| Tbs |
| Tbs |
OPTION
FFP
Performance Incentive Fee Pool To be determined and applied per Attachment J-X, Performance Incentive Fee Plan. See Note A
| 1 |
| Lot |
| Tbs |
| Tbs |
OPTION
Data, Not Separately Priced
(NSP).
FOB ORIGIN
| 1 |
| Lot |
| NSP |
| NSP |
PHASE III SHIP / MM INTEGRATION & FLEET EXPERIMENTATION
2001 OPTION
CPFF
Phase III: RTI OPTION 2: Cost Plus Fixed Fee :
Ship MM Integration, Fleet Experimentation and Test Engineering Services
| The LOE will be provided by the Government in the RFP |
| Hours |
| Tbs |
| Tbs |
(See NOTES A & C) FOB: Origin
| 2002 OPTION |
| Support for Engineering Services (Meals, Travel, incidental expenses) AT COST: (See NOTE A) |
FOB: Origin
| 1 |
| Lot |
| Tbs |
| Tbs |
OPTION
Data, Not Separately Priced
(NSP).
(See NOTE A) FOB Origin
| 1 |
| Lot |
| NSP |
| NSP |
PHASE IV. FIELDING:
OPERATIONAL LOGISTICS SUPPORT AND SUSTAINMENT PRODUCTS
OPTION
FFP
RTI OPTION 3, FIELDING: FFP; Logistics Support Package for RTI Product/Technology (See NOTE A)
| 1 |
| Each |
| Tbs |
| Tbs |
OPTION
Data, Not Separately Priced (NSP). FOB Origin
| 1 |
| Lot |
| NSP |
| NSP |
RESERVED
FIRST YEAR PRODUCTON OPTIONS:
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QTY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
5001 OPTION
FFP
| FFP: Full Production Units |
| See Table 1 |
| Each |
| See Table 1 |
| See Table 1 |
(See NOTES A & B)
FOB: Origin
5002 OPTION
FFP
FFP: Spares and Installation and Checkout Hardware for Item 5001 (See NOTES A & B) FOB: Origin
| See Table 4 |
| Lot |
| See Table 4 |
| See Table 4 |
OPTION
Data, Not Separately Priced (NSP). See NOTES A & B
FOB ORIGIN
| 1 |
| Lot |
| NSP |
| NSP |
SECOND YEAR PRODUCTON OPTIONS:
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QTY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
6001 OPTION
FFP
FFP: Full Production Units (See NOTES A & B) FOB: Origin
| See Table 2 |
| Each |
| See Table 2 |
| See Table 2 |
6002 OPTION
FFP
FFP: Spares and Installation and Checkout Hardware for Item 6001 (See NOTES A & B) FOB: Origin
| See Table 5 |
| Lot |
| See Table 5 |
| See Table 5 |
OPTION
Data, Not Separately Priced (NSP). See NOTES A & B
FOB ORIGIN
| 1 |
| Lot |
| NSP |
| NSP |
THIRD YEAR PRODUCTON OPTIONS:
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QTY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
7001 OPTION
FFP
FFP: Full Production Units (See NOTES A & B) FOB: Origin
| See Table 3 |
| Each |
| See Table 3 |
| See Table 3 |
7002 OPTION
FFP
| FFP: Spares and Installation and Checkout Hardware for Item 7001 (See NOTES A & B) |
| See Table 6 |
| Lot |
| See Table 6 |
See Table 6
OPTION
Data, Not Separately Priced (NSP). See NOTES A &B.
FOB ORIGIN
| 1 |
| Lot |
| NSP |
| NSP |
PROVISIONING ITEM ORDERS (PIO):
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QTY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
OPTION
Provisioned Items Orders (PIO)
FFP, FOB ORIGIN
| 1 |
| Lot |
| TBD |
| To be provided by the Government in the RFP |
DATA RIGHTS:
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QTY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
OPTION
DATA RIGHTS (See NOTES A & D)
FFP, FOB ORIGIN
| 1 |
| Lot |
| TBD |
| TBD |
OPTION
| Data, Not Separately Priced (NSP) for CLIN 9001. |
| 1 |
| Lot |
| NSP |
| NSP |
NOTE A – Option item which is to be supplied only if, and to the extent, said option is exercised.
NOTE B – Stepladder pricing for CLINs 5001, 5002, 6001, 6002, and 7001, 7002 is established in Tables 1-6 below. The offerors shall adjust the break-point quantities for the step levels within its proposal in order to match the optimal economic quantity manufacturing processes and supplier pricing.
NOTE C – Labor hours, if any, shall be ordered by issuance of Technical Instructions (TIs) by the Contracting Officer’s Representative in accordance with NAVSEA 5252.242-9115 TECHNICAL INSTRUCTIONS (APR 1999) included in Section H –Special Contract Requirements.
Fixed Fee Table
| CLIN |
| Hours |
| Est Cost/Hr (rate) |
| Fixed Fee/Hr (FF) |
| Fixed Fee (Hrs*FF) |
| Est Cost (Hrs*rate) |
| CPFF |
NOTE D –Competitive Data Package. The Contractor shall provide the price of data rights, if any, that would provide complete Government Purpose Data Rights with the project technology.
TABLE 1: Stepladder Pricing for RTI Production Units, CLIN 5001
UNIT NAME
| Part / Drawing Number |
| PRICE PER QUANTITY PROCURED |
CLIN
| Qty 1 – Max |
| Qty Min - Max |
| Qty Min – 8 |
Breakpoints to be Proposed by Contractors
| TBS Description of Item Here |
| 5001 |
| Pricing here for each unit |
| Pricing here for each unit |
| Pricing here for each unit |
TABLE 2: Stepladder Pricing for RTI Production Units, CLIN 6001
UNIT NAME
| Part / Drawing Number |
| PRICE PER QUANTITY PROCURED |
CLIN
| Qty 1 – Max |
| Qty Min - Max |
| Qty Min – 8 |
Breakpoints to be Proposed by Contractors
| TBS Description of Item Here |
| 6001 |
| Pricing here for each unit |
| Pricing here for each unit |
| Pricing here for each unit |
TABLE 3: Stepladder Pricing for RTI Production Units, CLIN 7001
UNIT NAME
| Part / Drawing Number |
| PRICE PER QUANTITY PROCURED |
CLIN
| Qty 1 – Max |
| Qty Min - Max |
| Qty Min – 8 |
Breakpoints to be Proposed by Contractors
| TBS Description of Item Here |
| 7001 |
| Pricing here for each unit |
| Pricing here for each unit |
| Pricing here for each unit |
TABLE 4: Stepladder Pricing for RTI Spare Parts for CLIN 5002
UNIT NAME
| Part / Drawing Number |
| PRICE PER QUANTITY PROCURED |
CLIN
| Qty 1 – Max |
| Qty Min – Max |
| Qty Min - Max |
Breakpoints to be Proposed by Contractors
| List Spare Parts Individually |
| 5002 |
| Pricing here for each unit |
| Pricing here for each unit |
| Pricing here for each unit |
| Continue Lines as needed. |
| 5002 |
TABLE 5: Stepladder Pricing for RTI Spare Parts for CLIN 6002
UNIT NAME
| Part / Drawing Number |
| PRICE PER QUANTITY PROCURED |
CLIN
| Qty 1 – Max |
| Qty Min - Max |
| Qty Min - Max |
Breakpoints to be Proposed by Contractors
| List Spare Parts Individually |
| 6002 |
| Pricing here for each unit |
| Pricing here for each unit |
| Pricing here for each unit |
| Continue Lines as needed. |
| 6002 |
TABLE 6: Stepladder Pricing for RTI Spare Parts for CLIN 7002
UNIT NAME
| Part / Drawing Number |
| PRICE PER QUANTITY PROCURED |
CLIN
| Qty 1 – Max |
| Qty Min – Max |
| Qty Min - Max |
Breakpoints to be Proposed by Contractors
| List Spare Parts Individually |
| 7002 |
| Pricing here for each unit |
| Pricing here for each unit |
| Pricing here for each unit |
| Continue Lines as needed. |
| 7002 |
File details come from the government source that posted it. Updated .